CN106712299B - A kind of five-preventing system for Intelligent transformer station - Google Patents

A kind of five-preventing system for Intelligent transformer station Download PDF

Info

Publication number
CN106712299B
CN106712299B CN201710059972.1A CN201710059972A CN106712299B CN 106712299 B CN106712299 B CN 106712299B CN 201710059972 A CN201710059972 A CN 201710059972A CN 106712299 B CN106712299 B CN 106712299B
Authority
CN
China
Prior art keywords
lock modules
control device
wall
monitoring system
intelligent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710059972.1A
Other languages
Chinese (zh)
Other versions
CN106712299A (en
Inventor
周德生
沈冰
邹晓峰
宋杰
徐洁
曾平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd, East China Power Test and Research Institute Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201710059972.1A priority Critical patent/CN106712299B/en
Publication of CN106712299A publication Critical patent/CN106712299A/en
Application granted granted Critical
Publication of CN106712299B publication Critical patent/CN106712299B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J13/0006
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention relates to a kind of five-preventing systems for Intelligent transformer station, the five-preventing system is located in the monitoring system of Intelligent transformer station, it is connect respectively with the intelligent terminal of Intelligent transformer station and terminal device, the five-preventing system includes monitoring system backstage lock modules, wall lock modules and electronic circuit lock modules, monitoring system backstage lock modules respectively in monitoring system monitoring data library and electronic circuit lock modules connect, the wall lock modules are connect with intelligent terminal, and the electronic circuit lock modules are connect with terminal device.Compared with prior art, the present invention has many advantages, such as that the level of informatization is high, high convenient for remote control operation and security performance.

Description

A kind of five-preventing system for Intelligent transformer station
Technical field
The present invention relates to Intelligent transformer stations, more particularly, to a kind of five-preventing system for Intelligent transformer station.
Background technique
In conventional substation, it is usually installed with independent temperature survey by c omputer, complete micro_computer five_proof is divided into three from framework Layer, first is that the anti-error host of upper layer, the major function of anti-error host is to obtain logic blocking by communicating with monitoring system and use Related remote signalling information, carry out logic blocking calculating;Second is that the romote controlled locking controller of wall, the major function of controller are The latch open message of anti-error host is received, and is converted into contact and outputs;Third is that the remote controlled locking relay of execution level, is latched Controller outputs control, and contact is connected in the control loop of electric operating equipment, is remotely controlled contact with monitoring system divide-shut brake It realizes series connection, realizes anti mis-closedown function.Complete micro_computer five_proof is other than related remote signalling amount is derived from monitoring system, other parts It being completely independent with monitoring system, under such mode, monitoring system of electric substation upper layer and wall can be not provided with blocking function, The mode is suitable for the electric substation without monitoring locking and observing and controlling locking in other words.
Above-mentioned independent five-preventing system framework is complicated, and especially scene needs to add locking controller and locking relay, leads Secondary circuit is related to, many work is brought to system design, delivery receiving acceptance and the operation and maintenance in later period;Five anti-systems simultaneously Unification and independence stand on monitoring system, and the repetition erection of system causes the increase of investment cost, it is therefore desirable to a kind of intelligence degree is high, The strong five-preventing system of automatic performance, to cooperate existing Intelligent transformer station.
Summary of the invention
The purpose of the present invention is provide a kind of five-preventing system for Intelligent transformer station regarding to the issue above.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of five-preventing system for Intelligent transformer station, the five-preventing system are located at the monitoring system of Intelligent transformer station It is interior, it is connect respectively with the intelligent terminal of Intelligent transformer station and terminal device, the five-preventing system includes that monitoring system backstage is closed Lock module, wall lock modules and electronic circuit lock modules, monitoring system backstage lock modules are with monitoring respectively Monitoring data library in system is connected with electronic circuit lock modules, and the wall lock modules are connect with intelligent terminal, described Electronic circuit lock modules are connect with terminal device.
Monitoring system backstage lock modules include monitoring system station romote controlled locking, remote monitoring romote controlled locking or scheduling Hold romote controlled locking.
Monitoring system backstage lock modules are connect by SMV network with electronic circuit lock modules.
The wall lock modules include at least three wall measure and control device, phase between the wall measure and control device Mutually independent, the wall measure and control device is connect with intelligent terminal and electronic circuit lock modules respectively.
The wall measure and control device is connect by GOOSE network with intelligent terminal and electronic circuit lock modules.
The interactive process of the wall measure and control device and intelligent terminal specifically:
21) wall measure and control device sends the request signal that terminal unit status acquires to intelligent terminal;
22) wall measure and control device judges whether GOOSE network interrupts, if then entering step 24), if otherwise receiving intelligence The GOOSE message comprising terminal unit status that energy terminal returns;
23) wall measure and control device carries out logic calculation according to the received GOOSE message of step 22), judges terminal device Whether it is latched, if then entering step 24), if otherwise return step 21);
24) wall measure and control device sends locking order to electronic circuit lock modules.
The terminal device includes the switch, plug-in strip and earthing knife-switch of Intelligent transformer station.
Compared with prior art, the invention has the following advantages:
(1) five-preventing system is located in the monitoring system of Intelligent transformer station, and monitoring system backstage lock modules directly with Monitoring data library connection in monitoring system, is dissolved into monitoring system so that five-preventing system is seamless, and due to intelligent power transformation The monitoring system stood includes the operation ticket function at all-graphic interface, therefore formulation operation order, simulation preview in monitoring system With remote control operation, programming operations, the verifying by five-preventing system is required, greatly strengthens the safety of Intelligent transformer station Energy.
(2) monitoring system backstage lock modules are connect by SMV network with electronic circuit lock modules, and wall is latched Module is connect with intelligent terminal by GOOSE network, mutually isolated between two networks, so that monitoring backstage lock modules can be with It realizes and is latched by the telemetering of whole station and remote signals manipulation, and wall lock modules are real by the logic judgment of the SOT state of termination Now it is latched, the two is mutually indepedent, and security performance is high and locking Rule of judgment is accurate, it can both be controlled in global level, Also ensure that Lower level logical will not malfunction.
(3) mutually indepedent between wall measure and control device, so that will not influence remaining observing and controlling when a certain measure and control device failure The normal work of device ensure that the stability of five-preventing system.
(4) wall measure and control device is in the interactive process with intelligent terminal, if GOOSE network is interrupted, defaults to end End equipment is latched, and the security performance of system is further improved.
(5) terminal device includes the switch, plug-in strip and earthing knife-switch of Intelligent transformer station, i.e., five-preventing system is to Intelligent transformer station All terminals realize defense controls, protective range is wide, and security performance is high.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the five-preventing system for Intelligent transformer station;
Wherein, 1 be monitoring system backstage lock modules, 2 be wall lock modules, 3 be electronic circuit lock modules, 4 It is terminal device for intelligent terminal, 5.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to Following embodiments.
It is as shown in Figure 1 a kind of five-preventing system for Intelligent transformer station provided in the present embodiment, it is anti-with tradition five System is compared, which is located in the monitoring system of Intelligent transformer station, respectively with the intelligent terminal of Intelligent transformer station 4 It is connected with terminal device 5, terminal device 5 includes switch, plug-in strip and the earthing knife-switch of Intelligent transformer station.Five-preventing system includes monitoring system System backstage lock modules 1, wall lock modules 2 and electronic circuit lock modules 3, monitoring system backstage lock modules 1 are distinguished With in monitoring system monitoring data library and electronic circuit lock modules 3 connect, wall lock modules 2 and intelligent terminal 4 connect It connects, electronic circuit lock modules 3 are connect with terminal device 5.
Wherein, monitoring system backstage lock modules 1 include monitoring system station romote controlled locking, remote monitoring romote controlled locking or tune Spend end romote controlled locking.Monitoring system backstage lock modules 1 are connect by SMV network with electronic circuit lock modules 3.Wall closes Lock module 2 includes at least three wall measure and control device, and mutually indepedent between wall measure and control device, wall measure and control device is equal It is connect respectively with intelligent terminal 4 and electronic circuit lock modules 3.Wall measure and control device passes through GOOSE network and intelligent terminal 4 It is connected with electronic circuit lock modules 3.
The interactive process of wall measure and control device and intelligent terminal 4 specifically:
21) wall measure and control device sends the request signal of 5 state acquisition of terminal device to intelligent terminal 4;
22) wall measure and control device judges whether GOOSE network interrupts, if then entering step 24), if otherwise receiving intelligence The GOOSE message comprising 5 state of terminal device that energy terminal 4 returns;
23) wall measure and control device carries out logic calculation according to the received GOOSE message of step 22), judges terminal device 5 Whether it is latched, if then entering step 24), if otherwise return step 21);
24) wall measure and control device sends locking order to electronic circuit lock modules 3.
The locking in three levels has been implemented according to the five-preventing system that foregoing description is realized:
One, the romote controlled locking at the locking of monitoring system station level or remote monitoring end, dispatching terminal.Five is anti-as monitoring system One subsystem of system, database and the unification of monitoring data library, it is seamless to be dissolved into monitoring system.Intelligent transformer station monitoring system System includes operation ticket function, and all-graphic interface is easily operated, formulation operation order, simulation preview and remote control in monitoring system It is all verified through five anti-subsystems when operation, programming operations.
Two, wall measure and control device is latched, and wall five-defence block is established in GOOSES mechanism, can on measure and control device To realize in interval and the technology across interval latching logic, real-time is high.
Interval measure and control device carries out information exchange by GOOSE network with intelligent terminal 4.Intelligent terminal 4 acquires relevant Switch, plug-in strip, earthing knife-switch state are sent by GOOSE message with the forms of broadcasting.Each interval measure and control device is configured according to logic to close System, receives associated intelligent terminal 4GOOSE message, calculates this spacing devices operation logic, interrupts in GOOSE In the case of, the operation of relevant device will be blocked.Without lateral ties, other measure and control device failures do not influence each interval measure and control device The logic blocking of this interval measure and control device.
Three, 18 it is counter arrange regulation, when using computer supervisory control system, a distant place, local operation should all have and prevent from accidentally grasping Make blocking function, therefore when for guillotine kind local operation, it is necessary to have complete latching logic, simplify electric blocking circuit Under design principle, the locking on electronic circuit is preferably realized in such a way that measure and control device is outputed and is latched hard contact.In intelligent station mould Under formula, separating brake, combined floodgate, unlock open three in the GOOSE message that measure and control device is sent comprising each control object are ordered, intelligence Energy terminal 4 is converted into contact relationship after receiving the GOOSE message of measure and control device, and the control that locking contact is series at disconnecting link is returned Lu Zhong, the operation for opening electric operating equipment control power supply.Therefore, under normal circumstances, plug-in strip operation is either remotely controlled Still electric operating on the spot, all has perfect logic blocking.
The locking of monitoring system backstage and wall locking are logically consistent substantially.Foundation is spaced on the net in GOOSE Layer observing and controlling locking, barring condition is the telemetry with on-off model and this interval in this GOOSE network, due to becoming In power station between each voltage class GOOSE network and GOOSE network and SMV network it is mutually isolated, therefore barring condition cannot Telemetering, the remote signals for adopting whole station can not allow virtual remote signal to participate in latching logic;The locking of monitoring system backstage is established in MMS On the net, barring condition can be telemetering, the remote signals of whole station, while should also include the empty remote signals such as ground line.

Claims (4)

1. a kind of five-preventing system for Intelligent transformer station, which is characterized in that the five-preventing system is located at Intelligent transformer station Monitoring system in, connect respectively with the intelligent terminal of Intelligent transformer station and terminal device, the five-preventing system include monitoring System background lock modules, wall lock modules and electronic circuit lock modules, monitoring system backstage lock modules point Not in monitoring system monitoring data library and electronic circuit lock modules connect, the wall lock modules and intelligent terminal Connection, the electronic circuit lock modules are connect with terminal device;
The wall lock modules include at least three wall measure and control device, between the wall measure and control device mutually solely Vertical, the wall measure and control device is connect with intelligent terminal and electronic circuit lock modules respectively;
The wall measure and control device is connect by GOOSE network with intelligent terminal and electronic circuit lock modules;
The interactive process of the wall measure and control device and intelligent terminal specifically:
21) wall measure and control device sends the request signal that terminal unit status acquires to intelligent terminal,
22) wall measure and control device judges whether GOOSE network interrupts, if then entering step 24), if otherwise receiving intelligence eventually The GOOSE message comprising terminal unit status returned is held,
23) wall measure and control device carries out logic calculation according to the received GOOSE message of step 22), whether judges terminal device It is latched, if then entering step 24), if otherwise return step 21),
24) wall measure and control device sends locking order to electronic circuit lock modules.
2. the five-preventing system according to claim 1 for Intelligent transformer station, which is characterized in that after the monitoring system Platform lock modules include monitoring system station romote controlled locking, remote monitoring romote controlled locking or dispatching terminal romote controlled locking.
3. the five-preventing system according to claim 1 for Intelligent transformer station, which is characterized in that after the monitoring system Platform lock modules are connect by SMV network with electronic circuit lock modules.
4. the five-preventing system according to claim 1 for Intelligent transformer station, which is characterized in that the terminal device packet Include the switch, plug-in strip and earthing knife-switch of Intelligent transformer station.
CN201710059972.1A 2017-01-24 2017-01-24 A kind of five-preventing system for Intelligent transformer station Active CN106712299B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710059972.1A CN106712299B (en) 2017-01-24 2017-01-24 A kind of five-preventing system for Intelligent transformer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710059972.1A CN106712299B (en) 2017-01-24 2017-01-24 A kind of five-preventing system for Intelligent transformer station

Publications (2)

Publication Number Publication Date
CN106712299A CN106712299A (en) 2017-05-24
CN106712299B true CN106712299B (en) 2019-08-20

Family

ID=58910318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710059972.1A Active CN106712299B (en) 2017-01-24 2017-01-24 A kind of five-preventing system for Intelligent transformer station

Country Status (1)

Country Link
CN (1) CN106712299B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109450088B (en) * 2018-11-05 2022-03-29 国网山西省电力公司忻州供电公司 Anti-calibration and monitoring method for transformer substation five-prevention system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101776910A (en) * 2010-01-19 2010-07-14 华北电网有限公司 Integrated five-prevention operation ticket system-based substation programmed control system
WO2013078653A1 (en) * 2011-11-30 2013-06-06 Abb Technology Ltd. Diagnosis for goose communication

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101776910A (en) * 2010-01-19 2010-07-14 华北电网有限公司 Integrated five-prevention operation ticket system-based substation programmed control system
WO2013078653A1 (en) * 2011-11-30 2013-06-06 Abb Technology Ltd. Diagnosis for goose communication

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于IEC61850标准的变电站防误闭锁工程应用;丁峰等;《电力系统保护与控制》;20100501;第38卷(第9期);第96-99页

Also Published As

Publication number Publication date
CN106712299A (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN104600849B (en) Intelligent grid boss stands Layered Security anti-error system implementation method
CN101692524B (en) Method and device for preventing faulty operation of electric power system based on wireless communication
CN106712300A (en) Intelligent master station and sub-station multi-level anti-misoperation locking system
CN101951026A (en) Double machine measurement and control online main and standby switching method
CN104467183A (en) Dispatch anti-misoperation system for regional power grid in adjustment and control integrated mode
CN101813928B (en) Automated one-machine multiple-station intelligent five-defense system of energy system transformer substation
CN202034678U (en) Error preventing system used for electrical power system
CN104852469B (en) Intelligent substation based on the equipment real-time status long-range method for preventing misoperation of soft pressing plate
CN107508264B (en) A kind of site route protection does not have a power failure drive method
CN101752909B (en) Remote checking method of operation circuit
CN101951032A (en) Method of realizing dynamic error-prevention function of transformer substation by monitoring and controlling unit
CN201498885U (en) Electric power system faulty operation preventing device based on wireless communication
CN104993597A (en) Anti-misoperation system
CN106208372A (en) Based on visualization and the switch remote operation method of anti-error topological analysis comprehensively
CN105446202B (en) A kind of anti-control system of substation five
CN102983627B (en) Transition method of intellectualized monitoring system modification process of conventional transformer substation
CN104967216B (en) A kind of substation and its monitoring system and its monitoring method
CN104158294B (en) One kind scheduling anti-misoperation control method
CN114844223A (en) One-key sequential control operation system and method of secondary equipment
CN205178647U (en) Relay protection of transformer substation intelligence clamp plate system
CN106712299B (en) A kind of five-preventing system for Intelligent transformer station
CN106774068B (en) The anti-error implementation method of intelligent substation and realization system
CN106451788B (en) Using the dispatch automated system remote control method of remote control security policy module
CN117955230A (en) Global anti-misoperation method, system, device and storage medium for power distribution network
CN113036911A (en) Intelligent online anti-misjudgment five-prevention system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant