CN106712299A - Five-prevention system for intelligent substation - Google Patents

Five-prevention system for intelligent substation Download PDF

Info

Publication number
CN106712299A
CN106712299A CN201710059972.1A CN201710059972A CN106712299A CN 106712299 A CN106712299 A CN 106712299A CN 201710059972 A CN201710059972 A CN 201710059972A CN 106712299 A CN106712299 A CN 106712299A
Authority
CN
China
Prior art keywords
lock modules
wall
intelligent
transformer station
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710059972.1A
Other languages
Chinese (zh)
Other versions
CN106712299B (en
Inventor
周德生
沈冰
邹晓峰
宋杰
徐洁
曾平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd, East China Power Test and Research Institute Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201710059972.1A priority Critical patent/CN106712299B/en
Publication of CN106712299A publication Critical patent/CN106712299A/en
Application granted granted Critical
Publication of CN106712299B publication Critical patent/CN106712299B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J13/0006
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Abstract

The invention relates to a five-prevention system for an intelligent substation. The five-prevention system is positioned in a monitoring system of the intelligent substation and is connected with an intelligent terminal and terminal equipment of the intelligent substation respectively. The five-prevention system comprises a monitoring-system background locking module, a spacing-layer locking module and an electric-loop locking module; the monitoring-system background locking module is connected with a monitoring database in the monitoring system and the electric-loop locking module respectively; the spacing-layer locking module is connected with the intelligent terminal; and the electric-loop locking module is connected with the terminal equipment. Compared with the prior art, the five-prevention system has the advantages of high informationization degree, convenience in remote-control operation and high safety performance and the like.

Description

A kind of five-preventing system for Intelligent transformer station
Technical field
The present invention relates to Intelligent transformer station, more particularly, to a kind of five-preventing system for Intelligent transformer station.
Background technology
In conventional substation, independent temperature survey by c omputer is generally equiped with, complete micro_computer five_proof is divided into three from framework Layer, one is the anti-error main frame of upper layer, and the major function of anti-error main frame is communicated by with monitoring system, obtains logic blocking and uses Related remote signalling information, carry out logic blocking calculating;Two is the romote controlled locking controller of wall, and the major function of controller is The latch open message of anti-error main frame is received, and is converted into contact and outputed;Three is the remote controlled locking relay of execution level, by locking Controller outputs control, and its contact is connected in the control loop of electric operating equipment, with monitoring system divide-shut brake remote control contact Series connection is realized, anti mis-closedown function is realized.Complete micro_computer five_proof in addition to related remote signalling amount takes from monitoring system, other parts It is completely independent with monitoring system, under this kind of pattern, monitoring system of electric substation upper layer and wall can be not provided with blocking function, The pattern is applied to the electric substation without monitoring locking and observing and controlling locking in other words.
Above-mentioned independent five-preventing system framework is complicated, and especially scene needs to set up locking controller and locking relay, leads Secondary circuit is related to, the operation maintenance to system design, delivery receiving acceptance and later stage brings many work;While five anti-systems Unification and independence stand on monitoring system, and the repetition of system sets up the increase for causing investment cost, it is therefore desirable to a kind of intelligence degree is high, The strong five-preventing system of automatic performance, is used to coordinate existing Intelligent transformer station.
The content of the invention
The purpose of the present invention is directed to above mentioned problem and provides a kind of five-preventing system for Intelligent transformer station.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of five-preventing system for Intelligent transformer station, the five-preventing system is located at the monitoring system of Intelligent transformer station It is interior, it is connected with the intelligent terminal and terminal device of Intelligent transformer station respectively, the five-preventing system is closed including monitoring system backstage Lock module, wall lock modules and electronic loop lock modules, monitoring system backstage lock modules respectively with monitoring be Monitoring data storehouse and electronic loop lock modules connection in system, the wall lock modules are connected with intelligent terminal, described Electronic loop lock modules are connected with terminal device.
Monitoring system backstage lock modules include monitoring system station romote controlled locking, remote monitoring romote controlled locking or scheduling End romote controlled locking.
Monitoring system backstage lock modules are connected by SMV networks with electronic loop lock modules.
The wall lock modules include at least 3 wall measure and control devices, phase between the wall measure and control device Mutually independent, the wall measure and control device is respectively connected with intelligent terminal and electronic loop lock modules.
The wall measure and control device is connected by GOOSE network with intelligent terminal and electronic loop lock modules.
The wall measure and control device is specially with the interaction of intelligent terminal:
21) wall measure and control device sends the request signal that terminal unit status is gathered to intelligent terminal;
22) wall measure and control device judges whether GOOSE network interrupts, if then entering step 24), if otherwise receiving intelligence The GOOSE message comprising terminal unit status that energy terminal is returned;
23) wall measure and control device is according to step 22) receive GOOSE message carry out logical calculated, judge terminal device Whether need to carry out locking, if then entering step 24), if otherwise return to step 21);
24) wall measure and control device sends locking order to electronic loop lock modules.
The terminal device includes switch, plug-in strip and the ground knife of Intelligent transformer station.
Compared with prior art, the invention has the advantages that:
(1) five-preventing system be located at Intelligent transformer station monitoring system in, and monitoring system backstage lock modules directly with Monitoring data storehouse connection in monitoring system so that five-preventing system is seamless to be dissolved into monitoring system, and due to intelligent power transformation Operation ticket function of the monitoring system stood comprising all-graphic interface, therefore formulation operation order, simulation preview in monitoring system With straighforward operation, programming operations, it is required for being greatly strengthen by the checking of five-preventing system the security of Intelligent transformer station Energy.
(2) monitoring system backstage lock modules are connected by SMV networks with electronic loop lock modules, and wall locking Module is connected with intelligent terminal by GOOSE network, mutually isolated between two networks so that monitoring backstage lock modules can be with Realize manipulating locking with remote signals by the remote measurement of whole station, and wall lock modules pass through the logic judgment reality of the SOT state of termination Existing locking, the two is separate, and security performance is high and locking Rule of judgment is accurate, can be both controlled in global level, Also ensure that Lower level logical will not malfunction.
(3) it is separate between wall measure and control device so that remaining observing and controlling is not interfered with during a certain measure and control device failure The normal work of device, it is ensured that the stability of five-preventing system.
(4) wall measure and control device, if GOOSE network is interrupted, is given tacit consent to end in the interaction with intelligent terminal End equipment carries out locking, further increases the security performance of system.
(5) terminal device includes switch, plug-in strip and the ground knife of Intelligent transformer station, i.e., five-preventing system is to Intelligent transformer station All terminals realize defense controls, protective range is wide, and security performance is high.
Brief description of the drawings
Fig. 1 is the structural representation of the five-preventing system for Intelligent transformer station;
Wherein, 1 is monitoring system backstage lock modules, and 2 is wall lock modules, and 3 is electronic loop lock modules, 4 It is intelligent terminal, 5 is terminal device.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed implementation method and specific operating process, but protection scope of the present invention is not limited to Following embodiments.
It is as shown in Figure 1 a kind of five-preventing system for Intelligent transformer station provided in the present embodiment, prevents with tradition five System is compared, and the five-preventing system is located in the monitoring system of Intelligent transformer station, respectively with the intelligent terminal 4 of Intelligent transformer station Connected with terminal device 5, terminal device 5 includes switch, plug-in strip and the ground knife of Intelligent transformer station.Five-preventing system includes that monitoring is System backstage lock modules 1, wall lock modules 2 and electronic loop lock modules 3, monitoring system backstage lock modules 1 are distinguished It is connected with the monitoring data storehouse in monitoring system and electronic loop lock modules 3, wall lock modules 2 connect with intelligent terminal 4 Connect, electronic loop lock modules 3 are connected with terminal device 5.
Wherein, monitoring system backstage lock modules 1 include monitoring system station romote controlled locking, remote monitoring romote controlled locking or tune Degree end romote controlled locking.Monitoring system backstage lock modules 1 are connected by SMV networks with electronic loop lock modules 3.Wall is closed Lock module 2 includes at least 3 wall measure and control devices, and separate between wall measure and control device, wall measure and control device is equal It is connected with intelligent terminal 4 and electronic loop lock modules 3 respectively.Wall measure and control device is by GOOSE network and intelligent terminal 4 Connected with electronic loop lock modules 3.
Wall measure and control device is specially with the interaction of intelligent terminal 4:
21) wall measure and control device sends the request signal of the state acquisition of terminal device 5 to intelligent terminal 4;
22) wall measure and control device judges whether GOOSE network interrupts, if then entering step 24), if otherwise receiving intelligence The GOOSE message comprising the state of terminal device 5 that energy terminal 4 is returned;
23) wall measure and control device is according to step 22) receive GOOSE message carry out logical calculated, judge terminal device 5 Whether need to carry out locking, if then entering step 24), if otherwise return to step 21);
24) wall measure and control device sends locking order to electronic loop lock modules 3.
The five-preventing system realized according to foregoing description has implemented the locking in three aspects:
First, the locking of monitoring system station level, or remote monitoring end, the romote controlled locking of dispatching terminal.Five is anti-as monitoring system One subsystem of system, its database and monitoring data storehouse are unified, seamless to be dissolved into monitoring system.Intelligent transformer station monitoring system System includes operation ticket function, all-graphic interface, it is easy to operate, formulation operation order, simulation preview and remote control in monitoring system All verified through five anti-subsystems when operation, programming operations.
2nd, wall measure and control device locking, wall five-defence block is set up in GOOSES mechanism, can on measure and control device To realize that, in interval and across the technology of interval latching logic, real-time is high.
Interval measure and control device carries out information exchange with intelligent terminal 4 by GOOSE network.Intelligent terminal 4 gathers correlation Switch, plug-in strip, knife-like state, by GOOSE message with the forms of broadcasting send.Each interval measure and control device is configured according to logic and closed System, receives associated intelligent terminal 4GOOSE messages, and this spacing devices operation logic is calculated, and is interrupted in GOOSE In the case of, the operation of relevant device will be blocked.Without lateral ties, other measure and control device failures do not influence each interval measure and control device The logic blocking of this interval measure and control device.
3rd, 18 it is counter arrange regulation, during using computer supervisory control system, a distant place, local operation all should possess to be prevented from grasping by mistake Make blocking function, therefore during for guillotine kind local operation, it is necessary to there is complete latching logic, simplifying electric blocking loop Under design principle, the locking on electronic loop is preferably realized by the way of measure and control device outputs the hard contact of locking.In intelligent station mould Under formula, the separating brake comprising each control object, combined floodgate, open three orders of unblock, intelligence in the GOOSE message that measure and control device sends Energy terminal 4 is converted into contact relation after the GOOSE message for receiving measure and control device, and the control that locking contact is series at disconnecting link is returned Lu Zhong, the operational control power supply for opening electric operating equipment.Therefore, under normal circumstances, plug-in strip operation either remote control Still electric operating on the spot, is respectively provided with perfect logic blocking.
The locking of monitoring system backstage and wall locking are logically consistent substantially.Foundation is spaced on the net in GOOSE Layer observing and controlling locking, its barring condition be with the on-off model and the telemetry at this interval in this GOOSE network, due to change In power station between each voltage class GOOSE network and GOOSE network and SMV networks it is mutually isolated, therefore barring condition can not Remote measurement, the remote signals of whole station are adopted, Virtual remote signal can not be allowed to participate in latching logic;The locking of monitoring system backstage is set up in MMS On the net, its barring condition can be whole station remote measurement, remote signals, while should also including ground wire etc. void remote signals.

Claims (7)

1. a kind of five-preventing system for Intelligent transformer station, it is characterised in that the five-preventing system is located at Intelligent transformer station Monitoring system in, be connected with the intelligent terminal and terminal device of Intelligent transformer station respectively, the five-preventing system include monitoring System background lock modules, wall lock modules and electronic loop lock modules, monitoring system backstage lock modules point It is not connected with the monitoring data storehouse in monitoring system and electronic loop lock modules, the wall lock modules and intelligent terminal Connection, the electronic loop lock modules are connected with terminal device.
2. the five-preventing system for Intelligent transformer station according to claim 1, it is characterised in that after the monitoring system Platform lock modules include monitoring system station romote controlled locking, remote monitoring romote controlled locking or dispatching terminal romote controlled locking.
3. the five-preventing system for Intelligent transformer station according to claim 1, it is characterised in that after the monitoring system Platform lock modules are connected by SMV networks with electronic loop lock modules.
4. the five-preventing system for Intelligent transformer station according to claim 1, it is characterised in that the wall locking Module includes at least 3 wall measure and control devices, separate between the wall measure and control device, the wall observing and controlling dress Put and be respectively connected with intelligent terminal and electronic loop lock modules.
5. the five-preventing system for Intelligent transformer station according to claim 4, it is characterised in that the wall observing and controlling Device is connected by GOOSE network with intelligent terminal and electronic loop lock modules.
6. the five-preventing system for Intelligent transformer station according to claim 5, it is characterised in that the wall observing and controlling Device is specially with the interaction of intelligent terminal:
21) wall measure and control device sends the request signal that terminal unit status is gathered to intelligent terminal;
22) wall measure and control device judges whether GOOSE network interrupts, if then entering step 24), if otherwise receiving intelligence eventually Hold the GOOSE message comprising terminal unit status for returning;
23) wall measure and control device is according to step 22) receive GOOSE message carry out logical calculated, whether judge terminal device Need to carry out locking, if then entering step 24), if otherwise return to step 21);
24) wall measure and control device sends locking order to electronic loop lock modules.
7. the five-preventing system for Intelligent transformer station according to claim 1, it is characterised in that the terminal device bag Include switch, plug-in strip and the ground knife of Intelligent transformer station.
CN201710059972.1A 2017-01-24 2017-01-24 A kind of five-preventing system for Intelligent transformer station Active CN106712299B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710059972.1A CN106712299B (en) 2017-01-24 2017-01-24 A kind of five-preventing system for Intelligent transformer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710059972.1A CN106712299B (en) 2017-01-24 2017-01-24 A kind of five-preventing system for Intelligent transformer station

Publications (2)

Publication Number Publication Date
CN106712299A true CN106712299A (en) 2017-05-24
CN106712299B CN106712299B (en) 2019-08-20

Family

ID=58910318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710059972.1A Active CN106712299B (en) 2017-01-24 2017-01-24 A kind of five-preventing system for Intelligent transformer station

Country Status (1)

Country Link
CN (1) CN106712299B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109450088A (en) * 2018-11-05 2019-03-08 国网山西省电力公司忻州供电公司 Anti- school and monitoring method for fail safe system for transformer substation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101776910A (en) * 2010-01-19 2010-07-14 华北电网有限公司 Integrated five-prevention operation ticket system-based substation programmed control system
WO2013078653A1 (en) * 2011-11-30 2013-06-06 Abb Technology Ltd. Diagnosis for goose communication

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101776910A (en) * 2010-01-19 2010-07-14 华北电网有限公司 Integrated five-prevention operation ticket system-based substation programmed control system
WO2013078653A1 (en) * 2011-11-30 2013-06-06 Abb Technology Ltd. Diagnosis for goose communication

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
丁峰等: "基于IEC61850标准的变电站防误闭锁工程应用", 《电力系统保护与控制》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109450088A (en) * 2018-11-05 2019-03-08 国网山西省电力公司忻州供电公司 Anti- school and monitoring method for fail safe system for transformer substation
CN109450088B (en) * 2018-11-05 2022-03-29 国网山西省电力公司忻州供电公司 Anti-calibration and monitoring method for transformer substation five-prevention system

Also Published As

Publication number Publication date
CN106712299B (en) 2019-08-20

Similar Documents

Publication Publication Date Title
CN103414251B (en) A kind of substation network communication analogue system based on IEC61850
CN101692524B (en) Method and device for preventing faulty operation of electric power system based on wireless communication
CN108155717B (en) FA anti-error checking method of power distribution main station based on power grid operation data
CN106680634B (en) A kind of intelligent early-warning method of intelligent substation relay protection safety measure
CN105388370B (en) A kind of substation's wall connection latching logic automated closed-loop test method
CN107591892B (en) Intelligent substation operation and maintenance method and system
CN106712300A (en) Intelligent master station and sub-station multi-level anti-misoperation locking system
CN103488835A (en) Simulation platform and method for dispatching automation system
CN103354355B (en) A kind of micro-capacitance sensor networking guard method and device
CN104880629B (en) The remote diagnosis method of dispatching terminal protection element action behavior
CN201498885U (en) Electric power system faulty operation preventing device based on wireless communication
CN107742925A (en) The hard pressing plate method for inspecting of transformer station based on three-level network
CN203691057U (en) Arc online monitoring and protecting system
CN105406589A (en) Intellectual press plate system for relay protection of transformer substation
CN105573283A (en) Transformer station equipment function association database establishing method and event association information group filtering method
CN102983627B (en) Transition method of intellectualized monitoring system modification process of conventional transformer substation
CN107276228B (en) Misoperation prevention management and control system for transformer substation pressing plate state
CN205178647U (en) Relay protection of transformer substation intelligence clamp plate system
CN104795897A (en) Intelligent substation configurable relay protecting method and system
CN106774068B (en) The anti-error implementation method of intelligent substation and realization system
CN203423539U (en) Low-voltage power grid load and leak current integrated monitoring device
CN102738892B (en) Realization method of intelligent anti-error system of transformer substation based on IEC61850
CN103545805B (en) Modeling-based railway power supply arm monitoring method
CN106712299A (en) Five-prevention system for intelligent substation
CN112631219A (en) Remote intelligent circuit breaker control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant