CN106709639A - Dynamic management method for infrastructure project - Google Patents

Dynamic management method for infrastructure project Download PDF

Info

Publication number
CN106709639A
CN106709639A CN201611151109.0A CN201611151109A CN106709639A CN 106709639 A CN106709639 A CN 106709639A CN 201611151109 A CN201611151109 A CN 201611151109A CN 106709639 A CN106709639 A CN 106709639A
Authority
CN
China
Prior art keywords
database
construction
data
goods
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611151109.0A
Other languages
Chinese (zh)
Inventor
孙丽婷
张红燕
马韬韬
张子兆
陈轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201611151109.0A priority Critical patent/CN106709639A/en
Publication of CN106709639A publication Critical patent/CN106709639A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks

Abstract

The present invention discloses a dynamic management method of an infrastructure project. The method comprises the following steps: a system constructing step, namely, constructing a cloud server including a database server, a WEB management server and a mobile application server, and connecting the PC and the smart phone to the cloud server respectively; a data import step, namely, in the support of the WEB management server, importing data into a material order database, a financial database, a construction plan database, a construction progress database and a construction team status database of the database server through the PC; a sigh-in and sign-out data import step, namely, binding the number of the smart phone with the user, and in the support of the mobile application server, inputting sigh-in and sign-out data corresponding to the construction team status database through the smart phone; a material receipt data editing step, namely, in the support of the mobile application server, editing material receipt data in the material order database through the smart phone; and a statistics and display step.

Description

A kind of construction project dynamic management approach
Technical field
The present invention relates to a kind of construction project dynamic management approach of field of electricity construction.
Background technology
Current construction project management is all that, by safeguarding electrical form by hand, dialogue is linked up and carrys out synchronizing information.Construction Person and manager be not generally in same physical space, therefore the construction party of construction project cannot in real time be slapped as manager Goods and materials order data is held, while manager cannot also grasp the state of construction team, the data of construction party and manager cannot be same Step, construction plan is arranged to manager, and construction party performs construction speed and brings difficulty.
The content of the invention
The invention aims to overcome the deficiencies in the prior art, there is provided one kind automation keep the scene intact learning equipment with Management method, its its can guarantee that construction project data are dynamically updated in real time by system, break away from and safeguard data by hand, and safeguard number Cumbersome dialogue during is linked up, and mitigates maintenance workload, improves operating efficiency.
Realizing a kind of technical scheme of above-mentioned purpose is:A kind of construction project dynamic management approach;Comprise the following steps:
System constructing step:Structure includes the cloud clothes of database server, WEB management servers, mobile application server Business device, and PC and smart mobile phone are connected with the Cloud Server respectively;
Data steps for importing:Under the support of the WEB management servers, the number is imported data to by the PC According to the goods and materials order database of storehouse server, financial database, construction plan database, construction speed database and construction team Slip condition database;
Register sign-out data steps for importing:The number of the smart mobile phone and user are bound, by the smart mobile phone, Sign-out data of registering accordingly in being input into construction team's slip condition database under the support of the mobile application server;
Goods and materials are received data edition step:By the smart mobile phone, compiled under the support of the mobile application server Goods and materials in volume goods and materials order database are received data;
Statistics and displaying step:By the PC, under the support of the WEB management servers, the goods and materials are transferred Order database, the financial database, the construction plan database, the construction speed database and the construction team Data in slip condition database are counted, and statistics is shown by graphic interface.
Further, register in sign-out data steps for importing, first the smart mobile phone is positioned, only when the intelligence Sign-out data of being registered accordingly in construction team's slip condition database can could be input into after being located through of mobile phone.
Further, during the goods and materials receive data edition step, the user of the smart mobile phone should by the movement The goods and materials edited in the goods and materials order database could be received data with after the checking of server.
Further, in the data steps for importing, the database server is being imported data to by the PC Goods and materials order database, financial database, construction plan database, construction speed database and construction team's slip condition database Before, first pass through the WEB management servers and obtain corresponding authority.
Further, it is the goods and materials order database, the financial database, described in the data steps for importing Data in construction plan database, the construction speed database and construction team's slip condition database are with Excel file Import.
Further, in the statistics and displaying step, the goods and materials order database, the financial database, institute The data stated in construction plan database, the construction speed database and construction team's slip condition database pass through MySQL Database is counted, and statistics is shown by graphic interface.
Further, after the statistics and result show step, also including data edition step, i.e., according to the goods and materials Order database, the financial database, the construction speed database and data in construction team's slip condition database Statistics, adjusts construction plan, and under the support of the WEB management servers, is constructed by described in the PC editor Data in plan database, and will in time notify the smart mobile phone for the prompting of the adjustment of construction plan and construction speed User.
Further, in the data edition step, will lead to for the adjustment of construction plan and the prompting of construction speed Cross the user that instant communication software notifies the smart mobile phone.
Further, in the statistics and result displaying step, the data in construction speed database and construction are counted The data drawn in database are compared, and show comparative result.
Further, backup server is provided with the system constructing step.
Employ a kind of construction project dynamic management approach of the invention;Comprise the following steps:System constructing step:Build Including database server, WEB management servers, mobile application server Cloud Server, and by PC and smart mobile phone point It is not connected with Cloud Server;Data steps for importing:Under the support of WEB management servers, data are imported data to by PC The goods and materials order database of storehouse server, financial database, construction plan database, construction speed database and construction team's shape State database;Register sign-out data steps for importing:The number of smart mobile phone and user are bound, by smart mobile phone, in movement Sign-out data of registering accordingly under the support of application server in editor construction team slip condition database;Goods and materials receive data volume Collect step:By the smart mobile phone, in editing the goods and materials order database under the support of the mobile application server Goods and materials receive data;Statistics and displaying step:By the PC, under the support of the WEB management servers, institute is transferred State goods and materials order database, the financial database, the construction plan database, the construction speed database and described apply Data in the slip condition database of crew 5 are counted, and statistics is shown by graphic interface.Its technology is imitated It is really:It can guarantee that construction project data are dynamically updated in real time by system, breaks away from and safeguards data by hand, and safeguards data procedures In cumbersome dialogue link up, mitigate maintenance workload, improve operating efficiency.
Brief description of the drawings
The network architecture diagram of the system that Fig. 1 is used by a kind of construction project dynamic management approach of the invention.
Fig. 2 is the schematic diagram of the smart mobile phone of the system that a kind of construction project dynamic management approach of the invention is used.
Fig. 3 is the schematic diagram of the PC of the system that a kind of construction project dynamic management approach of the invention is used.
Fig. 4 is a kind of flow chart of construction project dynamic management approach of the invention.
Specific embodiment
Refer to Fig. 1 to Fig. 4, the present inventor in order to be able to preferably understand technical scheme, Below by specifically embodiment, and it is described in detail with reference to accompanying drawing:
Fig. 1 is referred to, a kind of construction project dynamic management approach of the invention comprises the following steps:
System constructing step:The system built in the step includes, is managed at least provided with database server 12, WEB and taken Business device 13, the Cloud Server 1 of mobile application server 14, and at least one smart mobile phone 2 and at least one PC 3.Intelligence Mobile phone 2 and PC 3 pass through Internet connection Cloud Server 1.Cloud Server 1 be rent come, with reduces cost, and can ensure be The stabilization of system.Smart mobile phone 2 can access internet and reconnect Cloud Server by wireless router or mobile network.PC 3 leads to Cross router and access Cloud Server 1.
The system built in system constructing step may also include backup server 10, the simultaneous connection evidence of backup server 10 Storehouse server 12, mobile application server 14, WEB management servers 13.Backup server 10 can be with Cloud Server 1, also solely Stand on Cloud Server 1.
Therefore, physically, the system for being built in the step ensures that there is no possible Single Point of Faliure, it is possible to provide data Backup.The regular automatic or manual of data in database server 12, mobile application server 14, WEB management servers 13 is standby Part on backup server 10, number can occur in database server 12, mobile application server 14, WEB management servers 1 Backup Data is refunded according to when damaging, losing, realizes certain data recovery, be easy to the maintenance of system.
In the system built in the step, database server 12 is located at the data Layer on basis, smart mobile phone 2 and PC 3 Five-star operation layer is respectively positioned on, WEB management servers 13 and mobile application server 14 are respectively positioned on the Business Logic of centre.
Data steps for importing:PC 3 is provided with data and imports editor module 31, and data steps for importing is imported by data and compiled Collecting module 31 is carried out.Data import editor module 31 under the support of WEB management servers 13, to the thing of database server 12 Money order database, financial database, construction plan database, construction speed database and construction team's slip condition database are imported Data.
In data steps for importing, goods and materials order database, financial database, construction plan database, construction speed data Data in storehouse and construction team's slip condition database are imported using Excel file.
Register sign-out data steps for importing:The number of smart mobile phone 2 is bound with user, smart mobile phone 2 be provided with register it is sign-out The d GPS locating module 22 that module 21 is bound with sign-out module 21 of registering.Register in sign-out data steps for importing, Mobile solution service Device 14 after the user that smart mobile phone 2 is confirmed by d GPS locating module 22 is located at job location, i.e., lead to by the positioning of smart mobile phone 2 Later, registering and sign-out data for editor is allowed in sign-out module 21 of registering input construction team slip condition database.Certainly it is mobile Application server 14 can also confirm the positioning of smart mobile phone 2 by wireless router or mobile focus.
Goods and materials are received data edition step:Smart mobile phone 2 be additionally provided with senior authentication module 23 and with senior authentication module The goods and materials order data editor module 24 of 23 bindings, goods and materials receive data edition step by goods and materials order data editor module 24 Carry out.The user of smart mobile phone 2 can answer after senior authentication module 23 obtains the checking of mobile application server 14 mobile Under support with server 14, by goods and materials order data editor module 24, the goods and materials order numbers of database server 12 are edited Received data according to the goods and materials in storehouse.It is further to note that the user of the smart mobile phone 2 to obtain senior certification can only edit The sign-out data of registering of oneself, and obtain the sign-out number of registering of other users of user's editable of the smart mobile phone 2 of senior certification According to.
Statistics and displaying step:PC 3 is provided with data statistics display module 32, and statistics and displaying step are in data statistics Carried out on display module 32, data statistics display module 32 under the support of WEB management servers 13, called data storehouse server Goods and materials order database in 12, financial database, construction plan database, construction speed database and construction team's status number Counted according to the data in storehouse, and statistics is shown by graphic interface.Carry out construction team's status information Statistics with displaying, goods and materials receive situation statistics with displaying, finance spend money situation statistics with displaying, project schedule plan node statistics Contrast with displaying, and construction plan and construction speed shows.Displaying is by both artistic and practical, friendly intuitively Chinese Graphic Interface is shown, and takes into full account the custom of staff, facilitates easy to learn, easily operated, it is ensured that the key of most functions one is reached.Letter The manifestation mode of breath is more directly perceived, in hgher efficiency.
Goods and materials order database, financial database, construction plan database, construction speed database and construction team's state The displaying of data is carried out by MySOL in database.The reason for using MySOL databases is:MYSql databases are increased income and are exempted from Take, stabilization safety, excellent performance takes hardware few.
Data edition step:The keeper of PC 3 grasps data and the construction management side of the goods and materials stock in construction party hand The data of the goods and materials stock in hand, and for goods and materials order database, financial database, construction plan database, construct into The result of data statistics in degrees of data storehouse and construction team's slip condition database, therefore the keeper with authority can be in PC 3 The data of construction plan are updated in construction plan database, or notifies that manager replenishes in time.
Data on PC 3 import editor module 31 can also be on the premise of corresponding authority have been obtained, to having been introduced into State goods and materials order database, the financial database, the construction plan database, the construction speed database and described apply The data of the slip condition database of crew 5 enter edlin, such as delete, and increase, modification record, increase or delete a certain field, Huo Zhexiu Change specific data, to ensure the synchronization of manager and construction party data.
Identical JICQ, such as wechat are respectively arranged with smart mobile phone 2 and PC 3 simultaneously, so as to manager, i.e., The keeper of PC 3 notifies the adjustment or the prompting of construction speed of user's construction plan of construction party, i.e. smart mobile phone 2 in time.
PC 3 is provided with safety management module 33, for by WEB server 13, to keeper from after the login of PC 3, To the goods and materials order database of database server 12, financial database, construction plan database, construction speed database and apply The authority that data in the slip condition database of crew 5 are imported, edited or transferred carries out multilayer setting, safety management module 33 It is additionally operable to by mobile application server 14, to user from after the login of smart mobile phone 2, operates the authority of sign-out module 21 of registering, Allow the GPS location information registered, or wireless router IP address, and the IP address of mobile network is defined, Also smart mobile phone 2 is defined by the user that senior authentication module 23 obtains the checking of mobile application server 13.
Thus, security authentication module 31 has following function:
Its exterior safety:The authority of the keeper logged in by the user to being logged in from smart mobile phone 2 and from PC 3 The mandate of level such as carry out, realize multi-level security protection, establish relatively independent security mechanism, effectively prevent outside Unauthorized access.
Internal system safety:While ensureing that its exterior is safe, system also ensures that the legal of authorized user uses. Database server 12, WEB management servers 13 in system, mobile application server 14, smart mobile phone 2 and PC 3 have There are fault tolerance, including bomp, reason investigation, and automatically or by artificial operation the system of error can be made to return to just Normal state.Safety management module 33 also provides strict operational control and access control.
A kind of construction project dynamic management approach of the invention, can reduce the work of current project sites management Amount;Realize the work attendance statistics management of engineering construction troop;Realize that engineering site goods and materials situation data of receiving upgrade in time statistics;It is real Existing project finance is spent money situation, project process Statistic Analysis;Using data analysis technique carry out project goods and materials receive situation, Project progress situation, finance are spent money Statistic Analysis, for project management person provides information service;Fully use network skill Art, realizes online interconnection, information sharing, improves the efficiency and level of work.
Those of ordinary skill in the art it should be appreciated that the embodiment of the above be intended merely to explanation the present invention, And be not used as being limitation of the invention, as long as in spirit of the invention, the change to embodiment described above Change, modification will all fall in the range of claims of the present invention.

Claims (10)

1. a kind of construction project dynamic management approach;Comprise the following steps:
System constructing step:Structure includes database server, WEB management servers, the Cloud Server of mobile application server, And be connected PC and smart mobile phone with the Cloud Server respectively;
Data steps for importing:Under the support of the WEB management servers, the database is imported data to by the PC The goods and materials order database of server, financial database, construction plan database, construction speed database and construction team's state Database;
Register sign-out data steps for importing:The number of the smart mobile phone and user are bound, by the smart mobile phone, in institute State the sign-out data of registering accordingly being input into construction team's slip condition database under the support of mobile application server;
Goods and materials are received data edition step:By the smart mobile phone, the editor institute under the support of the mobile application server The goods and materials in goods and materials order database are stated to receive data;
Statistics and displaying step:By the PC, under the support of the WEB management servers, the goods and materials order is transferred Database, the financial database, the construction plan database, the construction speed database and construction team's state Data in database are counted, and statistics is shown by graphic interface.
2. a kind of construction project dynamic management approach according to claim 1, it is characterised in that:Sign-out data of registering are imported In step, first the smart mobile phone is positioned, only when the smart mobile phone is after being located through, described applying could be input into Registered accordingly in the slip condition database of crew 5 sign-out data.
3. a kind of construction project dynamic management approach according to claim 1, it is characterised in that:The goods and materials are received data In edit step, the user of the smart mobile phone after the checking of the mobile application server by that could will edit the goods and materials Goods and materials in order database are received data.
4. a kind of construction project dynamic management approach according to claim 1, it is characterised in that:The data steps for importing In, goods and materials order database, financial database, the construction meter of the database server are being imported data to by the PC Before drawing database, construction speed database and construction team's slip condition database, first pass through the WEB management servers and obtain corresponding Authority.
5. a kind of construction project dynamic management approach according to claim 4, it is characterised in that:The data steps for importing In, the goods and materials order database, the financial database, the construction plan database, the construction speed database and Data in construction team's slip condition database are imported with Excel file.
6. a kind of construction project dynamic management approach according to claim 1, it is characterised in that:The statistics and displaying step In rapid, the goods and materials order database, the financial database, the construction plan database, the construction speed database Counted by MySQL database with the data in construction team's slip condition database, and figure is passed through to statistics Change interface to be shown.
7. a kind of construction project dynamic management approach according to claim 6, it is characterised in that:The statistics and result exhibition After showing step, also including data edition step, i.e., according to the goods and materials order database, the financial database, described apply The statistics of data in work progress data storehouse and construction team's slip condition database, adjusts construction plan, and in the WEB Under the support of management server, by the data in construction plan database described in the PC editor, and will be counted for construction The adjustment and the prompting of construction speed drawn notify the user of the smart mobile phone in time.
8. a kind of construction project dynamic management approach according to claim 6, it is characterised in that:The data edition step In, the use of the smart mobile phone will be notified by instant communication software for the adjustment of construction plan and the prompting of construction speed Family.
9. a kind of construction project dynamic management approach according to claim 6, it is characterised in that:The statistics and result exhibition Show in step, the data in the data in construction speed database and construction plan database are compared, knot is compared in displaying Really.
10. a kind of construction project dynamic management approach according to claim 1, it is characterised in that:The system constructing step Backup server is provided with rapid.
CN201611151109.0A 2016-12-14 2016-12-14 Dynamic management method for infrastructure project Pending CN106709639A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611151109.0A CN106709639A (en) 2016-12-14 2016-12-14 Dynamic management method for infrastructure project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611151109.0A CN106709639A (en) 2016-12-14 2016-12-14 Dynamic management method for infrastructure project

Publications (1)

Publication Number Publication Date
CN106709639A true CN106709639A (en) 2017-05-24

Family

ID=58937411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611151109.0A Pending CN106709639A (en) 2016-12-14 2016-12-14 Dynamic management method for infrastructure project

Country Status (1)

Country Link
CN (1) CN106709639A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108470048A (en) * 2018-03-09 2018-08-31 国网上海市电力公司 A kind of construction project data display systems based on instrument board

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100082842A1 (en) * 2008-09-30 2010-04-01 Latista Technologies Computer program product, system and method for field management and mobile inspection
CN103942654A (en) * 2014-04-30 2014-07-23 国家电网公司 Electric power engineering quality supervision and management platform
CN103942744A (en) * 2013-01-23 2014-07-23 成都勤智数码科技股份有限公司 Operation personnel management method and system based on mobile phone GPS positioning

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100082842A1 (en) * 2008-09-30 2010-04-01 Latista Technologies Computer program product, system and method for field management and mobile inspection
CN103942744A (en) * 2013-01-23 2014-07-23 成都勤智数码科技股份有限公司 Operation personnel management method and system based on mobile phone GPS positioning
CN103942654A (en) * 2014-04-30 2014-07-23 国家电网公司 Electric power engineering quality supervision and management platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108470048A (en) * 2018-03-09 2018-08-31 国网上海市电力公司 A kind of construction project data display systems based on instrument board

Similar Documents

Publication Publication Date Title
CN103795745B (en) The monitoring method and system of a kind of intelligent mobile terminal
CN107579998A (en) Personal data center and digital identification authentication method based on block chain, digital identity and intelligent contract
CN102479413B (en) Network invoicing system and method thereof
CN104079636B (en) A kind of Mobile Campus Network based on cloud computing
CN106600231A (en) Dynamic management system for infrastructure projects
CN106330575A (en) Safety service platform and safety service deployment method
CN103475680B (en) A kind of capability of Internet of things integrated approach and system
CN109034720A (en) A kind of mobile oa platform and device suitable for power scheduling service management
CN107211016A (en) Secure session is divided and application program parser
CN102025710A (en) Multi-application intelligent card and intelligent card multi-application management system and method
CN104253810B (en) Safe login method and system
CN106790034A (en) A kind of internet of things equipment certification and the method for secure accessing
CN109962805A (en) A kind of multi-platform cut-in method and equipment based on Authority and Domain Based Management
CN106470184A (en) Safety certifying method, apparatus and system
CN106716968A (en) Account management method, device and account management system
CN110084048A (en) A kind of implementation method of bank's unified user management
CN104580081A (en) Integrated SSO (single sign on) system
CN106506565A (en) A kind of remote command executes method and apparatus
CN103426041A (en) Radiation source real-time monitoring and managing system and method based on Internet of things
CN102647296B (en) Business registering method based on authorization setting
CN102592374B (en) Intelligent terminal for network invoices
CN101090336A (en) Command line interface authority hierarchical method for network equipment
CN104318353A (en) High-end electronic medical record device and management system
CN106709639A (en) Dynamic management method for infrastructure project
CN103065104A (en) Mobile storage equipment and monitoring system formed by same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170524

WD01 Invention patent application deemed withdrawn after publication