CN106706120A CN201611187540.0A CN201611187540A CN106706120A CN 106706120 A CN106706120 A CN 106706120A CN 201611187540 A CN201611187540 A CN 201611187540A CN 106706120 A CN106706120 A CN 106706120A
Authority
CN
China
Prior art keywords
transformer
vibration
acceleration
test point
stress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611187540.0A
Other languages
Chinese (zh)
Inventor
张福轩
余军
卢理成
李圣
程永锋
卢智成
王岳
张谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201611187540.0A priority Critical patent/CN106706120A/en
Publication of CN106706120A publication Critical patent/CN106706120A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01HMEASUREMENT OF MECHANICAL VIBRATIONS OR ULTRASONIC, SONIC OR INFRASONIC WAVES
    • G01H17/00Measuring mechanical vibrations or ultrasonic, sonic or infrasonic waves, not provided for in the preceding groups

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The invention discloses a transformer vibration test system and a transformer vibration test method, and relates to the technical field of power equipment. The technical problem that the vibration of a transformer cannot be tested in the moving process of the transformer is solved. The transformer vibration test system comprises a sensor unit used for measuring vibration data of a transformer, and an acquisition unit used for automatically acquiring and processing the vibration data measured by the sensor unit. The sensor unit is installed on a transformer. The input end of the acquisition unit is connected with the data output end of the sensor unit. The power interface of the acquisition unit is connected with an attachment unit used for supplying power to the acquisition unit. The transformer vibration test system of the invention is applied to vibration test in the moving process of transformers.

Description

A kind of transformer vibration test system and method
Technical field
The present invention relates to electrical equipment technical field, more particularly to a kind of transformer vibration test system and method.
Background technology
Transformer is the electrical equipment of transformer station's inner core, for ultra-high voltage transformer station, huge, the weight of transformer Up to 300 tons~500 tons, limited by the elevating capacity of crane, the movement of transformer in place cannot be by with crane in transformer station Lifting is completed.
Existing transformer movement has two ways in place, and the first is to remove the sleeve pipe of transformer, by transformer tank Internal transformer oil is released, and to mitigate weight, transformer then is moved into place using jack and temporary track;Second It is to be filled transformer movement entirely in place, i.e., using special track and track transfer trolley, is not removing sleeve pipe and be not vented change In the case of depressor oil, transformer is moved in special transfer vehicle by jack, the shifting of transformer is realized by dedicated track It is dynamic in place.In both the above transformer movement Intrusive way, the second way is few due to its operation, can significantly reduce change Time needed for depressor movement is in place, therefore, during the repairing after new construction and substation operation, mostly using the Two kinds of transformers move Intrusive way.
However, when Intrusive way is moved using second transformer, because transformer is in the portions such as full dress state, sleeve pipe Part is not removed, and the vibration of moving process will produce influence to the security of transformer, wherein, bushing shell for transformer is special to vibration Insensitive part, the unfavorable vibration in moving process is there is a possibility that bushing shell for transformer produces structural damage or influence transformer fortune The performance of the function of row middle sleeve, also, bushing shell for transformer involves great expense, and the sleeve pipe to failing is changed will also produce huge Economic loss.Therefore, in the moving process of transformer, vibration-testing is carried out to it and is very important.
The content of the invention
It is an object of the invention to provide a kind of transformer vibration test system and method, for being moved through in transformer Cheng Zhong, vibration-testing is carried out to it, to obtain Vibration Condition of the transformer in moving process.
To reach above-mentioned purpose, the present invention provides a kind of transformer vibration test system, adopts the following technical scheme that:
The transformer vibration test system includes:For the sensor unit of the vibration data of measuring transformer, Yi Jiyong In automatic data collection and the collecting unit of the vibration data of the treatment sensor unit measurement;The sensor unit is arranged on institute State on transformer, the input of the collecting unit is connected with the data output end of the sensor unit, the collecting unit Power interface be connected with for the adjunct unit powered to the collecting unit.
Compared with prior art, the transformer vibration test system that the present invention is provided has the advantages that:
In the transformer vibration test system that the present invention is provided, for the sensor list of the vibration data of measuring transformer Unit is installed on the transformer, then in the moving process of transformer, you can by the vibration of the sensor unit measuring transformer Data, then by collecting unit, the vibration data of automatic data collection and treatment sensor unit measurement, you can obtain transformer shifting Vibration Condition during dynamic, so that transformer moving process can be judged according to the Vibration Condition in the transformer moving process It is whether safe, and then ensure the full safety for filling the parts such as transformer middle sleeve, help to realize the safety moving of transformer.
The present invention also provides a kind of transformer method for testing vibration, adopts the following technical scheme that:
The transformer method for testing vibration includes:
Multiple test points are chosen on the transformer, in the moving process of the transformer, respectively in multiple tests The Vibration Condition of point measuring transformer, obtains the vibration data of transformer;
The vibration data of automatic data collection and the treatment transformer, obtains the vibration analysis result of the transformer;
Vibration analysis result according to the transformer, judges whether the moving process of the transformer is safe.
Compared with prior art, the beneficial effect of the transformer method for testing vibration that the present invention is provided is shaken with above-mentioned transformer The beneficial effect of dynamic test system is identical, therefore is no longer repeated herein.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, embodiment will be described below Needed for the accompanying drawing to be used be briefly described, it should be apparent that, drawings in the following description are only more of the invention Embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, can also be attached according to these Figure obtains other accompanying drawings.
Fig. 1 is the structural representation of transformer vibration test system provided in an embodiment of the present invention;
Fig. 2 is sensor unit in transformer vibration test system provided in an embodiment of the present invention peace on the transformer Holding position schematic diagram;
Fig. 3 is transformer method for testing vibration flow chart provided in an embodiment of the present invention.
Description of reference numerals:
1-sensor unit, 2-collecting unit,
3-adjunct unit, 11-acceleration transducer,
12-strain transducer, 13-pulling force sensor,
14-speed probe, 21-dynamic signal acquisition instrument,
22-processor, 23-transformer vibration monitor,
31-power supply module, 32-wireless communication module,
33-memory module, the casing of 101-transformer,
The value side bushing of 102-transformer, the network side sleeve of 103-transformer,
The valve side of 104-transformer raises, and the net side of 105-transformer rises dais,
The towing point of 106-transformer, the wheel of 107-transformer transfer car(buggy).
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is a part of embodiment of the invention, rather than whole embodiments.Based on this hair Embodiment in bright, the every other implementation that those of ordinary skill in the art are obtained under the premise of creative work is not made Example, belongs to the scope of protection of the invention.
Embodiment one
The embodiment of the present invention provides a kind of transformer vibration test system, as shown in figure 1, the transformer vibration test system Including:For the sensor unit 1 of the vibration data of measuring transformer, and for automatic data collection and treatment sensor unit 1 The collecting unit 2 of the vibration data of measurement;Sensor unit 1 is installed on the transformer, the input and sensor of collecting unit 2 The data output end of unit 1 is connected, the power interface of collecting unit 2 with for the phase of adjunct unit 3 to the power supply of collecting unit 2 Even.
In transformer moving process, when carrying out vibration-testing to transformer using above-mentioned transformer vibration test system, Multiple test points can be on the transformer chosen first, the install sensor unit 1 in multiple test points, in being moved through for transformer Cheng Zhong, respectively in the Vibration Condition of multiple test point measuring transformers, obtains the vibration data of transformer, then single by gathering The vibration data of unit 2, automatic data collection and treatment transformer, obtains the vibration analysis result of transformer, finally can be according to the change The vibration analysis result of depressor, judges whether the moving process of transformer is safe.
In the transformer vibration test system that the present embodiment is provided, for the sensor of the vibration data of measuring transformer Unit is installed on the transformer, then in the moving process of transformer, you can by shaking for the sensor unit measuring transformer Dynamic data, then by collecting unit, the vibration data of automatic data collection and treatment sensor unit measurement, you can obtain transformer Vibration Condition in moving process, so as to can judge that transformer is moved through according to the Vibration Condition in the transformer moving process Whether journey is safe, and then ensures the safety of the parts such as full dress transformer middle sleeve, helps to realize the safety moving of transformer.
Exemplarily, as depicted in figs. 1 and 2, sensor unit 1 may include at least 7 acceleration transducers 11, transformer The bottom of casing 101, the side of casing 101 of transformer, the top of casing 101 of transformer, the value side bushing 102 of transformer push up At the top of portion, the network side sleeve 103 of transformer, the valve side of transformer rises the top of dais 104 and the net side liter dais 105 of transformer is pushed up Portion is provided with least one acceleration transducer 11.It should be noted that can also set many at the other positions of transformer Individual acceleration transducer, those skilled in the art can be configured according to actual conditions, and the embodiment of the present invention is not defined.
Preferably, above-mentioned acceleration transducer is the acceleration transducer that can measure orthogonal three-dimensional acceleration, so that Obtain in the moving process of transformer, can respectively measure bottom half, the body side of transformer, the case of transformer of transformer Body top, the value side bushing top of transformer, the network side sleeve top of transformer, the valve side of transformer rise dais top and transformation The net side of device rises the orthogonal three-dimensional acceleration at the top of dais, and then the transformer that can be measured according to above-mentioned multiple acceleration test points Acceleration, obtain transformer acceleration information.
Further, after by the acceleration information of collecting unit automatic data collection and treatment transformer, transformer is obtained Acceleration analysis result, then the acceleration analysis result according to transformer, is carried out with default transformer acceleration peak value Compare, judge whether the moving process of transformer is safe.
Specifically, because the different parts of transformer are different to the impact shock sensitivity of different frequency scope, therefore, For the acceleration test result of different acceleration test points, the frequency range of selected acceleration test result is also different. Exemplarily:Due to having substantial amounts of easily worn part, seal and fastener in transformer tank body, therefore the casing top of selection The frequency range of the test result of acceleration is 0.1Hz~1000Hz;And the net side of transformer and the liter dais of valve side are cylinder As a result, its structure frequency is in the range of tens hertz, and influence of the dither to liter dais and sleeve pipe thereon is relatively small, therefore The frequency range of the test result of the acceleration of the net side of selection and the liter dais of valve side is 0.1Hz~100Hz;The net of transformer The sleeve pipe of side and valve side is typical low-frequency vibration sensitive structure, and the fundamental frequency of sleeve pipe is within ten hertz, and fundamental vibration point Amount is the main reason of vibration stress on sleeve pipe, therefore the net side and the frequency of the test result of the sleeve pipe acceleration of valve side for selecting Scope is 0.1Hz~20Hz.
Exemplarily, as depicted in figs. 1 and 2, sensor unit 1 may include at least two strain transducers 12, transformer Valve side rise the bottom of network side sleeve 103 of the bottom of dais 104 and transformer and be provided with least one strain transducer 12.Specifically Ground, above-mentioned strain transducer 12 can be stress section, the valve side that stress section is pasted onto transformer can be risen into the bottom of dais 104 and change The bottom of network side sleeve 103 of depressor, foil gauge can rise the network side sleeve of the bottom of dais 104 and transformer in the valve side of transformer Pasted at 0 °, 90 °, 180 ° and 270 ° position of 103 bottoms, when being limited by field condition, also can only selected at 0 ° and 90 ° Pasted at position, those skilled in the art can be selected according to actual conditions, and the embodiment of the present invention is not defined.
Additionally, when the valve side of transformer is porcelain valve side, pasting for stress section will not cause to damage to the valve side of transformer Wound, therefore, the root of the value side bushing of transformer is also provided with least one strain transducer, such that it is able to not damage change In the case of the valve side of depressor, suffered stress in transformer moving process is more accurately measured.
Specifically, in the moving process of transformer, the stress test point and net side of dais bottom can be risen in valve side respectively The stress test point of sleeve bottom, the stress of measuring transformer obtains the stress data of transformer;Then, by collecting unit, The stress data of automatic data collection and treatment transformer, after the stress analysis result of acquisition transformer, you can according to transformer Stress analysis result, the safe stress value with transformer is compared, and judges whether the moving process of transformer is safe.
Exemplarily, when transformer is moved by transformer transfer car(buggy), as depicted in figs. 1 and 2, the sensor unit 1 may also include pulling force sensor 13 and speed probe 14, and pressure sensor 13 is arranged at the towing point 106 of transformer, turn Fast sensor 14 is arranged on the wheel 107 of transformer transfer car(buggy).
Specifically, in the moving process of transformer, transformation can be measured in the point of the tensile test at the towing point of transformer The suffered tractive force of device, obtains the traction force data of transformer, and the measurement of rotating speed point on the wheel of transformer transfer car(buggy) is surveyed The translational speed of quantitative change depressor, obtains the translational speed data of transformer;Then, by collecting unit, automatic data collection and treatment The traction force data and the translational speed data of transformer of transformer, obtain the traction force analysis results and transformer of transformer After translational speed analysis result, you can the translational speed analysis knot of traction force analysis result and transformer according to transformer Really, judge whether the moving process of transformer is safe.Additionally, those skilled in the art can also be by the traction force analysis knot of transformer The translational speed analysis result of fruit and transformer and the acceleration analysis result of the transformer for obtaining and the stress point of transformer Analysis result is combined, and the moving process of comprehensive analysis transformer helps further to improve what transformer moving process was used Transformer transfer car(buggy) and transhipment track.Exemplarily, as shown in figure 1, collecting unit 2 includes:Dynamic signal acquisition instrument 21 and The connected processor 22 of the output end of dynamic signal acquisition instrument 21 and the transformer vibration being connected with the output end of processor 22 Monitor 23, the input of dynamic signal acquisition instrument 21 is connected with the data output end of sensor unit 1, and adjunct unit 3 is distinguished The power interface of power interface, the power interface of processor 22 and transformer vibration monitor 23 with dynamic signal acquisition instrument 21 It is connected.
Exemplarily, as shown in figure 1, adjunct unit 3 includes:For powered for collecting unit 2 power supply module 31, be used for The wireless communication module 32 communicated with collecting unit 2, and memory module 33.
Specifically, power interface, the power interface of processor 22 respectively with dynamic signal acquisition instrument 21 of power supply module 31 Power interface with transformer vibration monitor 23 is connected;Memory module 33 and transformer are vibrated by wireless communication module 32 The wireless connection of monitor 23, such that it is able to realize real-time reception and the storage of transformer vibration-testing data, in order to technology people Member calls research in the future.
Embodiment two
The embodiment of the present invention provides a kind of transformer method for testing vibration, is shaken using the transformer in the embodiment of the present invention one Dynamic test system carries out vibration-testing to transformer, specifically, as shown in figure 3, the transformer method for testing vibration includes:
The multiple test points of step S1, on the transformer selection, in the moving process of transformer, respectively in multiple test points The Vibration Condition of measuring transformer, obtains the vibration data of transformer.
Exemplarily, choose on the transformer after multiple test points, sensor can be arranged on each selected test On point, in the moving process of transformer, by sensor, respectively in the Vibration Condition of multiple test point measuring transformers, obtain Obtain the vibration data of transformer.
You need to add is that, in the embodiment of the present invention preferably during the following four of transformer movement, stress test Its Vibration Condition:(1), be drawn through the process of straight track, should during transformer transfer car(buggy) and track match it is bad or The irregularity of track, is likely to result in the vibration unfavorable to transformer;(2) when, transformer is moved, by the process of rail junction, The track of infall discontinuously is likely to cause vibration;(3), transformer value side bushing enters the process in the valve Room, now by operation The limitation in face is changed to a side-lining or two side-linings, it is necessary to change mode of traction, and the imbalance of tractive force can also cause vibration; (4), transformer is moved to the process of pedestal by jack, impulsive force during jacking is also possible to cause vibration.
The vibration data of step S2, automatic data collection and treatment transformer, obtains the vibration analysis result of transformer.
Exemplarily, shaking for transformer can be obtained by collecting unit, automatic data collection and the vibration data for the treatment of transformer Dynamic analysis result.
Step S3, the vibration analysis result according to transformer, judge whether the moving process of transformer is safe.
In the transformer method for testing vibration that the present embodiment is provided, on the transformer after the multiple test points of selection, just Can be in the moving process of transformer, respectively in the Vibration Condition of multiple test point measuring transformers, to obtain shaking for transformer Dynamic data;Then by automatic data collection and the vibration data for the treatment of transformer, you can obtain the vibration analysis result of transformer, The vibration analysis result is Vibration Condition of the transformer in moving process, those skilled in the art can according to the result, Judge whether the moving process of transformer is safe, and then ensure the safety of the parts such as full dress transformer middle sleeve, help to realize The safety moving of transformer.
Alternatively, above-mentioned multiple test points are including being located at the acceleration test point of the bottom half of transformer, positioned at transformation The acceleration test point of the body side of device, positioned at transformer casing top acceleration test point, the valve positioned at transformer The acceleration test point of side cannula tip, the acceleration test point at the top of the network side sleeve of transformer, positioned at transformer Valve side rises the acceleration test point at the top of dais and the acceleration test point at the top of the net side liter dais of transformer.
Specifically, in the moving process of transformer, acceleration test point respectively in bottom half, body side plus Adding at the top of the acceleration test point, network side sleeve at the top of velocity test point, the acceleration test point of casing top, value side bushing The acceleration test point and net side that velocity test point, valve side are risen at the top of dais rise the acceleration test point at the top of dais, and measurement becomes The acceleration of depressor, obtains the acceleration information of transformer.
Then, the acceleration information of automatic data collection and treatment transformer, obtains the acceleration analysis result of transformer.
Finally, can be compared with default transformer acceleration peak value according to the acceleration analysis result of transformer, sentenced Whether the moving process of disconnected transformer is safe.Exemplarily, the acceleration peak value of bottom half and body side be preferably smaller than or Equal to 3g, the acceleration peak value of casing top is preferably lower than or equal to 1g, and valve side rises dais top and net side is risen at the top of dais Acceleration peak value is preferably lower than or equal to 0.6g, the acceleration peak value at the top of value side bushing top and network side sleeve be preferably smaller than or Equal to 0.2g, wherein, g is acceleration of gravity.
Alternatively, above-mentioned multiple test points may also include positioned at the valve side of transformer rise dais bottom stress test point and It is further, above-mentioned when the valve side of transformer is porcelain valve side positioned at the stress test point of the network side sleeve bottom of transformer Multiple test points may also include the stress test point of the root positioned at the valve side of transformer.
Specifically, in the moving process of transformer, the stress test point and net side set of dais bottom are risen in valve side respectively The stress test point of bottom of the tube, the stress of measuring transformer obtains the stress data of transformer;Then, automatic data collection and treatment The stress data of transformer, obtains the stress analysis result of transformer, finally, can according to the stress analysis result of transformer, with The safe stress value of transformer is compared, and judges whether the moving process of transformer is safe.
Exemplarily, in the moving process of transformer, primary concern is that vibration is to produced by the sleeve pipe in transformer Influence of the stress to sleeve pipe come judge transformer moving process middle sleeve whether safety.Exemplarily, by positioned at transformer Valve side root stress test point, test obtain stress as sleeve pipe (those skilled in the art instruct, the present invention implement Valve side in example is sleeve pipe) stress, the stress test point of dais bottom, the stress test result that test is obtained are risen by valve side Liter moment of flexure in dais section can be converted into, in prediction on such basis the moment of flexure and stress of sleeve pipe.Also can be by acceleration test resulting estimate set The stress of pipe:σ=0.5maL/W, wherein, m is the gross mass of the oil-filled sleeve pipe of inside transformer, and a is cannula tip Acceleration, L is the length of sleeve pipe, and W is the bending resistance the moment of inertia of sleeve pipe.In the embodiment of the present invention, the preferred stress and sleeve pipe of sleeve pipe The ratio of bursting stress is less than or equal to 1/8, with ensureing transformer moving process, the safety of sleeve pipe.
Alternatively, when transformer is moved by transformer transfer car(buggy), above-mentioned multiple test points may include to be located at transformer Towing point at tensile test point and the point of the measurement of rotating speed on the wheel of transformer transfer car(buggy).
Specifically, in the moving process of transformer, the tensile test point at the towing point of transformer, measuring transformer Suffered tractive force, obtain transformer traction force data, the measurement of rotating speed point on the wheel of transformer transfer car(buggy), measurement The translational speed of transformer, obtains the translational speed data of transformer;Then, the tractive force number of automatic data collection and treatment transformer According to the translational speed data with transformer, the traction force analysis result of transformer and the translational speed analysis knot of transformer are obtained Really;Finally, the shifting of transformer can be judged according to the traction force analysis result of transformer and the translational speed analysis result of transformer Whether dynamic process is safe.
The above, specific embodiment only of the invention, but protection scope of the present invention is not limited thereto, and it is any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all contain Cover within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (13)

1. a kind of transformer vibration test system, it is characterised in that including:For the sensor of the vibration data of measuring transformer Unit, and for automatic data collection and the collecting unit of the vibration data of the treatment sensor unit measurement;The sensor Unit is arranged on the transformer, and the input of the collecting unit is connected with the data output end of the sensor unit, The power interface of the collecting unit is connected with the adjunct unit for being powered to the collecting unit.
2. transformer vibration test system according to claim 1, it is characterised in that the sensor unit is included at least 7 acceleration transducers, the bottom half of the transformer, the body side of the transformer, the casing top of the transformer Portion, the value side bushing top of the transformer, the network side sleeve top of the transformer, the valve side of the transformer rise dais top The net side of portion and the transformer rises dais top and is provided with acceleration transducer described at least one.
3. transformer vibration test system according to claim 2, it is characterised in that the acceleration transducer is can Measure the acceleration transducer of orthogonal three-dimensional acceleration.
4. transformer vibration test system according to claim 1, it is characterised in that the sensor unit is included at least Two strain transducers, the valve side of the transformer rise dais bottom and the transformer network side sleeve bottom be provided with to A few strain transducer.
5. Testing System of Transformer according to claim 4, it is characterised in that when the valve side of the transformer is porcelain valve During side, the root of the value side bushing of the transformer is additionally provided with strain transducer described at least one.
6. transformer vibration test system according to claim 1, it is characterised in that when the transformer passes through transformer When transfer car(buggy) is moved, the sensor unit includes pulling force sensor and speed probe, and the pressure sensor is arranged on institute State at the towing point of transformer, the speed probe is arranged on the wheel of the transformer transfer car(buggy).
7. transformer vibration test system according to claim 1, it is characterised in that the collecting unit includes:Dynamic Processor and the output end phase with the processor that signal sampler is connected with the output end of the dynamic signal acquisition instrument Transformer vibration monitor even, the input of the dynamic signal acquisition instrument and the data output end phase of the sensor unit Even, adjunct unit power interface respectively with the dynamic signal acquisition instrument, the power interface of the processor and described The power interface of transformer vibration monitor is connected.
8. transformer vibration test system according to claim 1, it is characterised in that the adjunct unit includes:For Power supply module, the wireless communication module for being communicated with the collecting unit powered for the collecting unit, and storage mould Block.
9. a kind of transformer method for testing vibration, it is characterised in that including:
Multiple test points are chosen on the transformer, in the moving process of the transformer, are surveyed in multiple test points respectively The Vibration Condition of quantitative change depressor, obtains the vibration data of transformer;
The vibration data of automatic data collection and the treatment transformer, obtains the vibration analysis result of the transformer;
Vibration analysis result according to the transformer, judges whether the moving process of the transformer is safe.
10. transformer method for testing vibration according to claim 9, it is characterised in that multiple test points include position Acceleration test point in the bottom half of the transformer, positioned at the transformer body side acceleration test point, Acceleration test point positioned at the casing top of the transformer, the acceleration at the top of the value side bushing of the transformer are surveyed Pilot, the acceleration test point at the top of the network side sleeve of the transformer, the valve side liter dais top positioned at the transformer The acceleration test point in portion and the net side positioned at the transformer rise the acceleration test point at the top of dais;
In the moving process of the transformer, acceleration test point respectively in the bottom half, the body side Acceleration test point, the net at the top of acceleration test point, the acceleration test point of the casing top, the value side bushing The acceleration test point and the net side that the acceleration test point of side cannula tip, the valve side are risen at the top of dais rise dais top Acceleration test point, measure the acceleration of the transformer, obtain the acceleration information of the transformer;
The acceleration information of automatic data collection and the treatment transformer, obtains the acceleration analysis result of the transformer;
Acceleration analysis result according to the transformer, is compared with default transformer acceleration peak value, judges described Whether the moving process of transformer is safe.
11. transformer method for testing vibration according to claim 9, it is characterised in that multiple test points include position The stress test point and the stress positioned at the network side sleeve bottom of the transformer of dais bottom are risen in the valve side of the transformer Test point;
In the moving process of the transformer, the stress test point and the net side set of dais bottom are risen in the valve side respectively The stress test point of bottom of the tube, measures the stress of the transformer, obtains the stress data of the transformer;
The stress data of automatic data collection and the treatment transformer, obtains the stress analysis result of the transformer;
Stress analysis result according to the transformer, the safe stress value with the transformer is compared, and judges the change Whether the moving process of depressor is safe.
12. transformer method for testing vibration according to claim 11, it is characterised in that when the valve side of the transformer is During porcelain valve side, multiple test points also include the stress test point of the root of the value side bushing positioned at the transformer.
13. transformer method for testing vibration according to claim 9, it is characterised in that when the transformer passes through transformation When device transfer car(buggy) is moved, multiple test points are including the tensile test point at the towing point of the transformer and positioned at institute State the measurement of rotating speed point on the wheel of transformer transfer car(buggy);
In the moving process of the transformer, the tensile test point at the towing point of the transformer measures the transformation The suffered tractive force of device, obtains the traction force data of the transformer;
In the moving process of the transformer, the measurement of rotating speed point on the wheel of the transformer transfer car(buggy), measurement is described The translational speed of transformer, obtains the translational speed data of the transformer;
The translational speed data of the traction force data and the transformer of automatic data collection and the treatment transformer, obtain the change The traction force analysis result of depressor and the translational speed analysis result of the transformer;
The translational speed analysis result of traction force analysis result and the transformer according to the transformer, judges the transformation Whether the moving process of device is safe.
CN201611187540.0A 2016-12-20 2016-12-20 Transformer vibration test system and transformer vibration test method Pending CN106706120A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611187540.0A CN106706120A (en) 2016-12-20 2016-12-20 Transformer vibration test system and transformer vibration test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611187540.0A CN106706120A (en) 2016-12-20 2016-12-20 Transformer vibration test system and transformer vibration test method

Publications (1)

Publication Number Publication Date
CN106706120A true CN106706120A (en) 2017-05-24

Family

ID=58938514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611187540.0A Pending CN106706120A (en) 2016-12-20 2016-12-20 Transformer vibration test system and transformer vibration test method

Country Status (1)

Country Link
CN (1) CN106706120A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108051070A (en) * 2017-11-29 2018-05-18 中国电力科学研究院有限公司 Vibration detecting system and method in a kind of full dress main transformer moving process
CN108377685A (en) * 2018-05-25 2018-08-10 贵州省福轩实业发展有限公司 Vegetable cultivation equipment
CN108450312A (en) * 2018-05-25 2018-08-28 贵州省福轩实业发展有限公司 Fertilising equipment
CN108496492A (en) * 2018-05-30 2018-09-07 贵州省福轩实业发展有限公司 A kind of planting vegetable equipment
CN108597753A (en) * 2018-05-29 2018-09-28 保定天威保变电气股份有限公司 Casing reinforcement device and method when a kind of transformer is integrally transported
CN109884442A (en) * 2019-04-15 2019-06-14 安庆师范大学 A kind of transformer fault localization method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102706526A (en) * 2012-05-14 2012-10-03 中国电力科学研究院 Anti-vibration test model and test method for power transformer and casing pipe
CN102795463A (en) * 2011-05-26 2012-11-28 黑龙江省送变电工程公司 Method for transporting converter transformer in station
WO2013185405A1 (en) * 2012-06-13 2013-12-19 江苏省电力公司南京供电公司 Power transformer iron core looseness fault diagnosis and preliminary fault location system and method
CN103884415A (en) * 2014-03-25 2014-06-25 国家电网公司 Transformer vibration monitoring system based on wireless sensing technology and testing method
CN103994868A (en) * 2014-06-04 2014-08-20 句容华源电器设备有限公司 Bumping vibration test device for power transformer
CN204009562U (en) * 2014-08-27 2014-12-10 山东电力设备有限公司 Transformer body travel position on-line monitoring system
CN206362447U (en) * 2016-12-20 2017-07-28 国家电网公司 A kind of transformer vibration test system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102795463A (en) * 2011-05-26 2012-11-28 黑龙江省送变电工程公司 Method for transporting converter transformer in station
CN102706526A (en) * 2012-05-14 2012-10-03 中国电力科学研究院 Anti-vibration test model and test method for power transformer and casing pipe
WO2013185405A1 (en) * 2012-06-13 2013-12-19 江苏省电力公司南京供电公司 Power transformer iron core looseness fault diagnosis and preliminary fault location system and method
CN103884415A (en) * 2014-03-25 2014-06-25 国家电网公司 Transformer vibration monitoring system based on wireless sensing technology and testing method
CN103994868A (en) * 2014-06-04 2014-08-20 句容华源电器设备有限公司 Bumping vibration test device for power transformer
CN204009562U (en) * 2014-08-27 2014-12-10 山东电力设备有限公司 Transformer body travel position on-line monitoring system
CN206362447U (en) * 2016-12-20 2017-07-28 国家电网公司 A kind of transformer vibration test system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108051070A (en) * 2017-11-29 2018-05-18 中国电力科学研究院有限公司 Vibration detecting system and method in a kind of full dress main transformer moving process
CN108377685A (en) * 2018-05-25 2018-08-10 贵州省福轩实业发展有限公司 Vegetable cultivation equipment
CN108450312A (en) * 2018-05-25 2018-08-28 贵州省福轩实业发展有限公司 Fertilising equipment
CN108450312B (en) * 2018-05-25 2023-10-31 台州市路桥区信发管业有限公司 Fertilizing equipment
CN108377685B (en) * 2018-05-25 2024-01-12 黑龙江京卓农业科技有限公司 Vegetable planting equipment
CN108597753A (en) * 2018-05-29 2018-09-28 保定天威保变电气股份有限公司 Casing reinforcement device and method when a kind of transformer is integrally transported
CN108496492A (en) * 2018-05-30 2018-09-07 贵州省福轩实业发展有限公司 A kind of planting vegetable equipment
CN108496492B (en) * 2018-05-30 2024-04-12 沽源县三源食品有限公司 Vegetable planting equipment
CN109884442A (en) * 2019-04-15 2019-06-14 安庆师范大学 A kind of transformer fault localization method
CN109884442B (en) * 2019-04-15 2021-08-31 安庆师范大学 Transformer fault positioning method

Similar Documents

Publication Publication Date Title
CN106706120A (en) Transformer vibration test system and transformer vibration test method
CN106759216B (en) A kind of penetrometer and its measurement method having both dynamic sounding and static sounding
CN205388474U (en) Deep sea seabed shallow layer deposit in situ test device
CN105258683A (en) Deep sea floor shallow sediment in-situ testing device
CN102478472B (en) Test apparatus used for simulating influence of three-axis loading and unloading on engineering pile
CN104359689B (en) EMUs braking performance test method and test device
CN102269676A (en) High-precision geotechnical simple shear apparatus and use method thereof
CN206362447U (en) A kind of transformer vibration test system
CN206479268U (en) For loess and the forced three-dimensional soil pressure sensor of weak soil
CN104596581B (en) A kind of intelligent hanging stick current surveying device
CN103759954A (en) Method and device for precisely testing rolling resistance of tyres
CN104749032A (en) Testing device for internal stress of soil-rock mixture or concrete
CN105890829A (en) Device for comparing test performance of force measuring locking anchor pipes of tunnel and test method
CN107843711A (en) A kind of dynamic consolidation construction effect detection method based on impact acceleration
CN1619269A (en) Railroad rail stress testing method
CN208254458U (en) Soft base deepwater diking settlement monitoring device
CN106124148B (en) A kind of deep hole transmission function test system and its test method
CN105758606A (en) Submarine pipeline strain response experimental measurement device resisting anchoring
CN204612681U (en) Jacking bridge and culvert position automatic testing equipment
CN107843743A (en) A kind of dynamic consolidation construction collecting method based on impact acceleration
CN103630283A (en) Sleeper longitudinal-transverse resistance dynamic detector and detecting method
CN104713793A (en) Roadbed filling quality detector
CN206593974U (en) A kind of boring elastic modulus instrument probe
CN209879721U (en) Geological disaster monitoring and collecting system based on narrow-band Internet of things communication
CN206038262U (en) Deep hole transfer function test system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination