Batch bundling device for cement bricks Download PDFInfo
- Publication number
- CN106697568A CN106697568A CN201710067157.XA CN201710067157A CN106697568A CN 106697568 A CN106697568 A CN 106697568A CN 201710067157 A CN201710067157 A CN 201710067157A CN 106697568 A CN106697568 A CN 106697568A
- Authority
- CN
- China
- Prior art keywords
- slip
- fixing hole
- bundling
- ties
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D71/00—Bundles of articles held together by packaging elements for convenience of storage or transport, e.g. portable segregating carrier for plural receptacles such as beer cans or pop bottles; Bales of material
- B65D71/0088—Palletisable loads, i.e. loads intended to be transported by means of a fork-lift truck
Abstract
The invention provides a batch bundling device for cement bricks. The batch bundling device for the cement bricks comprises a bundling assembly for bundling the cement bricks; the bundling assembly comprises a first bundling sheet strip and a second bundling sheet strip, wherein the first bundling sheet strip is fixedly connected to the second bundling sheet strip, and the first bundling sheet strip and the second bundling sheet strip are both in square frame shapes; the first bundling sheet strip is provided with a fixing connector; the second bundling sheet strip is a closed square frame; and one end part of the first bundling sheet strip is provided with a first fixing hole, a second fixing hole and a third fixing hole. The bundling device has the beneficial effects that the scattering of the cement bricks in the transportation process can be avoided, cracks and breakage of the cement bricks caused by collision in the transportation process can be avoided, and bundling and lifting can be facilitated.
Description
Technical field
The present invention relates to tile machinery, and in particular to the batch bundling conveying arrangement of cement brick.
Background technology
Cement brick can cause the breakage of fragment of brick during transport;The meeting during transport of large batch of cement brick
Cause being scattered for cement brick, consequence is hardly imaginable;Therefore need to provide a kind of brand-new technology on the basis of prior art
Scheme solves this technical problem.
The content of the invention
The present invention overcomes the shortcomings of that background technology provides cement brick batch binding apparatus, goal of the invention:Avoid cement
It is scattered in the transportation of brick, it is to avoid collide with caused slight crack, defect in cement brick transportation.
The invention provides following technical proposals:Cement brick batch binding apparatus, including the bundling component of cement brick is tied up,
The bundling component ties up slip, second ties up slip including first, and described first ties up slip ties up slip with described second
It is fixedly connected, described first ties up slip, second ties up slip and be square frame-shaped, described first ties up slip is provided with fixation and connects
Head, described second ties up slip for closed square frame, and first one end for tying up slip is provided with the first fixing hole, second consolidates
Determine hole, the 3rd fixing hole, described first the other end for tying up slip is provided with the 4th fixing hole, and described second ties up slip and institute
State the corresponding position of anchor tip and be provided with through hole, screw runs through the through hole, the 4th fixing hole and the first fixing hole;Or it is described
Screw runs through the through hole, the 4th fixing hole and the second fixing hole;Or the screw through the through hole, the 4th fixing hole and
3rd fixing hole.
Described first ties up slip, the second body for tying up slip offers rubber hole, and the rubber hole is placed in rubber strip,
It is spaced apart by the rubber strip between the cement brick.
Described first ties up slip or second ties up slip and be provided with hook.
Beneficial effects of the present invention:First tie up slip 1, second tie up slip 2 be elasticity steel disc, in bottom plug
Enter the cement brick that four rubber strips 7 are put into ground floor, the cement brick that rubber strip 7 is put into the second layer is then filled in again, according to this
Method is piled up upwards successively, and the rubber strip 7 plays damping, buffering, and to the buffer action of each cement brick 8.Screw runs through institute
State through hole, the 4th fixing hole and the first fixing hole 3;Or the screw is fixed through the through hole, the 4th fixing hole and second
Hole 4;Or the screw runs through the through hole, the 4th fixing hole and the 3rd fixing hole 5.According to actual conditions by cement brick 80
Word is tightened, and use the first fixing hole 3, the second fixing hole 4 according to actual conditions selectivity, the 3rd fixing hole 5 adapt to different
Elasticity, and hook 9 is provided with, facilitate crane loading.Therefore present arrangement avoids being scattered in the transportation of cement brick, this dress
Put the caused slight crack that collides with avoided in cement brick transportation, defect, while the present apparatus has been also convenient for tying up, has lifted by crane.
Brief description of the drawings
Fig. 1 is the front view of cement brick batch binding apparatus of the present invention.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the upward view of Fig. 1.
Specific embodiment
Below in conjunction with accompanying drawing, the invention will be further described with specific embodiment.
In Fig. 1,2,3:First ties up slip 1, second ties up slip 2, the first fixing hole 3, the second fixing hole the 4, the 3rd and consolidate
Determine hole 5, rubber hole 6, rubber strip 7, cement brick 8, hook 9.
Cement brick batch binding apparatus, including the bundling component of cement brick 8 is tied up, the bundling component is tied up including first
Slip 1, second tie up slip 2, and described first ties up slip 1 ties up slip 2 and be fixedly connected with described second, and described first ties up
Slip 1, second tie up slip 2 and are square frame-shaped, and described first ties up slip 1 is provided with anchor tip, and described second ties up slip 2
It is closed square frame, first one end for tying up slip 1 is provided with the first fixing hole 3, the second fixing hole 4, the 3rd fixing hole
5, described first the other end for tying up slip 1 is provided with the 4th fixing hole, and described second ties up slip 2 with the anchor tip pair
The position answered is provided with through hole, and screw runs through the through hole, the 4th fixing hole and the first fixing hole 3;Or the screw runs through institute
State through hole, the 4th fixing hole and the second fixing hole 4;Or the screw is fixed through the through hole, the 4th fixing hole and the 3rd
Hole 5.
Described first ties up slip 1, the second body for tying up slip 2 offers rubber hole 6, and the rubber hole 6 is placed in rubber
Adhesive tape 7, is spaced apart between the cement brick 8 by the rubber strip 7.
Described first ties up slip 1 or the second ties up slip 2 and is provided with hook 9.
Operating instruction:First tie up slip 1, second tie up slip 2 be elasticity steel disc, fill in four rubbers in the bottom
Adhesive tape 7 is put into the cement brick of ground floor, and the cement brick that rubber strip 7 is put into the second layer is then filled in again, in this way successively to
On pile up, the rubber strip 7 plays damping, buffering, and to the buffer action of each cement brick 8.Screw through the through hole,
4th fixing hole and the first fixing hole 3;Or the screw runs through the through hole, the 4th fixing hole and the second fixing hole 4;Or
The screw runs through the through hole, the 4th fixing hole and the 3rd fixing hole 5.The cross of cement brick 8 is tightened according to actual conditions, root
Different elasticities are adapted to according to use first fixing hole 3 of actual conditions selectivity, the second fixing hole 4, the 3rd fixing hole 5, and
Hook 9 is provided with, facilitates crane loading.
Claims (2)
1. cement brick batch binding apparatus, including tie up cement brick(8)Bundling component, it is characterised in that the bundling component
Slip is tied up including first(1), second tie up slip(2), described first ties up slip(1)Slip is tied up with described second(2)
It is fixedly connected, described first ties up slip(1), second tie up slip(2)Square frame-shaped is, described first ties up slip(1)If
There is anchor tip, described second ties up slip(2)It is closed square frame, described first ties up slip(1)One end be provided with
One fixing hole(3), the second fixing hole(4), the 3rd fixing hole(5), described first ties up slip(1)The other end be provided with the 4th
Fixing hole, described second ties up slip(2)Position corresponding with the anchor tip is provided with through hole, screw through the through hole,
4th fixing hole and the first fixing hole(3);Or the screw runs through the through hole, the 4th fixing hole and the second fixing hole(4);
Or the screw runs through the through hole, the 4th fixing hole and the 3rd fixing hole(5);
Described first ties up slip(1), second tie up slip(2)Body offer rubber hole(6), the rubber hole(6)Put
In rubber strip(7), the cement brick(8)Between by the rubber strip(7)It is spaced apart.
2. cement brick batch binding apparatus according to claim 1, it is characterised in that described first ties up slip(1)Or
Second ties up slip(2)It is provided with hook(9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710067157.XA CN106697568A (en) | 2017-02-07 | 2017-02-07 | Batch bundling device for cement bricks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710067157.XA CN106697568A (en) | 2017-02-07 | 2017-02-07 | Batch bundling device for cement bricks |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106697568A true CN106697568A (en) | 2017-05-24 |
Family
ID=58910378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710067157.XA Pending CN106697568A (en) | 2017-02-07 | 2017-02-07 | Batch bundling device for cement bricks |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106697568A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2515616A1 (en) * | 1981-11-05 | 1983-05-06 | Baudouin Jean Claude | Storage group of bricks - has stacked alternating layers of bricks in rows using void rows to locate forks lift truck |
CN2083140U (en) * | 1991-02-12 | 1991-08-21 | 谢大新 | Bricks-packaging container |
US5899046A (en) * | 1997-09-17 | 1999-05-04 | Hughes; Barry T. | Edge protector for masonry products and a system for its application |
CN201023864Y (en) * | 2007-04-30 | 2008-02-20 | 谢志江 | Brick packing structure |
CN201907758U (en) * | 2010-04-30 | 2011-07-27 | 陈有福 | Single-row brick aggregate formed by stacked bricks |
CN203601760U (en) * | 2013-11-21 | 2014-05-21 | 福建宏伟环保建材有限公司 | Brick frame |
US9090388B2 (en) * | 2011-05-19 | 2015-07-28 | Signode Industrial Group, LLC | Void board and packaging using a void board |
CN105539914A (en) * | 2015-11-30 | 2016-05-04 | 济南大学 | Tile bundling machine |
CN206537723U (en) * | 2017-02-07 | 2017-10-03 | 南通市恒达机械制造有限公司 | Cement brick batch binding apparatus |
-
2017
- 2017-02-07 CN CN201710067157.XA patent/CN106697568A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2515616A1 (en) * | 1981-11-05 | 1983-05-06 | Baudouin Jean Claude | Storage group of bricks - has stacked alternating layers of bricks in rows using void rows to locate forks lift truck |
CN2083140U (en) * | 1991-02-12 | 1991-08-21 | 谢大新 | Bricks-packaging container |
US5899046A (en) * | 1997-09-17 | 1999-05-04 | Hughes; Barry T. | Edge protector for masonry products and a system for its application |
CN201023864Y (en) * | 2007-04-30 | 2008-02-20 | 谢志江 | Brick packing structure |
CN201907758U (en) * | 2010-04-30 | 2011-07-27 | 陈有福 | Single-row brick aggregate formed by stacked bricks |
US9090388B2 (en) * | 2011-05-19 | 2015-07-28 | Signode Industrial Group, LLC | Void board and packaging using a void board |
CN203601760U (en) * | 2013-11-21 | 2014-05-21 | 福建宏伟环保建材有限公司 | Brick frame |
CN105539914A (en) * | 2015-11-30 | 2016-05-04 | 济南大学 | Tile bundling machine |
CN206537723U (en) * | 2017-02-07 | 2017-10-03 | 南通市恒达机械制造有限公司 | Cement brick batch binding apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206537723U (en) | Cement brick batch binding apparatus | |
CN106697568A (en) | Batch bundling device for cement bricks | |
CN106481091A (en) | A kind of concrete column steel-bonded reinforcement method | |
CN201770406U (en) | Simple hoist fixing device | |
CN206468016U (en) | A kind of skyscraper concrete distributing device | |
CN210195049U (en) | Device for supporting upper and lower steel bars of floor slab | |
CN209179496U (en) | Aluminum alloy pattern plate root stuff up a crack structure | |
CN102635179A (en) | Device for preventing beam or beamless slab filler wall top from cracking and construction method | |
JPH05229651A (en) | Device for conveying brick for construction work of hot blast stove | |
CN203034819U (en) | Brick conveying device | |
CN205132594U (en) | Cement loading area | |
CN204416895U (en) | A kind of cage suspender of improvement | |
CN108487660B (en) | Traditional residential green brick wall righting method | |
CN207176725U (en) | A kind of pump foundation secondary grout layer anti-drop structure | |
CN202544167U (en) | Device for preventing top cracking of beam or beamless plate bottom filler walls | |
CN202194291U (en) | Prefabricated thin plate hoisting and connecting device for superposing floor | |
CN207647196U (en) | It is a kind of to be used for the device that framework of steel reinforcement height is adjusted when anchor bolt construction | |
CN207878453U (en) | Filling pile head reinforcing bar protective device | |
CN201581550U (en) | Overlong structural beam provided with guide holes | |
CN103112777A (en) | Brick conveyer | |
CN203613469U (en) | Bridge bonding steel plate reinforcing device | |
CN105908982B (en) | A kind of overhanging unloading platform tool-type limit for tonnage support | |
CN203293376U (en) | Track type multi-function lifting hopper of agitator | |
CN207986116U (en) | A kind of Bottle & Can material automatic wire charging flow controlling device | |
CN207276041U (en) | The hanging apparatus of steel bar truss floor support plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170524 |
|
WD01 | Invention patent application deemed withdrawn after publication |