CN106691089B - A kind of Novel steel glass cup preparation method - Google Patents
A kind of Novel steel glass cup preparation method Download PDFInfo
- Publication number
- CN106691089B CN106691089B CN201710064514.7A CN201710064514A CN106691089B CN 106691089 B CN106691089 B CN 106691089B CN 201710064514 A CN201710064514 A CN 201710064514A CN 106691089 B CN106691089 B CN 106691089B
- Authority
- CN
- China
- Prior art keywords
- glass
- layer
- stainless steel
- cup
- shaping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- A—HUMAN NECESSITIES
- A47—FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
- A47G—HOUSEHOLD OR TABLE EQUIPMENT
- A47G19/00—Table service
- A47G19/22—Drinking vessels or saucers used for table service
- A47G19/2205—Drinking glasses or vessels
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B23/00—Re-forming shaped glass
- C03B23/04—Re-forming tubes or rods
- C03B23/13—Reshaping combined with uniting or heat sealing, e.g. for making vacuum bottles
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B23/00—Re-forming shaped glass
- C03B23/20—Uniting glass pieces by fusing without substantial reshaping
- C03B23/207—Uniting glass rods, glass tubes, or hollow glassware
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Re-Forming, After-Treatment, Cutting And Transporting Of Glass Products (AREA)
Abstract
The invention discloses a kind of Novel steel glass cup preparation method, its step is:1) fracture is earnestly rotated:The single-layer glass tube of different tube diameters is peeled into glass pipeline section base;2) individual layer receives bottom shaping;3) preheat;4) compound shaping of closing up;5) pressure screw thread scrapes mouth;6) fly-cutting stainless steel tube;7) revolve and squeeze thread forming;8) it is punched Origuchi shaping;9) sealing gasket is installed;10) assembled formation.The steel glass cup good integral strength that the present invention makes, product quality is high, and production efficiency is high, changes glass cup conveniently, is adapted to widely use in people's daily life.
Description
Technical field
The present invention relates to cup preparation method, particularly belongs to a kind of Novel steel glass cup preparation method.
Background technology
For Glass cup because it is easily cleaned, translucency is good, is not easy by the superior function such as pollution-free, by the extensive joyous of the people
Meet, the huge market demand.Glass cup in actual use often there arises a problem that:1) bulk strength is poor, easily broken
Split;2) heat hot water in Glass cup, cup surface are scalded one's hand, and taking away during drinking-water is easily ironed;Even 3) double-layer glass,
Because of rim of a cup drinking water place unprotect, the junction of internal layer and glass outer body is easily broken off, and whole cup is scrapped after fracture.Therefore,
The invention provides a kind of Novel steel glass cup preparation method, the steel glass cup for adopting this method making can solve above-mentioned ask
Topic.
The content of the invention
The invention provides a kind of Novel steel glass cup preparation method, and it is heated by flame, rotating sliding, pressure screw thread are scraped
Double glazing cup is made in mouth, stainless steel pipe sleeve is made using stainless steel tube, steel glass cup is made in assembled formation.
The technical solution adopted by the present invention is as follows:
A kind of Novel steel glass cup preparation method, its step are:1) fracture is earnestly rotated:By the single-glass of different tube diameters
Pipe is peeled into glass pipeline section base;
2) individual layer receives bottom shaping:Glass pipeline section base both ends are clamped on slewing after rotary-cut is molded, in the middle part of section base
Carry out partial flame and be heated to Glass Transition, be less than heating region width and heat-resisting blade not affine with glass from adding with thickness
Cutting forms the two single-layer cup material bottom of among thermal region;
3) preheat:The less band bottom single-layer cup material of external diameter is put into resistance furnace and preheated, resistance furnace temperature is set in 120 DEG C
~150 DEG C;
4) compound shaping of closing up:Rotation is fixed into the larger one end with bottom single-layer cup material clamping on slewing of internal diameter
End, the other end rotation that the less band bottom single-layer cup material of external diameter after preheating is sleeved on slewing can be elapsed into end, rotated
While the less band bottom single-layer cup material of external diameter is pushed into inside the larger band bottom single-layer cup material of internal diameter, be directed at external diameter with flame gun
Less band bottom single-layer cup material openend and the larger band bottom single-layer cup material openend of internal diameter are quickly heated, and use can elapse punching block will
Two openends bond be integrated at high temperature, form double glazing blank;
5) pressure screw thread scrapes mouth:The openend of double glazing blank is heated with flame gun on slewing, use can press
Positioning punching block is quickly hot pressed into screw thread in the openend of double glazing blank, and scraping mould with L-shaped round steel, quickly receipts scrape double glazing base
Expect the inwall of openend, double-layer glass base is made;
6) fly-cutting stainless steel tube:With quick sawing machine by long stainless steel tube, stainless steel tube blank is cut into;
7) revolve and squeeze thread forming:Thread forming equipment is squeezed with rotation, stainless steel tube blank both ends are processed into screw thread;
8) it is punched Origuchi shaping;By the stainless steel tube blank of TBE (threaded both ends) after rotation extrusion forming, blanking equipment is put into, is carried out
It is punched Origuchi shaping;
9) sealing gasket is installed:By the stainless steel tube blank after punching Origuchi, annular seal pad quick press mounting equipment is put into,
Annular seal pad is arranged on the inside at punching Origuchi, stainless steel pipe sleeve is made;
10) assembled formation:Double-layer glass base is arranged in stainless steel pipe sleeve, the openend setting-in of double-layer glass base
At the punching Origuchi end of stainless steel pipe sleeve, the other end of stainless steel pipe sleeve is provided with externally threaded plastics saucer and with external screw thread
Plastics collet, tapped cup lid is arranged on stainless steel pipe sleeve double-layer glass base openend, steel glass cup is made.
The rotating speed of individual layer receipts bottom shaping slewing is not less than 100 revs/min in described preparation method, compound shaping of closing up
The rotating speed for clamping the larger band bottom single-layer cup material slewing fixation round end of internal diameter is 70~100 revs/min, the less band bottom of external diameter
The rotating speed that the other end rotation that single-layer cup material is sleeved on slewing can elapse end is 40~65 revs/min.
The Flame Heating Temperature that individual layer receives in the shaping of bottom in described preparation method is 900 DEG C~1200 DEG C, the time 15
~20 seconds, fire resisting blade was the carbide chip that knife-edge part has WC layers.
Annular seal pad is made up of Cowhells material in described preparation method.
Plastics saucer is cylinder in described preparation method, and there is circular indent saddle upper end, and there is indent circular trough lower end,
There is internal thread in circular trough, collet has external screw thread to have hollow cylindrical boss among circle outside boss.
Compared with the prior art, beneficial effects of the present invention are as follows:
The present invention scrapes mouth and double glazing cup is made by the heating of optimization design flame, rotating sliding, pressure screw thread, using not
Stainless steel pipe sleeve is made in rust steel pipe, and steel glass cup, the steel glass cup good integral strength of making, product quality is made in assembled formation
Height, production efficiency is high, and it is convenient to change glass cup.It is poor can to solve Glass cup bulk strength simultaneously, is easily broken;Glass rim
Heat hot water in cup, cup surface scalded one's hand, and taking away during drinking-water is easily ironed;Even double-layer glass, because of rim of a cup drinking water place
The problem of junction of unprotect, internal layer and glass outer body is easily broken off, and whole cup is scrapped after fracture.It is adapted to making newly
Promoted the use of in shaped steel glass cup.
Brief description of the drawings
Fig. 1 is steel glass cup overall structure diagram;
Fig. 2 is steel glass cup entirety installation diagram;
Fig. 3 is double-layer glass base;
Fig. 4 is stainless steel pipe sleeve;
Fig. 5 is plastics saucer;
Fig. 6 is collet;
Fig. 7 is cup lid.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of invention protection.
With reference to embodiment and embodiment, the present invention is further detailed explanation.
A kind of Novel steel glass cup preparation method, its step are:1) fracture is earnestly rotated:By the single-glass of different tube diameters
Pipe is peeled into glass pipeline section base;
2) individual layer receives bottom shaping:Glass pipeline section base both ends are clamped on slewing after rotary-cut is molded, in the middle part of section base
Carry out partial flame and be heated to Glass Transition, be less than heating region width and heat-resisting blade not affine with glass from adding with thickness
Cutting forms two single-layer cup material 202 bottom of among thermal region;
3) preheat:The less band bottom single-layer cup material 202 of external diameter is put into resistance furnace and preheated, resistance furnace temperature is set in
120 DEG C~150 DEG C;
4) compound shaping of closing up:The larger one end being clamped in bottom single-layer cup material 203 on slewing of internal diameter is fixed
Round end, the other end rotation that the less band bottom single-layer cup material 202 of external diameter after preheating is sleeved on slewing can be elapsed
End, the less band bottom single-layer cup material 202 of external diameter is pushed into inside the larger band bottom single-layer cup material 203 of internal diameter while rotation, used
The flame gun less openend of band bottom single-layer cup material 202 of alignment external diameter and internal diameter it is larger band bottom 203 openends of single-layer cup material it is fast
Speed heating, use, which can elapse punching block and bond two openends at high temperature, to be integrated, and forms double glazing blank;
5) pressure screw thread scrapes mouth:The openend of double glazing blank is heated with flame gun on slewing, use can press
Positioning punching block is quickly hot pressed into screw thread 201 in the openend of double glazing blank, and scraping mould with L-shaped round steel, quickly receipts scrape double glazing
The inwall of blank openend, double-layer glass base 2 is made;
6) fly-cutting stainless steel tube:With quick sawing machine by long stainless steel tube, stainless steel tube blank is cut into;
7) revolve and squeeze thread forming:Thread forming equipment is squeezed with rotation, stainless steel tube blank both ends are processed into screw thread 303;
8) it is punched Origuchi shaping;By the stainless steel tube blank of TBE (threaded both ends) 303 after rotation extrusion forming, blanking equipment is put into,
Punching Origuchi 302 is carried out to be molded;
9) sealing gasket is installed:By the stainless steel tube blank after punching Origuchi 302,301 fast ram compression of annular seal pad is put into
Install it is standby, by annular seal pad 301 be arranged on punching Origuchi 302 inside, stainless steel pipe sleeve 3 is made;
10) assembled formation:Double-layer glass base 2 is arranged in stainless steel pipe sleeve 3, the openend of double-layer glass base 2
The end of punching Origuchi 302 of stainless steel pipe sleeve 3 is inlaid in, the other end of stainless steel pipe sleeve 3 is provided with externally threaded plastics saucer 4
With with externally threaded plastics collet 5, tapped cup lid 1 is open installed in the double-layer glass base 2 of stainless steel pipe sleeve 3
End, is made steel glass cup.
The rotating speed of individual layer receipts bottom shaping slewing is not less than 100 revs/min in described preparation method, compound shaping of closing up
The rotating speed for clamping the larger band bottom single-layer cup material slewing fixation round end of internal diameter is 70~100 revs/min, the less band bottom of external diameter
The rotating speed that the other end rotation that single-layer cup material is sleeved on slewing can elapse end is 40~65 revs/min.
The Flame Heating Temperature that individual layer receives in the shaping of bottom in described preparation method is 900 DEG C~1200 DEG C, the time 15
~20 seconds, fire resisting blade was the carbide chip that knife-edge part has WC layers.
Annular seal pad 301 is made up of Cowhells material in described preparation method.
Plastics saucer 4 is cylinder in described preparation method, and there is circular indent saddle 401 upper end, and there is indent circle lower end
Shape groove 402, there is internal thread in circular trough 402, and collet 5 is has hollow cylindrical boss 501, the outside of boss 501 among circular
There is external screw thread.
Above-described is only the preferred embodiment of the present invention, it is noted that for one of ordinary skill in the art
For, without departing from the concept of the premise of the invention, various modifications and improvements can be made, these belong to the present invention
Protection domain.
Claims (5)
1. a kind of Novel steel glass cup preparation method, its step are:1) fracture is earnestly rotated:By the single-layer glass tube of different tube diameters
It is peeled into glass pipeline section base;
2) individual layer receives bottom shaping:Glass pipeline section base both ends are clamped on slewing after rotary-cut is molded, to being carried out in the middle part of section base
Partial flame is heated to Glass Transition, is less than heating region width and heat-resisting blade not affine with glass from heating zone with thickness
Cutting forms the two single-layer cup material bottom of among domain;
3) preheat:The less band bottom single-layer cup material of external diameter is put into resistance furnace and preheated, resistance furnace temperature be set in 120 DEG C~
150℃;
4) compound shaping of closing up:Round end is fixed into the larger one end with bottom single-layer cup material clamping on slewing of internal diameter,
The rotation of the other end that the less band bottom single-layer cup material of external diameter after preheating is sleeved on slewing can be elapsed into end, rotation it is same
When the less band bottom single-layer cup material of external diameter is pushed into inside the larger band bottom single-layer cup material of internal diameter, it is smaller to be directed at external diameter with flame gun
The band bottom single-layer cup material openend larger with bottom single-layer cup material openend and internal diameter quickly heat, use can elapse punching block by two
Openend bonds be integrated at high temperature, forms double glazing blank;
5) pressure screw thread scrapes mouth:The openend of double glazing blank is heated with flame gun on slewing, use can press positioning
Punching block is quickly hot pressed into screw thread in the openend of double glazing blank, scrapes mould with L-shaped round steel and quickly receives and scrapes double glazing blank and open
The inwall at mouth end, is made double-layer glass base;
6) fly-cutting stainless steel tube:With quick sawing machine by long stainless steel tube, stainless steel tube blank is cut into;
7) revolve and squeeze thread forming:Thread forming equipment is squeezed with rotation, stainless steel tube blank both ends are processed into screw thread;
8) it is punched Origuchi shaping;By the stainless steel tube blank of TBE (threaded both ends) after rotation extrusion forming, blanking equipment is put into, is punched
Origuchi is molded;
9) sealing gasket is installed:By the stainless steel tube blank after punching Origuchi, annular seal pad quick press mounting equipment is put into, by circle
Gask-O-Seal is arranged on the inside at punching Origuchi, and stainless steel pipe sleeve is made;
10) assembled formation:Double-layer glass base is arranged in stainless steel pipe sleeve, the openend of double-layer glass base is inlaid in not
The punching Origuchi end of rust steel pipe socket, the other end of stainless steel pipe sleeve are provided with externally threaded plastics saucer and with externally threaded modeling
Expect collet, tapped cup lid is arranged on stainless steel pipe sleeve double-layer glass base openend, steel glass cup is made.
2. a kind of Novel steel glass cup preparation method according to claim 1, it is characterised in that in described preparation method
The rotating speed that individual layer receives bottom shaping slewing is not less than 100 revs/min, the compound shaping clamping larger band bottom single-layer cup material of internal diameter that closes up
The rotating speed that slewing fixes round end is 70~100 revs/min, and the less band bottom single-layer cup material of external diameter is sleeved on slewing
The other end rotation can elapse end rotating speed be 40~65 revs/min.
3. a kind of Novel steel glass cup preparation method according to claim 1, it is characterised in that in described preparation method
The Flame Heating Temperature that individual layer receives in the shaping of bottom is 900 DEG C~1200 DEG C, and the time is 15~20 seconds, and fire resisting blade has for knife-edge part
The carbide chip of WC layers.
4. a kind of Novel steel glass cup preparation method according to claim 1, it is characterised in that in described preparation method
Annular seal pad is made up of Cowhells material.
5. a kind of Novel steel glass cup preparation method according to claim 1, it is characterised in that in described preparation method
Plastics saucer is cylinder, and there is circular indent saddle upper end, and there is indent circular trough lower end, there is internal thread in circular trough, and collet is
There is hollow cylindrical boss among circular, have external screw thread outside boss.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710064514.7A CN106691089B (en) | 2017-02-04 | 2017-02-04 | A kind of Novel steel glass cup preparation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710064514.7A CN106691089B (en) | 2017-02-04 | 2017-02-04 | A kind of Novel steel glass cup preparation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106691089A CN106691089A (en) | 2017-05-24 |
CN106691089B true CN106691089B (en) | 2018-01-09 |
Family
ID=58909840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710064514.7A Expired - Fee Related CN106691089B (en) | 2017-02-04 | 2017-02-04 | A kind of Novel steel glass cup preparation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106691089B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108606629B (en) * | 2018-05-11 | 2021-05-11 | 熊与杨(佛山)家居科技有限公司 | Manufacturing method of electric kettle |
CN111358315B (en) * | 2018-12-26 | 2022-11-01 | 九阳股份有限公司 | Glass cup body processing technology for food processing machine |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1634781A (en) * | 2003-12-30 | 2005-07-06 | 陈则明 | Method for producing goblet by using glass tube |
CN1736913A (en) * | 2005-06-03 | 2006-02-22 | 王鑫淼 | Glass container production method |
CN104287571A (en) * | 2013-07-16 | 2015-01-21 | 王祖刚 | Method for manufacturing glass cup |
CN103405104B (en) * | 2013-07-23 | 2015-06-10 | 台州市泰澄电子科技有限公司 | Titanium metal vacuum cup and manufacturing method thereof |
CN103936264A (en) * | 2014-04-22 | 2014-07-23 | 太仓福缘琉璃工艺品有限公司 | Double-layer coloured glaze cup manufacturing method |
CN104490206B (en) * | 2014-12-24 | 2016-03-30 | 合肥伊佳欢家庭用品有限公司 | A kind of special-shaped glass cup |
-
2017
- 2017-02-04 CN CN201710064514.7A patent/CN106691089B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN106691089A (en) | 2017-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106691089B (en) | A kind of Novel steel glass cup preparation method | |
CN104490206B (en) | A kind of special-shaped glass cup | |
CN205130157U (en) | Plastic tubing raw materials constant temperature mixing arrangement | |
CN207599166U (en) | A kind of reinforcement grade 3PE anti-corrosions polyethylene steel-plastic conversion pipe fitting | |
CN102128318A (en) | CPVC plastic-lined steel-plastic composite pipe and production method thereof | |
CN107091380A (en) | A kind of steel lining PE pipelines and preparation method thereof | |
CN201180883Y (en) | Hot melting connection joint for polypropylene pipe | |
CN209208033U (en) | It is a kind of for producing the extruder of insulating materials | |
CN203940135U (en) | Thermostable heat-conductive insulation PE pipe | |
CN106382375A (en) | Heat-insulating jacket valve for online sampling of fluid pipeline medium | |
CN203994629U (en) | A kind of plastic rod extrusion die | |
CN1218821C (en) | Method for producing metal and plastic composite tube | |
CN203880320U (en) | Nozzle seal structure of gas metal tube | |
CN203664387U (en) | Vortex flow continuous extrusion joining device | |
CN103737333A (en) | Vortex flow continuous extrusion joint device and operation method thereof | |
CN208233828U (en) | A kind of high efficiency resin heat preservation storage still | |
CN207256931U (en) | A kind of PP pipe forming apparatus | |
CN206306446U (en) | A kind of oval plastic tube heating arbor press | |
CN206201493U (en) | The effective hot melt die head of antibiotic steady state | |
CN205738197U (en) | A kind of high speed sealing machine | |
CN206112370U (en) | Winding arrangement wall tubular product hot melt connection structure | |
CN212819748U (en) | Special pipeline system for condensation crystallization slicing machine | |
CN204471818U (en) | A kind of silane cross-linked polyethylene pipe extrusion die head special | |
CN107471699A (en) | A kind of PP pipe forming apparatus | |
CN205350643U (en) | From a calorie water pipe head |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180109 Termination date: 20220204 |