CN106685083A - 一种充电桩用电行为分析的智能配电终端及方法 - Google Patents
一种充电桩用电行为分析的智能配电终端及方法 Download PDFInfo
- Publication number
- CN106685083A CN106685083A CN201611227240.0A CN201611227240A CN106685083A CN 106685083 A CN106685083 A CN 106685083A CN 201611227240 A CN201611227240 A CN 201611227240A CN 106685083 A CN106685083 A CN 106685083A
- Authority
- CN
- China
- Prior art keywords
- charging pile
- power
- current
- submodule
- distribution terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004458 analytical method Methods 0.000 title claims abstract description 14
- 238000000034 method Methods 0.000 title claims abstract description 9
- 238000004891 communication Methods 0.000 claims abstract description 33
- 239000000835 fiber Substances 0.000 claims abstract description 13
- 238000001914 filtration Methods 0.000 claims abstract description 4
- 230000002093 peripheral effect Effects 0.000 claims abstract description 4
- 230000005611 electricity Effects 0.000 claims description 21
- 230000003542 behavioural effect Effects 0.000 claims description 12
- 238000006243 chemical reaction Methods 0.000 claims description 9
- 230000011664 signaling Effects 0.000 claims description 6
- 239000013307 optical fiber Substances 0.000 claims description 3
- 238000005070 sampling Methods 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 238000002955 isolation Methods 0.000 abstract 1
- 230000008901 benefit Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- H02J13/0017—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/124—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
Landscapes
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611227240.0A CN106685083B (zh) | 2016-12-27 | 2016-12-27 | 一种充电桩用电行为分析的智能配电终端及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611227240.0A CN106685083B (zh) | 2016-12-27 | 2016-12-27 | 一种充电桩用电行为分析的智能配电终端及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106685083A true CN106685083A (zh) | 2017-05-17 |
CN106685083B CN106685083B (zh) | 2023-10-27 |
Family
ID=58872079
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611227240.0A Active CN106685083B (zh) | 2016-12-27 | 2016-12-27 | 一种充电桩用电行为分析的智能配电终端及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106685083B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107627878A (zh) * | 2017-09-13 | 2018-01-26 | 国网重庆市电力公司电力科学研究院 | 一种智能充电桩 |
CN107749629A (zh) * | 2017-10-27 | 2018-03-02 | 深圳供电局有限公司 | 一种基于充电站负荷实时调度充电桩接入的控制方法 |
CN108336818A (zh) * | 2017-11-11 | 2018-07-27 | 深圳供电局有限公司 | 一种智能配电终端及充电站充电管理系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103280822A (zh) * | 2013-05-27 | 2013-09-04 | 东南大学 | 一种电动汽车充电行为的智能配网调度管理系统 |
CN203942321U (zh) * | 2014-07-17 | 2014-11-12 | 国家电网公司 | 一种户外电动汽车充电桩协调同步装置 |
CN105305577A (zh) * | 2015-11-10 | 2016-02-03 | 科大智能电气技术有限公司 | 不基于通讯系统的主动式智能充电桩及其智能充电方法 |
CN206432785U (zh) * | 2016-12-27 | 2017-08-22 | 深圳供电局有限公司 | 一种充电桩用电行为分析的智能配电终端 |
-
2016
- 2016-12-27 CN CN201611227240.0A patent/CN106685083B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103280822A (zh) * | 2013-05-27 | 2013-09-04 | 东南大学 | 一种电动汽车充电行为的智能配网调度管理系统 |
CN203942321U (zh) * | 2014-07-17 | 2014-11-12 | 国家电网公司 | 一种户外电动汽车充电桩协调同步装置 |
CN105305577A (zh) * | 2015-11-10 | 2016-02-03 | 科大智能电气技术有限公司 | 不基于通讯系统的主动式智能充电桩及其智能充电方法 |
CN206432785U (zh) * | 2016-12-27 | 2017-08-22 | 深圳供电局有限公司 | 一种充电桩用电行为分析的智能配电终端 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107627878A (zh) * | 2017-09-13 | 2018-01-26 | 国网重庆市电力公司电力科学研究院 | 一种智能充电桩 |
CN107749629A (zh) * | 2017-10-27 | 2018-03-02 | 深圳供电局有限公司 | 一种基于充电站负荷实时调度充电桩接入的控制方法 |
CN108336818A (zh) * | 2017-11-11 | 2018-07-27 | 深圳供电局有限公司 | 一种智能配电终端及充电站充电管理系统 |
CN108336818B (zh) * | 2017-11-11 | 2024-04-19 | 深圳供电局有限公司 | 一种智能配电终端及充电站充电管理系统 |
Also Published As
Publication number | Publication date |
---|---|
CN106685083B (zh) | 2023-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103760454B (zh) | Mov避雷器漏电流检测装置、远程监控系统及方法 | |
Reddy et al. | A review of Integration, Control, Communication and Metering (ICCM) of renewable energy based smart grid | |
CN106451556A (zh) | 一种确定配电网馈线接纳分布式电源能力的方法和装置 | |
CN104052159B (zh) | 一种用于风光储微网系统的能量管理控制器 | |
CN106226591A (zh) | 配电网同步相量与电能质量一体化监测系统及方法 | |
CN103595136A (zh) | 一种微网能量管理系统 | |
CN105896610B (zh) | 一种微电网调度方法 | |
CN106685083A (zh) | 一种充电桩用电行为分析的智能配电终端及方法 | |
CN113285495B (zh) | 一种针对虚假注入攻击的微电网分布式同步检测方法 | |
CN204761157U (zh) | 一种用于分布式电源的综合测控装置 | |
CN206432785U (zh) | 一种充电桩用电行为分析的智能配电终端 | |
CN107169644A (zh) | 一种配电网安全运行管控方法 | |
CN104009489B (zh) | 一种微电网管理系统及其管理方法 | |
CN214755733U (zh) | 智慧式建筑工地用的成套设备接线系统 | |
Singh | The role of hosting capacity study in power system advancements: a review | |
CN205304734U (zh) | 光伏电站状态预测及故障诊断装置 | |
CN204243535U (zh) | 配电箱 | |
CN210927110U (zh) | 一种基于新能源电站的智能测控装置 | |
CN210955469U (zh) | 一种新型水气电三表无线自组织抄表控制装置 | |
CN112564174A (zh) | 一种智能光伏并网箱及系统 | |
CN113922497A (zh) | 一种用于边缘计算的馈线终端ftu装置 | |
CN103513122A (zh) | 电能质量监测方法和装置 | |
CN202798154U (zh) | 大规模分布式光伏电站组实时远程智能运行控制系统 | |
CN214479645U (zh) | 一种智能光伏并网箱及系统 | |
Shen et al. | Analysis of cascading failure evolution process of high proportion new energy power system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 518000 electric power dispatching and communication building, 4020 Shennan East Road, Luohu District, Shenzhen, Guangdong Applicant after: SHENZHEN POWER SUPPLY BUREAU Co.,Ltd. Applicant after: China Southern Power Grid Digital Platform Technology (Guangdong) Co.,Ltd. Address before: 518000 electric power dispatching and communication building, 4020 Shennan East Road, Luohu District, Shenzhen, Guangdong Applicant before: SHENZHEN POWER SUPPLY BUREAU Co.,Ltd. Applicant before: SHENZHEN COMTOP INFORMATION TECHNOLOGY Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |