CN106682269A - PCB drilling tool diameter hole count comparison method - Google Patents
PCB drilling tool diameter hole count comparison method Download PDFInfo
- Publication number
- CN106682269A CN106682269A CN201611074626.2A CN201611074626A CN106682269A CN 106682269 A CN106682269 A CN 106682269A CN 201611074626 A CN201611074626 A CN 201611074626A CN 106682269 A CN106682269 A CN 106682269A
- Authority
- CN
- China
- Prior art keywords
- drill hole
- hole information
- pcb
- information
- footpath
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/30—Circuit design
- G06F30/39—Circuit design at the physical level
- G06F30/392—Floor-planning or layout, e.g. partitioning or placement
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K3/00—Apparatus or processes for manufacturing printed circuits
- H05K3/40—Forming printed elements for providing electric connections to or between printed circuits
- H05K3/42—Plated through-holes or plated via connections
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K3/00—Apparatus or processes for manufacturing printed circuits
- H05K3/40—Forming printed elements for providing electric connections to or between printed circuits
- H05K3/42—Plated through-holes or plated via connections
- H05K3/429—Plated through-holes specially for multilayer circuits, e.g. having connections to inner circuit layers
Abstract
The invention provides a PCB drilling tool diameter hole count comparison method capable of achieving cross-platform data sharing. According to the method, all drilling information of corresponding types in a database can be automatically acquired from PCB pre-production engineering automation software and PCB production software, and then matching confirmation is carried out. By means of the method in practical application, the original average speed of 2 min/order is reduced to current 10 s/order during PCB drilling treatment, the efficiency of drilling manufacturing is greatly improved, and the situation that due to the fact that an engineering design drilling belt is inconsistent with the production indicating tool procedure, tool diameter and hole count, scrapping is caused is effectively reduced.
Description
Technical field
The present invention relates to PCB engineering datas field, a kind of PCB bore cutters footpath hole count control methods is referred in particular to.
Background technology
Existing PCB is generally multiple sliding cover, and used as the connection hinge of each sandwich circuit, PCB aperture plays vital effect,
PCB aperture needs to have different sizes according to design, in order to ensure in PCB productions different operations can appropriate treatment drill into
And good via qualification rate is obtained, it is necessary to hand inspection following items:
1. row's knife knife sequence that production is indicated;
2. the hole number needed for producing;
3. the drill size that production is indicated.
However, manually checking inefficient one by one, also easily error, is unfavorable for the implementation of automated production.
The content of the invention
The technical problems to be solved by the invention are:A kind of automatic comparison check drill hole information of energy is provided and difference is given and is carried
The method shown.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:A kind of PCB bore cutters footpath hole count is to analogy
Method, comprises the following steps successively:
S1, obtain drill hole information in engineering automated software from before system;
S2, from PCB production software in obtain drill hole information;
S3, PCB is produced into the drill hole information obtained in engineering automated software before the drill hole information that is obtained in software and system
Matching contrast is done, step S4 is gone to if the match is successful;The matching contrast is the brill of the drill hole information for comparing PCB production softwares
Whether hole information is corresponding identical with the drill hole information of engineering automated software before system;
S4, output mismatch are pointed out and mark unmatched drill hole information in drill hole information;
S5, etc. drill hole information to be modified;
The mark of S6, removal correspondence modification drill hole information, return to step S3.
Further, the step S1 is obtained by the Oracle data Select functional inquiries of engineering automated software before system
Take the drill hole information;Engineering automated software is Inplan before the system.
Further, in the step S1, by make the drill hole information obtained in preceding engineering automated software include T-Code,
It is pre- it is big after aperture, the drill hole information of hole number.
Further, in the step S2, included by the drill hole information obtained in the ODB++ data of PCB production softwares pre-
Aperture, hole number after big, and be ranked up by the rule that drilling is exported, generate drill hole information.
Further, also include being obtained in engineering automated software before system between step S2, S3 drill hole information with
The step of the drill hole information of drill hole information is obtained in PCB production softwares carrying out data processing and be converted to homogeneous data.
Further, it is to go to step S41 in the step S3,
The matching status of S41, output drill hole information.
Further, step is also included between the step S5 and S6:
S51, judge modification drill hole information form whether mistake, be to go to step S52, otherwise go to step S6;
S52, output format miscue, go to step S5.
The beneficial effects of the present invention are:There is provided it is a kind of can the shared PCB bore cutters footpath hole count contrast of cross-platform data
Method, the method can automatically by correspondence model in acquisition in engineering automated software before PCB systems and PCB production softwares and database
All drill hole informations, and then carry out matching confirmation, substantially increase the efficiency that drilling makes.By the party in practical application
Method, is reduced to by equal 2 minutes of Yuanping City/mono- existing 10 seconds/mono- in PCB drillings treatment, and effectively reduces engineering design drilling
Knife sequence, knife footpath are indicated with production, hole count is inconsistent causes situation about scrapping.
Brief description of the drawings
Idiographic flow of the invention is described in detail in detail below in conjunction with the accompanying drawings:
Fig. 1 is flow chart of the method for the present invention
Specific embodiment
To describe technology contents of the invention, structural feature, the objects and the effects in detail, below in conjunction with implementation method
And coordinate accompanying drawing to be explained in detail.
Fig. 1 is referred to, a kind of PCB bore cutters footpath hole count control methods is comprised the following steps successively:
S1, obtain drill hole information in engineering automated software from before system;
S2, from PCB production software in obtain drill hole information;
S3, PCB is produced into the drill hole information obtained in engineering automated software before the drill hole information that is obtained in software and system
Matching contrast is done, step S4 is gone to if the match is successful;The matching contrast is the brill of the drill hole information for comparing PCB production softwares
Whether hole information is corresponding identical with the drill hole information of engineering automated software before system;
S4, output mismatch are pointed out and mark unmatched drill hole information in drill hole information;
S5, etc. drill hole information to be modified;
The mark of S6, removal correspondence modification drill hole information, return to step S3.
Knowable to foregoing description, the beneficial effects of the present invention are:There is provided it is a kind of can the shared PCB of cross-platform data bore
Hole knife footpath hole count control methods, the method can automatically by being obtained and number in engineering automated software before PCB systems and PCB production softwares
According to all drill hole informations of correspondence model in storehouse, and then matching confirmation is carried out, substantially increase the efficiency that drilling makes.It is actual to answer
By the method in, it is reduced to by equal 2 minutes of Yuanping City/mono- in PCB drillings treatment existing 10 seconds/mono-, and is effectively reduced
Engineering design drilling and production indicate knife sequence, knife footpath, hole count is inconsistent causes situation about scrapping.
Implement example
The drilling information for corresponding to model is obtained such as by the Oracle data Select functional inquiries of Inplan softwares:T-
Code, it is pre- it is big after aperture, hole number, drill hole information is stored in Installed System Memory;
Drill hole information in OBB++ data is automatically taken out by program again, such as:Aperture, hole number, are exported by drilling
Rule is ranked up, and the result after sequence is stored in internal memory;
Two group informations are taken out from internal memory, two group informations is circulated by algorithm is contrasted item by item, algorithm is substantially regular
For:The T-Code in T-Code and Genesis/Incam in Inplan is contrasted, and aperture and aperture contrast, hole count and hole
Number contrast, when any group of data are inconsistent, matching result row red is highlighted, and shows specific inconsistent project,
User's confirmation is presented in the form of GUI graphical interfaces, user's modification drill hole information is waited, when user has been changed drill hole information
Finish, confirmation can after next step operation, system detect first modification drill hole information form whether mistake, if wrong, point out again
Drill hole information is wrong, the state of drill hole information to be modified such as returns to;If without mistake, removal drill hole information mark is right again
Two group informations make circulation contrast item by item, until all data are consistent, i.e., are presented to user in the form of GUI graphical interfaces.
Embodiment 1
The step S1 obtains the brill by the Oracle data Select functional inquiries of engineering automated software before system
Hole information;Engineering automated software is Inplan before the system.
Embodiment 2
In the step S1, by make the drill hole information obtained in preceding engineering automated software include T-Code, it is pre- it is big after
Aperture, the drill hole information of hole number.
Embodiment 3
In the step S2, by the drill hole information obtained in the ODB++ data of PCB production softwares include it is pre- it is big after hole
Footpath, hole number, and be ranked up by the rule that drilling is exported, generate drill hole information.
Such as rule can be set to the blade row first of 1.15mm, the blade row second of 3.175mm, then arrange successively by size
Sequence;Or how much come successively to rank knife by call number.
Embodiment 4
Drill hole information is obtained in engineering automated software and PCB productions are soft before also including making between step S2, S3
The step of the drill hole information of drill hole information is obtained in part carrying out data processing and be converted to homogeneous data.
The drill hole information data content of the drill hole information group before due to making in engineering automated software and PCB production softwares,
Form there may be difference (such as data metric system, difference made in Great Britain), it is therefore desirable to further carry out data processing for homogeneous data
Afterwards to match contrast.
Embodiment 5
It is to go to step S41 in the step S3,
The matching status of S41, output drill hole information.
Labeling method increases the mark of such as " red highlighted " after for example being listed to problematic drill hole information, out of question
Drill hole information increases the mark of such as " green background color " after listing;There is such as " red highlighted " mark, wait artificial correction, treat
Amendment just continues executing with next step after finishing.
Embodiment 6
Also include step between the step S5 and S6:
S51, judge modification drill hole information form whether mistake, be to go to step S52, otherwise go to step S6;
S52, output format miscue, go to step S5.
In the present embodiment, in order to avoid the error in data of amendment by hand, a basic format identification flow is set up, so that
The mistake of amendment data can be prevented effectively from.
Embodiments of the invention are the foregoing is only, the scope of the claims of the invention is not thereby limited, it is every to utilize this hair
Equivalent structure or equivalent flow conversion that bright specification and accompanying drawing content are made, or directly or indirectly it is used in other related skills
Art field, is included within the scope of the present invention.
Claims (7)
- The hole count control methods of 1.PCB bore cutters footpath, comprises the following steps successively,S1, obtain drill hole information in engineering automated software from before system;S2, from PCB production software in obtain drill hole information;S3, PCB is produced the drill hole information obtained in engineering automated software before the drill hole information that is obtained in software and system do With contrast, step S4 is gone to if the match is successful;Drilling of the matching contrast to compare the drill hole information of PCB production softwares is believed Whether breath is corresponding identical with the drill hole information of engineering automated software before system;S4, output mismatch are pointed out and mark unmatched drill hole information in drill hole information;S5, etc. drill hole information to be modified;The mark of S6, removal correspondence modification drill hole information, return to step S3.
- 2. PCB bore cutters footpath hole count control methods as claimed in claim 1, it is characterised in that:Before the step S1 is by system The Oracle data Select functional inquiries of engineering automated software obtain the drill hole information;Engineering automation is soft before the system Part is Inplan.
- 3. PCB bore cutters footpath hole count control methods as claimed in claim 1, it is characterised in that:In the step S1, before making The drill hole information obtained in engineering automated software include T-Code, it is pre- it is big after aperture, the drill hole information of hole number.
- 4. PCB bore cutters footpath hole count control methods as claimed in claim 1, it is characterised in that:In the step S2, by PCB Produce the drill hole information obtained in the ODB++ data of software include it is pre- it is big after aperture, hole number, and rule exported by drilling Then it is ranked up, generates drill hole information.
- 5. PCB bore cutters footpath hole count control methods as claimed in claim 1, it is characterised in that:Between step S2, S3 also Drill hole information will be obtained before including that will make in engineering automated software to enter with the drill hole information of acquisition drill hole information in PCB production softwares The step of row data processing is converted to homogeneous data.
- 6. PCB bore cutters footpath hole count control methods as claimed in claim 1, it is characterised in that:It is to turn in the step S3 To step S41,The matching status of S41, output drill hole information.
- 7. PCB bore cutters footpath hole count control methods as claimed in claim 1, it is characterised in that:Between the step S5 and S6 Also include step:S51, judge modification drill hole information form whether mistake, be to go to step S52, otherwise go to step S6;S52, output format miscue, go to step S5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611074626.2A CN106682269A (en) | 2016-11-29 | 2016-11-29 | PCB drilling tool diameter hole count comparison method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611074626.2A CN106682269A (en) | 2016-11-29 | 2016-11-29 | PCB drilling tool diameter hole count comparison method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106682269A true CN106682269A (en) | 2017-05-17 |
Family
ID=58866876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611074626.2A Pending CN106682269A (en) | 2016-11-29 | 2016-11-29 | PCB drilling tool diameter hole count comparison method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106682269A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111970827A (en) * | 2020-08-05 | 2020-11-20 | 金禄电子科技股份有限公司 | Drilling method of drilling machine |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101342604A (en) * | 2008-08-08 | 2009-01-14 | 东莞生益电子有限公司 | Hole drilling method with single-side brass plate as back drill cover plate |
CN101378635A (en) * | 2008-09-19 | 2009-03-04 | 深圳崇达多层线路板有限公司 | Method for producing circuit board with local electric thick gold |
CN101452283A (en) * | 2008-12-18 | 2009-06-10 | 深圳市大族激光科技股份有限公司 | Drilling control method and control device for printed circuit board |
CN105183971A (en) * | 2015-08-31 | 2015-12-23 | 深圳崇达多层线路板有限公司 | PCB borehole enlargement method |
-
2016
- 2016-11-29 CN CN201611074626.2A patent/CN106682269A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101342604A (en) * | 2008-08-08 | 2009-01-14 | 东莞生益电子有限公司 | Hole drilling method with single-side brass plate as back drill cover plate |
CN101378635A (en) * | 2008-09-19 | 2009-03-04 | 深圳崇达多层线路板有限公司 | Method for producing circuit board with local electric thick gold |
CN101452283A (en) * | 2008-12-18 | 2009-06-10 | 深圳市大族激光科技股份有限公司 | Drilling control method and control device for printed circuit board |
CN105183971A (en) * | 2015-08-31 | 2015-12-23 | 深圳崇达多层线路板有限公司 | PCB borehole enlargement method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111970827A (en) * | 2020-08-05 | 2020-11-20 | 金禄电子科技股份有限公司 | Drilling method of drilling machine |
CN111970827B (en) * | 2020-08-05 | 2021-10-01 | 金禄电子科技股份有限公司 | Drilling method of drilling machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190019115A1 (en) | Pcb board assembling method and assembling system | |
CN111580480A (en) | Production management method and device and computer readable storage medium | |
CN102298373B (en) | Monitoring method and monitoring system of programmable logic controller (PLC) | |
CN105511873A (en) | User interface control display method and device | |
CN110287098A (en) | Automatically create test script method, server and computer readable storage medium | |
CN113919252B (en) | Component connectivity detection system based on different design data | |
WO2021042900A1 (en) | Creation method and creation apparatus for component library, and electronic device and storage medium | |
CN111610744B (en) | Logic control program generation method and system based on process time sequence and storage medium | |
CN110209118B (en) | Petri net-based robustness control method with various kinds of majority resources and flexible path characteristics | |
CN208614035U (en) | One kind being used for pcb board laser boring control system | |
CN105183971A (en) | PCB borehole enlargement method | |
CN109583526A (en) | Two dimensional code application method, device and the storage medium of pcb board | |
CN114117798A (en) | Automatic interface model generation method and system based on matlab | |
CN106682269A (en) | PCB drilling tool diameter hole count comparison method | |
CN113935276B (en) | Design data mapping relation construction system | |
CN110458184A (en) | Optical character identification householder method, device, computer equipment and storage medium | |
CN106407117A (en) | Universal interface test method | |
CN107895064B (en) | Component polarity detection method, system, computer readable storage medium and device | |
CN110705969B (en) | Transformer substation monitoring system, main station and method for automatically associating measuring point ID | |
Kim et al. | Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint | |
CN107944083B (en) | Method for automatically manufacturing copper cutting of PCB (printed Circuit Board) | |
CN108073142B (en) | Scheduling method and device for job shop resources | |
CN111475159B (en) | Method, device and storage medium for automatically generating program | |
US20220309094A1 (en) | Surface mount data conversion method, system, medium and device based on component three-dimensional database | |
CN110699863B (en) | Timing method, system, computer readable storage medium and server |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170517 |
|
RJ01 | Rejection of invention patent application after publication |