CN106677351A - Transfer beam structure used for adjusting deviation of hanging embedded parts and construction method - Google Patents

Transfer beam structure used for adjusting deviation of hanging embedded parts and construction method Download PDF

Info

Publication number
CN106677351A
CN106677351A CN201710014463.7A CN201710014463A CN106677351A CN 106677351 A CN106677351 A CN 106677351A CN 201710014463 A CN201710014463 A CN 201710014463A CN 106677351 A CN106677351 A CN 106677351A
Authority
CN
China
Prior art keywords
conversion
hanging
embedded part
times transfer
deviation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710014463.7A
Other languages
Chinese (zh)
Inventor
邢遵胜
刘磊
周雁兵
刘中华
郑波
吴昊
王磊
王晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNMING LOGAN-KSEC AIRPORT LOGISTICS SYSTEM Co Ltd
Zhejiang Jinggong Steel Structure Group Co Ltd
Original Assignee
KUNMING LOGAN-KSEC AIRPORT LOGISTICS SYSTEM Co Ltd
Zhejiang Jinggong Steel Structure Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNMING LOGAN-KSEC AIRPORT LOGISTICS SYSTEM Co Ltd, Zhejiang Jinggong Steel Structure Group Co Ltd filed Critical KUNMING LOGAN-KSEC AIRPORT LOGISTICS SYSTEM Co Ltd
Priority to CN201710014463.7A priority Critical patent/CN106677351A/en
Publication of CN106677351A publication Critical patent/CN106677351A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention belongs to the field of steel structure building matching structures, and particularly relates to a transfer beam structure used for adjusting deviation of hanging embedded parts and a construction method. The transfer beam structure comprises vertical members connected with the hanging embedded parts, first transfer beams connected with the vertical members through hanging rods, second transfer beams connected with the bottoms of the first transfer beams and bottom platforms hung on the second transfer beams through the hanging rods. The structure is simple, by transferring for two times, the problem that hanging points are unable to be installed caused by embedding deviation of the embedded parts can be solved, the construction precision of a hanging platform is guaranteed, and construction efficiency is improved.

Description

A kind of conversion girder construction and construction method for adjusting hanging embedded part deviation
Technical field
The invention belongs to steel building supporting structure field, and in particular to it is a kind of for adjust hanging embedded part deviation turn Change girder construction and construction method.
Background technology
In recent years, the need for meet the growth of the aviation services amounts such as Airport passenger Throughput, goods postal handling capacity, airport is improved Overall support capability, promotes the development of airport region economic society, the increasing airport expansion and newly-built machine Field will implement.
As the steel structure platform of airdrome luggage processing system affiliated facility, in order to meet the baggage transport cart of lower space Current requirement, it is often necessary to be designed to hang platform, hung using built-in fitting embedding in concrete main body structure Hang.
Due to professional numerous, the arranged crosswise of the various electromechanical pipelines such as water pipe, fulgurite, airduct in airport engineering process of construction Part built-in fitting can be caused to be blocked;The built-in fitting for being installed on concrete structure bottom also has the presence of construction deviation.If It is traditional direct from built-in fitting or rear anchoring hanging when anchoring can not very easily be implemented afterwards due to the limitation of condition Method cannot just be applied.
Therefore the present invention is exactly the demand from practice of construction, there is provided a kind of conversion for adjusting hanging embedded part deviation Girder construction and construction method.
The content of the invention
It is an object of the invention to provide it is a kind of for adjust hanging embedded part deviation conversion girder construction and construction method, with Realize, without measuring the existing deviation of built-in fitting, being mounted directly two times transfer girder construction to eliminate its deviation, improve constructing operation just Profit, while improving the efficiency and security of construction.
To achieve the above object, the technical scheme of the specific offer of the present invention is:It is a kind of for adjusting hanging embedded part deviation Conversion girder construction, including the conversion beam and that the vertical member being connected with built-in fitting is connected with vertical member by suspension rod The connected two times transfer beam in secondary conversion beam bottom, the bottom platform on two times transfer beam is hung by suspension rod.
Further, described vertical member is connected with a conversion beam by height-adjustable suspension rod.
Further, the slotted hole of adjustable suspension rod plan-position is provided with a described conversion beam.
Further, described two times transfer beam is fixed and is welded in a conversion beam lower section or a conversion beam top.
A kind of construction method for adjusting the conversion girder construction of hanging embedded part deviation, comprises the following steps:First, using survey Measuring appratus carry out getting setting-out ready on ground, demarcate embedded part central point and hanging structure suspension centre axis;2nd, according to suspension centre axis on ground Two times transfer beam is laid on face;3rd, a conversion beam is laid according to embedded part center position, and carries out a conversion beam and secondary The welding of conversion beam;4th, a conversion beam and two times transfer beam are lifted to design code position;5th, spelling bottom in ground is put down Platform, is lifted to design code position, tightens nut, and suspension rod is fixed with the connector being welded in advance on two times transfer beam;6th, Integral position measurement, and adjusting deviation are carried out after installation.
After such scheme, the present invention has many beneficial effects:
First, measurement work is greatly reduced.Large airport baggage handling system steel platform area is big, the built-in fitting point position that need to be used Quantity is big, if surveying the position of each built-in fitting, measurement work is huge.It is of the invention to use, it is not necessary to measure built-in fitting Physical location, reduces measurement workload, improves efficiency of construction.
2nd, built-in fitting uniform force.By two times transfer, can make full use of makes platform suspension centre arrange uniform, rule, so that Ensure that the attractive in appearance of platform structure.
3rd, component can be made full-length, easy construction.Because the embedding error of built-in fitting can be by conversion beam knot Structure is eliminated, therefore conversion beam and lower platform component can be made into full-length, facilitates factory process and site operation.
4th, a range of built-in fitting error can be adjusted, it is ensured that construction precision.
Brief description of the drawings
Fig. 1 is the general structure schematic diagram of two times transfer beam preferred embodiment under a conversion beam in the present invention;
Fig. 2 is the general structure schematic diagram of two times transfer beam preferred embodiment on a conversion beam in the present invention;
Fig. 3 is close-up schematic view at A in Fig. 1;
Fig. 4 is node profile at A in Fig. 1;
Fig. 5 is node top view at A in Fig. 1;
Fig. 6 is close-up schematic view at B in Fig. 1;
Fig. 7 is node profile at B in Fig. 1;
Fig. 8 is node top view at B in Fig. 1;
Fig. 9 is close-up schematic view at C in Fig. 1;
Figure 10 is node profile at C in Fig. 1;
Figure 11 is close-up schematic view at D in Fig. 1;
Figure 12 is node profile at D in Fig. 1;
Label declaration:
Built-in fitting 1;Vertical member 2;Bolt 3;Vertical member base plate 4;With the packing ring 5 of bolt matching;Suspension rod 6;Two times transfer beam 7;Conversion beam 8;Platform girder 9;First stiffening plate 10;Second stiffening plate.
Specific embodiment
With reference to accompanying drawing, present pre-ferred embodiments are described in further details.
As shown in figs. 1-11, it is a kind of that the conversion girder construction of embedded part deviation is hung for adjusting, including be connected with built-in fitting 1 Be connected with bottom of conversion beam 8 secondary turn of the conversion beam 8 that vertical member 2 and vertical member 2 are connected by suspension rod 6 Beam 7 is changed, the bottom platform on two times transfer beam 7 is hung by suspension rod 6.
In the present embodiment, vertical member 2 is by the angle welding of surrounding weld all around and the phase of built-in fitting 1 of concrete structure bottom Even.
Conversion beam 8 of full-length is connected by suspension rod with vertical member 2, can be disappeared by the position of adjusting nut Except the vertical error of built-in fitting, slotted hole is provided with conversion beam 8 of rectangular tube, can be by moving position of the suspension rod in slotted hole Put to eliminate the plane error of built-in fitting.
Two times transfer beam 7 is welded on a lower section of conversion beam 8(Or top).
Bottom platform is hung on two times transfer beam by suspension rod 6, and bottom platform suspension centre is it is noted that avoid built-in fitting position.
A kind of construction method for adjusting the conversion girder construction of hanging embedded part deviation, comprises the following steps:
First, carry out getting setting-out ready on ground using measuring instrument;2nd, two times transfer beam 7 is placed on the ground;3rd, according to setting-out Point position place a conversion beam 8, and carry out the welding of a conversion beam 8 and two times transfer beam 7;4th, by an and of conversion beam 8 Two times transfer beam 7 is lifted to design code position, is rectified a deviation by suspension rod 6 and slotted hole;5th, decorative pattern is laid in bottom platform Steel plate or general steel plate, and lift to design code position;6th, integral position measurement, and adjusting deviation are carried out after installation.
Above-described embodiment is only used for illustrating inventive concept of the invention, rather than the restriction to rights protection of the present invention, All changes for carrying out unsubstantiality to the present invention using this design, all should fall into protection scope of the present invention.

Claims (5)

1. it is a kind of for adjust hanging embedded part deviation conversion girder construction, it is characterised in that:It is vertical including what is be connected with built-in fitting The two times transfer beam that the conversion beam that component and vertical member are connected by suspension rod is connected with conversion beam bottom, passes through Suspension rod hangs the bottom platform on two times transfer beam.
2. a kind of conversion girder construction for adjusting hanging embedded part deviation as claimed in claim 1, it is characterised in that:Described Vertical member is connected with a conversion beam by height-adjustable suspension rod.
3. a kind of conversion girder construction for adjusting hanging embedded part deviation as claimed in claim 1, it is characterised in that:Described The slotted hole of adjustable suspension rod plan-position is provided with conversion beam.
4. a kind of conversion girder construction for adjusting hanging embedded part deviation as claimed in claim 1, it is characterised in that:Described Two times transfer beam is fixed and is welded in a conversion beam lower section or a conversion beam top.
5. it is a kind of for adjust hanging embedded part deviation conversion girder construction construction method, it is characterised in that comprise the following steps: First, carry out getting setting-out ready on ground using measuring instrument, demarcate embedded part central point and hanging structure suspension centre axis;2nd, basis is hung Point axis lays two times transfer beam on the ground;3rd, a conversion beam is laid according to embedded part center position, and is once turned Change the welding of beam and two times transfer beam;4th, a conversion beam and two times transfer beam are lifted to design code position;5th, ground Spelling bottom platform, is lifted to design code position, tightens nut, and suspension rod is entered with the connector being welded in advance on two times transfer beam Row is fixed;6th, integral position measurement, and adjusting deviation are carried out after installation.
CN201710014463.7A 2017-01-10 2017-01-10 Transfer beam structure used for adjusting deviation of hanging embedded parts and construction method Pending CN106677351A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710014463.7A CN106677351A (en) 2017-01-10 2017-01-10 Transfer beam structure used for adjusting deviation of hanging embedded parts and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710014463.7A CN106677351A (en) 2017-01-10 2017-01-10 Transfer beam structure used for adjusting deviation of hanging embedded parts and construction method

Publications (1)

Publication Number Publication Date
CN106677351A true CN106677351A (en) 2017-05-17

Family

ID=58849380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710014463.7A Pending CN106677351A (en) 2017-01-10 2017-01-10 Transfer beam structure used for adjusting deviation of hanging embedded parts and construction method

Country Status (1)

Country Link
CN (1) CN106677351A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707164A (en) * 2018-11-23 2019-05-03 中国五冶集团有限公司 A kind of Civil Aviation Airport baggage system steel platform installation method
CN113107092A (en) * 2021-03-29 2021-07-13 中铁十二局集团建筑安装工程有限公司 Overhung conversion construction method for super high-rise steel structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200421539Y1 (en) * 2006-05-02 2006-07-12 두우균 structure of the insert mold with complex functions
CN101200916A (en) * 2007-11-29 2008-06-18 浙江精工钢结构有限公司 Construction method of prestressed suspension type building structure
CN202416577U (en) * 2012-02-27 2012-09-05 山东同圆设计集团有限公司 Suspended type equipment layer
CN204491837U (en) * 2015-03-17 2015-07-22 天津天一建设集团有限公司 Suspension type high-strength steel bar lifting module
CN205688642U (en) * 2016-06-18 2016-11-16 青岛海川建设集团有限公司 A kind of large space ceiling decoration supporting construction
CN206495330U (en) * 2017-01-10 2017-09-15 浙江精工钢结构集团有限公司 A kind of conversion girder construction for being used for adjusting hanging embedded part deviation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200421539Y1 (en) * 2006-05-02 2006-07-12 두우균 structure of the insert mold with complex functions
CN101200916A (en) * 2007-11-29 2008-06-18 浙江精工钢结构有限公司 Construction method of prestressed suspension type building structure
CN202416577U (en) * 2012-02-27 2012-09-05 山东同圆设计集团有限公司 Suspended type equipment layer
CN204491837U (en) * 2015-03-17 2015-07-22 天津天一建设集团有限公司 Suspension type high-strength steel bar lifting module
CN205688642U (en) * 2016-06-18 2016-11-16 青岛海川建设集团有限公司 A kind of large space ceiling decoration supporting construction
CN206495330U (en) * 2017-01-10 2017-09-15 浙江精工钢结构集团有限公司 A kind of conversion girder construction for being used for adjusting hanging embedded part deviation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707164A (en) * 2018-11-23 2019-05-03 中国五冶集团有限公司 A kind of Civil Aviation Airport baggage system steel platform installation method
CN113107092A (en) * 2021-03-29 2021-07-13 中铁十二局集团建筑安装工程有限公司 Overhung conversion construction method for super high-rise steel structure

Similar Documents

Publication Publication Date Title
CN103556836B (en) Spherical reticulated shells assembling and construction method under restricted clearance condition
CN114086669B (en) Modularized rapid construction method for large-scale space special-shaped curved surface steel net rack
CN101781879B (en) Construction method of single-pylon cable-stayed bridge without dorsal cables
CN206495330U (en) A kind of conversion girder construction for being used for adjusting hanging embedded part deviation
CN103114732B (en) Cast steel penetration pipe node space positioning method
CN103352476B (en) Large-scale bolt high-precision pre-burying construction method
CN102733545A (en) Section steel column for high-rise building section steel concrete combination structure, and construction method thereof
CN104652281B (en) A kind of outward inclined steel box arch installation method
CN102828469B (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN201053123Y (en) Deep foundation ditch tower crane platform base frame
CN113123469A (en) Method for constructing complex curved surface modeling roof grid structure
CN106677351A (en) Transfer beam structure used for adjusting deviation of hanging embedded parts and construction method
CN104674665A (en) Installation method for corridor bridge of large space steel structure
CN103759719A (en) Point location tooling and method for measuring datum point for detecting installation accuracy of circular track beam
CN109267493A (en) A kind of construction method installed across river steel lid beam
CN207362866U (en) A kind of bolt collar fixed structure
CN115977401A (en) High-altitude installation method for steel structure
CN102146492A (en) Method for installing converter body equipment and tooling platform
CN106760275A (en) The construction method of stainless steel spiral stairses is installed using sectional shelf-unit
CN202139255U (en) Tooling platform for assembling converter body equipment
CN206495384U (en) A kind of assembled hangs platform structure
CN104773654A (en) Concrete electric pole arrangement device
CN104264781B (en) Latticed cylinder Steel Shell and construction method thereof
CN107060093B (en) The support system and assembling method of large-scale oblique braiding gusset plate latticed shell structure
CN105822066A (en) Construction method for underground large-span large-space ultrahigh non-column steel structural tube truss

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170517

RJ01 Rejection of invention patent application after publication