CN106672023A - Route release method for cross-line overlapped region - Google Patents

Route release method for cross-line overlapped region Download PDF

Info

Publication number
CN106672023A
CN106672023A CN201611153336.7A CN201611153336A CN106672023A CN 106672023 A CN106672023 A CN 106672023A CN 201611153336 A CN201611153336 A CN 201611153336A CN 106672023 A CN106672023 A CN 106672023A
Authority
CN
China
Prior art keywords
controller
area
parking
route
confirmation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611153336.7A
Other languages
Chinese (zh)
Other versions
CN106672023B (en
Inventor
郜春海
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Traffic Control Technology TCT Co Ltd
Original Assignee
Traffic Control Technology TCT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Traffic Control Technology TCT Co Ltd filed Critical Traffic Control Technology TCT Co Ltd
Priority to CN201611153336.7A priority Critical patent/CN106672023B/en
Publication of CN106672023A publication Critical patent/CN106672023A/en
Application granted granted Critical
Publication of CN106672023B publication Critical patent/CN106672023B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L21/00Station blocking between signal boxes in one yard
    • B61L21/04Electrical locking and release of the route; Electrical repeat locks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

The invention provides a route release method for a cross-line overlapped region. The method comprises the steps that a first interlock device sends a route total manual release request in a co-management zone to a first zone controller of the zone where the first interlock device is located; after the first zone controller receives the route total manual release request, a parking guarantee request is sent to an on-board controller through a second zone controller or is directly sent to the on-board controller; after the on-board controller receives the parking guarantee request, a parking guarantee confirmation message is sent to the second zone controller or the first zone controller; and after the first zone controller receives the parking guarantee confirmation message, it is determined that whether a route total manual release confirmation message needs to be sent to the first interlock device or not according to the parking guarantee confirmation message, so that route release is conducted. Through the method, rapid response to the route manual release request of the overlapped region is conducted, the manual release route response time is greatly shortened, and the running efficiency of lines is greatly improved.

Description

A kind of route release method of cross-line overlay region
Technical field
The present invention relates to Train Operation Control Technology field, more particularly to a kind of route release method of cross-line overlay region.
Background technology
With the continuous development that train signal is controlled, the safe and efficient traveling of train is more and more important.As city rail is handed over Logical fast development, the safety and automatization while high efficiency operation to whole train control system is proposed higher Require.
Current China is low in Train Control field automatization, intellectuality, particularly responds into passerby in cross-line overlay region During solution request, current cross-line overlay region enters passerby's solution request processing scheme and is:When route is in close locking states, interlocking sets Standby (CI) after total people's solution is received, the line state that enters for meeting unlocking condition can be switched to be close to by total people solution order unblock Time delay released state.If delay time is arrived, the state of route is converted to automatic unlocking state by close time delay released state.
As can be seen here, CI by time delay for a period of time, can only judge that the state of route meets after unblock, could be by route The free time is set to, is lacked into passerby's solution request and is automatically controlled measure, and the efficiency of railroad embankment is more low.
The content of the invention
For the defect of prior art, the invention provides a kind of route release method of cross-line overlay region, can solve the problem that Route total people solution time delay unblock in prior art, lacks into passerby's solution request and automatically controls measure, and the efficiency of railroad embankment compared with For low problem.
In a first aspect, the invention provides a kind of route release method of cross-line overlay region, methods described includes:
First interlock device solves the total people of route in the condominium region of first area controller and second area controller Request is sent to the first area controller of the first interlock device affiliated area;
The first area controller is received after the route total people solution request, will be stopped and be ensured request by described the Two zone controllers send to Vehicle Controller or are sent directly to Vehicle Controller;
The Vehicle Controller receives described parking and ensures after request, and parking is ensured into confirmation is sent to described the Two zone controllers or the first area controller;Described parking ensures that confirmation includes that parking ensures that point and movement are awarded Power terminal;
The first area controller receives the parking of the second area controller or Vehicle Controller feedback Ensure confirmation, and ensure that confirmation determines whether that first interlock device sends the total people of route according to the parking Solution confirmation, to be unlocked to route.
Alternatively, described will parking ensures that request is sent to Vehicle Controller or straight by the second area controller Vehicle Controller is delivered in sending and receiving, including:
If control area of the Vehicle Controller in the second area controller, the first area controller will Described parking ensures that request is sent to the second area controller, so that the second area controller ensures described parking Request is sent to the Vehicle Controller;
If control area of the Vehicle Controller in the first area controller, the first area controller will Described parking ensures that request is sent to the Vehicle Controller.
Alternatively, the Vehicle Controller receives described parking and ensures after request, will stop and ensures that confirmation sends To the second area controller or the first area controller, including:
If control area of the Vehicle Controller in the second area controller, the Vehicle Controller will be described Parking ensures that confirmation is sent to the second area controller, so that the second area controller ensures described parking Confirmation is sent to first area control;
If control area of the Vehicle Controller in the first area controller, the Vehicle Controller will be described Parking ensures that confirmation is sent to the first area controller.
Alternatively, the first area controller receives the second area controller or Vehicle Controller feedback Parking ensure confirmation, including:
If control area of the Vehicle Controller in the second area controller, the first area controller Receive the parking guarantee confirmation that the second area controller sends;
If control area of the Vehicle Controller in the first area controller, the first area controller Receive the parking guarantee confirmation that the Vehicle Controller sends.
Alternatively, methods described also includes:
The Vehicle Controller receives described parking and ensures after request, according to train status information the car to be calculated The parking of set controller ensures point;
Wherein, the train status information includes positional information, traffic direction and the velocity information of train.
Alternatively, it is described to ensure that confirmation determines whether that first interlock device sends route according to the parking Total people's solution confirmation, including:
Ensure that the parking in confirmation ensures point and train consistent with mobile authorization terminal in institute in described parking State when can come to a complete stop before mobile authorization terminal, the first area controller to first interlock device sends the total people of route Solution confirmation, to be unlocked to route.
Alternatively, methods described also includes:
When train is through mobile authorization separation of the first area controller with the second area controller, institute The Vehicle Controller and the first area controller for stating train is attached, to carry out zone controller switching.
Alternatively, before the Vehicle Controller of the train is attached with the first area controller, methods described Also include:
The Vehicle Controller sends positional information to the second area controller in real time.
As shown from the above technical solution, the present invention is provided in a kind of route release method of cross-line overlay region, the first interlocking The total people's solution request of route in condominium region is sent to the first area of the first interlock device affiliated area and is controlled by equipment Device;The first area controller is received after the total people's solution request of the route, will be stopped and is ensured that request passes through secondth area Domain controller sends to Vehicle Controller or is sent directly to Vehicle Controller;The first area controller receives described the The parking of two zone controllers or Vehicle Controller feedback ensures confirmation, and ensures confirmation letter according to described parking Breath determines whether that first interlock device sends the total people of route and solves confirmation, to be unlocked to route;Wherein, it is described Stop and ensure that confirmation includes the guarantee point that stops.Thus, in the present invention at Train Approaching cross-line overlay region, interlock device without The corresponding delay time is needed to wait for, and ensures that the parking in confirmation ensures that point and mobile authorization terminal are according to the parking of train Can be determined whether to be unlocked route, so as to people's solution request of quick response overlay region route, effectively shorten people Xie Jinlu Response time, drastically increases the efficiency of operation of circuit.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these figures.
Fig. 1 is a kind of schematic flow sheet of the route release method of cross-line overlay region that one embodiment of the invention is provided;
Fig. 2 is a kind of schematic flow sheet of the route release method of cross-line overlay region that another embodiment of the present invention is provided;
Fig. 3 is the schematic diagram of a scenario of the route release of the cross-line overlay region that another embodiment of the present invention is provided;
Fig. 4 is a kind of schematic flow sheet of the route release method of cross-line overlay region that another embodiment of the present invention is provided;
Fig. 5 is a kind of schematic flow sheet of the route release method of cross-line overlay region that another embodiment of the present invention is provided.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Fig. 1 is a kind of schematic flow sheet of the route release method of the cross-line overlay region in one embodiment of the invention, such as Fig. 1 Shown, methods described comprises the steps:
S101:First interlock device is total by the route in the condominium region of first area controller and second area controller People's solution request is sent to the first area controller of the first interlock device affiliated area.
Specifically, in Train Approaching cross-line overlay region (first area controller and the second area control being adjacent The condominium region of device) when, if treating, released route is located at the overlay region, the route initial endpoint signal machine corresponding first of the route Lock device CI sends the total people's solution request of route to the first area controller of the first interlock device affiliated area.
S102:The first area controller is received after the total people's solution request of the route, and parking is ensured into request passes through The second area controller sends to Vehicle Controller or is sent directly to Vehicle Controller.
Specifically, after first area controller receives the total people's solution request of route, according to the vehicle-mounted control of current train The particular location of device processed, will stop and ensures that request is forwarded to Vehicle Controller by second area controller, or directly will stop Car ensures that request is sent to Vehicle Controller.
S103:The Vehicle Controller receive it is described stop ensure request after, by parking ensure confirmation send to The second area controller or the first area controller;It is described stop ensure confirmation include stop ensure point and Mobile authorization terminal.
Wherein, described parking ensures that confirmation includes stop guarantee point and mobile authorization terminal.
Specifically, methods described also includes:
The Vehicle Controller receives described parking and ensures after request, according to train status information the car to be calculated The parking of set controller ensures point;Wherein, the train status information includes positional information, traffic direction and the speed letter of train Breath.
Understandably, due to being unlocked to the route of overlay region, then the mobile authorization terminal is to treat released route Initial endpoint signal machine position.
S104:What the first area controller reception second area controller or the Vehicle Controller fed back Stop and ensure confirmation, and ensure that confirmation determines whether that first interlock device sends route according to the parking Total people's solution confirmation, to be unlocked to route.
Specifically, the first area controller directly receives what second area controller or Vehicle Controller sent Stop and ensure after confirmation, ensure that the parking in confirmation ensures that point and mobile authorization terminal are determined whether according to stopping First interlock device sends the total people of route and solves confirmation, to be unlocked to route.
Specifically, ensure that the parking in confirmation ensures that point is consistent with mobile authorization terminal and arranges in described parking When car can come to a complete stop before the mobile authorization terminal, the first area controller to first interlock device send into The total people in road solves confirmation, to be unlocked to route;It is described stop ensure confirmation in the parking ensure point with When mobile authorization terminal is inconsistent, i.e., when train cannot come to a complete stop before mobile authorization terminal, the first area controller is not The total people of route is sent to first interlock device solve confirmation, route release failure.
In the present embodiment, the first interlock device sends the total people's solution request of route in condominium region to the described first interlocking The first area controller of equipment affiliated area;The first area controller is received after the total people's solution request of the route, will Stop and ensure that request is sent to Vehicle Controller by the second area controller or is sent directly to Vehicle Controller;Institute State the parking guarantee confirmation letter that first area controller receives the second area controller or Vehicle Controller feedback Breath, and ensure that confirmation determines whether that first interlock device sends the total people of route and solves confirmation letter according to the parking Breath, to be unlocked to route;Wherein, described parking ensures that confirmation includes the guarantee point that stops.Thus, in the present embodiment During Train Approaching cross-line overlay region, interlock device ensures confirmation letter without waiting for the corresponding delay time according to the parking of train Parking in breath ensures that point and mobile authorization terminal can be determined whether to be unlocked route, so as to quick response overlay region is entered People's solution request on road, effectively shortens people's Xie Jinlu response times, drastically increases the efficiency of operation of circuit.
In an alternate embodiment of the present invention where, as shown in Fig. 2 the first area controller receives the route After total people's solution request, if during control area of the Vehicle Controller in the second area controller, above-mentioned steps S102 Specifically include:
S1021:Described parking is ensured that request is sent to the second area controller by the first area controller, with Make the second area controller that described parking is ensured into request is sent to the Vehicle Controller.
Further, above-mentioned steps S103 are specifically included:
S1031:The Vehicle Controller receives described parking and ensures after request, and described parking is ensured into confirmation is sent out The second area controller is delivered to, so that the parking is ensured that confirmation is sent to described by the second area controller First area controls;
Further, above-mentioned steps S104 are specifically included:
S1041:The first area controller receives the parking guarantee confirmation that the second area controller sends, And ensure that confirmation determines whether that first interlock device sends the total people of route and solves confirmation according to the parking, with Route is unlocked.
For example, as shown in figure 3, in the present embodiment positioned at overlay region treat released route for semaphore S1 to semaphore The route of S2, communication truck is entered behind overlay region, is introduced into transfer ZC, after the separation of mobile ZC and adapter ZC, is entered and is connect The control area of pipe ZC.
Specifically, the schematic flow sheet of the route release method of the cross-line overlay region in the present embodiment is as shown in figure 4, the party Method comprises the steps:
S401:The total people's solution request of route in overlapping region is sent to correspondence ZC and (is connect by adapter regional interlock equipment (CI) Pipe ZC);
S402:Adapter ZC is received after the total people's solution request of route of affiliated route, and to transferring ZC and sending to stop request is ensured;
S403:Transfer ZC forwards the parking to ensure request to the VOBC in its control area;
In the present embodiment, when adapter ZC receives route total people solution request, train is still located at transferring the control area of ZC, because Guarantee request of stopping is forwarded to this adapter ZC the Vehicle Controller (VOBC) of train by transferring ZC.
S404:VOBC is received and transferred after the parking guarantee application that ZC sends, and to its affiliated ZC (transferring ZC) guarantor of stopping is sent Card confirmation;
S405:Transfer ZC and stop to adapter ZC forwardings and ensure confirmation;
S406:Adapter ZC ensures that confirmation judges whether that sending the total people of route to CI solves confirmation according to parking, if It is to go to step S407, otherwise terminates the route release flow process;
Specifically, in the present embodiment, transfer ZC and send to the parking of adapter ZC the parking guarantee ensured in confirmation Point is consistent with mobile authorization (MA) terminal and be able to can be stopped before the guarantee point that stops with train, then send route to CI total People solves confirmation, otherwise route release failure.
In the present embodiment, as shown in figure 3, before the total people's solution request of route is sent, the mobile authorization MA ends of the communication truck Point should be the terminal signaling machine S2 of route, and after the total people's solution request of route is sent, the route need to be unlocked, then move MA terminals are authorized to be changed into the initial endpoint signal machine S1 of route.In the present embodiment, will specifically stop and ensure point with initial endpoint signal machine S1's Position is compared, and judges whether train can stop before initial endpoint signal machine S1, if then sending the total people of route to CI To be unlocked to route, otherwise route release fails solution confirmation.
S407:Adapter ZC sends the total people of route and solves confirmation to CI.
In the present embodiment, on the basis of safety and high efficiency is taken into full account, according to the status information of train, calculate The parking of VOBC ensures point, so as to people's solution request of quick response overlay region route, significantly shorten it is original enter passerby Xie Xiang Between seasonable, the efficiency of operation of circuit is greatly improved.
In an alternate embodiment of the present invention where, as shown in figure 5, the first area controller receives the route After total people's solution request, if during control area of the Vehicle Controller in the first area controller, above-mentioned steps S102 Specifically include:
S1022:Described parking is ensured that request is sent to the Vehicle Controller by the first area controller.
Further, above-mentioned steps S103 include:
S1032:The Vehicle Controller receives described parking and ensures after request, and described parking is ensured into confirmation is sent out Deliver to the first area controller;
Further, above-mentioned steps S104 include:
S1042:The first area controller receives the parking guarantee confirmation that the Vehicle Controller sends, and root Ensure that confirmation determines whether that first interlock device sends the total people of route and solves confirmation according to the parking, with to entering Road is unlocked.
It is described vehicle-mounted due to when the first area controller receives the total people's solution of the route asks in the present embodiment Control area of the controller in the first area controller, therefore first area controller is directly to Vehicle Controller transmission Stop and ensure request, the Vehicle Controller reception is stopped and ensures that feedback parking ensures confirmation, Jin Er after request One zone controller directly receives the parking of Vehicle Controller feedback and ensures confirmation.
Further, said method also comprises the steps:
When train is through mobile authorization separation of the first area controller with the second area controller, institute The Vehicle Controller and the first area controller for stating train is attached, to carry out zone controller switching.
For example, as shown in figure 3, train enters overlapping region (the condominium region in Fig. 3) attempts and take over region control Device (ZC) processed sets up connection, sets up connection opportunity for MA separations.Now train enters ZC switching states.
Further, the step of Vehicle Controller of train described above is attached with the first area controller it Before, methods described also includes:
The Vehicle Controller sends positional information to the second area controller in real time.
As shown in figure 3, VOBC sets up before being connected with adapter ZC, VOBC reports position letter to ZC (current controlled ZC) is transferred Breath.
The present embodiment proposes the route release scheme of cross-line overlay region, on the basis of original logical calculated is changed, can Run into demands such as passerby's solutions with covering user's train cross-line and entering passerby's solution, the train right way, adapt to that domestic segmentation is built, segmentation is opened Logical main flow subway construction mode, and meet user's demand growing to system automation and efficiency of operation.
In describing the invention, it should be noted that term " on ", the orientation of the instruction such as D score or position relationship be base In orientation shown in the drawings or position relationship, it is for only for ease of the description present invention and simplifies description, rather than indicates or imply The device or element of indication must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this The restriction of invention.Unless otherwise clearly defined and limited, term " installation ", " connected ", " connection " should be interpreted broadly, example Such as, can be fixedly connected, or be detachably connected, or be integrally connected;Can be mechanically connected, or be electrically connected Connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, can be the connection of two element internals.For this For the those of ordinary skill in field, above-mentioned term concrete meaning in the present invention can be as the case may be understood.
Also, it should be noted that herein, such as first and second or the like relational terms are used merely to one Entity or operation make a distinction with another entity or operation, and not necessarily require or imply between these entities or operation There is any this actual relation or order.And, term " including ", "comprising" or its any other variant are intended to contain Lid nonexcludability is included, so that a series of process, method, article or equipment including key elements not only will including those Element, but also including other key elements being not expressly set out, or also include for this process, method, article or equipment Intrinsic key element.In the absence of more restrictions, the key element for being limited by sentence "including a ...", it is not excluded that Also there is other identical element in process, method, article or equipment including the key element.
Above example only to illustrate technical scheme, rather than a limitation;Although with reference to the foregoing embodiments The present invention has been described in detail, it will be understood by those within the art that:It still can be to aforementioned each enforcement Technical scheme described in example is modified, or carries out equivalent to which part technical characteristic;And these modification or Replace, do not make the spirit and scope of the essence disengaging various embodiments of the present invention technical scheme of appropriate technical solution.

Claims (8)

1. a kind of route release method of cross-line overlay region, it is characterised in that methods described includes:
First interlock device asks the total people's solution of route in the condominium region of first area controller and second area controller Send to the first area controller of the first interlock device affiliated area;
The first area controller is received after the total people's solution request of the route, will be stopped and is ensured that request passes through secondth area Domain controller sends to Vehicle Controller or is sent directly to Vehicle Controller;
The Vehicle Controller receives described parking and ensures after request, parking to be ensured into confirmation is sent to secondth area Domain controller or the first area controller;Described parking ensures that confirmation includes stop guarantee point and mobile authorization end Point;
The first area controller receives the second area controller or the parking of Vehicle Controller feedback ensures Confirmation, and it is true to ensure that confirmation determines whether that first interlock device sends the total people's solution of route according to the parking Information is recognized, to be unlocked to route.
2. route release method according to claim 1, it is characterised in that described will parking ensures request by described the Two zone controllers send to Vehicle Controller or are sent directly to Vehicle Controller, including:
If control area of the Vehicle Controller in the second area controller, the first area controller will be described Stop and ensure that request is sent to the second area controller, so that described parking is ensured request by the second area controller Send to the Vehicle Controller;
If control area of the Vehicle Controller in the first area controller, the first area controller will be described Stop and ensure that request is sent to the Vehicle Controller.
3. route release method according to claim 2, it is characterised in that the Vehicle Controller receives the parking After ensureing request, parking is ensured into that confirmation is sent to the second area controller or the first area controller, Including:
If control area of the Vehicle Controller in the second area controller, the Vehicle Controller is by the parking Ensure that confirmation is sent to the second area controller, so that described parking is ensured to confirm by the second area controller Information is sent to first area control;
If control area of the Vehicle Controller in the first area controller, the Vehicle Controller is by the parking Ensure that confirmation is sent to the first area controller.
4. route release method according to claim 3, it is characterised in that the first area controller receives described the The parking of two zone controllers or Vehicle Controller feedback ensures confirmation, including:
If control area of the Vehicle Controller in the second area controller, the first area controller is received The parking that the second area controller sends ensures confirmation;
If control area of the Vehicle Controller in the first area controller, the first area controller is received The parking that the Vehicle Controller sends ensures confirmation.
5. the route release method according to any one of claim 1-4, it is characterised in that methods described also includes:
The Vehicle Controller receives described parking and ensures after request, according to train status information the vehicle-mounted control to be calculated The parking of device processed ensures point;
Wherein, the train status information includes positional information, traffic direction and the velocity information of train.
6. the route release method according to any one of claim 1-4, it is characterised in that described to be protected according to described parking Card confirmation determines whether that first interlock device sends the total people of route and solves confirmation, including:
Ensure that the parking in confirmation ensures point and train consistent with mobile authorization terminal in the shifting in described parking When can come to a complete stop before dynamic mandate terminal, it is true that the first area controller sends the total people's solution of route to first interlock device Information is recognized, to be unlocked to route.
7. the route release method according to any one of claim 1-4, it is characterised in that methods described also includes:
When train is through mobile authorization separation of the first area controller with the second area controller, the row The Vehicle Controller of car is attached with the first area controller, to carry out zone controller switching.
8. route release method according to claim 7, it is characterised in that the Vehicle Controller of the train and described Before one zone controller is attached, methods described also includes:
The Vehicle Controller sends positional information to the second area controller in real time.
CN201611153336.7A 2016-12-14 2016-12-14 A kind of route release method of cross-line overlay region Active CN106672023B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611153336.7A CN106672023B (en) 2016-12-14 2016-12-14 A kind of route release method of cross-line overlay region

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611153336.7A CN106672023B (en) 2016-12-14 2016-12-14 A kind of route release method of cross-line overlay region

Publications (2)

Publication Number Publication Date
CN106672023A true CN106672023A (en) 2017-05-17
CN106672023B CN106672023B (en) 2018-09-04

Family

ID=58867958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611153336.7A Active CN106672023B (en) 2016-12-14 2016-12-14 A kind of route release method of cross-line overlay region

Country Status (1)

Country Link
CN (1) CN106672023B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107444432A (en) * 2017-08-14 2017-12-08 北京全路通信信号研究设计院集团有限公司 Control method
CN107499336A (en) * 2017-08-14 2017-12-22 北京全路通信信号研究设计院集团有限公司 Control method
CN107933619A (en) * 2017-11-23 2018-04-20 交控科技股份有限公司 A kind of method of urban track traffic zone controller processing section occupied information
CN108683656A (en) * 2018-05-10 2018-10-19 中国铁路总公司 The method for detecting man-in-the-middle attack in urban railway transit train control system
CN110329322A (en) * 2019-08-07 2019-10-15 湖南中车时代通信信号有限公司 The security processing of driving license is shortened in a kind of cooperation
CN110834651A (en) * 2019-11-11 2020-02-25 通号城市轨道交通技术有限公司 Unlocking method and system for route protection section
CN111645728A (en) * 2020-04-22 2020-09-11 浙江众合科技股份有限公司 Interconnection-based urban rail transit train handover method
CN111874042A (en) * 2020-06-28 2020-11-03 通号城市轨道交通技术有限公司 Train information processing method and system based on overlapping administration areas
WO2021104358A1 (en) * 2019-11-29 2021-06-03 比亚迪股份有限公司 Train management method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4066228A (en) * 1976-10-07 1978-01-03 Westinghouse Air Brake Company Route control system for railroad interlockings
CN101927775A (en) * 2010-08-18 2010-12-29 北京交通大学 Safety protection method of CBTC (Communication Based Train Control) system during crossing control area
CN102556120A (en) * 2011-12-22 2012-07-11 北京交控科技有限公司 Interlock access control method
CN103029723A (en) * 2012-12-24 2013-04-10 北京交控科技有限公司 Mixing method of movement authorities during zone switching
CN104512439A (en) * 2013-09-27 2015-04-15 北京南车时代信息技术有限公司 Route unlocking method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4066228A (en) * 1976-10-07 1978-01-03 Westinghouse Air Brake Company Route control system for railroad interlockings
CN101927775A (en) * 2010-08-18 2010-12-29 北京交通大学 Safety protection method of CBTC (Communication Based Train Control) system during crossing control area
CN102556120A (en) * 2011-12-22 2012-07-11 北京交控科技有限公司 Interlock access control method
CN103029723A (en) * 2012-12-24 2013-04-10 北京交控科技有限公司 Mixing method of movement authorities during zone switching
CN104512439A (en) * 2013-09-27 2015-04-15 北京南车时代信息技术有限公司 Route unlocking method and device

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107499336A (en) * 2017-08-14 2017-12-22 北京全路通信信号研究设计院集团有限公司 Control method
CN107444432B (en) * 2017-08-14 2021-03-16 北京全路通信信号研究设计院集团有限公司 Control method for improving train cross-line route access efficiency
CN107444432A (en) * 2017-08-14 2017-12-08 北京全路通信信号研究设计院集团有限公司 Control method
CN107933619B (en) * 2017-11-23 2020-02-14 交控科技股份有限公司 Method for processing section occupation information by urban rail transit area controller
CN107933619A (en) * 2017-11-23 2018-04-20 交控科技股份有限公司 A kind of method of urban track traffic zone controller processing section occupied information
CN108683656B (en) * 2018-05-10 2021-01-19 中国铁路总公司 Method for detecting man-in-the-middle attack in urban rail transit train control system
CN108683656A (en) * 2018-05-10 2018-10-19 中国铁路总公司 The method for detecting man-in-the-middle attack in urban railway transit train control system
CN110329322A (en) * 2019-08-07 2019-10-15 湖南中车时代通信信号有限公司 The security processing of driving license is shortened in a kind of cooperation
CN110329322B (en) * 2019-08-07 2021-10-15 湖南中车时代通信信号有限公司 Safety processing method for collaboratively shortening driving permission
CN110834651A (en) * 2019-11-11 2020-02-25 通号城市轨道交通技术有限公司 Unlocking method and system for route protection section
WO2021104358A1 (en) * 2019-11-29 2021-06-03 比亚迪股份有限公司 Train management method and system
US12097895B2 (en) 2019-11-29 2024-09-24 Byd Company Limited Train management method and system
CN111645728A (en) * 2020-04-22 2020-09-11 浙江众合科技股份有限公司 Interconnection-based urban rail transit train handover method
CN111874042A (en) * 2020-06-28 2020-11-03 通号城市轨道交通技术有限公司 Train information processing method and system based on overlapping administration areas

Also Published As

Publication number Publication date
CN106672023B (en) 2018-09-04

Similar Documents

Publication Publication Date Title
CN106672023A (en) Route release method for cross-line overlapped region
CN105096618B (en) Method for controlling priority and system that a kind of tramcar passes through crossing
CN104240525B (en) There is the road traffic signal controller system of tramcar priority control function
CN101927775B (en) Safety protection method of CBTC (Communication Based Train Control) system during crossing control area
CN103723167B (en) A kind of point type train speed limit method to set up
CN105083339B (en) A kind of two ends load the method for turning back automatically of the CBTC trains of mobile unit
CN113335350A (en) Train autonomous operation system for interconnection, intercommunication, collinear operation and overline operation
CN104867340A (en) Emergency vehicle release method and system for city traffic
CN208978874U (en) Train operation control system based on Big Dipper short message
CN109436025B (en) Intelligent turnout control system and method for magnetic suspension train
CN112550379B (en) Moving block train operation control method based on section direction control
CN204355082U (en) A kind of tramway train main track interlocking of signals control system
CN106476847A (en) The unlocking method of entry protection section and device
CN105035120B (en) A kind of region switching method
CN113911181B (en) Train control system compatible method based on virtual marshalling
CN112124358A (en) System and method for realizing switching from automatic inter-station block to mobile block
CN111232022A (en) Trackside resource management method combined with train identity information
CN111874036B (en) Tramcar autonomous operation control system based on car-to-car communication
CN106672017A (en) Rail transit turnout remote control system based on mobile terminal and method
CN106560372A (en) Obturation mode adaptive control system based on vehicle controller
CN110329320A (en) A kind of tramcar route control method of based on LTE vehicle continuous communiction
CN103213518B (en) Ground automatic passing over of neutral section locomotive position detecting system and detection method
CN114394134B (en) Virtual section unlocking device and method suitable for non-track circuit section
CN105882689B (en) Expanding element in inter-city passenger rail autonomy-oriented row control vehicle-mounted system
CN103303343A (en) Train network control method of automatic stop announcement of PIS

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant