CN106670409A - Crystallizer for continuous casting - Google Patents

Crystallizer for continuous casting Download PDF

Info

Publication number
CN106670409A
CN106670409A CN201710142051.1A CN201710142051A CN106670409A CN 106670409 A CN106670409 A CN 106670409A CN 201710142051 A CN201710142051 A CN 201710142051A CN 106670409 A CN106670409 A CN 106670409A
Authority
CN
China
Prior art keywords
water
crystallizer
meniscus
supplying chamber
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710142051.1A
Other languages
Chinese (zh)
Other versions
CN106670409B (en
Inventor
朱书成
赵家亮
廖春谊
王希彬
周彦锋
辛文科
郭明源
辛浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xixia Longcheng Special Material Co Ltd
Original Assignee
Xixia Longcheng Special Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xixia Longcheng Special Material Co Ltd filed Critical Xixia Longcheng Special Material Co Ltd
Priority to CN201710142051.1A priority Critical patent/CN106670409B/en
Publication of CN106670409A publication Critical patent/CN106670409A/en
Application granted granted Critical
Publication of CN106670409B publication Critical patent/CN106670409B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/04Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/22Controlling or regulating processes or operations for cooling cast stock or mould

Abstract

The invention discloses a crystallizer capable of preventing flaws, and belongs to the technical field of the crystallizers. The crystallizer comprises a copper plate and a water tank; the water tank is provided with a water inlet chamber and a plurality of water outlet chambers; the water tank or the copper plate is provided with a middle pit for forming a water-cooling heat exchange channel; the water-cooling heat exchange channel communicates with the water inlet chamber and the water outlet chambers; at least one of the water outlet chambers is arranged in a meniscus area; and at least one of the water outlet chambers is arranged below the meniscus area. With the adoption of the structure, the cooling water amount of the meniscus area, the cooling intensity of the meniscus area and the heat flux density are reduced, the meniscus area is extended, the heat conduction is relatively uniform, no cooling water amount is recued as to the crystallizer wholly, the effects of reducing the cooling intensity of the meniscus area of the crystallizer and reducing the shrinkage variation amplitude of the meniscus area are exerted, the forming and growth of a continuous casting billet are more uniform, the continuous casting billet is prevented from generating the flaws or the number of the flaws of the continuous casting billet are reduced effectively, and the quality of the continuous casting billet is improved.

Description

A kind of continuous cast mold
Technical field
The present invention relates to a kind of continuous cast mold, belong to crystallizer technology field, and in particular to slab, square billet, round billet, Shaped blank, slim slab continuous cast mold technical field.
Background technology
Continuous casting billet has various defects, and the method for preventing various defects from producing is also a lot, wherein the generation of many defects with Key equipment-the crystallizer of continuous casting is relevant, and many defects of continuous casting billet are produced at meniscus, are derived near meniscus Heat it is too many and derived heat is uneven, crackle and bleed-out can be caused, in particular with people to generation efficiency requirement, draw Fast more and more higher, nearby derived heat is more violent for meniscus, and derived heat is more uneven, the crackle for thus causing and Bleed-out probability increase is more frequent.Strand heat derives rely on taking out of for continuous cast mold cooling water, and continuous casting crystallizer copper plate is cold But the passage of water is unanimous between the higher and lower levels, and the design of water is all consistent up and down.With the raising of pulling rate, it is desirable to total cooling Water increases, and heat is certainly more as derived from meniscus, and heat derived from meniscus will be more uneven, and defect is naturally more It is many, frequently.
In order to prevent and treat various defects, prior art has the technological means of various solutions.
Notification number a kind of novel crystallization device for pouring into a mould square billet for the patent document of the U of CN 203155963 is disclosed, in slab On the basis of crystallizer, the production of square billet is realized by installing part flow arrangement so that plate slab crystallizer production product has many Sample feature;Compared to square blank crystallizer is redesigned, the application of part flow arrangement reduces the cost of equipment;Because shunting is filled Put with good heat conductivity, the characteristics of rapid heat dissipation, meanwhile, cooling water is passed through so that the partial heat of high-temperature molten steel is through shunting The cooled water of device is taken away, and improves the service life of plate slab crystallizer;In the process of setting of molten steel, each several part green shell is equal Even cooling, its growth is also more uniform, it is to avoid the generation of the defect such as strand crackle, bulge, improves the lumber recovery of strand.
But, this patent is really, using plate slab crystallizer wider, narrow side crystallizer to be inserted in width, by slab Crystallizer is divided into several square blank crystallizers, and the narrow side crystallizer must all be cooled down because of its both sides, so both sides must all have cold But water hole, rather than so-called shunting, above-mentioned document is big in the water-carrying capacity of meniscus surface area, and heat conduction is uneven, does not have controlling stream The part of amount, causes heat to conduct uncontrollable, prevents crack defect effect bad.
Notification number discloses a kind of wide-surface copper plate of crystallizer of continuous slab casting machine for the patent document of the U of CN 202155493 Cooling structure, it is unreasonable for current broadside copper board of continuous casting crystallizer for thin slab blank cooling structure, cause face copper coin wide and strand temperature The problems such as spending inhomogeneous cooling, easily cause copper coin severe crack, low life-span, slab quality defect is improved, wide to crystallizer Face copper coin cooling water channel is optimized design, and its cooling water channel diameter reduces, quantity increases, and is distributed according to liquid steel temperature Situation carries out reasonable layout, is effectively improved crystallizer face intensity of cooling wide, improves crystallizer face Temperature Distribution wide, reduces crystallizer Copper coin surface temperature is poor, improves slab quality.
Tank chilling room cools down also uneven every uneven, and being changed into water hole can design that interval is uniform, and Temperature Distribution is relative Uniformly.While cooling, in order to carry out heat conduction, employ the reduction of cooling water channel diameter, quantity increases above-mentioned patent, and root Reasonable layout is carried out according to liquid steel temperature distribution situation, is not reduced in the water-carrying capacity of meniscus surface area, it is equally existed in bent moon The water-carrying capacity in face region is big, and heat conduction is uneven, the part without control flow, causes heat to conduct uncontrollable, prevents crackle Defect effect is bad.
The content of the invention
In view of this, the purpose of the present invention is directed to the deficiencies in the prior art, there is provided a kind of heat conduction is uniform, in meniscus area Domain can control the device of cooling flow, solve that meniscus surface area heat conduction present in prior art is uneven, flow can not Control, so as to cause the technical problem of the defects such as crackle.
To reach above-mentioned purpose, the present invention uses following technical scheme:
A kind of crystallizer, including copper coin and water tank, water tank set an intake chamber and multiple water-supplying chamber, during water tank or copper coin are set Between be recessed, form water-cooled hot switching path, passage connects with intake chamber and water-supplying chamber, the multiple water-supplying chamber at least one set Put in meniscus surface area, at least one is arranged on the lower section of meniscus surface area, water tank peripheral projection carries seal groove and sealing Circle..
Preferably, the depression in meniscus area is shallower than the depression below meniscus.
Preferably, described being arranged on water-supplying chamber's connecting pipe of meniscus surface area or lower section sets valve.
Preferably, the intake chamber is arranged on the bottom of water-cooled hot switching path, and the water-supplying chamber is arranged on water-cooled friendship Change the top of passage.
Preferably, the intake chamber is arranged on the bottom of water-cooled hot switching path, and the water-supplying chamber is arranged on water-cooled friendship Change the top of passage.
Preferably, water-supplying chamber one is arranged on meniscus area, is connected with the water-cooled hot switching path, and water-supplying chamber two is arranged on Meniscus area lower section.
Preferably, the pipeline of the intake chamber and water-supplying chamber at most has one to be not provided with flowmeter.
Preferably, including fast changeable water tank backboard, intake chamber and water-supplying chamber are located at the water tank backboard.
Preferably, the depressed area of the water tank or copper coin has set support and water conservancy diversion at both by fastener drawing position Diamond block, the thickness of the diamond block is equal to the depth of depression.
Preferably, by controlling water-cooled hot switching path in the sinking degree of meniscus come regulating water flow.
Preferably, by controlling the opening degree of the valve come regulating water flow.
Preferably, the intake chamber is connected with water inlet pipe, and water-supplying chamber one connects with outlet pipe one, water-supplying chamber two and outlet pipe Two connections, the outlet pipe one and/or outlet pipe two set valve.
Preferably, by controlling water-cooled hot switching path in the sinking degree of meniscus and/or the opening degree of the valve Carry out regulating water flow.
Preferably, the water-carrying capacity in meniscus area is the 40%~80% of total water current amount.
The beneficial effects of the invention are as follows:
1st, the present invention sets multiple water-supplying chamber on crystallizer, and current can be by shunting the current reduced in meniscus surface area Amount, in the prior art in the case of pulling rate more and more higher, meniscus cooling is more uniform, prevents acutely cooling, and meniscus is big Amplitude contraction change, eliminates defect.2nd, the cooling duct that the present invention is set is located at water tank, is formed by depression, uniform cooling effect It is more significantly.Control meniscus flow can be carried out by adjusting the sinking degree of meniscus surface area, facilitate the manufacture can be with essence Really control.
3rd, the present invention flows through the water-carrying capacity of meniscus in order to adjust, and valve can be set on water-supplying chamber's connecting pipe, leads to Crossing valve can flow through flow at meniscus with accurate adjustment, and convenient experiment obtains accurate parameter to control defect.
4th, current flow from down to up in the present invention, and continuous casting steel billet heat transfer is good, and cooling is played a part of well, lead to Cross setting flowmeter to measure flow, can intuitively obtain influence of the flow to defects such as crackles, so as to control suitable ginseng Number.
5th, the present invention sets water tank backboard, can be with quick-replaceable, so as to reduce in the labour intensity for mounting and dismounting, more It is convenient, fast.
6th, the setting of diamond block, makes copper coin be unlikely in the case where drawing is acted on water tank, deforms copper coin or water tank, while water chestnut The tip of shape block does not influence the heat exchange of crystallizer along water (flow) direction.
In a word, Liang Ge water-supplying chamber, the opening degree of control valve are set and change meniscus surface area water-cooled hot switching path Flowmeter in the size in gap, and observable water inlet pipe and water outlet pipe, makes meniscus surface area water-flowing amount be the total water-flowing amount of continuous cast mold Adjust more controllable between 40%~80%, making the cooling water inflow in meniscus area reduces, meniscus area intensity of cooling reduction, hot-fluid is close Degree reduces, and meniscus surface area extension, heat transfer is relatively uniform, and, cooling water inflow is not reduced to crystallizer generally speaking, overall cold But ability does not change, and the factor for producing continuous casting defect in meniscus surface area is substantially reduced, and can effectively eliminate continuous casting defect.
Brief description of the drawings
Fig. 1 is the crystallizer sectional elevation schematic diagram that crystallizer copper pipe and crystallizer water tank are constituted.
Fig. 2 is that crystallizer copper pipe and crystallizer water tank are illustrated in the crystallizer sectional elevation that meniscus area forms narrow water seam composition Figure.
Fig. 3 is the crystallizer sectional elevation schematic diagram that crystallizer water tank is made up of water tank and water tank backboard.
Fig. 4 is the crystallizer sectional elevation schematic diagram that the water seam cooling duct formed by crystallizer copper pipe intermediate recess constitutes.
Fig. 5 is the support block schematic diagram that crystallizer water tank sets support copper coin and water conservancy diversion cooling water in groove surface.
Fig. 6 is to set groove on copper plate of crystallizer, and the support of support copper coin and energy water conservancy diversion cooling water is set in groove surface The crystallizer elevational schematic view of block composition.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples.
Embodiment one:As shown in figure 1, a kind of continuous cast mold, including crystallizer copper pipe 1 and branch is played to crystallizer copper pipe The crystallizer water tank 2 that support is acted on and cooling water flowing is acted on, the crystallizer water tank sets an intake chamber 3 and Liang Ge water-supplying chamber, It is respectively the 4a of the water-supplying chamber one and 4b of water-supplying chamber two, the intake chamber 3 is connected with water inlet pipe 5, the 4a of the water-supplying chamber one and outlet pipe One 6a is connected, and the 4b of the water-supplying chamber two is connected with the 6b of outlet pipe two, and valve 7, the outlet pipe are set on the 6b of the outlet pipe two Two 6b are connected with the valve 7, and the crystallizer water tank 2 sets intermediate recess, peripheral projection and carries seal groove 8 and sealing ring 9, Peripheral sealing is formed with the contact surface of crystallizer copper pipe 1, there are the water-cooled hot switching path 10 in gap, the water-supplying chamber one 4a pairs in centre The meniscus area of water-cooled hot switching path 10 should be arranged on, the 4b of the water-supplying chamber two is next under the 4a of the water-supplying chamber one Face, the intake chamber 3 is arranged on the bottom of water-cooled hot switching path 10, and flowmeter 11, the water outlet are set on the water inlet pipe 5 Flowmeter 12 is set on the 6a of pipe one, flowmeter 13 is set on the 6b of the outlet pipe two, by controlling the opening degree of the valve 7, Water-flowing amounts of the 4a of the water-supplying chamber one and 6a of outlet pipe one with continuous cast mold in meniscus area is set to be the total water-flowing amount of continuous cast mold 70%~80%.
Embodiment two:As shown in Fig. 2 a kind of continuous cast mold, including crystallizer copper pipe 1 and support is played to crystallizer copper pipe Effect and the crystallizer water tank 2 of cooling water flowing effect, it is convex that the crystallizer water tank 2 sets the middle depression with step, periphery Rise and carry seal groove 8 and sealing ring 9, peripheral sealing, water-cooled of the centre with step clearance are formed with the contact surface of crystallizer copper pipe 1 Hot switching path, the depression in depression correspondence meniscus area of the centre with step is relatively shallower, below correspondence meniscus Depression is relatively deep, and the 10b of water-cooled hot switching path two in correspondence meniscus area is relatively small, the water-cooled below correspondence meniscus 10a is relatively large for interchange channel one, and the crystallizer water tank sets an intake chamber 3 and Liang Ge water-supplying chamber, is respectively water-supplying chamber The one 4a and 4b of water-supplying chamber two, the intake chamber 3 is connected with water inlet pipe 5, and the 4a of the water-supplying chamber one is connected with the 6a of outlet pipe one, described The 4b of water-supplying chamber two is connected with the 6b of outlet pipe two, and valve 7, the 6b of the outlet pipe two and the valve are set on the 6b of the outlet pipe two 7 connections, the 4a of the water-supplying chamber one is correspondingly arranged at the meniscus area of the 10b of water-cooled hot switching path two, and the 4b of the water-supplying chamber two sets Put close to below the 4a of the water-supplying chamber one, the intake chamber 3 is arranged on the bottom of water-cooled hot switching path 10a, it is described enter On water pipe 5 set flowmeter 11, on the 6a of the outlet pipe one set flowmeter 12, by control the valve 7 opening degree and Change the 10b of water-cooled hot switching path two, make the 4a of the water-supplying chamber one and 6a of outlet pipe one and continuous cast mold in the water flowing in meniscus area Measure is the 40%~50% of the total water-flowing amount of continuous cast mold.
Embodiment three:As shown in figure 3, a kind of continuous cast mold, including copper plate of crystallizer 1 and support is played to copper plate of crystallizer Effect and the crystallizer water tank of cooling water flowing effect, the crystallizer water tank, including water tank 2a and water tank 2a and copper plate of crystallizer 1 Between increased fast changeable water tank backboard 2b, the water tank backboard 2b sets an intake chamber 3 and Liang Ge water-supplying chamber, point It is not the 4a of the water-supplying chamber one and 4b of water-supplying chamber two, i.e., described crystallizer water tank water intake room and crystallizer water tank water-supplying chamber are transferred to described Water tank backboard correspondence position, the intake chamber 3 is connected with water tank 2a and water inlet pipe 5, the 4a of the water-supplying chamber one and water tank 2a and is gone out The 6a of water pipe one is connected, and the 4b of the water-supplying chamber two is connected with water tank 2a and the 6b of outlet pipe two, and valve is set on the 6b of the outlet pipe two 7, the 6b of the outlet pipe two is connected with the valve 7, and the crystallizer water tank 2 sets intermediate recess, peripheral projection with sealing Groove 8 and sealing ring 9, peripheral sealing is formed with the contact surface of copper plate of crystallizer 1, and there are the water-cooled hot switching path 10 in gap, institute in centre The meniscus area that the 4a of water-supplying chamber one is correspondingly arranged at water-cooled hot switching path 10 is stated, the 4b of the water-supplying chamber two is next to described Below the 4a of water-supplying chamber one, the intake chamber 3 is arranged on the bottom of water-cooled hot switching path 10, is set on the 6a of the outlet pipe one Flowmeter 12, by controlling the opening degree of the valve 7, makes the 4a of the water-supplying chamber one and 6a of outlet pipe one with continuous cast mold in bent moon The water-flowing amount in face area is the 55%~65% of the total water-flowing amount of continuous cast mold.
Example IV:As shown in figure 4, a kind of continuous cast mold, including crystallizer copper pipe 1 and support is played to crystallizer copper pipe Effect and the crystallizer water tank 2 of cooling water flowing effect, the crystallizer water tank set an intake chamber 3 and Liang Ge water-supplying chamber, point It is not the 4a of the water-supplying chamber one and 4b of water-supplying chamber two, the intake chamber 3 is connected with water inlet pipe 5, the 4a of the water-supplying chamber one and outlet pipe one 6a is connected, and the 4b of the water-supplying chamber two is connected with the 6b of outlet pipe two, and valve 7, the outlet pipe one are set on the 6a of the outlet pipe one 6a is connected with the valve 7, intermediate recess, peripheral projection is set on the crystallizer copper pipe 1 and carries seal groove 8 and sealing ring 9, Peripheral sealing is formed with the contact surface of crystallizer water tank 2, there are the water-cooled hot switching path 10 in gap, the water-supplying chamber one 4a pairs in centre The meniscus area of water-cooled hot switching path 10 should be arranged on, the 4b of the water-supplying chamber two is next under the 4a of the water-supplying chamber one Face, the intake chamber 3 is arranged on the bottom of water-cooled hot switching path 10, and flowmeter 11, the water outlet are set on the water inlet pipe 5 Flowmeter 12 is set on the 6a of pipe one, flowmeter 13 is set on the 6b of the outlet pipe two, by controlling the opening degree of the valve 7, Water-flowing amounts of the 4a of the water-supplying chamber one and 6a of outlet pipe one with continuous cast mold in meniscus area is set to be the total water-flowing amount of continuous cast mold 45%~55%.
Embodiment five:Crystallizer is essentially identical with embodiment three, further, as shown in figure 5, the crystallizer water tank exists The diamond block 15 of support copper coin and water conservancy diversion cooling water is set in groove surface, can effectively prevent what copper coin from producing in cooling procedure Deformation, and water conservancy diversion can be carried out to current, beneficial to heat conduction, so as to reduce crackle, prevent defect from occurring.Diamond block sets Put, copper coin is unlikely in the case where drawing is acted on water tank, deform copper coin or water tank, while the tip of diamond block is along current side To not influenceing the heat exchange of crystallizer.
Embodiment six:Such as Fig. 6, a kind of continuous cast mold, including copper plate of crystallizer 1 and copper plate of crystallizer is played a supportive role And the crystallizer water tank 2 of cooling water flowing effect, the setting of crystallizer water tank one intake chamber 3 and the Liang Ge water-supplying chamber, it is respectively The 4a of the water-supplying chamber one and 4b of water-supplying chamber two, the intake chamber 3 is connected with water inlet pipe 5, and the 4a of the water-supplying chamber one and 6a of outlet pipe one connects Logical, the 4b of the water-supplying chamber two connect with the 6b of outlet pipe two, setting valve 7 on the outlet pipe 6b and 6a, the outlet pipe 6b with 6a is connected with the valve 7, and the copper plate of crystallizer 1 sets intermediate recess, peripheral projection and carries seal groove 8 and sealing ring 9, with The contact surface of crystallizer water tank 2 forms peripheral sealing, and there is the water-cooled hot switching path 10 in gap centre, and the copper plate of crystallizer 1 exists The support block 15 of support copper coin and water conservancy diversion cooling water is set in groove surface, and the 4a of the water-supplying chamber one is correspondingly arranged at water-cooled heat exchange The meniscus area of passage 10, the 4b of the water-supplying chamber two is next to below the 4a of the water-supplying chamber one, and the intake chamber 3 is set Flowmeter 11 is set on the bottom of water-cooled hot switching path 10, the water inlet pipe 5, flowmeter is set on the 6b of the outlet pipe two 13, by controlling the opening degree of the valve 7, make the 4a of the water-supplying chamber one and 6a of outlet pipe one with continuous cast mold in meniscus area Water-flowing amount is the 55%~65% of the total water-flowing amount of continuous cast mold.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, this area is common Other modifications or equivalent that technical staff is made to technical scheme, without departing from technical solution of the present invention Spirit and scope, all should cover in the middle of scope of the presently claimed invention.

Claims (14)

1. a kind of crystallizer, it is characterised in that including copper coin and water tank, water tank sets an intake chamber and multiple water-supplying chamber, water Case or copper coin set intermediate recess, form water-cooled hot switching path, and passage is connected with intake chamber and water-supplying chamber, the multiple water outlet At least one is arranged on meniscus surface area for room, and at least one is arranged on the lower section of meniscus surface area, and the water tank periphery is convex Rise and carry seal groove and sealing ring.
2. a kind of crystallizer as claimed in claim 1, it is characterised in that the depression in the meniscus area is shallower than below meniscus Depression.
3. a kind of crystallizer as claimed in claim 1 or 2, it is characterised in that meniscus surface area or the lower section of being arranged on Valve is set on water-supplying chamber's connecting pipe.
4. a kind of crystallizer as claimed in claim 1 or 2, it is characterised in that the intake chamber is arranged on water-cooled heat exchange and leads to The bottom in road, the water-supplying chamber is arranged on the top of water-cooled hot switching path.
5. a kind of crystallizer as claimed in claim 3, it is characterised in that the intake chamber is arranged on water-cooled hot switching path Bottom, the water-supplying chamber is arranged on the top of water-cooled hot switching path.
6. a kind of crystallizer as claimed in claim 1 or 2, it is characterised in that water-supplying chamber one is arranged on meniscus area, and described Water-cooled hot switching path is connected, and water-supplying chamber two is arranged on meniscus area lower section.
7. a kind of crystallizer as described in claim 1 or 2 or 5, it is characterised in that the pipeline of the intake chamber and water-supplying chamber is extremely There is one to be not provided with flowmeter more.
8. a kind of crystallizer as described in claim 1 or 2 or 5, it is characterised in that the water tank backboard including fast changeable, Intake chamber and water-supplying chamber are located at the water tank backboard.
9. a kind of crystallizer as described in claim 1 or 2 or 5, it is characterised in that the depressed area of the water tank or copper coin is two Person has set the diamond block of support and water conservancy diversion by fastener drawing position, and the thickness of the diamond block is equal to the depth of depression.
10. a kind of crystallizer as claimed in claim 2, it is characterised in that by controlling water-cooled hot switching path in meniscus Sinking degree adjust meniscus area water-carrying capacity.
11. a kind of crystallizers as claimed in claim 3, it is characterised in that adjusted by controlling the opening degree of the valve Meniscus area water-carrying capacity.
12. a kind of crystallizers as claimed in claim 2, it is characterised in that the intake chamber is connected with water inlet pipe, water-supplying chamber one Connected with outlet pipe one, water-supplying chamber two connects with outlet pipe two, the outlet pipe one or/and outlet pipe two set valve.
13. a kind of crystallizers as claimed in claim 12, it is characterised in that by controlling water-cooled hot switching path in meniscus Sinking degree and/or the opening degree of the valve carry out regulating water flow.
The 14. a kind of crystallizer as described in claim 6 or 10 or 13, it is characterised in that the water-carrying capacity in meniscus area is total The 40%~80% of water-carrying capacity.
CN201710142051.1A 2017-03-10 2017-03-10 A kind of continuous cast mold Active CN106670409B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710142051.1A CN106670409B (en) 2017-03-10 2017-03-10 A kind of continuous cast mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710142051.1A CN106670409B (en) 2017-03-10 2017-03-10 A kind of continuous cast mold

Publications (2)

Publication Number Publication Date
CN106670409A true CN106670409A (en) 2017-05-17
CN106670409B CN106670409B (en) 2019-02-22

Family

ID=58828746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710142051.1A Active CN106670409B (en) 2017-03-10 2017-03-10 A kind of continuous cast mold

Country Status (1)

Country Link
CN (1) CN106670409B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4129172A (en) * 1976-10-27 1978-12-12 Lukens Steel Company Mold for electroslag remelting process
CN2936495Y (en) * 2006-07-15 2007-08-22 西峡龙成特种材料有限公司 Heat top crystallizer form work of meniscus area narrow shallow water channel
CN2936496Y (en) * 2006-07-15 2007-08-22 西峡龙成特种材料有限公司 Heat top crystallizer formwork equiped with low heat conductive alloy layer in meniscus area water channel
CN202155493U (en) * 2011-07-08 2012-03-07 河北钢铁股份有限公司唐山分公司 Cooling structure for wide-surface copper plate of crystallizer of continuous slab casting machine
CN206622582U (en) * 2017-03-10 2017-11-10 西峡龙成特种材料有限公司 A kind of continuous cast mold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4129172A (en) * 1976-10-27 1978-12-12 Lukens Steel Company Mold for electroslag remelting process
CN2936495Y (en) * 2006-07-15 2007-08-22 西峡龙成特种材料有限公司 Heat top crystallizer form work of meniscus area narrow shallow water channel
CN2936496Y (en) * 2006-07-15 2007-08-22 西峡龙成特种材料有限公司 Heat top crystallizer formwork equiped with low heat conductive alloy layer in meniscus area water channel
CN202155493U (en) * 2011-07-08 2012-03-07 河北钢铁股份有限公司唐山分公司 Cooling structure for wide-surface copper plate of crystallizer of continuous slab casting machine
CN206622582U (en) * 2017-03-10 2017-11-10 西峡龙成特种材料有限公司 A kind of continuous cast mold

Also Published As

Publication number Publication date
CN106670409B (en) 2019-02-22

Similar Documents

Publication Publication Date Title
CN102151808B (en) Water cooling channel for large beam blank continuous casting crystallizer
CN202045348U (en) Vertical type semi-continuous casting crystallizer with double-layer water cavities
CN104889350B (en) Round steel ingot mould and round ingot manufacture method
CN112338154B (en) Casting flow dividing device for improving yield of cast high-temperature alloy
CN104232918B (en) Electroslag smelting casting high efficiency and heat radiation crystallizer
CN103978189A (en) Improved die cooling device
CN104107889B (en) Large-cross-section nodular cast iron horizontal casting production technology and graphite jig device thereof
CN115007816A (en) Thin slab continuous casting crystallizer copper plate with cooling structure
CN206622582U (en) A kind of continuous cast mold
CN202155493U (en) Cooling structure for wide-surface copper plate of crystallizer of continuous slab casting machine
CN1150070C (en) Horizontal casting equipment for aluminium alloy flat ingot
CN106670410A (en) Crystallizer for preventing various defects of continuous cast billet
CN203109207U (en) Die fine hole cooling device
CN106670409A (en) Crystallizer for continuous casting
CN206622583U (en) A kind of crystallizer for preventing slab defects
CN206622584U (en) A kind of crystallizer for preventing continuous casting billet from producing various defects
CN203862995U (en) Improved mold cooling device
CN202715800U (en) Funnel type crystallizer copper plate with cooling water gaps in non-uniform distribution
CN206662223U (en) A kind of wide face copper coin of new type superthin plate slab crystallizer
CN202415652U (en) Slab mold crystallizer with adjustable inner cavity
CN205020772U (en) External recessing round steel ingot mould
CN106825465A (en) A kind of crystallizer for preventing slab defects
CN107116186B (en) A kind of slim slab copper plate of crystallizer of compound cooling structure
CN202239531U (en) Cooling water passage of large-sized shaped blank continuous casting crystallizer
CN203610630U (en) Water-cooled crystallizer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant