CN106656550A - Project system monitoring method and device - Google Patents

Project system monitoring method and device Download PDF

Info

Publication number
CN106656550A
CN106656550A CN201610868446.5A CN201610868446A CN106656550A CN 106656550 A CN106656550 A CN 106656550A CN 201610868446 A CN201610868446 A CN 201610868446A CN 106656550 A CN106656550 A CN 106656550A
Authority
CN
China
Prior art keywords
project
data
destination server
flows
service data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610868446.5A
Other languages
Chinese (zh)
Inventor
王岩龙
王智骞
夏永宏
唐贵明
李惠梅
王凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Win Technology Co Ltd
Original Assignee
Beijing Win Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Win Technology Co Ltd filed Critical Beijing Win Technology Co Ltd
Priority to CN201610868446.5A priority Critical patent/CN106656550A/en
Publication of CN106656550A publication Critical patent/CN106656550A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/04Network management architectures or arrangements
    • H04L41/042Network management architectures or arrangements comprising distributed management centres cooperatively managing the network
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/0703Error or fault processing not based on redundancy, i.e. by taking additional measures to deal with the error or fault not making use of redundancy in operation, in hardware, or in data representation
    • G06F11/0793Remedial or corrective actions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3055Monitoring arrangements for monitoring the status of the computing system or of the computing system component, e.g. monitoring if the computing system is on, off, available, not available
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3065Monitoring arrangements determined by the means or processing involved in reporting the monitored data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/32Monitoring with visual or acoustical indication of the functioning of the machine
    • G06F11/324Display of status information
    • G06F11/327Alarm or error message display
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/32Monitoring with visual or acoustical indication of the functioning of the machine
    • G06F11/324Display of status information
    • G06F11/328Computer systems status display
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0631Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/12Discovery or management of network topologies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network

Abstract

The invention provides a project system monitoring method and device. The method comprises steps that connection with a database is carried out to load the registration information of a project needing monitoring, and a resource list of a target server of the project is loaded; according to the resource list of the target server of the project, operation data and flow data of the target server of the project are acquired through a safety gateway corresponding to the project; safety check for the operation data and the flow data of the target server of the project is carried out; if check is determined to be successful, data statistics and analysis of the operation data and the flow data are carried out, and the data is inputted into the database; according to the operation data and the flow data of the target server of the project inputted to the database, a topological structure corresponding to the project is constructed, when monitoring early warning is carried out and a fault occurs, a fault processing template is called to carry out automatic fault processing. The method is advantaged in that project system data acquisition is accomplished, a project operation data analysis form is realized, monitoring data display is realized in a topological mode, a multi-channel customized alarm method is supported, and a remote system control function is further realized.

Description

A kind of project system monitoring and managing method and device
Technical field
The present invention relates to network articles system supervisory technical field, more particularly to a kind of project system monitoring and managing method and dress Put.
Background technology
It is to be directed in client's construction project system that intelligentized project supervision control device system is mainly used in enterprise Into the project system data acquisition of safety, project operation data analysis form, the exhibition of monitoring data is completed by way of topology Show, Templated project automates O&M processing mode, individual character alarm method by all kinds of means, the function of remote system control.
With the development of internet ecology business, enterprise is technically needed to ensure that the project system built for client can Keep the uninterrupted health externally service of 7x24 hours, the in addition continuous development of cloud computing Intel Virtualization Technology in the last few years, item Mesh system is also built more complicated and more complicated, builds more high-end and more high-end, so the system operation maintenance personnel band of the system operation maintenance personnel to client and enterprise More challenges are carried out, for example:System resource is needed to adjust in occasion, or when needing first when breaking down Between processed and safeguarded.This is accomplished by the technology that operation maintenance personnel possesses suitable experience and correlation.
The technical scheme of current remote items system administration on the market, there is two categories below, the first kind:Network security manufacturer gives birth to Often there is the network management system equipment of linkage property, main feature:Safety and stability, interface standard, function is classical, but towards customization Business cannot provide accurate technological service, and price very expensive needs individually purchase, need to put into the related clothes of purchase for a long time Business.Equations of The Second Kind:The cloud guard system of some cloud service company design research and development, is mainly characterized by the cloud operation system just for our company Management and virtual management, it is impossible to custom service, also cannot simultaneously manage the project system on many ground.3rd class:The monitoring increased income Management tool, technical characteristics are, with huge active technology community, to support many monitoring management functions, but are not possessed Virtual management function, and relative leak is also while increase income.
To sum up, this area needs a kind of intelligentized project system regulation technique scheme badly, meets many project systems Supervision demand.
The content of the invention
The embodiment of the present invention provides a kind of project system monitoring and managing method and device, to provide a kind of intelligentized project system Regulation technique scheme.
On the one hand, a kind of project system monitoring and managing method is embodiments provided, methods described includes:
The log-on message of the project that connection database loading need to be supervised, so as to load the money of the destination server of the project Source list;
According to the Resources list of the destination server of the project, obtain described by the corresponding security gateway of the project The service data and data on flows of the destination server of project;
Safety check is carried out to the service data and data on flows of the destination server of the project of reception;
If it is determined that verifying successfully, the service data and data on flows of the destination server of the project for receiving are entered into line number According to statistics with analyze and put in storage;
According to the service data and data on flows of the destination server of the project of warehouse-in, the project is created corresponding Topological structure, carries out supervising early warning and when breaking down, and calls troubleshooting template to carry out failure automatic business processing.
On the other hand, a kind of project system maintenance device is embodiments provided, described device includes:
Message data receiver module, for connecting the log-on message of the project that database loading need to be supervised, so as to load State the Resources list of the destination server of project;According to the Resources list of the destination server of the project, by the project Corresponding security gateway obtains the service data and data on flows of the destination server of the project;
Project safety control module, for service data and data on flows to the destination server of the project for receiving Carry out safety check;
Data statistics and analytical statement module, for if it is determined that verify successfully, by the destination service of the project of reception The service data and data on flows of device carries out data statistics and analyzes and put in storage;
Topology monitoring module, for according to warehouse-in the project destination server service data and data on flows, Create the corresponding topological structure of the project;
Early warning and failure automatic business processing module, for according to the service data of the destination server of the project of warehouse-in The corresponding topological structure of the project created with data on flows, carries out supervising early warning and when breaking down, and calls at failure Reason template carries out failure automatic business processing.
Above-mentioned technical proposal has the advantages that:Intelligentized project system supervises scheme by more than, can complete Project system data acquisition, project operation data analysis form completes the displaying of monitoring data, by all kinds of means by way of topology Individual character alarm method, remote system control etc. function.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of project system monitoring and managing method flow chart of the embodiment of the present invention;
Fig. 2 is a kind of project system maintenance device structural representation of the embodiment of the present invention;
Fig. 3 is a kind of intelligentized project system maintenance device structural representation of application example of the present invention;
Fig. 4 is connected scene structure for a kind of intelligentized project system maintenance device of application example of the present invention with project system Schematic diagram.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
As shown in figure 1, being a kind of project system monitoring and managing method flow chart of the embodiment of the present invention, methods described includes:
101st, the log-on message of the project that database loading need to be supervised is connected, so as to load the destination server of the project The Resources list;
102nd, according to the Resources list of the destination server of the project, obtained by the corresponding security gateway of the project The service data and data on flows of the destination server of the project;
103rd, to receive the project destination server service data and data on flows carry out safety check;
104th, if it is determined that verifying successfully, the service data and data on flows of the destination server of the project for receiving are entered Line number according to statistics with analyze and put in storage;
105th, according to the service data and data on flows of the destination server of the project of warehouse-in, the project pair is created The topological structure answered, carries out supervising early warning and when breaking down, and calls troubleshooting template to carry out failure automatic business processing.
Preferably, the Resources list of the destination server according to the project, by the corresponding safety of the project Gateway obtains the service data and data on flows of the destination server of the project, including:According to the destination service of the project The Resources list of device, using secure hyper-text transfer agreement http request, by the corresponding security gateway of the project institute is obtained State the service data and data on flows of the destination server of project.
Preferably, the utilization secure hyper-text transfer agreement http request, by the corresponding security gateway of the project The service data and data on flows of the destination server of the project are obtained, including:Using encryption http request triggering Agentd The running status of the destination server of the project is checked, the mesh of the project is obtained by the corresponding security gateway of the project The service data and data on flows of mark server.
Preferably, the service data and data on flows of the destination server of the project according to warehouse-in, creates institute The corresponding topological structure of project is stated, including:According to the service data and data on flows of the destination server of the project of warehouse-in, The corresponding topological structure of the project is created, by way of red line or yellow line or green line or red icon, the project is marked Equipment running status.
Preferably, the service data and data on flows of the destination server of the project according to warehouse-in, creates institute The corresponding topological structure of project is stated, carries out supervising early warning and when breaking down, call troubleshooting template to carry out failure automatic Change is processed, including:By way of mail, or by way of the wechat enterprise number for docking, or by nail nail collaboration client Mode, the information of supervision early warning is sent into the corresponding shareholder of the project.
Corresponding to said method embodiment, as shown in Fig. 2 being a kind of project system maintenance device structure of the embodiment of the present invention Schematic diagram, described device includes:
Message data receiver module 21, for connecting the log-on message of the project that database loading need to be supervised, so as to load The Resources list of the destination server of the project;According to the Resources list of the destination server of the project, by the item The corresponding security gateway of mesh obtains the service data and data on flows of the destination server of the project;
Project safety control module 22, for service data and flow number to the destination server of the project for receiving According to carrying out safety check;
Data statistics and analytical statement module 23, for if it is determined that verify successfully, the target of the project of reception being taken The service data and data on flows of business device carries out data statistics and analyzes and put in storage;
Topology monitoring module 24, for according to the service data and flow number of the destination server of the project of warehouse-in According to the corresponding topological structure of the establishment project;
Early warning and failure automatic business processing module 25, for according to the operation number of the destination server of the project of warehouse-in According to the corresponding topological structure of the project created with data on flows, carry out supervising early warning and when breaking down, call failure Processing template carries out failure automatic business processing.
Preferably, the message data receiver module 21, specifically for the resource of the destination server according to the project List, using secure hyper-text transfer agreement http request, by the corresponding security gateway of the project project is obtained The service data and data on flows of destination server.
Preferably, the message data receiver module 21, further specifically for using encryption http request triggering Agentd checks the running status of the destination server of the project, and by the corresponding security gateway of the project item is obtained The service data and data on flows of purpose destination server.
Preferably, the topology monitoring module 24, specifically for the fortune of the destination server of the project according to warehouse-in Row data and data on flows, create the corresponding topological structure of the project, by red line or yellow line or green line or red icon Mode, marks the running status of the item purpose equipment.
Preferably, the early warning and failure automatic business processing module 25, specifically for by way of mail, or by right The mode of the wechat enterprise number for connecing, or by way of nail nail collaboration client, the information of supervision early warning is sent into the item The corresponding shareholder of purpose.
The purpose of the embodiment of the present invention is to provide a remote items supervision and control system, promising towards institute for enterprise The project system that client builds, completes the project system data acquisition for client safety, project operation data analysis report Table, completes the displaying of monitoring data by way of topology, and Templated project automates O&M processing mode, by all kinds of means Property alarm method, remote system control etc. function method and device system.
As shown in figure 3, being a kind of intelligentized project system maintenance device structural representation of application example of the present invention.Realize Above-mentioned technical proposal be by the message data receiver module of said apparatus and system, project safety control module, it is self-defined from Dynamicization O&M template, data statistics and analytical statement module, topology monitoring module, early warning and failure automatic business processing module group are several The collaboration works such as security gateway, Docker Swarm services, Docker Server, Agentd in individual module linkage project system Make, carry out the functions such as the management of finished item system monitoring and automated maintenance, pre-alert notification, statement analysis, resource adjustment management.
Message data receiver module:The http request encrypted by safety completes host and the application for receiving gateway apparatus The service data of container, forms data record, for data alarm, safeguards that process task provides foundation.
Project safety control module:For service data and data on flows to the destination server of the project for receiving Carry out safety check.Operation maintenance personnel can be activated through the http- of safety encryption by the way to manage of the web graph shape on backstage API request, completes some project system control tasks, for example:Destroy reconstruct mirror image, restart certain service processes etc..
Self-defined automation O&M template:Realize for the failure of some system orienteds, obtain corresponding node ID, IP Address, process service, Container Type etc., complete to complete manual maintenance process operation by default template flow process when alarm is received.
Data statistics and analytical statement module:According to each system operation data that security gateway is reported, data point are completed Analysis, according to the threshold values of default template warning limit is divided, and according to curvilinear trend alarm time is judged, periodically sends customer-oriented Operation form.
Topology monitoring module:By hardware resource, running status data on flows of registration etc. in system, identification creates corresponding Topological structure by way of red line/yellow line/green line and red icon, mark project equipment running status, flow system flow feelings Condition simultaneously provides corresponding alarm.
Early warning and failure automatic business processing module:Early warning and failure automatic business processing module are by way of mail by trend Analysis report, early warning mail is sent to specified subscriber mailbox.It is note by the wechat enterprise number and nail nail collaboration client that dock Volume management user sends related warning information.Obtain early warning information while, with Mishap Database in load fault signature with Threshold parameter compares, and troubleshooting template is called in automation, obtains corresponding malfunctioning node ID, IP address, process service, appearance Device type etc., by handling failure template flow process troubleshooting is completed.For example:Answer by the way that the http-API remote destroyings encrypted are specific With container, then re-create, add network interface card, open application service.
The security gateway device of this programme embodiment is one can be received safe cryptographic API task and performed or added Plus the gateway apparatus that plan or forwarding are performed.It includes following components:Receiver, transfer interpreter, actuator, Jobserver.Security gateway device can by receiver receive from Agentd and central controller cryptographic API please Ask, the translation parsing of being completed by transfer interpreter for task judges API request type, and by actuator corresponding process, example are completed Such as:Forwarding reports Docker running statuses, addition Jobserver tasks, performs Docker Container Management tasks etc..
Docker Server are an application container engines increased income, it is desirable to provide a kind of Automation of application program Administration's solution, creates rapidly a container Container (lightweight virtual machine) and deployment and operation should on linux system With program, and can easily realize that the automation of application program is installed, deployment and upgraded by configuration file, it is very convenient.
Docker Swarm are the Clusterings of Docker ecosystems.He can be with Docker's or Docker-Machine Order every trade instrument coordinates, there is provided the basic function of container engine is managed on mainframe cluster.The network that gateway apparatus pass through it Port (2375) is interacted by way of API with Swarm.It is similar with the mode that Docker is interacted with the interactive mode of Swarm complete Establishment into container, (attach) operation destroyed, run, depending on, and obtaining operation host and operating in Docker Server Application container daily record and other related contents.
Agentd:It mainly completes to receive the clocked flip task of Jobserver and complete execution action accordingly, for example Collection host service data and returned data.Security gateway device is completed in addition and directly triggers assignment instructions, for example:Add Plus Microsoft Loopback Adapter.
By above technical method, this intelligentized project system is supervised and control device energy finished item system data Collection, project operation data analysis form completes the displaying of monitoring data, Templated project automation by way of topology The functions such as O&M processing mode, individual character alarm method by all kinds of means, remote system control.
The intelligentized project system supervision of the embodiment of the present invention mainly includes several modules with control system:Message data connects Receive module, project safety control module, self-defined automation O&M template, data statistics and analytical statement module, topology monitoring Module, early warning and failure automatic business processing module composition.One kind is realized by arrangement described above and system to be based on Docker realizes the gateway apparatus of remote items system supervisory.
As shown in figure 4, being connected with project system for a kind of intelligentized project system maintenance device of application example of the present invention Scene structure schematic diagram.Enterprise is saved by above-mentioned this device and buys network management system purchase cost, while improve enterprise Supervision to project system running status, it additionally enhances the management means that project system automates O&M, increased Security, the promptness of fault pre-alarming, and reduce the workload of operation maintenance personnel.
The intelligentized project system supervision stated using the present invention and control system, in the process of project system management In, completed towards project objective server by the modules in system above, gathered by Agentd, security gateway is reported Service data statistical function.Control management, the destruction reconstruct to Docker containers in project is completed by security gateway.Project Show that the still exception that whether gives a warning reports an error by data statistics and analysis template after the completion of system data acquisition, by making by oneself The O&M template of justice goes to trigger corresponding system maintenance action and task.By wechat public number and Ding Ding team collaborations instrument, The various ways such as mail trigger early warning information.Corresponding system operation data analytical statement is periodically completed according to change curve, in advance Alarm time is surveyed, corresponding shareholder is notified.The remote of finished item system is operated by what is iconified to project system by backstage Process control is managed.
The application example that the supervision of embodiment of the present invention project system be the following is with control method and device is in actual scene Operation principle schematic diagram.
Specific embodiment step is as follows:
Step 1:Start intelligentized project system supervision and control system, connect the registration that database loads relevant item Information, loads the Resources list of each project objective server.
Step 2:Message data receiver module inquires about the security gateway service of each project by encrypting http request, pacifies Full gateway service forwards request task, triggers Agentd inspection system running statuses.Agentd inquiry returned datas are by safety Gateway service is reported, if the Agentd of new registration learns the ID of this client automatically.
Step 3:Message data receiver module carries out rapidly safety check, if verified successfully, carries out corresponding data and enters Storehouse.
Step 4:Monitoring topological module according to the data on flows and system operation data for reporting, by red line, yellow line, green line Show topological structure with the mode of red circle early warning.
Step 5:Data statistics and analytical statement module, related alarm equipment is gone out through data statistics to monitoring template query And service, early warning report is completed by historical data and trend analysis.
Step 6:Early warning, according to automation O&M template contral flow process, triggers project system with failure automatic business processing module Security gateway, control Docker Swarm and Agentd completion system maintenance and managements, and by alarm send mail respectively Early warning, and the notice of the warning of wechat enterprise number and nail collaborative tools.
The embodiment of the present invention is the supervision of intelligentized project system and control system for proposing, in the mistake of project system management Cheng Zhong, is completed towards project objective server by the modules in system above, is gathered by Agentd, on security gateway The service data statistical function of report.Control management, the destruction reconstruct to Docker containers in project is completed by security gateway. Show that the still exception that whether gives a warning reports an error by data statistics and analysis template after the completion of mesh system data acquisition, by certainly The O&M template of definition goes to trigger corresponding system maintenance action and task.By wechat public number and Ding Ding team collaborations work The various ways such as tool, mail trigger early warning information.Corresponding system operation data analytical statement is periodically completed according to change curve, Prediction alarm time, notifies corresponding shareholder.The operation finished item system for passing through to iconify to project system by backstage The remote control management.
The project system number for safety needed for client's construction project system has been substantially met by above technical scheme According to collection, project operation data analysis form, the displaying of monitoring data is completed by way of topology, Templated project is automatic Change the functions such as O&M processing mode, individual character alarm method by all kinds of means, remote system control.
In above-mentioned detailed description, various features are combined together in single embodiment, to simplify the disclosure.No This open method should be construed to reflect such intention, i.e. the embodiment of theme required for protection needs ratio The more features of feature clearly stated in each claim.Conversely, as appending claims reflects Like that, the present invention is in the state fewer than whole features of disclosed single embodiment.Therefore, appending claims In being hereby expressly incorporated into detailed description, wherein each claim is alone as the single preferred embodiment of the present invention.
To enable any technical staff in the art to realize or using the present invention, disclosed embodiment being entered above Description is gone.To those skilled in the art;The various modification modes of these embodiments will be apparent from, and this The General Principle of text definition can also be applied to other embodiments on the basis of the spirit and scope without departing from the disclosure. Therefore, the disclosure is not limited to embodiments set forth herein, but most wide with principle disclosed in the present application and novel features Scope is consistent.
Described above includes the citing of one or more embodiments.Certainly, in order to above-described embodiment is described and description portion The all possible combination of part or method is impossible, but it will be appreciated by one of ordinary skill in the art that each enforcement Example can do further combinations and permutations.Therefore, embodiment described herein is intended to fall into appended claims Protection domain in all such changes, modifications and variations.Additionally, with regard to the term used in specification or claims "comprising", the word covers mode similar to term " including ", just as " including, " solved as link word in the claims As releasing.Additionally, the use of any one term "or" in the specification of claims being to represent " non-exclusionism Or ".
Those skilled in the art will also be appreciated that the various illustrative components, blocks that the embodiment of the present invention is listed (illustrative logical block), unit, and step can by electronic hardware, computer software, or both knot Conjunction is realized.To clearly show that the replaceability (interchangeability) of hardware and software, above-mentioned various explanations Property part (illustrative components), unit and step have universally described their function.Such work( It can be the design requirement for realizing depending on specific application and whole system by hardware or software.Those skilled in the art Can be for every kind of specific application, it is possible to use various methods realize described function, but this realization is understood not to Beyond the scope of embodiment of the present invention protection.
Various illustrative logical block described in the embodiment of the present invention, or unit can by general processor, Digital signal processor, special IC (ASIC), field programmable gate array or other programmable logic devices, discrete gate Or the design of transistor logic, discrete hardware components, or any of the above described combination is come the function realized or described by operate.General place Reason device can be microprocessor, and alternatively, the general processor can also be any traditional processor, controller, microcontroller Device or state machine.Processor can also be realized by the combination of computing device, such as digital signal processor and microprocessor, Multi-microprocessor, one or more microprocessors combine a Digital Signal Processor Core, or any other like configuration To realize.
The step of method or algorithm described in the embodiment of the present invention can be directly embedded into hardware, computing device it is soft Part module or the combination of both.Software module can be stored in RAM memory, flash memory, ROM memory, EPROM storages Other any form of storage media in device, eeprom memory, register, hard disk, moveable magnetic disc, CD-ROM or this area In.Exemplarily, storing medium can be connected with processor, so that processor can read information from storage medium, and Write information can be deposited to storage medium.Alternatively, storing medium can also be integrated into processor.Processor and storage medium can In to be arranged at ASIC, ASIC can be arranged in user terminal.Alternatively, processor and storage medium can also be arranged at use In different part in the terminal of family.
In one or more exemplary designs, the above-mentioned functions described by the embodiment of the present invention can be in hardware, soft Any combination of part, firmware or this three is realizing.If realized in software, these functions can be stored and computer-readable On medium, or it is transmitted on the medium of computer-readable with one or more instructions or code form.Computer readable medium includes electricity Brain stores medium and is easy to so that allowing computer program to be transferred to other local telecommunication medias from a place.Storage medium can be with It is that any general or special computer can be with the useable medium of access.For example, such computer readable media can include but RAM, ROM, EEPROM, CD-ROM or other optical disc storages, disk storage or other magnetic storage devices are not limited to, or other are appointed What can be used for carrying or store with instruct or data structure and other can be by general or special computer or general or specially treated Device reads the medium of the program code of form.Additionally, any connection can be properly termed computer readable medium, example Such as, if software is by a coaxial cable, fiber optic cables, double from web-site, server or other remote resources Twisted wire, Digital Subscriber Line (DSL) or with the wireless way for transmitting such as example infrared, wireless and microwave be also contained in it is defined In computer readable medium.Described video disc (disk) and disk (disc) includes Zip disk, radium-shine disk, CD, DVD, floppy disk And Blu-ray Disc, disk is generally with magnetic duplication data, and video disc generally carries out optical reproduction data with laser.Combinations of the above Can also be included in computer readable medium.
Above-described specific embodiment, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect Describe in detail, should be understood that the specific embodiment that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, all any modification, equivalent substitution and improvements within the spirit and principles in the present invention, done etc. all should include Within protection scope of the present invention.

Claims (10)

1. a kind of project system monitoring and managing method, it is characterised in that methods described includes:
The log-on message of the project that connection database loading need to be supervised, so as to load the resource row of the destination server of the project Table;
According to the Resources list of the destination server of the project, the project is obtained by the corresponding security gateway of the project Destination server service data and data on flows;
Safety check is carried out to the service data and data on flows of the destination server of the project of reception;
If it is determined that verifying successfully, the service data and data on flows of the destination server of the project for receiving are carried out into data system Count and analyze and put in storage;
According to the service data and data on flows of the destination server of the project of warehouse-in, the corresponding topology of the project is created Structure, carries out supervising early warning and when breaking down, and calls troubleshooting template to carry out failure automatic business processing.
2. project system monitoring and managing method as claimed in claim 1, it is characterised in that the destination server according to the project The Resources list, the service data and flow of the destination server of the project are obtained by the corresponding security gateway of the project Data, including:
According to the Resources list of the destination server of the project, using secure hyper-text transfer agreement http request, by institute State the service data and data on flows of the destination server of the project corresponding security gateway acquisition project.
3. project system monitoring and managing method as claimed in claim 1, it is characterised in that the utilization secure hyper-text transfer agreement Http request, the service data and flow number of the destination server of the project are obtained by the corresponding security gateway of the project According to, including:
The running status of the destination server of the project is checked using encryption http request triggering Agentd, by the project Corresponding security gateway obtains the service data and data on flows of the destination server of the project.
4. project system monitoring and managing method as claimed in claim 1, it is characterised in that the target of the project according to warehouse-in The service data and data on flows of server, creates the corresponding topological structure of the project, including:
According to the service data and data on flows of the destination server of the project of warehouse-in, the corresponding topology of the project is created Structure, by way of red line or yellow line or green line or red icon, marks the running status of the item purpose equipment.
5. project system monitoring and managing method as claimed in claim 1, it is characterised in that the target of the project according to warehouse-in The service data and data on flows of server, creates the corresponding topological structure of the project, carries out supervising early warning and event occurring During barrier, troubleshooting template is called to carry out failure automatic business processing, including:
By way of mail, or by way of the wechat enterprise number for docking, or by way of nail nail collaboration client, will The information of supervision early warning is sent to the corresponding shareholder of the project.
6. a kind of project system maintenance device, it is characterised in that described device includes:
Message data receiver module, for connecting the log-on message of the project that database loading need to be supervised, so as to load the item The Resources list of purpose destination server;According to the Resources list of the destination server of the project, by project correspondence Security gateway obtain the project destination server service data and data on flows;
Project safety control module, for carrying out to the service data and data on flows of the destination server of the project for receiving Safety check;
Data statistics and analytical statement module, for if it is determined that verify successfully, by the destination server of the project of reception Service data and data on flows carry out data statistics and analyze and put in storage;
Topology monitoring module, for according to the service data and data on flows of the destination server of the project of warehouse-in, creating The corresponding topological structure of the project;
Early warning and failure automatic business processing module, for according to the service data and stream of the destination server of the project of warehouse-in The corresponding topological structure of the project of amount data creation, carries out supervising early warning and when breaking down, and calls troubleshooting mould Plate carries out failure automatic business processing.
7. project system maintenance device as claimed in claim 6, it is characterised in that
The message data receiver module, specifically for the Resources list of the destination server according to the project, using encryption HTTP http request, the fortune of the destination server of the project is obtained by the corresponding security gateway of the project Row data and data on flows.
8. project system maintenance device as claimed in claim 6, it is characterised in that
The message data receiver module, further specifically for checking the project using encryption http request triggering Agentd Destination server running status, the fortune of the destination server of the project is obtained by the corresponding security gateway of the project Row data and data on flows.
9. project system maintenance device as claimed in claim 6, it is characterised in that
The topology monitoring module, specifically for the service data and flow number of the destination server of the project according to warehouse-in According to, the corresponding topological structure of the project is created, by way of red line or yellow line or green line or red icon, mark is described The running status of item purpose equipment.
10. project system maintenance device as claimed in claim 6, it is characterised in that
The early warning and failure automatic business processing module, specifically for by way of mail, or the wechat enterprise by docking Number mode, or by way of nail nail collaboration client, the information of supervision early warning is sent into the corresponding responsibility of the project People.
CN201610868446.5A 2016-09-29 2016-09-29 Project system monitoring method and device Pending CN106656550A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610868446.5A CN106656550A (en) 2016-09-29 2016-09-29 Project system monitoring method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610868446.5A CN106656550A (en) 2016-09-29 2016-09-29 Project system monitoring method and device

Publications (1)

Publication Number Publication Date
CN106656550A true CN106656550A (en) 2017-05-10

Family

ID=58853549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610868446.5A Pending CN106656550A (en) 2016-09-29 2016-09-29 Project system monitoring method and device

Country Status (1)

Country Link
CN (1) CN106656550A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109710822A (en) * 2018-12-27 2019-05-03 北京奇安信科技有限公司 A kind of data source operation method for visualizing, system, interface, equipment and medium
CN109753420A (en) * 2018-12-29 2019-05-14 深圳市思迪信息技术股份有限公司 The acquisition method and device of monitoring data
CN111724898A (en) * 2020-06-15 2020-09-29 中国医学科学院医学信息研究所 Intelligent skin disease monitoring and early warning system based on big data technology

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101155218A (en) * 2006-09-30 2008-04-02 中兴通讯股份有限公司 Webmaster multi-grade alarming network element or veneer icon representation method
CN101388903A (en) * 2008-10-16 2009-03-18 中国移动通信集团福建有限公司 Mobile enterprise IT standardization management platform
CN101640612A (en) * 2009-09-07 2010-02-03 杭州华三通信技术有限公司 Method and device for flow path discovery and fault fast positioning
CN102932201A (en) * 2012-09-26 2013-02-13 迈普通信技术股份有限公司 Display control system and method for network monitoring data
CN103746548A (en) * 2014-01-21 2014-04-23 国家电网公司 Multifunction simulation power source used for distributed generation grid connection detection
CN105656698A (en) * 2016-03-24 2016-06-08 鞠洪尧 Intelligent monitoring structure and method for network application system
CN105721561A (en) * 2016-01-28 2016-06-29 华北电力大学(保定) Fan fault data center based on cloud platform

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101155218A (en) * 2006-09-30 2008-04-02 中兴通讯股份有限公司 Webmaster multi-grade alarming network element or veneer icon representation method
CN101388903A (en) * 2008-10-16 2009-03-18 中国移动通信集团福建有限公司 Mobile enterprise IT standardization management platform
CN101640612A (en) * 2009-09-07 2010-02-03 杭州华三通信技术有限公司 Method and device for flow path discovery and fault fast positioning
CN102932201A (en) * 2012-09-26 2013-02-13 迈普通信技术股份有限公司 Display control system and method for network monitoring data
CN103746548A (en) * 2014-01-21 2014-04-23 国家电网公司 Multifunction simulation power source used for distributed generation grid connection detection
CN105721561A (en) * 2016-01-28 2016-06-29 华北电力大学(保定) Fan fault data center based on cloud platform
CN105656698A (en) * 2016-03-24 2016-06-08 鞠洪尧 Intelligent monitoring structure and method for network application system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
车路 等: ""基于开源软件的云监控平台设计与实现"", 《计算技术与自动化》 *
郭晓慧 等: ""基于Zabbix的分布式服务器监控应用研究"", 《通信学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109710822A (en) * 2018-12-27 2019-05-03 北京奇安信科技有限公司 A kind of data source operation method for visualizing, system, interface, equipment and medium
CN109753420A (en) * 2018-12-29 2019-05-14 深圳市思迪信息技术股份有限公司 The acquisition method and device of monitoring data
CN111724898A (en) * 2020-06-15 2020-09-29 中国医学科学院医学信息研究所 Intelligent skin disease monitoring and early warning system based on big data technology

Similar Documents

Publication Publication Date Title
CN111355780B (en) Internet of things monitoring management method and system based on block chain
WO2021017279A1 (en) Cluster security management method and apparatus based on kubernetes and network domain, and storage medium
CN103166933B (en) A kind of data security switching system and method
CN110971614A (en) Internet of things adaptation method and system, computer equipment and storage medium
CN105139139B (en) Data processing method and device and system for O&M audit
US9413597B2 (en) Method and system for providing aggregated network alarms
CN107094158B (en) Automatic change intranet security fragile analytic system
CN103283208B (en) Based on the remote real-time monitoring system of cloud computing
CN103188088B (en) Equipment information collection system and method
US8176137B2 (en) Remotely managing a data processing system via a communications network
CN109831327A (en) IMS full service network based on big data analysis monitors intelligent operation support system
CN107819876A (en) A kind of data processing method and system based on cloud platform
WO2023142054A1 (en) Container microservice-oriented performance monitoring and alarm method and alarm system
CN102624554B (en) Comprehensive network management method combining equipment management mode with service management mode
CN106533804A (en) Network operation support system
US11392873B2 (en) Systems and methods for simulating orders and workflows in an order entry and management system to test order scenarios
CN102916839A (en) Automatic monitoring system for agricultural work in sugarhouse
CN106100902A (en) High in the clouds index monitoring method and apparatus
CN102739802A (en) Service application-oriented IT contralized operation and maintenance analyzing system
CN110276594A (en) A kind of banking operational system and method based on Ansible
CN107247648A (en) Method, the apparatus and system of remote items system supervisory are realized based on Docker
CN107426191A (en) A kind of leak early warning and emergency response automatic warning system
CN114679292B (en) Honeypot identification method, device, equipment and medium based on network space mapping
CN106656550A (en) Project system monitoring method and device
CN104637265A (en) Dispatch-automated multilevel integration intelligent watching alarming system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170510

RJ01 Rejection of invention patent application after publication