CN106649931B - A kind of calculation of ground surface settlement method after rectangular top pipe constructing tunnel work - Google Patents
A kind of calculation of ground surface settlement method after rectangular top pipe constructing tunnel work Download PDFInfo
- Publication number
- CN106649931B CN106649931B CN201610850605.9A CN201610850605A CN106649931B CN 106649931 B CN106649931 B CN 106649931B CN 201610850605 A CN201610850605 A CN 201610850605A CN 106649931 B CN106649931 B CN 106649931B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- unit symbol
- water pressure
- soil body
- pore water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004364 calculation method Methods 0.000 title claims abstract description 23
- 238000000034 method Methods 0.000 title claims abstract description 17
- 239000002689 soil Substances 0.000 claims abstract description 138
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 88
- 239000011148 porous material Substances 0.000 claims abstract description 72
- 238000010276 construction Methods 0.000 claims abstract description 43
- 238000007596 consolidation process Methods 0.000 claims abstract description 30
- 238000011160 research Methods 0.000 claims abstract description 14
- 230000007774 longterm Effects 0.000 claims abstract description 7
- 239000011800 void material Substances 0.000 claims description 12
- 230000006835 compression Effects 0.000 claims description 7
- 238000007906 compression Methods 0.000 claims description 7
- 230000003068 static effect Effects 0.000 claims description 7
- 238000004062 sedimentation Methods 0.000 claims description 6
- 239000004927 clay Substances 0.000 claims description 3
- 238000009412 basement excavation Methods 0.000 claims description 2
- 238000005253 cladding Methods 0.000 claims description 2
- RVRCFVVLDHTFFA-UHFFFAOYSA-N heptasodium;tungsten;nonatriacontahydrate Chemical compound O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.[Na+].[Na+].[Na+].[Na+].[Na+].[Na+].[Na+].[W].[W].[W].[W].[W].[W].[W].[W].[W].[W].[W] RVRCFVVLDHTFFA-UHFFFAOYSA-N 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims description 2
- 229920006395 saturated elastomer Polymers 0.000 claims description 2
- 238000012546 transfer Methods 0.000 claims description 2
- 230000007704 transition Effects 0.000 claims description 2
- 230000000977 initiatory effect Effects 0.000 abstract description 2
- 230000002265 prevention Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 8
- 238000004458 analytical method Methods 0.000 description 7
- 230000008859 change Effects 0.000 description 4
- 238000013459 approach Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000004088 simulation Methods 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000012517 data analytics Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000004836 empirical method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- General Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610850605.9A CN106649931B (en) | 2016-09-26 | 2016-09-26 | A kind of calculation of ground surface settlement method after rectangular top pipe constructing tunnel work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610850605.9A CN106649931B (en) | 2016-09-26 | 2016-09-26 | A kind of calculation of ground surface settlement method after rectangular top pipe constructing tunnel work |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106649931A CN106649931A (en) | 2017-05-10 |
CN106649931B true CN106649931B (en) | 2019-08-27 |
Family
ID=58854112
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610850605.9A Active CN106649931B (en) | 2016-09-26 | 2016-09-26 | A kind of calculation of ground surface settlement method after rectangular top pipe constructing tunnel work |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106649931B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108256172B (en) * | 2017-12-26 | 2021-12-07 | 同济大学 | Dangerous case early warning and forecasting method in process of pipe jacking and downward passing existing box culvert |
CN108062450B (en) * | 2018-01-03 | 2021-03-16 | 中国铁路设计集团有限公司 | Design method of ground settlement severe area in high-speed rail tunnel crossing area |
CN108520085A (en) * | 2018-01-31 | 2018-09-11 | 浙江大学城市学院 | Soil deformation caused by saturated soil shield driving and excess pore water pressure computational methods |
CN108931422B (en) * | 2018-04-27 | 2020-10-13 | 中铁十九局集团第一工程有限公司 | Measuring and calculating method for lateral extrusion deformation of foundation under roadbed load |
CN109141716B (en) * | 2018-08-16 | 2020-11-03 | 中铁二十局集团第一工程有限公司 | Comprehensive pipe gallery large-section rectangular pipe jacking construction pipe-soil contact pressure testing method |
CN109145473B (en) * | 2018-08-31 | 2020-09-18 | 华中科技大学 | Method for predicting settling process of vertical drainage plate consolidated saturated soft soil |
CN109359373B (en) * | 2018-10-09 | 2022-10-21 | 上海交通大学 | Method for predicting surface subsidence caused by pressure reduction and precipitation of confined aquifer |
CN109211669A (en) * | 2018-10-26 | 2019-01-15 | 淮阴工学院 | The often measuring method that lateral extrusion deforms in consolidation batt ground |
CN110489840B (en) * | 2019-08-09 | 2020-05-22 | 中铁第六勘察设计院集团有限公司 | Structure final settlement method considering immersed tube tunnel special process |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733413A (en) * | 2012-06-18 | 2012-10-17 | 河海大学 | Method for controlling subsidence of operating subway tunnel |
CN102966356A (en) * | 2012-12-07 | 2013-03-13 | 河海大学 | Method for controlling upward flotation and deformation of liquefiable ground operating tunnel under action of earthquake |
EP2653333A1 (en) * | 2012-04-19 | 2013-10-23 | Inergy Automotive Systems Research (Société Anonyme) | Fuel tank with flexible baffle for limiting fluid flow in one direction |
WO2014111920A1 (en) * | 2013-01-17 | 2014-07-24 | Sure Erasure Ltd. | System and method for monitoring of an electro-mechanical device |
-
2016
- 2016-09-26 CN CN201610850605.9A patent/CN106649931B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2653333A1 (en) * | 2012-04-19 | 2013-10-23 | Inergy Automotive Systems Research (Société Anonyme) | Fuel tank with flexible baffle for limiting fluid flow in one direction |
CN102733413A (en) * | 2012-06-18 | 2012-10-17 | 河海大学 | Method for controlling subsidence of operating subway tunnel |
CN102966356A (en) * | 2012-12-07 | 2013-03-13 | 河海大学 | Method for controlling upward flotation and deformation of liquefiable ground operating tunnel under action of earthquake |
WO2014111920A1 (en) * | 2013-01-17 | 2014-07-24 | Sure Erasure Ltd. | System and method for monitoring of an electro-mechanical device |
Also Published As
Publication number | Publication date |
---|---|
CN106649931A (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106649931B (en) | A kind of calculation of ground surface settlement method after rectangular top pipe constructing tunnel work | |
Mitew-Czajewska | A study of displacements of structures in the vicinity of deep excavation | |
CN104612700B (en) | A kind of Longitudinal Settlement deformation causes the determination method of shield tunnel additional internal force | |
Liu et al. | Design optimization of the soil nail wall-retaining pile-anchor cable supporting system in a large-scale deep foundation pit | |
CN102108707A (en) | Huge ultradeep foundation pit accurate subsidence and environmentally-friendly construction method | |
Zhu et al. | Combined Application of Optical Fibers and CRLD Bolts to Monitor Deformation of a Pit‐in‐Pit Foundation | |
Pakbaz et al. | Characteristics of diaphragm wall lateral deformations and ground surface settlements: Case study in Iran-Ahwaz metro | |
Wang et al. | Analysis of deep foundation pit construction monitoring in a metro station in Jinan city | |
Dong et al. | Advanced finite element analysis of a complex deep excavation case history in Shanghai | |
CN110046470A (en) | A kind of shield driving causes ground settlement method for determination of amount after work | |
CN108643246B (en) | The prediction technique that artesian water precipitation influences surrounding enviroment in foundation pit construction | |
CN107577836B (en) | Method for determining pressure of soil covering above tunnel in soft soil stratum | |
CN102031791B (en) | Method for determining integral groove wall stability of underground continuous wall and volume weight of slurry | |
Liu et al. | Numerical simulation and field monitoring of deformation characteristics of TRD composite supporting structure for deep foundation pit in quaternary stratum: a case study in Qingdao | |
Arulrajah et al. | Instrumentation at Changi land reclamation project, Singapore | |
CN107152039A (en) | A kind of two-dimentional quasi-static model under the conditions of earth and rockfill dam dam foundation liquefaction simplifies determination methods | |
CN102031770B (en) | Method for determining slot-wall local stability and slurry volume weight of diaphragm wall | |
CN106436785B (en) | Insuring highway' slope back-pressure reversed construction method and its structure | |
Hsiung et al. | Prediction of ground surface settlements caused by deep excavations in sands | |
Huang et al. | Study on deformation monitoring of subway station deep foundation construction | |
Liu et al. | Estimation of building damage caused by adjacent deep excavation in clay | |
Li et al. | Application of ANSYS 3D FEM in studies of surface deformation caused by pipe jacking | |
Liu et al. | Safety Monitoring and Stability of Building Foundation Pit Based on Fiber Bragg Grating Sensor | |
CN102061686B (en) | Partial stability and slurry volume weight determination method of pure viscosity slot wall of underground continuous wall | |
CN109460568A (en) | A kind of shield tunnel construction causes the prediction technique of subsidence of surface buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 310015 No. 50 Huzhou Street, Hangzhou City, Zhejiang Province Patentee after: HANGZHOU City University Address before: 310015 No. 50 Huzhou Street, Hangzhou City, Zhejiang Province Patentee before: Zhejiang University City College |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231201 Address after: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province Patentee after: Dragon totem Technology (Hefei) Co.,Ltd. Address before: 310015 No. 50 Huzhou Street, Hangzhou City, Zhejiang Province Patentee before: HANGZHOU City University Effective date of registration: 20231201 Address after: No. 184, Qianduozhuang Village, Wulongtang Township, Cang County, Cangzhou City, Hebei Province, 061000 Patentee after: Yin Ganggang Address before: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province Patentee before: Dragon totem Technology (Hefei) Co.,Ltd. |