CN106646232A - 一种基于故障录波数据的电气量计算方法 - Google Patents
一种基于故障录波数据的电气量计算方法 Download PDFInfo
- Publication number
- CN106646232A CN106646232A CN201611209180.XA CN201611209180A CN106646232A CN 106646232 A CN106646232 A CN 106646232A CN 201611209180 A CN201611209180 A CN 201611209180A CN 106646232 A CN106646232 A CN 106646232A
- Authority
- CN
- China
- Prior art keywords
- recording file
- sample frequency
- failure wave
- electric parameters
- passage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/34—Testing dynamo-electric machines
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
本发明涉及一种基于故障录波数据的电气量计算方法,包括以下步骤:S1.对故障录波文件进行解析;S2.对解析后的故障录波文件通道i的采样值进行读取,为通道i建立一个对象,然后采用零交越法对各个通道的采样频率j进行预估;S3.采用DFT方法对故障录波文件通道i一个采样周期内的采样频率k进行计算,并利用采样频率k对采样频率j进行矫正;S4.基于采样值、采样频率计算电气量有效值和相角,然后将有效值和相角存入通道i相对应的对象中。
Description
技术领域
本发明涉及抽水蓄能机组故障录波数据分析领域,更具体地,涉及一种基于故障录波数据的电气量计算方法。
背景技术
随着国民经济和社会的不断发展,电力负荷迅速增长,峰谷差不断加大,用户对电力供应的安全和质量要求越来越高。抽水蓄能电站以优秀的调峰调频的独特运行特性,在负荷调节、电能优化和电网的安全稳定方面发挥了重要作用。
由于抽水蓄能机组具有发电机和电动机两种运行工况,在调节负荷时,经常需要在不同的运行工况中进行转换。比如,在启动过程中,频率和电压一般需要2-10min的时间从零逐步上升至额定值,在此期间,系统的频率是处于不断变化的过程中,这导致系统的运行情况不断地改变,因此在此阶段需要对蓄能机组的运行状况进行分析。目前对蓄能机组运行状况进行分析的其中一个重要手段是基于故障录波进行电气量的计算,然后基于计算的结果进行运行状况的分析。
目前,基于故障录波的电气量计算是按照系统频率计算的,由于采样周期不变,当系统频率发生波动时,其计算的电气量会产生误差,抽水蓄能机组由于其独特的启动特性,其频率的变化幅度更大,因此基于系统固定频率计算电气量的误差将更大。
发明内容
本发明为解决以上现有技术的缺陷,提供了一种基于故障录波数据的电气量计算方法,该方法针对抽水蓄能机组的工作特性,首先预估出采样频率j,然后基于采样周期的采样频率k对采样频率j进行矫正,使得计算出来的采样频率j能够贴近抽水蓄能机组的实际采样频率,因此,通过本发明提供的方法计算得出的电气量更贴近抽水蓄能机组的实际的工作情况,有利于对抽水蓄能机组工作状态的分析。
为实现以上发明目的,采用的技术方案是:
一种基于故障录波数据的电气量计算方法,包括以下步骤:
S1.对故障录波文件进行解析;
S2.对解析后的故障录波文件通道i的采样值进行读取,为通道i建立一个对象,然后采用零交越法对各个通道的采样频率j进行预估;
S3.采用DFT方法对故障录波文件通道i一个采样周期内的采样频率k进行计算,并利用采样频率k对采样频率j进行矫正;
S4.基于采样值、采样频率计算电气量有效值和相角,然后将有效值和相角存入通道i相对应的对象中。
优选地,电气量计算方法首先判断故障录波文件是否符合标准格式,若否则按照标准格式生成通用的格式模板;对故障录波文件的数据进行读取和有效性检测,然后将有效的数据读入格式模板中;所述步骤S1中,对格式模板进行解析。
优选地,所述故障录波文件为COMTRADE文件。
与现有技术相比,本发明的有益效果是:
本发明提供的方法针对抽水蓄能机组的工作特性,首先预估出采样频率j,然后基于采样周期的采样频率k对采样频率j进行矫正,使得计算出来的采样频率j能够贴近抽水蓄能机组的实际采样频率,因此,通过本发明提供的方法计算得出的电气量更贴近抽水蓄能机组的实际的工作情况,有利于对抽水蓄能机组工作状态的分析。
附图说明
图1方法的流程示意图。
图2为生成格式模板的示意图。
图3为计算电气量的示意图。
具体实施方式
附图仅用于示例性说明,不能理解为对本专利的限制;
以下结合附图和实施例对本发明做进一步的阐述。
实施例1
如图1、2、3所示,本发明提供的方法包括有以下步骤:
S1.对COMTRADE文件进行解析;
S2.对解析后的COMTRADE文件通道i的采样值进行读取,为通道i建立一个对象,然后采用零交越法对各个通道的采样频率j进行预估;
S3.采用DFT方法对COMTRADE文件通道i一个采样周期内的采样频率k进行计算,并利用采样频率k对采样频率j进行矫正;
S4.基于采样值、采样频率计算电气量有效值和相角,然后将有效值和相角存入通道i相对应的对象中。
在具体的实施过程中,如图2所示,电气量计算方法首先判断COMTRADE文件是否符合标准格式,若否则按照标准格式生成通用的格式模板;对COMTRADE文件的数据进行读取和有效性检测,然后将有效的数据读入格式模板中;所述步骤S1中,对格式模板进行解析。由于COMTRADE文件的标准格式有两种:91版和99版,那么在具体实施的过程中,首先需要判断COMTRADE文件是否符合91版的标准格式,若是,则对其进行解析;若否则判断COMTRADE文件是否符合99版的标准格式,若COMTRADE文件符合99版的标准格式,则对其进行解析;否则生成通用的格式模板,并对COMTRADE文件的数据进行读取和有效性检测,然后将有效的数据读入格式模板中;所述步骤S1中,对格式模板进行解析。
显然,本发明的上述实施例仅仅是为清楚地说明本发明所作的举例,而并非是对本发明的实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明权利要求的保护范围之内。
Claims (3)
1.一种基于故障录波数据的电气量计算方法,其特征在于:包括以下步骤:
S1.对故障录波文件进行解析;
S2.对解析后的故障录波文件通道i的采样值进行读取,为通道i建立一个对象,然后采用零交越法对各个通道的采样频率j进行预估;
S3.采用DFT方法对故障录波文件通道i一个采样周期内的采样频率k进行计算,并利用采样频率k对采样频率j进行矫正;
S4.基于采样值、采样频率计算电气量有效值和相角,然后将有效值和相角存入通道i相对应的对象中。
2.根据权利要求1所述的基于故障录波数据的电气量计算方法,其特征在于:电气量计算方法首先判断故障录波文件是否符合标准格式,若否则按照标准格式生成通用的格式模板;对故障录波文件的数据进行读取和有效性检测,然后将有效的数据读入格式模板中;所述步骤S1中,对格式模板进行解析。
3.根据权利要求1或2所述的基于故障录波数据的电气量计算方法,其特征在于:所述故障录波文件为COMTRADE文件。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611209180.XA CN106646232A (zh) | 2016-12-23 | 2016-12-23 | 一种基于故障录波数据的电气量计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611209180.XA CN106646232A (zh) | 2016-12-23 | 2016-12-23 | 一种基于故障录波数据的电气量计算方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106646232A true CN106646232A (zh) | 2017-05-10 |
Family
ID=58828379
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611209180.XA Pending CN106646232A (zh) | 2016-12-23 | 2016-12-23 | 一种基于故障录波数据的电气量计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106646232A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110850288A (zh) * | 2019-11-12 | 2020-02-28 | 河南国网宝泉抽水蓄能有限公司 | 一种抽水蓄能机组故障录波定值整定方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101477170A (zh) * | 2009-01-19 | 2009-07-08 | 哈尔滨工业大学深圳研究生院 | 电力录波采样延时检测系统及方法 |
CN102313857A (zh) * | 2011-07-04 | 2012-01-11 | 武汉大学 | 一种电力系统故障录波数据分析方法及其装置 |
CN103414184A (zh) * | 2013-07-24 | 2013-11-27 | 南京南瑞继保电气有限公司 | 一种频率变化情况下序分量的计算方法 |
CN104133130A (zh) * | 2014-07-11 | 2014-11-05 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | 基于故障录波数据的变压器直流偏磁电流计算方法及系统 |
CN105553110A (zh) * | 2016-02-27 | 2016-05-04 | 国网安徽省电力公司蚌埠供电公司 | 智能变电站便携式故障录波与报文检测装置 |
-
2016
- 2016-12-23 CN CN201611209180.XA patent/CN106646232A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101477170A (zh) * | 2009-01-19 | 2009-07-08 | 哈尔滨工业大学深圳研究生院 | 电力录波采样延时检测系统及方法 |
CN102313857A (zh) * | 2011-07-04 | 2012-01-11 | 武汉大学 | 一种电力系统故障录波数据分析方法及其装置 |
CN103414184A (zh) * | 2013-07-24 | 2013-11-27 | 南京南瑞继保电气有限公司 | 一种频率变化情况下序分量的计算方法 |
CN104133130A (zh) * | 2014-07-11 | 2014-11-05 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | 基于故障录波数据的变压器直流偏磁电流计算方法及系统 |
CN105553110A (zh) * | 2016-02-27 | 2016-05-04 | 国网安徽省电力公司蚌埠供电公司 | 智能变电站便携式故障录波与报文检测装置 |
Non-Patent Citations (1)
Title |
---|
贺博林: "一种频率变化时的电气信号参数测量方法及其装置研究", 《中国优秀硕士学位论文全文数据库》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110850288A (zh) * | 2019-11-12 | 2020-02-28 | 河南国网宝泉抽水蓄能有限公司 | 一种抽水蓄能机组故障录波定值整定方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103955264B (zh) | 动态调节处理器工作频率的方法及系统 | |
Al-Badri et al. | A novel algorithm for estimating refurbished three-phase induction motors efficiency using only no-load tests | |
Ferreira et al. | Induction motor downsizing as a low-cost strategy to save energy | |
Faiz et al. | Detection of mixed eccentricity fault in doubly‐fed induction generator based on reactive power spectrum | |
JP2019154201A (ja) | 電力系統制御装置、電力系統制御システム、電力系統制御方法及び電力系統制御プログラム | |
Hasan et al. | Dynamic load modeling for bulk load-using synchrophasors with wide area measurement system for smart grid real-time load monitoring and optimization | |
Rahmani et al. | Reciprocal effects of the distorted wind turbine source and the shunt active power filter: full compensation of unbalance and harmonics under ‘capacitive non‐linear load’condition | |
Attoui et al. | Contribution to the fault diagnosis of a doubly fed induction generator for a closed-loop controlled wind turbine system associated with a two-level energy storage system | |
Sobhy et al. | Model‐assisted active disturbance rejection controller for maximum efficiency schemes of DFIG‐based wind turbines | |
Varshney et al. | Performance characteristics and reliability assessment of self‐excited induction generator for wind power generation | |
CN113783232A (zh) | 一种监测新能源并网系统的同步安全稳定性的方法和装置 | |
Trevisan et al. | Analysis of low frequency interactions of DFIG wind turbine systems in series compensated grids | |
CN106646232A (zh) | 一种基于故障录波数据的电气量计算方法 | |
Luo et al. | A novel PMU-based adaptive coordination strategy to mitigate modal resonance between full converter-based wind generation and grids | |
Wang et al. | Transient stability assessment and control system for power system | |
Sulla et al. | Short‐circuit analysis of a doubly fed induction generator wind turbine with direct current chopper protection | |
CN103701370B (zh) | 基于隐极同步电动机的失步检测及再同步的励磁控制方法 | |
Sajjadi et al. | A new approach for system‐wide power system frequency model validation via measurement data | |
Norman et al. | Parametric average-value converter modeling for aerospace applications | |
Zheng et al. | An impedance matrix constrained‐based method for harmonic emission level estimation | |
CN113437732B (zh) | 一种光伏发电并网联络线纵联保护方法及系统 | |
Magalhaes et al. | Experimental study of induction generator as a repowering solution | |
Li et al. | A simultaneous phase sequence exchange control method based on transient energy function | |
Jardim et al. | Variable time step application on hybrid eletromechanical–eletromagnetic simulation | |
CN110137943A (zh) | 基于广义运行短路比的电力系统稳定性判断方法及装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170510 |
|
RJ01 | Rejection of invention patent application after publication |