CN106642045A - Water-coal-slurry steam injection boiler in oilfields - Google Patents

Water-coal-slurry steam injection boiler in oilfields Download PDF

Info

Publication number
CN106642045A
CN106642045A CN201710008255.6A CN201710008255A CN106642045A CN 106642045 A CN106642045 A CN 106642045A CN 201710008255 A CN201710008255 A CN 201710008255A CN 106642045 A CN106642045 A CN 106642045A
Authority
CN
China
Prior art keywords
flue
water
coal
slurry
heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710008255.6A
Other languages
Chinese (zh)
Inventor
周建平
周俊虎
向新胜
刘建忠
林森明
贡军民
曹欣玉
万喜军
王斌
张晓彩
袁淑良
路亚莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Engineering Co of Xinjiang Petroleum Administration Bureau
Original Assignee
China National Petroleum Corp
Engineering Co of Xinjiang Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, Engineering Co of Xinjiang Petroleum Administration Bureau filed Critical China National Petroleum Corp
Priority to CN201710008255.6A priority Critical patent/CN106642045A/en
Publication of CN106642045A publication Critical patent/CN106642045A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B1/00Methods of steam generation characterised by form of heating method
    • F22B1/22Methods of steam generation characterised by form of heating method using combustion under pressure substantially exceeding atmospheric pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B31/00Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements of dispositions of combustion apparatus
    • F22B31/08Installation of heat-exchange apparatus or of means in boilers for heating air supplied for combustion
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D1/00Feed-water heaters, i.e. economisers or like preheaters
    • F22D1/02Feed-water heaters, i.e. economisers or like preheaters with water tubes arranged in the boiler furnace, fire tubes, or flue ways
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/02Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material

Abstract

The invention relates to the technical field of steam injection boilers for heavy oil wells in oilfields, in particular to a water-coal-slurry steam injection boiler in oilfields. The water-coal-slurry steam injection boiler comprises a boiler body, an upper water cooling wall, a lower water cooling wall, a superheater and an air preheater, an inverted-U-shaped flue is arranged in the boiler body and comprises a left vertical flue body, an upper horizontal flue body and a right vertical flue body, and a left flue slag-drip opening is formed in the bottom of the boiler body at the lower end of the left vertical flue body. The water-coal-slurry steam injection boiler has the advantages that the water-coal-slurry steam injection boiler is reasonable and compact in structure and convenient to use; a combustor in the steam injection boiler takes water coal slurry as fuel, and air is preheated by the air preheater and then is delivered to the water-coal-slurry combustor, so that flame extinguishing caused by low air temperatures is avoided, and reliability and stability in combustion are improved; combustion wastes can be discharged via the slag-drip opening, long-term continuous running and substituting the water coal slurry fuel for natural gas fuel can be achieved, and accordingly clean combustion, energy saving and emission reduction are achieved; the steam injection boiler is high in heat utilization ratio and convenient to move and transport.

Description

Water-coal-slurry uphole steam generator
Technical field
The present invention relates to heavy oil wells uphole steam generator technical field, is a kind of water-coal-slurry uphole steam generator.
Background technology
In the Karamy area in China such as Xinjiang, more based on viscous crude field;Viscous crude have special high viscosity and High-solidification point characteristic.Thickened oil recovery at present is generally individually using the thermal recovery mode of steam soak;Steam soak is exactly first to oil well note 250 to 350 DEG C of high temperature and high pressure steams, are heated oil reservoir and crude oil in the quite distance of near wellbore zone, the heating for so being formed Viscosity of crude in band is reduced, and crude oil flows to the resistance in shaft bottom and greatly reduces, and oil yield increases, and is a kind of very effective increase Heavy oil wells throughput method;In thermal process, high temperature and high pressure steam is heated by special injection boiler, it is common to use be combustion Gas injection boiler;But as natural gas consumption is limited, and the impact of the factor such as growing price is present using limited, The problem of high cost;Therefore, it is imperative to seek new alternative fuel;Jing is at present domestic to finding in the investigation in power station Many power stations all in the generation oil coal based fluid fuel using a kind of water-coal-slurry, its have low stain, high efficiency, can pipeline Feature, solves the problems, such as using natural gas;But at present, the injection boiler quantity with water-coal-slurry as fuel is few, its In, calendar year 2001 once carries out using the transformation of water-coal-slurry in Liaohe Oil Field to 23t/h fuel oils steam-injected boiler, has carried out continuous burning examination Test, although cool water mixture burning success, but because burner hearth cannot slag tap, it is impossible to long-term continuous operation, easily fire extinguishing, proves an abortion; After this, coal water slurry fuel injection boiler is also researched and developed in domestic each oil field, but generally existing heat utilization efficiency is low, and energy waste is tight Weight, and the problem of air pollution.
The content of the invention
The invention provides a kind of water-coal-slurry uphole steam generator, overcomes the deficiency of above-mentioned prior art, it can be effective The coal water slurry fuel injection boiler that solution is known at present, it is impossible to the problem of long-term continuous operation.
The technical scheme is that by following measures to realize:A kind of water-coal-slurry uphole steam generator, including stove Body, upper water-cooling wall, lower water-cooling wall, superheater and air preheater;Set in body of heater in inverted U-shaped flue, including the left side in left side is erected The vertical flue in the right side on straight flue, the horizontal flue of upside and right side;Bottom of furnace body in left vertically flue lower end is provided with left flue Slag-drip opening;The stable burning room for communicating therewith is provided with the left vertically body of heater of the lower left side of flue, is set on the furnace wall at stable burning room There is burner installing hole;Lower water-cooling wall is installed with inboard wall of furnace body in left vertically flue bottom corresponding with stable burning room; Water-cooling wall, lower water-cooled wall outlet and upper water-cooling wall import mouth phase are installed with the left vertically inboard wall of furnace body on flue top Connection;At least one superheater is installed with horizontal flue;It is empty at least one to be installed with right vertically flue Air preheater;Bottom of furnace body in the right vertically lower end of flue is provided with right flue slag-drip opening.
The further optimization and/or improvements to foregoing invention technical scheme are presented herein below:
Above-mentioned right vertically the interior of flue is installed with least one economizer.
Above-mentioned economizer is two, is respectively high-temperature economizer and low-level (stack-gas) economizer, and high-temperature economizer is fixedly mounted on the right side Vertically in the top of flue;Low-level (stack-gas) economizer is fixedly mounted in the right vertically bottom of flue;Air preheater is two, respectively For main air preheater and secondary air preheater, it is perpendicular that secondary air preheater is fixedly mounted on the right side on the downside of low-level (stack-gas) economizer In straight flue, in the vertical flue in the right side that secondary air preheater is fixedly mounted between high-temperature economizer and low-level (stack-gas) economizer.
Denitrification apparatus can be installed with above-mentioned left vertically flue.
Above-mentioned denitrification apparatus can adopt SCR denitration device.
Said burner installing hole can be at least two;Or/and, from bottom to top horizontal plate hangs fixation to the pipeline of lower water-cooling wall On the front furnace wall of lower portion of furnace body, right furnace wall and rear furnace wall;From bottom to top horizontal plate extension is fixed on body of heater to the pipeline of upper water-cooling wall On surrounding furnace wall.
The left ash bucket of back taper, left flue row can be fixed with above-mentioned stable burning room bottom and the left vertically body of heater of flue bottom Cinder notch is located at the bottom of left ash bucket;The right ash bucket of back taper, right flue deslagging are fixed with the right vertically body of heater of flue bottom Mouth is located at the bottom of right ash bucket;Or/and, it is installed with respectively at least in left vertically flue, horizontal flue and right vertically flue One soot blower.
Above-mentioned body of heater can be skid-mounted type body of heater;Or/and, body of heater is assembly module formula body of heater, including stable burning room and a left side are perpendicular The module one of straight flue lower section, the module two of left vertically flue upper segment, horizontal flue section and right vertically flue upper lateral section Module three, denitrification apparatus peace turns the module four of section, the module five of economizer construction section and the module six of air preheater construction section; Module one, module two, module three, module four, module five and module six are fixedly installed togather by connecting pipe.
Present configuration is reasonable and compact, easy to use;This injection boiler makees fuel using water-coal-slurry, by air preheat Device will again be conveyed to water coal slurry burner after air preheat, it is to avoid stamp out the flames because air themperature is low, improve burning reliability And stability;Combustion residue can also be discharged from slag-drip opening, can continuously be run for a long time, realize replacing day combustion with coal water slurry fuel Gas fuel, not only cleaning burning, additionally it is possible to energy-saving and emission-reduction;In addition, pass through to save before water-cooling wall and lower water-cooling wall on entering Coal device is preheated, and is gone out upper water-cooling wall and is heated through hot device again with the dry saturated steam after lower water-cooling wall, and heat utilization efficiency is high;And body of heater is adopted It is convenient to carry and transport with skid and assembly module formula.
Description of the drawings
Accompanying drawing 1 is the main view cross section structure diagram of preferred embodiment.
Coding in accompanying drawing is respectively:1 is body of heater, and 2 is left ash bucket, and 3 is secondary air preheater, and 4 is that main air is pre- Hot device, 5 is left flue slag-drip opening, and 6 is stable burning room, and 7 is burner installing hole, and 8 is lower water-cooling wall, and 9 is upper water-cooling wall, and 10 were Hot device, 11 is right ash bucket, and 12 is right flue slag-drip opening, and 13 is high-temperature economizer, and 14 is denitrification apparatus, and 15 is low-level (stack-gas) economizer, 16 is horizontal flue.
Specific embodiment
The present invention is not limited by following embodiments, can technology according to the present invention scheme and actual conditions determining specifically Embodiment.
In the present invention, for the ease of description, the description of the relative position relation of each part is according to Figure of description 1 Butut mode being described, such as:The position relationship of upper and lower, left and right etc. is according to the Butut direction of Figure of description 1 Come what is determined.
With reference to embodiment and accompanying drawing, the invention will be further described:
As shown in Figure 1, the water-coal-slurry uphole steam generator includes body of heater 1, upper water-cooling wall 9, lower water-cooling wall 8, the and of superheater 10 Air preheater;Set in inverted U-shaped flue in body of heater 1, including a left side vertical flue, the horizontal flue 16 of upside and the right side in left side The vertical flue in the right side;Left flue slag-drip opening 5 is provided with the bottom of body of heater 1 of left vertically flue lower end;In the lower-left of left vertically flue The body of heater 1 of side is provided with the stable burning room 6 for communicating therewith, and burner installing hole 7 is provided with the furnace wall at stable burning room 6;With steady combustion Lower water-cooling wall 8 is installed with inboard wall of furnace body in the corresponding left vertically flue bottom in room 6;In the stove on left vertically flue top In vivo water-cooling wall 9 is installed with wall, lower water-cooling wall 8 is exported and is connected with the import mouth of upper water-cooling wall 9;In horizontal flue 16 Inside it is installed with least one superheater 10;At least one air preheater is installed with right vertically flue;On the right side Vertically the bottom of body of heater 1 of the lower end of flue is provided with right flue slag-drip opening 12.
Wherein, described upper water-cooling wall 9 and described lower water-cooling wall 8 are using existing known water wall structure, water-cooled Wall construction is the main heated portion of boiler, and it is formed by the row's of number fastener for connection, can absorb left vertically flue high temperature flue gas Radiations heat energy, steam or hot water are produced in pipe, and reduce temperature of furnace wall, protect furnace wall;
Described superheater 10 using it is existing it is known steam in body of heater 1 can be further heated to from saturation temperature it is overheated The part of temperature;
Described air preheater is come the heat exchanger of preheated burning air using the flue gas heat in body of heater 1;
First, steam heating circulation system is set up;First the water inlet end of economizer is connected by pipeline with originally water feeder, The water side of economizer is connected by pipeline with the water inlet end of lower water-cooling wall 8, in the water separator of the peripheral hardware of body of heater 1, upper water The water side of cold wall 9 is connected with the import of water separator, and the steam (vapor) outlet of water separator is connected with superheater 10;Cross The steam output end of hot device 10 is connected by main steam valve with underground gas injection pipe road;
Secondly, hot-air combustion-supporting system is set up;The outer installation water coal slurry burner of body of heater 1 at burner installing hole 7, by air The outlet side of preheater is connected with the supply end of water coal slurry burner by connecting tube;
When using, supplied water to steam heating circulation system by originally water feeder first, enable water to be followed in steam heating Circulation in loop systems is got up;Then water coal slurry burner is restarted, the combustion flame of water coal slurry burner sprays into the internal combustion of stable burning room 6 Burn and produce high-temperature flue gas, high-temperature flue gas successively Jing left vertically flue, horizontal flue 16 to right vertically flue, along with temperature by Gradually successively decrease, and it is vertical to form the left vertically main heating section of flue, the superheat section of horizontal channel, the convection section of right vertical flue and the right side The preheating section of flue bottom;Main heating section temperature highest, the upper water-cooling wall 9 of arrangement and lower water-cooling wall 8, can effectively absorb height Heat, makes the water energy in lower water-cooling wall 8 enough heat rapidly, and steam or hot water are produced in pipe;As the rising of high-temperature flue gas is entered Enter horizontal flue 16, the section is superheat section;Herein install superheater 10, can effectively utilizes heat overheated here to passing through Dry saturated steam carries out overheated heating into superheater;High-temperature flue gas enter right vertically flue, high-temperature flue gas after entrance and its Original inner air contacts and produces convection current, although convection current declines can high-temperature flue-gas, can still keep certain Temperature, the section is convection section;High-temperature flue gas are continued traveling downwardly to right vertically flue bottom, heat may proceed to be lost exist it is certain remaining Heat, the section is preheating section;In the air preheater that convection section or preheating section are installed, can utilize what preheating section or convection section were present Heat is heated to cold air, and then again Jing connecting tubes are delivered to burner, the water-coal-slurry in burner is connect with hot-air Touch and burn, it is to avoid stamp out the flames because air themperature is low, improve burning reliability and stability;Combustion residue in body of heater 1 Can also discharge from slag-drip opening, be further ensured that this injection boiler can continuously run for a long time, realize with coal water slurry fuel replacement Natural gas fuel, not by using limiting, low cost.
Above-mentioned water-coal-slurry uphole steam generator can be made further optimization and/or improvements according to actual needs:
As shown in Figure 1, it is installed with least one economizer in right vertically flue.Install in right vertically flue and save coal Then device, economizer can again lead to initially preheating from originally water feeder into the water of steam heating circulation system Cross pipeline carries out high-temperature heating to lower water-cooling wall 8 and upper water-cooling wall 9;Heat utilization efficiency can so be improved, additionally it is possible to increase Plus evaporating capacity, it is more energy efficient efficient.
As shown in Figure 1, economizer is two, is respectively high-temperature economizer 13 and low-level (stack-gas) economizer 15, high-temperature economizer 13 are fixedly mounted in the right vertically top of flue;Low-level (stack-gas) economizer 15 is fixedly mounted in the right vertically bottom of flue;Air Preheater is two, respectively main air preheater 4 and secondary air preheater 3, and secondary air preheater 3 is fixedly mounted on Vertically in flue, secondary air preheater 3 is fixedly mounted on high-temperature economizer 13 and saves with low temperature on the right side of the downside of low-level (stack-gas) economizer 15 The right side between coal device 15 is vertically in flue.
With high-temperature economizer 13 by placed in series, high-temperature economizer 13 is located at right vertically flue top to low-level (stack-gas) economizer 15 Convection section, low-level (stack-gas) economizer 15 is located at the preheating section of right vertically flue bottom, heats into steam from originally water feeder The water of the circulatory system is first Jing after low-level (stack-gas) economizer 15 carries out tentatively preheating, then is entered into by pipeline pre- again in high-temperature economizer 13 Heat, the mode of this double preheatings, it is possible to increase pre-heat effect;Main air preheater 4 passes through gas with secondary air preheater 3 Tandem, secondary air preheater 3 because installation site is higher than the secondary air in main air preheater 4, therefore body of heater 1 The high-temperature flue-gas of preheater 3 are high compared with the temperature of main air preheater 4, and cold air is entered after main air preheater 4 again Jing gas passages enter secondary air preheater 3, realize the Dual heat exchange to cold air, improve the air efficiency of heating surface;To sum up, it is right Double preheating structures of water and the double heat exchanging structure to cold air effectively using the heat of high-temperature flue gas can be improved further Heat utilization efficiency, more efficient energy-saving.
As shown in Figure 1, denitrification apparatus 14 are installed with left vertically flue.Denitrification apparatus 14 can process high temperature cigarette Nitrogen oxides in gas, it is to avoid in discharged nitrous oxides to air, reduces pollution.
As shown in Figure 1, denitrification apparatus 14 adopt SCR denitration device.SCR denitration device also known as SCR skill Art denitrification apparatus, it can further improve the denitration efficiency of flue gas in this injection boiler.
As shown in Figure 1, burner installing hole 7 is at least two.Can be pacified by least two burners on combustion chamber Dress hole 7, while installing multiple gas(Water-coal-slurry and natural gas)Dual burner, or, multiple slurry oil(Water-coal-slurry and oil)Dual-purpose combustion Burner, or, slurry gas dual burner and the oily dual burner combination of slurry are installed, can so improve the smoke of high-temperature flue gas, enter one Step improves heat.
As shown in Figure 1, from bottom to top horizontal plate hangs front furnace wall, the right side for being fixed on the bottom of body of heater 1 to the pipeline of lower water-cooling wall 8 On furnace wall and rear furnace wall;From bottom to top horizontal plate extension is fixed on the surrounding furnace wall of body of heater 1 pipeline of upper water-cooling wall 9.Under such The pipeline diameter of water-cooling wall 8 and upper water-cooling wall 9 is big, path length, improves high-heating radiation duration, increases lower water-cooling wall 8 and upper water-cooled The vaporization effect of water in wall 9.
As shown in Figure 1, the left ash of back taper is fixed with the bottom of stable burning room 6 and the left vertically body of heater 1 of flue bottom Bucket 2, left flue slag-drip opening 5 is located at the bottom of left ash bucket 2;The right side of back taper is fixed with the right vertically body of heater 1 of flue bottom Ash bucket 11, right flue slag-drip opening 12 is located at the bottom of right ash bucket 11.The left ash bucket 2 of back taper and the right ash bucket 11 of back taper are played The effect of ash is led, ash discharge effect is improved.
As needed, for convenience of heavy to flue cleaning grey, divide in left vertically flue, horizontal flue 16 and right vertically flue It is not installed with least one soot blower.
As needed, move and dismount for convenience of body of heater 1, body of heater 1 is skid-mounted type body of heater.
As needed, for convenience of the transport of body of heater 1, body of heater 1 is assembly module formula body of heater, including stable burning room 6 and a left side are perpendicular The module one of straight flue lower section, the module two of left vertically flue upper segment, 16 sections of horizontal flue and right vertically flue upper lateral section Module three, the peace of denitrification apparatus 14 turns the module four of section, the module five of economizer construction section and the mould of air preheater construction section Block six;Module one, module two, module three, module four, module five and module six are fixedly installed togather by connecting pipe.Remove The module assembling mode mentioned in above-mentioned assembly module formula body of heater 1, can also be according to actual conditions swap modules quantity, to meet It is readily transported the demand of dismounting.
Above technical characteristic constitutes highly preferred embodiment of the present invention, and it has stronger adaptability and optimal enforcement effect Really, can according to actual needs increase and decrease non-essential technical characteristic to meet the demand of different situations.

Claims (10)

1. a kind of water-coal-slurry uphole steam generator, it is characterised in that including body of heater, upper water-cooling wall, lower water-cooling wall, superheater and sky Air preheater;Set in body of heater in inverted U-shaped flue, including the right side of a left side vertical flue, the horizontal flue of upside and right side in left side Vertical flue;Bottom of furnace body in left vertically flue lower end is provided with left flue slag-drip opening;In the stove of the left vertically lower left side of flue Body is provided with the stable burning room for communicating therewith, and burner installing hole is provided with the furnace wall at stable burning room;A left side corresponding with stable burning room Vertically it is installed with lower water-cooling wall on the inboard wall of furnace body in flue bottom;It is fixed on the left vertically inboard wall of furnace body on flue top Water-cooling wall is installed, lower water-cooled wall outlet is connected with upper water-cooling wall import mouth;It is installed with least in horizontal flue One superheater;At least one air preheater is installed with right vertically flue;In the stove of the right vertically lower end of flue Body bottom is provided with right flue slag-drip opening.
2. water-coal-slurry uphole steam generator according to claim 1, it is characterised in that be installed with right vertically flue At least one economizer.
3. water-coal-slurry uphole steam generator according to claim 2, it is characterised in that economizer is two, is respectively high temperature Economizer and low-level (stack-gas) economizer, high-temperature economizer is fixedly mounted in the right vertically top of flue;Low-level (stack-gas) economizer is fixedly mounted In the right vertically bottom of flue;Air preheater is two, respectively main air preheater and secondary air preheater, two Level air preheater is fixedly mounted in the vertical flue in the right side on the downside of low-level (stack-gas) economizer, and secondary air preheater is fixedly mounted on height The right side between warm economizer and low-level (stack-gas) economizer is vertically in flue.
4. the water-coal-slurry uphole steam generator according to claim 1 or 2 or 3, it is characterised in that fixed in left vertically flue Denitrification apparatus are installed.
5. water-coal-slurry uphole steam generator according to claim 4, it is characterised in that denitrification apparatus are filled using SCR denitration Put.
6. the water-coal-slurry uphole steam generator according to claim 1 or 2 or 3 or 5, it is characterised in that burner installing hole is At least two;Or/and, the pipeline of lower water-cooling wall from bottom to top horizontal plate hang be fixed on the front furnace wall of lower portion of furnace body, right furnace wall and Afterwards on furnace wall;From bottom to top horizontal plate extension is fixed on body of heater surrounding furnace wall the pipeline of upper water-cooling wall.
7. water-coal-slurry uphole steam generator according to claim 4, it is characterised in that burner installing hole is at least two; Or/and, from bottom to top horizontal plate extension is fixed on the front furnace wall of lower portion of furnace body, right furnace wall and rear furnace wall the pipeline of lower water-cooling wall; From bottom to top horizontal plate extension is fixed on body of heater surrounding furnace wall the pipeline of upper water-cooling wall.
8. the water-coal-slurry uphole steam generator according to claim 1 or 2 or 3 or 5 or 7, it is characterised in that stable burning room bottom With the left ash bucket that back taper is fixed with the left vertically body of heater of flue bottom, left flue slag-drip opening is positioned at the bottom of left ash bucket; The right ash bucket of back taper is fixed with the right vertically body of heater of flue bottom, right flue slag-drip opening is located at the bottom of right ash bucket;Or/ Be installed with least one soot blower respectively in left vertically flue, horizontal flue and right vertically flue.
9. water-coal-slurry uphole steam generator according to claim 6, it is characterised in that stable burning room bottom and left vertically flue The left ash bucket of back taper is fixed with the body of heater of bottom, left flue slag-drip opening is located at the bottom of left ash bucket;At right vertically flue bottom The right ash bucket of back taper is fixed with the body of heater at end, right flue slag-drip opening is located at the bottom of right ash bucket;Or/and, left vertically flue, At least one soot blower is installed with respectively in horizontal flue and right vertically flue.
10. the water-coal-slurry uphole steam generator according to any one of claim 1 to 9, it is characterised in that body of heater is skid-mounted type Body of heater;Or/and, body of heater is assembly module formula body of heater, including the module one of stable burning room and left vertically flue lower section, it is left vertically The module three of the module two of flue upper segment, horizontal flue section and right vertically flue upper lateral section, denitrification apparatus peace turns the module of section Four, the module five of economizer construction section and the module six of air preheater construction section;Module one, module two, module three, module 4th, module five and module six are fixedly installed togather by connecting pipe.
CN201710008255.6A 2017-01-05 2017-01-05 Water-coal-slurry steam injection boiler in oilfields Pending CN106642045A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710008255.6A CN106642045A (en) 2017-01-05 2017-01-05 Water-coal-slurry steam injection boiler in oilfields

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710008255.6A CN106642045A (en) 2017-01-05 2017-01-05 Water-coal-slurry steam injection boiler in oilfields

Publications (1)

Publication Number Publication Date
CN106642045A true CN106642045A (en) 2017-05-10

Family

ID=58843823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710008255.6A Pending CN106642045A (en) 2017-01-05 2017-01-05 Water-coal-slurry steam injection boiler in oilfields

Country Status (1)

Country Link
CN (1) CN106642045A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5513583A (en) * 1994-10-27 1996-05-07 Battista; Joseph J. Coal water slurry burner assembly
CN2553243Y (en) * 2002-07-05 2003-05-28 北京浙大国能科技有限公司 Heat-collecting steam boiler by burning coal-water slurry
CN2847050Y (en) * 2005-07-06 2006-12-13 王占林 Double boiler tube transverse water coal slurry burning boiler
CN104791748A (en) * 2015-05-13 2015-07-22 哈尔滨工业大学 Double-direct-current circulating fluidized bed steam injection boiler with buried pipes and evaporation coils
CN105091320A (en) * 2014-05-11 2015-11-25 南通万达锅炉有限公司 CWS (Coal Water Slurry) hot water boiler system
CN205402646U (en) * 2016-02-24 2016-07-27 广西梧锅锅炉制造有限公司 High pressure bagasse fuel boiler
CN206430074U (en) * 2017-01-05 2017-08-22 中国石油天然气集团公司 Water-coal-slurry uphole steam generator

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5513583A (en) * 1994-10-27 1996-05-07 Battista; Joseph J. Coal water slurry burner assembly
CN2553243Y (en) * 2002-07-05 2003-05-28 北京浙大国能科技有限公司 Heat-collecting steam boiler by burning coal-water slurry
CN2847050Y (en) * 2005-07-06 2006-12-13 王占林 Double boiler tube transverse water coal slurry burning boiler
CN105091320A (en) * 2014-05-11 2015-11-25 南通万达锅炉有限公司 CWS (Coal Water Slurry) hot water boiler system
CN104791748A (en) * 2015-05-13 2015-07-22 哈尔滨工业大学 Double-direct-current circulating fluidized bed steam injection boiler with buried pipes and evaporation coils
CN205402646U (en) * 2016-02-24 2016-07-27 广西梧锅锅炉制造有限公司 High pressure bagasse fuel boiler
CN206430074U (en) * 2017-01-05 2017-08-22 中国石油天然气集团公司 Water-coal-slurry uphole steam generator

Similar Documents

Publication Publication Date Title
CN107525090B (en) Come into operation the coal-fired power station boiler device and its application method of denitrating system when a kind of igniting
CN205403139U (en) Low nitrogen buggy boiler
JPH0313482B2 (en)
CN109405288A (en) Oil field waste heat of flue gas of heating furnace recyclable device
CN206430074U (en) Water-coal-slurry uphole steam generator
CN100455948C (en) Condensation type heat-storage type gas-firing boiler system
CN207716647U (en) Energy-saving, environmental protection boiler
CN203147726U (en) Pi-structural catalytic unit CO incineration waste heat boiler
CN103363663B (en) Heavy die block assembling high-efficiency condensing type gas-fired water heating boiler
CN106642045A (en) Water-coal-slurry steam injection boiler in oilfields
CN112268270B (en) Skid-mounted water pipe type low-nitrogen gas steam boiler
CN205825033U (en) High parameter garbage burning boiler with reheating
CN104633633A (en) Superheated steam combined boiler and superheated steam making method
CN208670988U (en) A kind of novel electricity generation boiler of burning away the refuse
CN204214131U (en) A kind of boiler taking heating surface segmentation backwater
CN104374079B (en) Operation method for boiler with segmented water returning of heating surface adopted
CN202303891U (en) Double-output compound boiler
CN201546689U (en) Overheat steam boiler for oil field steam injection
CN105928204B (en) Solar energy optical-thermal change type heating furnace
CN110440578A (en) A kind of vertical and cylindrical tubular heater
CN104165456B (en) Skid-mounted boiler integrated heat supply device
CN103759239B (en) Detachable steam generator
CN206094553U (en) Solar energy light and heat conversion formula heating furnace
CN203744212U (en) Small-capacity supercritical pressure fuel gas once-through boiler
CN201014703Y (en) Vertical type coal gas dual-purpose vacuum superconducting phase transition furnace

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170510

RJ01 Rejection of invention patent application after publication