CN106641452A - Suspension frame for overhead operation - Google Patents
Suspension frame for overhead operation Download PDFInfo
- Publication number
- CN106641452A CN106641452A CN201611267117.1A CN201611267117A CN106641452A CN 106641452 A CN106641452 A CN 106641452A CN 201611267117 A CN201611267117 A CN 201611267117A CN 106641452 A CN106641452 A CN 106641452A
- Authority
- CN
- China
- Prior art keywords
- snap ring
- fixed plate
- fixedly connected
- plate
- gripper shoe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
- F16L3/10—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/16—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
- F16L3/18—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in axial direction
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The invention discloses a suspension frame for overhead operation. The suspension frame for overhead operation comprises a wall. A first fixed plate is fixedly connected to the top of the right side of a wall. A second fixed plate is fixedly connected to the right side of the wall and located at the bottom of the first fixed plate. A second sliding rail is arranged on the right side of an inner cavity of the second fixed plate. The top and bottom of the right side of the first fixed plate are each provided with a first sliding rail. Through cooperation of the second fixed plate, an oblique plate, the first fixed plate, the second sliding rail, a second sliding chute, the first sliding rails, a sliding plate, first sliding chutes and a supporting plate, steel structures in a first clamping ring and a second clamping ring can be moved effectively, so that the using effect of the suspension frame is better, the problem that a suspension frame cannot effectively move the steel structures as the suspension frame cannot move in use is solved, and accordingly the steel structures in the first clamping ring and the second clamping ring are moved.
Description
Technical field
The present invention relates to pylon technical field, specially high altitude operation hanging frame.
Background technology
A kind of " electric hoist pipeline pylon " (patent No. is disclosed in Chinese patent:201420378191.0) patent makes
Used time, fixing anchor bar need to be set in lane side, first half bicircular arcs part is hung on the anchor pole of lane side by hanging hole, be laid
After upper supply water dust-proof pipeline and air line, then to connecting second half bicircular arcs part, fishbolt is tightened, although the patent
Many pipelines can be hung and be fixed on lane side simultaneously, but the patent utilization pylon can not effectively be moved to steel construction
Problem.
The content of the invention
It is an object of the invention to provide high altitude operation hanging frame, possesses the advantage moved to steel construction, solve
Pylon can not carry out effective mobile problem to steel construction.
For achieving the above object, the present invention provides following technical scheme:High altitude operation hanging frame, including body of wall, the wall
Top on the right side of body is fixedly connected with the first fixed plate, the right side of the body of wall and is fixedly connected positioned at the bottom of the first fixed plate
There is the second fixed plate, the second slide rail, the top on the right side of first fixed plate are provided with the right side of the second fixed plate inner chamber
The first slide rail is provided with bottom, slide plate is provided with the right side of first slide rail, the top and bottom on the left of the slide plate
The first chute matched with the first slide rail is offered, the inner chamber of the slide plate is provided through rotating shaft, the right side of the rotating shaft
Side is provided with gripper shoe, and slide plate is run through in one end of the gripper shoe, and the right side at the top of the gripper shoe is provided through pull bar, institute
State and be provided with the top of pull bar pulling block, the bottom of the pull bar is provided with draw ring, and the bottom of the draw ring inner chamber is provided with connection
Bar, the bottom of the connecting rod is fixedly connected with fixed block, and the fixing bolt that passes on left of the fixed block is fixedly connected with
One snap ring, the right side of the fixed block is fixedly connected with the second snap ring, first snap ring and the second snap ring by fixing bolt
Bottom be fixedly connected by connecting bolt, the bottom of the gripper shoe is fixedly connected with swash plate, and one end of the swash plate is run through
Second fixed plate, one end of the swash plate offers the second chute matched with the second slide rail.
Preferably, the fixture that passes on left of the left side of first fixed plate and the second fixed plate fixes company with body of wall
Connect, the top of the swash plate is fixedly connected with the junction of gripper shoe by fixture.
Preferably, the inner chamber of the draw ring, the first snap ring and the second snap ring is provided with wear-resistant pad.
Preferably, the surface of the pull bar offers through hole, and fix bar, the fixation are provided with the right side of the gripper shoe
One end of bar is provided with handle through gripper shoe and through hole on the right side of the fix bar.
Preferably, the top and bottom on the outside of first snap ring and the second snap ring is provided with fastening bolt, and described
The surface of one snap ring, the second snap ring and wear-resistant pad offers the bolt hole matched with fastening bolt.
Preferably, the surface of first slide rail and the second slide rail is provided with antifriction granule, the pull bar and handle
Surface be arranged with Anti-slip cover.
Compared with prior art, beneficial effects of the present invention are as follows:
1st, the present invention is by arranging the second fixed plate, swash plate, the first fixed plate, the second slide rail, the second chute, the first cunning
Using cooperatively for rail, slide plate, the first chute and gripper shoe, can effectively be moved to the steel construction in the first snap ring and the second snap ring
Dynamic, the using effect of such pylon more preferably, solves pylon during use, because pylon it is immovable, so as to
Cause pylon that effective mobile problem can not be carried out to steel construction, so as to enter to the steel construction in the first snap ring and the second snap ring
Row movement, is adapted to promote the use of.
2nd, the present invention can be protected by wear-resistant pad to draw ring, the use time of such draw ring is longer, it is to avoid draw ring
During prolonged use, draw ring inner chamber and pull bar and fix bar directly contact, so as to cause draw ring serious wear, so as to
The problem for causing draw ring to damage, by swash plate, can play a part of support to gripper shoe, and the using effect of such gripper shoe is more
It is good, it is to avoid the first snap ring is heavier with the steel construction in the second snap ring, the problem of fracture occurs so as to cause gripper shoe, by tight
Fixing bolt, can be fixed to the steel construction in the first snap ring and the second snap ring, and the using effect of such pylon is more preferable, it is to avoid
First snap ring is more loose with the steel construction in the second snap ring, so as to cause steel construction to take off in the first snap ring and the second snap ring
The problem that falls occurs, and by connecting bolt, can carry out effectively connection to the first snap ring and the second snap ring, such first snap ring and the
The using effect of two snap rings is more preferable, it is to avoid the first snap ring can not be connected with the second snap ring, so as to causing pylon effective
Storage steel construction.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is A-A enlarged drawings of the present invention;
Fig. 3 is B-B enlarged drawings of the present invention;
Fig. 4 is C-C enlarged drawings of the present invention.
In figure:1 body of wall, 2 second fixed plates, 3 swash plates, 4 first snap rings, 5 connecting bolts, 6 fastening bolts, 7 wear-resistant pads, 8
Second snap ring, 9 connecting rods, 10 draw rings, 11 pull bars, 12 handles, 13 fix bars, 14 through holes, 15 pulling blocks, 16 first fixed plates, 17
Second slide rail, 18 second chutes, 19 fixed blocks, 20 fixing bolts, 21 first slide rails, 22 slide plates, 23 rotating shafts, 24 first chutes,
25 gripper shoes.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
Fig. 1-4, high altitude operation hanging frame, including body of wall 1 are referred to, the top on the right side of body of wall 1 is fixedly connected with first and consolidates
Fixed board 16, the right side of body of wall 1 and is fixedly connected with the second fixed plate 2 positioned at the bottom of the first fixed plate 16, in the second fixed plate 2
It is provided with the second slide rail 17 on the right side of chamber, the top and bottom on the right side of the first fixed plate 16 are provided with the first slide rail 21, first
The right side of slide rail 21 is provided with slide plate 22, and the top and bottom in the left side of slide plate 22 offer the matched with the first slide rail 21
One chute 24, the inner chamber of slide plate 22 is provided through rotating shaft 23, and the right side of rotating shaft 23 is provided with gripper shoe 25, and the one of gripper shoe 25
Slide plate 22 is run through at end, and the right side at the top of gripper shoe 25 is provided through pull bar 11, and the top of pull bar 11 is provided with pulling block 15, pull bar
11 surface offers through hole 14, and the right side of gripper shoe 25 is provided with fix bar 13, and gripper shoe 25 is run through in one end of fix bar 13
With through hole 14, the right side of fix bar 13 is provided with the surface of handle 12, the first slide rail 21 and the second slide rail 17 and is provided with antifriction
The surface for wiping granule, pull bar 11 and handle 12 is arranged with Anti-slip cover, and the bottom of pull bar 11 is provided with draw ring 10, the inner chamber of draw ring 10
Bottom be provided with connecting rod 9, the bottom of connecting rod 9 is fixedly connected with fixed block 19, and fixed block 19 passes on left fixed spiral shell
Bolt 20 is fixedly connected with the first snap ring 4, and the right side of fixed block 19 is fixedly connected with the second snap ring 8, draw ring by fixing bolt 20
10th, the inner chamber of the first snap ring 4 and the second snap ring 8 is provided with wear-resistant pad 7, by wear-resistant pad 7, draw ring 10 can be protected,
The use time of so draw ring 10 is longer, it is to avoid draw ring 10 during prolonged use, the inner chamber of draw ring 10 and pull bar 11
With the directly contact of fix bar 13, so as to cause the serious wear of draw ring 10, so as to cause draw ring 10 damage problem, the first snap ring 4
Fastening bolt 6 is provided with the top and bottom in the outside of the second snap ring 8, by fastening bolt 6, can be to the first snap ring 4 and the
Steel construction in two snap rings 8 is fixed, and the using effect of such pylon is more preferable, it is to avoid the first snap ring 4 and the second snap ring 8
Interior steel construction is more loose, so as to the problem for causing steel construction to come off from the first snap ring 4 and the second snap ring 8 occurs, first
The surface of snap ring 4, the second snap ring 8 and wear-resistant pad 7 offers the bolt hole matched with fastening bolt 6, the first snap ring 4 and
The bottom of two snap rings 8 is fixedly connected by connecting bolt 5, by connecting bolt 5, the first snap ring 4 and the second snap ring 8 can be carried out
Effectively connection, the using effect of the snap ring 8 of such first snap ring 4 and second is more preferable, it is to avoid the first snap ring 4 and the second snap ring 8 are not
Can connection, so as to cause pylon effectively to deposit steel construction, the bottom of gripper shoe 25 is fixedly connected with swash plate 3, first
The fixture that passes on left of the left side of fixed plate 16 and the second fixed plate 2 is fixedly connected with body of wall 1, top and the support of swash plate 3
The junction of plate 25 is fixedly connected by fixture, by swash plate 3, can play a part of support to gripper shoe 25, is so supported
The using effect of plate 25 is more preferable, it is to avoid the first snap ring 4 is heavier with the steel construction in the second snap ring 8, so as to causing gripper shoe 25
There is the problem of fracture, the second fixed plate 2 is run through in one end of swash plate 3, and one end of swash plate 3 offers and matches with the second slide rail 17
The second chute 18, by arrange the second fixed plate 2, swash plate 3, the first fixed plate 16, the second slide rail 17, the second chute 18, the
Using cooperatively for one slide rail 21, slide plate 22, the first chute 24 and gripper shoe 25, can be to the steel in the first snap ring 4 and the second snap ring 8
Structure is effectively moved, and the using effect of such pylon more preferably, solves pylon during use, because of pylon
It is immovable, so as to cause pylon that effective mobile problem can not be carried out to steel construction, so as to the first snap ring 4 and the second card
Steel construction in ring 8 is moved, and is adapted to promote the use of.
When using, first chute 24 in the left side of slide plate 22 is moved on the surface of the first slide rail 21, second chute in the left side of swash plate 3
18 in the movement of the surface of the first slide rail 21, so as to move to pylon.
In sum:The high altitude operation hanging frame, by arranging the second fixed plate 2, swash plate 3, the first fixed plate 16, second
Using cooperatively for slide rail 17, the second chute 18, the first slide rail 21, slide plate 22, the first chute 24 and gripper shoe 25, solves hanging
Frame can not carry out effective mobile problem to steel construction.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding can carry out various changes, modification, replacement to these embodiments without departing from the principles and spirit of the present invention
And modification, the scope of the present invention be defined by the appended.
Claims (6)
1. high altitude operation hanging frame, including body of wall (1), it is characterised in that:Top on the right side of the body of wall (1) is fixedly connected with
One fixed plate (16), the right side of the body of wall (1) and is fixedly connected with the second fixed plate positioned at the bottom of the first fixed plate (16)
(2), the second slide rail (17), the top on the right side of first fixed plate (16) are provided with the right side of the second fixed plate (2) inner chamber
Portion and bottom are provided with the first slide rail (21), and on the right side of first slide rail (21) slide plate (22), the slide plate are provided with
(22) top and bottom on the left of offers the first chute (24) matched with the first slide rail (21), the slide plate (22)
Inner chamber is provided through rotating shaft (23), is provided with gripper shoe (25) on the right side of the rotating shaft (23), and the one of the gripper shoe (25)
Slide plate (22) is run through at end, and the right side at the top of the gripper shoe (25) is provided through pull bar (11), the top of the pull bar (11)
Pulling block (15) is provided with, the bottom of the pull bar (11) is provided with draw ring (10), and the bottom of draw ring (10) inner chamber is provided with
Connecting rod (9), the bottom of the connecting rod (9) is fixedly connected with fixed block (19), and passing on left for the fixed block (19) is solid
Determine bolt (20) and be fixedly connected with the first snap ring (4), the right side of the fixed block (19) is fixedly connected by fixing bolt (20)
The bottom for having the second snap ring (8), first snap ring (4) and the second snap ring (8) is fixedly connected by connecting bolt (5), described
The bottom of gripper shoe (25) is fixedly connected with swash plate (3), and the second fixed plate (2), the swash plate are run through in one end of the swash plate (3)
(3) one end offers the second chute (18) matched with the second slide rail (17).
2. high altitude operation hanging frame according to claim 1, it is characterised in that:The left side of first fixed plate (16) and
The fixture that passes on left of the second fixed plate (2) is fixedly connected with body of wall (1), top and the gripper shoe (25) of the swash plate (3)
Junction be fixedly connected by fixture.
3. high altitude operation hanging frame according to claim 1, it is characterised in that:The draw ring (10), the first snap ring (4) and
The inner chamber of the second snap ring (8) is provided with wear-resistant pad (7).
4. high altitude operation hanging frame according to claim 1, it is characterised in that:The surface of the pull bar (11) offers logical
Hole (14), is provided with fix bar (13) on the right side of the gripper shoe (25), gripper shoe is run through in one end of the fix bar (13)
(25) and through hole (14), it is provided with handle (12) on the right side of the fix bar (13).
5. high altitude operation hanging frame according to claim 1, it is characterised in that:First snap ring (4) and the second snap ring
(8) top and bottom on the outside of is provided with fastening bolt (6), first snap ring (4), the second snap ring (8) and wear-resistant pad (7)
Surface offer the bolt hole matched with fastening bolt (6).
6. high altitude operation hanging frame according to claim 1, it is characterised in that:First slide rail (21) and the second slide rail
(17) surface is provided with the surface of antifriction granule, the pull bar (11) and handle (12) and is arranged with Anti-slip cover.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611267117.1A CN106641452A (en) | 2016-12-31 | 2016-12-31 | Suspension frame for overhead operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611267117.1A CN106641452A (en) | 2016-12-31 | 2016-12-31 | Suspension frame for overhead operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106641452A true CN106641452A (en) | 2017-05-10 |
Family
ID=58837958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611267117.1A Pending CN106641452A (en) | 2016-12-31 | 2016-12-31 | Suspension frame for overhead operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106641452A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108408569A (en) * | 2018-03-30 | 2018-08-17 | 广东知识城运营服务有限公司 | A kind of suspender of lifting loading machine |
CN113513358A (en) * | 2021-07-26 | 2021-10-19 | 太原理工大学 | Unmanned automatic emergency discharge system for high-concentration gas in roadway |
-
2016
- 2016-12-31 CN CN201611267117.1A patent/CN106641452A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108408569A (en) * | 2018-03-30 | 2018-08-17 | 广东知识城运营服务有限公司 | A kind of suspender of lifting loading machine |
CN113513358A (en) * | 2021-07-26 | 2021-10-19 | 太原理工大学 | Unmanned automatic emergency discharge system for high-concentration gas in roadway |
CN113513358B (en) * | 2021-07-26 | 2022-11-29 | 太原理工大学 | Unmanned automatic emergency discharge system for high-concentration gas in roadway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106641452A (en) | Suspension frame for overhead operation | |
CN207638250U (en) | Cable tunnel lays special stand coaster | |
CN104891372A (en) | Cable inspection well cover opening device | |
CN205421890U (en) | Die carrier bearing beam | |
CN206439507U (en) | High altitude operation hanging frame | |
CN107339555A (en) | A kind of mining machinery platform leg | |
CN210855067U (en) | Portable cable well lid plays gallows | |
CN207735362U (en) | The dual-purpose pay off rack of wire rod I-beam wheel | |
CN210680423U (en) | Cable support device with slide rail structure | |
CN210577392U (en) | Overhead device for cable maintenance | |
CN210232977U (en) | Novel support for coal mine | |
CN207959895U (en) | Driving positioning pulley structure | |
CN209156545U (en) | A kind of rack rinsed for comprehensive mining hydraulic bracket | |
CN207069439U (en) | 4 × " one leads 2 " wires-erecting pulley hangers | |
CN207957638U (en) | A kind of hanging apparatus | |
CN206581088U (en) | A kind of movable rail supporting arrangement of multi-state | |
CN207139027U (en) | A kind of screw tap fixture for processing | |
CN206570707U (en) | A kind of bridge stiffening device | |
CN206457725U (en) | It is a kind of to be used for the overall device transferred and remove dragging suspension basket | |
CN205622141U (en) | Electrified specialized tool that changes of bar type insulator | |
CN220440289U (en) | Building intelligent wiring concentrator | |
CN106276033A (en) | A kind of process units of steel pipe self-emptying high-efficiency lubricating | |
CN213865068U (en) | Special lifting appliance for steel structure | |
CN203321297U (en) | Auxiliary ladder of steel tube tower | |
CN212926047U (en) | High stability foundation pile for hydraulic engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170510 |
|
WD01 | Invention patent application deemed withdrawn after publication |