CN106640097B CN201610792320.4A CN201610792320A CN106640097B CN 106640097 B CN106640097 B CN 106640097B CN 201610792320 A CN201610792320 A CN 201610792320A CN 106640097 B CN106640097 B CN 106640097B
Authority
CN
China
Prior art keywords
connecting plate
annular connecting
steel skeleton
skeleton
detachably connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610792320.4A
Other languages
Chinese (zh)
Other versions
CN106640097A (en
Inventor
王呼佳
伍伟林
孙琮涵
丁玉乔
朱宏海
喻波
苟明中
余军
韦青岑
范玲俐
杨朋
李勇
高鲲
铁富忠
刘昕铭
任玲
陈鼎
王天水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201610792320.4A priority Critical patent/CN106640097B/en
Publication of CN106640097A publication Critical patent/CN106640097A/en
Application granted granted Critical
Publication of CN106640097B publication Critical patent/CN106640097B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A kind of novel shield balance originating and sleeve arrangement is received, with the problem for effectively avoiding leakproofness difference and complexity present in the steel bushing being widely used at present high, saves investment, guarantee the safety of shield export & import.Including the transition connection ring being set at portal on active well inwall, the inside of the transition connection ring and the front end of rigid backbone are detachably connected, the rigid backbone rear end is removably connected with grid frame rear cover, and flexible water liner is circumferentially around covering rigid backbone inner wall and grid coverage skeleton rear cover medial surface.The rigid backbone includes front end annular connecting plate, rear end annular connecting plate, and longitudinal gap is set to circumferential steel skeleton between the two, it further include circumferentially spaced longitudinal steel skeleton, the both ends of each longitudinal direction steel skeleton are detachably connected with front end annular connecting plate, rear end annular connecting plate respectively, and circumferential steel skeleton is detachably connected with longitudinal steel skeleton.

Description

A kind of novel shield balance originating and receive sleeve arrangement
Technical field
The present invention relates to shield tunnel, in particular to a kind of novel shield balance originating and reception sleeve arrangement.
Background technique
Shield and pipe jacking tunnel engineering method are most widely used and most important engineering technology in current construction of underground tunnel, Has the advantages that safety, quick, quality control and construction environment is good.Originating and receiving for shield machine and push-bench is always shield Heavy difficult point in constructing tunnel is even more especially risk control weak, shield and push pipe are originated and received in water rich strata Difficult point.Using steel bushing balance originating and a kind of technology that shield machine is new opplication in recent years is received, core technology is to adopt It is mounted at portal with a reusable sealing steel bushing, by filling sand and water and is pressurizeed, form one and portal The environment that the natural Water And Earth Pressures in end point balance each other, shield machine do not have water and soil pressure at one originating and be equivalent in receive process It is completed in the environment of power mutation, to ensure that safety.Steel bushing balance originating has obtained in constructing metro tunnel with reception Application.
From the above it can be seen that keeping the Water And Earth Pressures in steel bushing to balance each other with the natural Water And Earth Pressures in portal end point is Steel bushing balance originating and one of the key for receiving success.But it is rigid structure since steel bushing is all steel material, and point It is assembled for 3~4 pieces, each piecemeal of steel bushing inevitably occurs centainly in transport, lifting and use process Deformation, causes piecemeal seam crossing not can guarantee closely connected, so that sealing performance is greatly reduced, so that leak and gas leakage, cannot keep Water And Earth Pressures in sleeve.
In addition steel bushing use full steel structure, there is problems: weight and volume is larger, transport and assembly be not easy, Processing is complicated and cost is higher.
Therefore it is very necessary for designing a set of sleeve arrangement easy, that sealing performance is excellent.
Patent of invention content
Technical problem to be solved by the invention is to provide a kind of novel shield balance originating and sleeve arrangement is received, to have Effect avoids leakproofness difference present in the steel bushing that is widely used at present and the high problem of complexity, saves investment, guarantees shield The safety of export & import.
The technical solution adopted by the present invention to solve the technical problems is as follows:
A kind of novel shield balance originating of the invention and sleeve arrangement is received, including is set to active well liner at portal Transition connection ring on wall, it is characterized in that: the inside of the transition connection ring and the front end of rigid backbone are detachably connected, this is just Property skeleton rear end be removably connected with grid frame rear cover, flexible water liner is circumferentially around covering rigid backbone inner wall and covering Grid frame rear cover medial surface;The rigid backbone includes front end annular connecting plate, rear end annular connecting plate and longitudinal gap It is set to circumferential steel skeleton between the two, further includes circumferentially spaced longitudinal steel skeleton, the both ends of each longitudinal direction steel skeleton It is detachably connected respectively with front end annular connecting plate, rear end annular connecting plate, circumferential steel skeleton detachably connects with longitudinal steel skeleton It connects.
The invention has the advantages that principle is simple using the structural system of rigid flexible system, rigid backbone is detachable and group Dress is easy to transport and assembled, while being sealed using flexible material liner, even if rigid backbone has centainly after a number of uses Deformation nor affects on the sealing performance and use of sleeve, strong applicability, and can be made according to different shield diameters corresponding big Small sleeve arrangement has wide promotion prospect;It is easily-deformable to efficiently solve common steel bushing at present, poor sealing performance, Weight and volume is larger, transport and assembly are not easy, processs complexity and the higher problem of cost, so as to avoid existing steel bushing by Water And Earth Pressures bad in sealing performance, internal are difficult to maintain caused construction risk to increase, the hair of even surface collapse accident It is raw.
Detailed description of the invention
This specification includes following eight width attached drawing:
Fig. 1 is a kind of novel shield balance originating of the present invention and the main view for receiving sleeve arrangement;
Fig. 2 is the sectional view of the line A-A along Fig. 1;
Fig. 3 is a kind of novel shield balance originating of the present invention and the dismantling schematic diagram for receiving sleeve arrangement;
Fig. 4 is the enlarged drawing of the part B in Fig. 1;
Fig. 5 is a kind of novel shield balance originating of the present invention and the main view for receiving circumferential steel skeleton 14 in sleeve arrangement;
Fig. 6 is a kind of novel shield balance originating of the present invention and the main view for receiving grid frame rear cover in sleeve arrangement;
Fig. 7 is a kind of novel shield balance originating of the present invention and the side view for receiving grid frame rear cover in sleeve arrangement;
Fig. 8 is a kind of novel shield balance originating of the present invention and the main view for receiving sleeve arrangement medial end portions liner rubber cord Figure;
Component and corresponding label: active well inwall 1, reaction frame 2, transition connection ring 3, rigid backbone are shown in figure 10, front end annular connecting plate 11a, rear end annular connecting plate 11b, grid frame rear cover (only using when shield receives) 12 are soft Property water-resistant liner 13, main body liner rubber cord 13a, end liners rubber cord 13b, circumferential steel skeleton 14, circumferential connecting pin Plate 14a, longitudinal steel skeleton 15, longitudinally connected end plate 15a.
Specific embodiment
With reference to the accompanying drawing, by taking shield receives as an example, the present invention is further described.
Referring to Figures 1 and 2, a kind of novel shield balance originating of the invention and sleeve arrangement is received, including is set to hole Transition connection ring 3 at door on active well inwall 1.The inside of the transition connection ring 3 and the front end of rigid backbone 10 are removable Connection is unloaded, which is removably connected with grid frame rear cover 12, and flexible water liner 13 is circumferentially around covering 12 medial surface of 10 inner wall of rigid backbone and grid coverage skeleton rear cover.When construction, first by rigid backbone 10, grid frame rear cover 12 It is assembled into sleeve-shaped, then hangs up flexible water liner 13 in rigid backbone 10, so that formation one is reusable close Envelope sleeve arrangement is mounted at portal, which is the structural system of rigid flexible system.When in use, to filling sand and water inside it And pressurize, flexible water liner 13 expansion but can will be limited to rigid backbone 10 outward after pressurization, inside the two is born jointly Pressure guarantee structure safety, formed an environment to balance each other with the natural Water And Earth Pressures in portal end point, shield machine originate with It is equivalent in receive process and is completed in an environment without Water And Earth Pressures mutation, to efficiently solve current Common Steels Sleeve is easily-deformable, and poor sealing performance, weight and volume are larger, transport and assembly is not easy, processes the complicated and higher problem of cost, Construction risk is effectively reduced, avoids that surface collapse occurs.Since structure is simple, phase can be made according to different shield diameters The sleeve arrangement for the size answered.
Referring to Fig.1 and Fig. 4, the rigid backbone 10 include front end annular connecting plate 11a, rear end annular connecting plate 11b, with And longitudinal gap is set to circumferential steel skeleton 14 between the two, further includes circumferentially spaced longitudinal steel skeleton 15, it is each vertical It is detachably connected respectively with front end annular connecting plate 11a, rear end annular connecting plate 11b to the both ends of steel skeleton 15, circumferential reinforcing bar Frame 14 is detachably connected with longitudinal steel skeleton 15.
Referring to Fig. 3 and Fig. 4, Fig. 5, as a preferred embodiment, for convenient in manufacturing and constructing installation, tear open It removes, the front end annular connecting plate 11a, rear end annular connecting plate 11b and circumferential steel skeleton 14 are in semi-annular shape, and both ends have Circumferential connection board 14a is detachably connected and is formed loopful, i.e. rigid backbone by bolt assembly and two longitudinal steel skeletons 15 10 are docked by upper and lower two semicircular structures.
Referring to Fig. 3, the both ends of each longitudinal steel skeleton 5 have longitudinally connected end plate 15a, pass through bolt assembly and front end Annular connecting plate 11a, rear end annular connecting plate 11b are detachably connected.
Referring to Figure 1 and Figure 3, Fig. 8, the flexible water liner 13 include the main body liner rubber cord being bonded as one 13a and end liners rubber cord 13b, main body liner rubber cord 13a are circumferentially around covering 10 inner wall of rigid backbone, in end Serve as a contrast 12 medial surface of rubber cord 13b grid coverage skeleton rear cover.Main body liner rubber cord 13a and end liners rubber cord 13b selects tensile strength and the preferable flexible material of toughness, seam crossing that can guarantee extraordinary leakproofness.
Referring to figure 6 and figure 7, the grid frame rear cover 12 is made of staggered lateral rib, lengthways of rod, inner end It is welded to connect with rear end annular connecting plate 11b.
The above, which only explains through diagrams, novel shield balance originating of the invention a kind of and receives the one of sleeve arrangement A little principles are not intended to for the present invention being confined in shown and described specific structure and the scope of application, therefore all possibility The corresponding modification being utilized and equivalent belong to the applied the scope of the patents of the present invention.

Claims (4)

1. a kind of novel shield balance originating and reception sleeve arrangement, including being set at portal on active well inwall (1) Transition connection ring (3), it is characterized in that: the inside of the transition connection ring (3) and the front end of rigid backbone (10) are detachably connected, Rigid backbone (10) rear end is removably connected with grid frame rear cover (12), and flexible water liner (13) is rigid circumferentially around covering Property skeleton (10) inner wall and grid coverage skeleton rear cover (12) medial surface;The rigid backbone (10) includes front end annular connecting plate (11a), rear end annular connecting plate (11b) and longitudinal gap are set to circumferential steel skeleton (14) between the two, further include week To spaced longitudinal steel skeleton (15), the both ends of each longitudinal direction steel skeleton (15) respectively with front end annular connecting plate (11a), after End annular connecting plate (11b) is detachably connected, and circumferential steel skeleton (14) is detachably connected with longitudinal steel skeleton (15).
2. a kind of novel shield balance originating as described in claim 1 and reception sleeve arrangement, it is characterized in that: the front end ring Shape connecting plate (11a), rear end annular connecting plate (11b) and circumferential steel skeleton (14) are in semi-annular shape, and both ends have circumferential connect End plate (14a) is met, be detachably connected by bolt assembly and two longitudinal steel skeletons (15) and forms loopful.
3. a kind of novel shield balance originating as claimed in claim 2 and reception sleeve arrangement, it is characterized in that: each longitudinal direction The both ends of steel skeleton (15) have longitudinally connected end plate (15a), pass through bolt assembly and front end annular connecting plate (11a), rear end Annular connecting plate (11b) is detachably connected.
4. a kind of novel shield balance originating as described in claim 1 and reception sleeve arrangement, it is characterized in that: described flexible anti- Water liner (13) includes the main body liner rubber cord (13a) and end liners rubber cord (13b) being bonded as one, in main body Rubber cord (13a) is served as a contrast circumferentially around covering rigid backbone (10) inner wall, end liners rubber cord (13b) grid coverage skeleton Rear cover (12) medial surface.
CN201610792320.4A 2016-08-31 2016-08-31 A kind of novel shield balance originating and receive sleeve arrangement Active CN106640097B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610792320.4A CN106640097B (en) 2016-08-31 2016-08-31 A kind of novel shield balance originating and receive sleeve arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610792320.4A CN106640097B (en) 2016-08-31 2016-08-31 A kind of novel shield balance originating and receive sleeve arrangement

Publications (2)

Publication Number Publication Date
CN106640097A CN106640097A (en) 2017-05-10
CN106640097B true CN106640097B (en) 2019-04-12

Family

ID=58853110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610792320.4A Active CN106640097B (en) 2016-08-31 2016-08-31 A kind of novel shield balance originating and receive sleeve arrangement

Country Status (1)

Country Link
CN (1) CN106640097B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387099A (en) * 2017-08-07 2017-11-24 北京市市政四建设工程有限责任公司 A kind of shield machine belt pressure reception device
CN108397206A (en) * 2018-03-08 2018-08-14 中铁建大桥工程局集团第四工程有限公司 Arrival method of reseptance under short stabilization zone operating mode in rich water soft soil layer
CN112879022B (en) * 2021-01-21 2022-03-25 中亿丰建设集团股份有限公司 Tunneling method of tunneling equipment for tunnel communication channel by means of flexible sleeve system
CN112846593B (en) * 2021-01-29 2022-09-16 中交二公局第三工程有限公司 Steel sleeve launching device for shield construction
CN113982654A (en) * 2021-10-09 2022-01-28 中国建设基础设施有限公司 Internal pressure type water and soil pressure control steel sleeve and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201407055Y (en) * 2009-04-09 2010-02-17 上海建工(集团)总公司 Sealing device applied in receiving pit of jacking pipe and tunneling construction
CN201424941Y (en) * 2009-06-15 2010-03-17 广东华隧建设股份有限公司 Device for airtight starting and reaching of shield machine
CN102748038A (en) * 2012-07-11 2012-10-24 上海盾构设计试验研究中心有限公司 Full-recovery shield tunnel enter and exit water stop device
CN204436274U (en) * 2014-12-19 2015-07-01 中铁十八局集团第四工程有限公司 Shield structure receives and uses sealed soft steel bushing
CN104806254A (en) * 2014-01-26 2015-07-29 宏润建设集团股份有限公司 Auxiliary device for shield tunneling machine to reach receiving position and auxiliary receiving construction method
CN205315002U (en) * 2015-12-16 2016-06-15 中铁工程装备集团机电工程有限公司 Lightweight shield constructs to receive uses steel sleeve
CN206016810U (en) * 2016-08-31 2017-03-15 中铁二院工程集团有限责任公司 A kind of novel shield balance originating and reception sleeve arrangement

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001254588A (en) * 2000-03-10 2001-09-21 Kidoh Construction Co Ltd Arrival portal wall of pipe jacking method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201407055Y (en) * 2009-04-09 2010-02-17 上海建工(集团)总公司 Sealing device applied in receiving pit of jacking pipe and tunneling construction
CN201424941Y (en) * 2009-06-15 2010-03-17 广东华隧建设股份有限公司 Device for airtight starting and reaching of shield machine
CN102748038A (en) * 2012-07-11 2012-10-24 上海盾构设计试验研究中心有限公司 Full-recovery shield tunnel enter and exit water stop device
CN104806254A (en) * 2014-01-26 2015-07-29 宏润建设集团股份有限公司 Auxiliary device for shield tunneling machine to reach receiving position and auxiliary receiving construction method
CN204436274U (en) * 2014-12-19 2015-07-01 中铁十八局集团第四工程有限公司 Shield structure receives and uses sealed soft steel bushing
CN205315002U (en) * 2015-12-16 2016-06-15 中铁工程装备集团机电工程有限公司 Lightweight shield constructs to receive uses steel sleeve
CN206016810U (en) * 2016-08-31 2017-03-15 中铁二院工程集团有限责任公司 A kind of novel shield balance originating and reception sleeve arrangement

Also Published As

Publication number Publication date
CN106640097A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106640097B (en) A kind of novel shield balance originating and receive sleeve arrangement
CN210530847U (en) Shield starting tunnel portal water stop device close to existing line
CN102268973B (en) Hole sealing device
CN208669215U (en) A kind of hammering hole-forming device with high pressure water impact for Application of light well point precipitation
CN110242313B (en) Tunnel portal sealing safety structure and construction method
CN109488370A (en) A kind of underground limestone leting speeper drilling construction method
CN109487813A (en) A kind of integrated prefabricated tube coupling and its construction method of pipe gallery street crossing push pipe
CN206016810U (en) A kind of novel shield balance originating and reception sleeve arrangement
CN206816278U (en) Novel recoverable supporting steel arch frame for excavating transverse channel
CN101864968A (en) Anti-spouting device for tunnel bottom stratum consolidation and construction method thereof
CN109026150A (en) The built-in airbag sealing unit of tunnel connection channel push bench process tube coupling and encapsulating method
CN205655003U (en) Major diameter socket joint formula reinforced concrete push pipe internode interface
CN205475710U (en) Steel -pipe column concrete jacking interface turnover device
CN111734427A (en) Flexible connection steel sleeve mechanism for shield starting and construction method thereof
CN202546006U (en) High pressure-resistant sealing device used for intermediate jacking station of pipe jacking equipment
CN208073482U (en) A kind of reception of shield type rectangular top pipe steel bushing device and constructing structure
CN207847634U (en) A kind of shield reception steel bushing
CN102518129A (en) Post pressure-grouting pre-stressed hollow square pile and manufacturing method thereof
CN206636570U (en) A kind of tunnel abutment wall collapses the supporting construction at place
CN212225220U (en) Shield constructs flexible connection steel sleeve mechanism that starts
CN211081878U (en) Hydraulic engineering construction is with excavating anti-collapse device
CN203701103U (en) Underwater dry method grouting assembly
CN204646267U (en) A kind of corrugated steel Tunnel structure
CN211598671U (en) Novel shield constructs receives steel sleeve
CN211171871U (en) Air cushion type surge chamber with double-layer air-closing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant