CN106639225B - Super large plate width stone wall surface dried hanging method - Google Patents
Super large plate width stone wall surface dried hanging method Download PDFInfo
- Publication number
- CN106639225B CN106639225B CN201611007546.5A CN201611007546A CN106639225B CN 106639225 B CN106639225 B CN 106639225B CN 201611007546 A CN201611007546 A CN 201611007546A CN 106639225 B CN106639225 B CN 106639225B
- Authority
- CN
- China
- Prior art keywords
- plate width
- super large
- large plate
- stone material
- width stone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/14—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0832—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
- E04F13/0853—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements adjustable perpendicular to the wall
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The present invention provides a kind of super large plate width stone wall surface dried hanging methods, pass through oval first and second connecting hole of the first flat head bolt connecting corner yard wall-connecting piece, can on the working face perpendicular to stone material surface adjusting position, achieve the effect that adjust stone material surface evenness, after the first face by the second flat head bolt and the first L-type galvanized steel of hanging strip and corner brace wall-connecting piece connects, adjust link position between the second face of the first L-type galvanized steel and the second face of the second L-type galvanized steel, make the hanging strip for connecting same stone material in same working face, utilize the adjusting of link position between the second face of the first L-type galvanized steel and the second face of the second L-type galvanized steel, the flatness of effective adjustment stone wall surface realizes that multiple spot is fixed, by utilizing super large plate width stone material self gravity, the super large plate width stone material of card will be had It is suspended in the hanging strip on the corner brace wall-connecting piece being fixed on wall, effectively the connection that stone material and wall is safe, reliable, efficient.
Description
Technical field
The invention belongs to building decoration engineering technologies to research and develop field, a kind of super large plate width slabstone wall surface dry-hang method.
Background technique
As quality of the life improves, user and designer step up finishing requirements.Conventional size stone wall surface
Have been unable to meet the demand of resident.With application of the super large version width stone wall surface in engineering, traditional stone wall surface connects dress
It sets and has been not suitable for.Can occur centainly to bend under super large plate width stone material self gravity, at the same conventional attachment devices cannot support it is super
Big plate width stone material, easily-deformable, stone material is not connected firmly, and influences wall construction aesthetics and degree of safety.
Summary of the invention
The purpose of the present invention is to provide a kind of super large plate width stone wall surface dried hanging methods, are able to solve super large plate width stone material
From great, Bartlit metope attachment device is fixed just for edge, connector is easily-deformable and installation built on the sand, influence stone wall
The problem of surface construction effect and safety.
To solve the above problems, the present invention provides a kind of super large plate width stone wall surface dried hanging method, comprising:
The base for clearing up wall cuts protrusion part base;
It is controlled by unwrapping wire, determines every block of super large plate width stone material and corner brace wall-connecting piece installation site;
Super large plate width stone material is selected according to the installation site, walkthrough super large plate width stone material carries out super large plate width stone material
Numbering, according to super large plate width stone material described in the number factory process, in the fixed back in the back side of the super large plate width stone material
Super large plate width stone material is transported to construction site by lath;
At the construction field (site), card is welded on the backboard item;
According to the installation site connecting corner yard wall-connecting piece to the base, the first tack spiral shell on corner brace wall-connecting piece is adjusted
The link position of bolt and the first connecting hole, the second connecting hole is in the corner brace wall-connecting piece for connecting same super large plate width stone material
In same working face, wherein the corner brace wall-connecting piece includes two blocks of L-type galvanized steels and the first flat head bolt, wherein two pieces of L-types
Galvanized steel is respectively the first L-type galvanized steel and the second L-type galvanized steel, and every block of L-type galvanized steel is by two sides group l-shaped, the first L
The first oval connecting hole is provided on second face of type galvanized steel, the first face of the second L-type galvanized steel passes through expanding screw
Bolt and the wall connecting, are provided with the second oval connecting hole on the second face of the second L-type galvanized steel, and described the
One connecting hole and the second connecting hole and the super large plate width Stone Vertical, the second face of the first L-type galvanized steel and described the
It is realized adjustable by the cooperation of first flat head bolt and the first connecting hole, the second connecting hole in second face of two L-type galvanized steels
Whole connection;
Hanging strip is connect with multiple corner brace wall-connecting pieces in same transverse direction, by the first L-type of each corner brace wall-connecting piece
First face of galvanized steel is connect by the second flat head bolt with the hanging strip, adjusts the first tack spiral shell on corner brace wall-connecting piece again
The link position of bolt and the first connecting hole, the second connecting hole makes the hanging strip for connecting same super large plate width stone material be in same work
Make in face;
The super large plate width stone material is installed since bottom, using crane adjustment super large plate width stone material in the base
Behind position, artificial super large plate width stone material of finely tuning, when stone material is adjusted to corresponding installation site, is utilized in the position of the base
The self gravity of super large plate width stone material, connects the card with hanging strip;
The processing that gluing is carried out to the super large plate width stone material, clears up surface.
Further, in above-mentioned super large plate width stone wall surface dried hanging method, card is welded on the backboard item, is wrapped
It includes:
The card is welded on lateral backboard item, welding position is close to vertical backboard item.
Further, in above-mentioned super large plate width stone wall surface dried hanging method, the edge of the card and hanging strip is oblique
Socket.
Further, solid at the back side of the super large plate width stone material in above-mentioned super large plate width stone wall surface dried hanging method
Determine backboard item, comprising:
5 lateral backboard items are set up the back side of the super large plate width stone material is horizontal, longitudinally disposed 3 described vertical
It supports or opposes lath.
Further, in above-mentioned super large plate width stone wall surface dried hanging method, the backboard item is apart from the super large plate width
The edge 75mm of stone material.
Further, in above-mentioned super large plate width stone wall surface dried hanging method, card is welded on the backboard item, comprising:
The card is welded on the upper, middle and lower three lateral backboard items.
Further, the number of cards in above-mentioned super large plate width stone wall surface dried hanging method, on the every backboard item
It is 4, card width 100mm, edge 100mm of the card apart from backboard item on side.
Further, in above-mentioned super large plate width stone wall surface dried hanging method, the backboard item is width 50mm, thick 3mm steel
Making sheet item.
Further, solid at the back side of the super large plate width stone material in above-mentioned super large plate width stone wall surface dried hanging method
Determine backboard item, comprising:
Glue and self threading pin will be used to connect between the backboard item and the super large plate width stone material.
Further, in above-mentioned super large plate width stone wall surface dried hanging method, the self threading pin spacing 150mm gos deep into institute
State super large plate width stone material 10mm.
Compared with prior art, the present invention connects oval the first of the corner brace wall-connecting piece by the first flat head bolt
With the second connecting hole, can on the working face perpendicular to stone material surface adjusting position, achieve the effect that adjust stone material surface evenness, peace
When dress, after the first face by the second flat head bolt and the first L-type galvanized steel of hanging strip and corner brace wall-connecting piece connects, institute is adjusted
Link position between the second face of the first L-type galvanized steel and the second face of the second L-type galvanized steel is stated, makes to connect same stone
The hanging strip of material in same working face, using the first L-type galvanized steel the second face and the second L-type galvanized steel the
The adjusting of link position between two faces, the effective flatness for adjusting stone wall surface realizes that multiple spot is fixed, by utilizing super large plate
Super large plate width stone material with card is suspended to the hanging strip on the corner brace wall-connecting piece being fixed on wall by width stone material self gravity
On, effectively by stone material and wall connecting, to ensure that the safe, reliable, efficient installation of super large plate width stone material, solve super
Big plate width stone material from great, fix just for edge by Bartlit metope attachment device, connector is easily-deformable and installation built on the sand,
It is not suitable for super large plate width stone wall surface, influences the problem of stone wall surface construction effect and safety.
Detailed description of the invention
Fig. 1 is the super large plate width stone wall of one embodiment of the invention and the connection main view of backboard item;
Fig. 2 is the connection side view of super large the plate width stone wall and backboard item of one embodiment of the invention;
Fig. 3 is the scheme of installation of the card of one embodiment of the invention;
Fig. 4 is the installation enlarged diagram of the card of one embodiment of the invention;
Fig. 5 is the corner brace wall-connecting piece of one embodiment of the invention and the connection schematic diagram of hanging strip;
Fig. 6 is the card of one embodiment of the invention and the cooperation enlarged diagram of hanging strip;
Fig. 7 is the card of one embodiment of the invention and the cooperation schematic diagram of hanging strip;
Fig. 8 is the card of one embodiment of the invention and the cooperation side schematic view of hanging strip.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real
Applying mode, the present invention is described in further detail.
The present invention provides a kind of super large plate width stone wall surface cladding system, comprising:
As illustrated in fig. 1 and 2, be fixed on the backboard item 2 at the back side of super large plate width stone material 1, the backboard item include laterally and
Longitudinal backboard item 2;Here, backboard item can increase the rigidity at the back side of super large plate width stone material;
As shown in Figures 3 and 4, the card 4 being fixed on the lateral backboard item 2;
As shown in Fig. 5 to 8, the multiple corner brace wall-connecting pieces being fixed on wall, the corner brace wall-connecting piece includes two pieces of L-type platings
Zinc steel and the first flat head bolt 51, wherein two blocks of L-type galvanized steels are respectively the first L-type galvanized steel 52 and the second L-type galvanized steel
53, every block of L-type galvanized steel is provided with oval on the second face of the first L-type galvanized steel 52 by two sides group l-shaped
First face of one connecting hole 522, the second L-type galvanized steel 53 passes through expansion bolt 531 and the wall connecting, second L-type
The second oval connecting hole 532, first connecting hole 522 and the second connecting hole are provided on second face of galvanized steel 53
532 is vertical with the super large plate width stone material 1, first connecting hole and the second connecting hole and the super large plate width Stone Vertical,
Second face of the second face of the first L-type galvanized steel and the second L-type galvanized steel by first flat head bolt 51 and
The cooperation of first connecting hole 522, the second connecting hole 532, realizes adjustable connection;
With the hanging strip 6 of the card 4 cooperation, the hanging strip 6 is connect with multiple corner brace wall-connecting pieces in same transverse direction,
First face of the first L-type galvanized steel 52 on each corner brace wall-connecting piece is connect by the second flat head bolt 521 with the hanging strip 6.
Here, connect oval first and second connecting hole of the corner brace wall-connecting piece by the first flat head bolt, can perpendicular to
Adjusting position on the working face of stone material surface achievees the effect that adjust stone material surface evenness, when installation, hanging strip and corner brace wall-connecting piece
After connecting by the first face of the second flat head bolt and the first L-type galvanized steel, the second face of the first L-type galvanized steel is adjusted
The link position between the second face of the second L-type galvanized steel makes the hanging strip for connecting same stone material in same working face
It is interior, utilize the tune of link position between the second face of the first L-type galvanized steel and the second face of the second L-type galvanized steel
Section, the effective flatness for adjusting stone wall surface are realized that multiple spot is fixed, by utilizing super large plate width stone material self gravity, will be had
The super large plate width stone material of card is suspended in the hanging strip on the corner brace wall-connecting piece being fixed on wall, effectively connects stone material and wall
It connects, to ensure that the safe, reliable, efficient installation of super large plate width stone material, solves super large plate width stone material from great, traditional stone
Material metope attachment device is fixed just for edge, and connector is easily-deformable and installs built on the sand, is not suitable for super large plate width stone wall
Face influences the problem of stone wall surface construction effect and safety.
In one embodiment of the invention, the card is welded on the lateral backboard item, welding position close to vertical backboard,
To transmit slabstone gravity, to mitigate effect of the moment of flexure to backboard.According to plate width size, number of cards can adjust.
In one embodiment of the invention, as shown in figure 8, the card and the edge of hanging strip are oblique cutting mouth, i.e., the described card
It is thinner than the thickness of non-edge part with the edge of hanging strip, facilitate connection.
In one embodiment of the invention, as shown in Figures 1 to 3,5 institutes are provided in the back side transverse direction of the super large plate width stone material
Lateral backboard item is stated, 3 longitudinal backboard items are vertically arranged with.Here, for having a size of 1500mm (transverse direction) * 2400mm
The stone wall surface of (longitudinal direction) describes, it is preferred that edge 75mm of the backboard item apart from super large plate width stone material, when reaching installation
Beautiful effect.Preferably, as shown in figure 3, the card is welded on the upper, middle and lower three lateral backboard items.Preferably,
Number of cards on the every backboard item is 4, card width 100mm, edge of the card apart from backboard item on side
100mm.In this way, as shown in fig. 7, the stone wall surface that a block size is 1500mm (transverse direction) * 2400mm (longitudinal direction) is arranged 12 altogether
Card, in addition, can be according to its adjustable whole quantity of plate of super large plate width stone material.
In one embodiment of the invention, the backboard item is width 50mm, thick 3mm steel lath.
In one embodiment of the invention, as illustrated in fig. 1 and 2, glue is used between the backboard item 2 and the super large plate width stone material 1
It is connected with self threading pin 3, here, backboard and stone material are combined into one using chemically and physically connecting, eliminates super large plate width stone material
Itself flexure, while the base as welding card, card improves the rigidity and safety of super large stone material.Preferably, described
Self threading pin spacing 150mm gos deep into the super large plate width stone material 10mm.
The present invention provides a kind of super large plate width stone wall surface dried hanging method, comprising:
The base for clearing up wall cuts protrusion part base;
It is controlled by unwrapping wire, determines every block of super large plate width stone material and corner brace wall-connecting piece installation site;
Super large plate width stone material is selected according to the installation site, walkthrough super large plate width stone material carries out super large plate width stone material
Numbering, according to super large plate width stone material described in the number factory process, in the fixed back in the back side of the super large plate width stone material
Super large plate width stone material is transported to construction site by lath;
At the construction field (site), card is welded on the backboard item;
According to the installation site connecting corner yard wall-connecting piece to the base, the first tack spiral shell on corner brace wall-connecting piece is adjusted
The link position of bolt and the first connecting hole, the second connecting hole is in the corner brace wall-connecting piece for connecting same super large plate width stone material
In same working face, wherein the corner brace wall-connecting piece includes two blocks of L-type galvanized steels and the first flat head bolt 51, wherein two pieces of L
Type galvanized steel is respectively the first L-type galvanized steel 52 and the second L-type galvanized steel 53, and every block of L-type galvanized steel is by two sides group l-shaped, institute
It states and is provided with the first oval connecting hole 522 on the second face of the first L-type galvanized steel 52, the of the second L-type galvanized steel 53
Pass through expansion bolt 531 and the wall connecting on one side, is provided on the second face of the second L-type galvanized steel 53 oval
The second connecting hole 532, first connecting hole 522 and the second connecting hole 532 are vertical with the super large plate width stone material 1, described
Second face of the first L-type galvanized steel and the second face of the second L-type galvanized steel pass through first flat head bolt 51 and first
The cooperation of connecting hole 522, the second connecting hole 532, realizes adjustable connection;
Hanging strip 6 is connect with multiple corner brace wall-connecting pieces in same transverse direction, by the first L-type of each corner brace wall-connecting piece
First face of galvanized steel 52 is connect by the second flat head bolt 521 with the hanging strip 6, adjusts first on corner brace wall-connecting piece again
The link position of flat head bolt and the first connecting hole, the second connecting hole is in the hanging strip for connecting same super large plate width stone material
In same working face;
The super large plate width stone material is installed since bottom, using crane adjustment super large plate width stone material in the base
Behind position, artificial super large plate width stone material of finely tuning, when stone material is adjusted to corresponding installation site, is utilized in the position of the base
The self gravity of super large plate width stone material, connects card with hanging strip;
The processing that gluing is carried out to the super large plate width stone material, clears up surface.Here, connecting institute by the first flat head bolt
State oval first and second connecting hole of corner brace wall-connecting piece, can on the working face perpendicular to stone material surface adjusting position, reach
To the effect for adjusting stone material surface evenness, when installation, hanging strip and corner brace wall-connecting piece pass through the second flat head bolt and the plating of the first L-type
After first face of zinc steel connects, the second face of the first L-type galvanized steel and the second face of the second L-type galvanized steel are adjusted
Between link position, make the hanging strip for connecting same stone material in same working face, utilize the of the first L-type galvanized steel
The adjusting of link position between two faces and the second face of the second L-type galvanized steel, the effective flatness for adjusting stone wall surface
It realizes that multiple spot is fixed, by utilizing super large plate width stone material self gravity, the super large plate width stone material with card is suspended to and is fixed on
In the hanging strip on corner brace wall-connecting piece on wall, effectively by stone material and wall connecting, to ensure that super large plate width stone material is pacified
Entirely, it reliably, efficiently installs, solves super large plate width stone material from great, Bartlit metope attachment device is solid just for edge
Fixed, connector is easily-deformable and installs built on the sand, is not suitable for super large plate width stone wall surface, influences stone wall surface construction effect and peace
Full problem.
In one embodiment of the invention, card is welded on the backboard item, comprising:
The card is welded on lateral backboard item, welding position is close to vertical backboard, to transmit slabstone gravity, to subtract
Light effect of the moment of flexure to backboard.According to plate width size, number of cards can adjust.
In one embodiment of the invention, as shown in figure 8, the card and the edge of hanging strip are oblique cutting mouth, i.e., the described card
It wants the thickness of non-edge part to want thin with the edge of hanging strip, facilitates connection.
In one embodiment of the invention, in the back side stationary backplate item of the super large plate width stone material, comprising:
5 lateral backboard items are set up the back side of the super large plate width stone material is horizontal, longitudinally disposed 3 described vertical
It supports or opposes lath.Here, for the stone wall surface narration having a size of 1500mm (transverse direction) * 2400mm (longitudinal direction), it is preferred that the back
Edge 75mm of the lath apart from super large plate width stone material is beautiful when achieving the effect that installation.Preferably, it is welded on the backboard item
Connect card, comprising:
The card is welded on the upper, middle and lower three lateral backboard items.Preferably, on the every backboard item
Number of cards is 4, card width 100mm, edge 100mm of the card apart from backboard item on side.In this way, a block size is
12 cards are arranged in the stone wall surface of 1500mm (transverse direction) * 2400mm (longitudinal direction) altogether, in addition, can be according to the plate of super large plate width stone material
Its adjustable whole quantity.
In one embodiment of the invention, the backboard item is width 50mm, thick 3mm steel lath.
In one embodiment of the invention, in the back side stationary backplate item of the super large plate width stone material, comprising:
Glue and self threading pin will be used to connect between the backboard item and the super large plate width stone material, here, utilizing chemistry and object
Reason connection, backboard and stone material are combined into one, and eliminate the flexure of super large plate width stone material itself, while as welding card, card
Base improve the rigidity and safety of super large stone material.Preferably, the self threading pin spacing 150mm gos deep into the super large plate
Width stone material 10mm.
In conclusion the present invention connects oval the first and second of the corner brace wall-connecting piece by the first flat head bolt
Connecting hole, can on the working face perpendicular to stone material surface adjusting position, achieve the effect that adjust stone material surface evenness, when installation,
After the first face by the second flat head bolt and the first L-type galvanized steel of hanging strip and corner brace wall-connecting piece connects, described the is adjusted
Link position between second face of one L-type galvanized steel and the second face of the second L-type galvanized steel makes to connect same stone material
Hanging strip utilizes the second face of the first L-type galvanized steel and the second face of the second L-type galvanized steel in same working face
Between link position adjusting, the effective flatness for adjusting stone wall surface realizes that multiple spot is fixed, passes through and utilize super large plate width stone
Super large plate width stone material with card is suspended in the hanging strip on the corner brace wall-connecting piece being fixed on wall, has by material self gravity
Stone material and wall connecting to ensure that the safe, reliable, efficient installation of super large plate width stone material, are solved super large plate by effect ground
Width stone material from great, fix just for edge by Bartlit metope attachment device, connector is easily-deformable and installation built on the sand, it is uncomfortable
For super large plate width stone wall surface, the problem of stone wall surface construction effect and safety is influenced.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention
And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it
Interior, then the invention is also intended to include including these modification and variations.
Claims (10)
1. a kind of super large plate width stone wall surface dried hanging method characterized by comprising
The base for clearing up wall cuts protrusion part base;
It is controlled by unwrapping wire, determines every block of super large plate width stone material and corner brace wall-connecting piece installation site;
Super large plate width stone material is selected according to the installation site, super large plate width stone material is numbered in walkthrough super large plate width stone material
Processing, according to super large plate width stone material described in the number factory process, in the back side stationary backplate item of the super large plate width stone material,
Super large plate width stone material is transported to construction site;
At the construction field (site), card is welded on the backboard item;
According to the installation site connecting corner yard wall-connecting piece to the base, adjust the first flat head bolt on corner brace wall-connecting piece with
The link position of first connecting hole, the second connecting hole makes the corner brace wall-connecting piece for connecting same super large plate width stone material be in same
In working face, wherein the corner brace wall-connecting piece includes two blocks of L-type galvanized steels and the first flat head bolt, wherein two pieces of L-types are zinc-plated
Steel is respectively the first L-type galvanized steel and the second L-type galvanized steel, and every block of L-type galvanized steel is by two sides group l-shaped, the first L-type plating
Be provided with the first oval connecting hole on second face of zinc steel, the first face of the second L-type galvanized steel by expansion bolt with
The wall connecting is provided with the second oval connecting hole on the second face of the second L-type galvanized steel, and described first connects
Connect hole and the second connecting hole and the super large plate width Stone Vertical, the second face of the first L-type galvanized steel and second L-type
It is realized adjustable by the cooperation of first flat head bolt and the first connecting hole, the second connecting hole in second face of galvanized steel
Connection;
Hanging strip is connect with multiple corner brace wall-connecting pieces in same transverse direction, the first L-type of each corner brace wall-connecting piece is zinc-plated
First face of steel connect by the second flat head bolt with the hanging strip, again the first flat head bolt on adjustment corner brace wall-connecting piece and
The link position of first connecting hole, the second connecting hole makes the hanging strip for connecting same super large plate width stone material be in same working face
It is interior;
The super large plate width stone material is installed since bottom, using crane adjustment super large plate width stone material in the position of the base
Afterwards, it manually finely tunes super large plate width stone material and utilizes super large when stone material is adjusted to corresponding installation site in the position of the base
The self gravity of plate width stone material, connects the card with hanging strip;
The processing that gluing is carried out to the super large plate width stone material, clears up surface.
2. super large plate width stone wall surface dried hanging method as described in claim 1, which is characterized in that welded on the backboard item
Card, comprising:
The card is welded on lateral backboard item, welding position is close to vertical backboard item.
3. super large plate width stone wall surface dried hanging method as described in claim 1, which is characterized in that the side of the card and hanging strip
Edge is oblique cutting mouth.
4. super large plate width stone wall surface dried hanging method as described in claim 1, which is characterized in that in the super large plate width stone material
Back side stationary backplate item, comprising:
5 lateral backboard items, longitudinally disposed 3 longitudinal backboard items are set up the back side of the super large plate width stone material is horizontal.
5. super large plate width stone wall surface dried hanging method as claimed in claim 4, which is characterized in that described in the backboard item distance
The edge 75mm of super large plate width stone material.
6. super large plate width stone wall surface dried hanging method as claimed in claim 4, which is characterized in that welded on the backboard item
Card, comprising:
The card is welded on the upper, middle and lower three lateral backboard items.
7. super large plate width stone wall surface dried hanging method as claimed in claim 4, which is characterized in that on the every backboard item
Number of cards is 4, card width 100mm, edge 100mm of the card apart from backboard item on side.
8. super large plate width stone wall surface dried hanging method as described in claim 1, which is characterized in that the backboard item is width
50mm, thick 3mm steel lath.
9. super large plate width stone wall surface dried hanging method as described in claim 1, which is characterized in that in the super large plate width stone material
Back side stationary backplate item, comprising:
Glue and self threading pin will be used to connect between the backboard item and the super large plate width stone material.
10. super large plate width stone wall surface dried hanging method as claimed in claim 9, which is characterized in that the self threading pin spacing
150mm gos deep into the super large plate width stone material 10mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611007546.5A CN106639225B (en) | 2016-11-16 | 2016-11-16 | Super large plate width stone wall surface dried hanging method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611007546.5A CN106639225B (en) | 2016-11-16 | 2016-11-16 | Super large plate width stone wall surface dried hanging method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106639225A CN106639225A (en) | 2017-05-10 |
CN106639225B true CN106639225B (en) | 2019-02-19 |
Family
ID=58807000
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611007546.5A Active CN106639225B (en) | 2016-11-16 | 2016-11-16 | Super large plate width stone wall surface dried hanging method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106639225B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107013005B (en) * | 2017-05-17 | 2019-06-21 | 江苏笃有建设股份有限公司 | Dry-hanging component and the dried hanging method for applying it |
CN107386568A (en) * | 2017-07-29 | 2017-11-24 | 无为县鑫品石业有限公司 | A kind of marble coating dry hanging construction technique |
CN110295716B (en) * | 2018-10-24 | 2021-03-09 | 浙江亚厦装饰股份有限公司 | Wall fast-assembling stone material is hung system futilely |
CN110056148B (en) * | 2019-05-23 | 2023-12-22 | 金螳螂精装科技(苏州)有限公司 | Assembled dry hanging installation structure of small-specification ceramic tile |
CN113833227A (en) * | 2021-09-13 | 2021-12-24 | 深圳市奇信集团股份有限公司 | Stone dry-hanging structure and stone dry-hanging construction method |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0893178A (en) * | 1994-09-28 | 1996-04-09 | Toto Ltd | Dry execution mounting bearing construction of walling |
CN2635791Y (en) * | 2003-06-24 | 2004-08-25 | 杨小林 | Plate material hanging installation device for building |
CN2644552Y (en) * | 2003-08-04 | 2004-09-29 | 中建一局建设发展公司 | Fixture for direct hanging stone on a slotted stone curtain wall |
CN201381566Y (en) * | 2009-01-05 | 2010-01-13 | 深圳市方大装饰工程有限公司 | Back-bolt type stone curtain wall |
CN202577847U (en) * | 2012-03-29 | 2012-12-05 | 中国建筑装饰集团有限公司 | Honeycomb aluminum plate composite patterning shell mosaic decorative system for wall body |
CN202530702U (en) * | 2012-04-11 | 2012-11-14 | 浙江圣美木业有限公司 | Novel wallboard pendant |
CN103031936A (en) * | 2012-12-31 | 2013-04-10 | 环球石材(东莞)有限公司 | Erect type hang mounting element |
CN204282731U (en) * | 2014-11-24 | 2015-04-22 | 浙江亚厦装饰股份有限公司 | A kind of wall surface dry-hang syndeton of adjustable process seam |
-
2016
- 2016-11-16 CN CN201611007546.5A patent/CN106639225B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106639225A (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106639225B (en) | Super large plate width stone wall surface dried hanging method | |
CN101956438B (en) | Three-dimensionally adjustable disconnectable curtain wall connecting device and construction method thereof | |
CN209837434U (en) | A prevent structure of ftractureing for special-shaped curved surface GRG furred ceiling | |
CN205577327U (en) | Metal clad sheet system is hung futilely to wall body | |
CN208152459U (en) | A kind of quick cladding installation infrastructure of decoration material | |
CN104929297A (en) | Combined type ceiling hanging part and wood veneer ceiling installing process | |
CN104895193A (en) | Precast outer wallboard connecting box and connecting joint | |
CN104895279A (en) | Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure | |
CN201901964U (en) | Three-dimensional adjustable and disconnectable curtain wall | |
CN205046791U (en) | Artificial stone plate material connection structure convenient to hang dress | |
CN203213372U (en) | F-shaped hanging piece and suspended ceiling system employing same | |
CN206554450U (en) | The cladding system of super large plate width stone wall surface | |
CN204899113U (en) | Quick installation pendant of board section bar | |
CN206153325U (en) | Coalignment of dysmorphism H shaped steel | |
JP5861903B1 (en) | Indirect lighting structure unit parts | |
CN206408888U (en) | The cladding system of super large plate width stone wall surface | |
CN106639227B (en) | Super large plate width stone wall surface dried hanging method | |
CN204899108U (en) | Node structure is hung futilely to marble | |
CN108301585A (en) | Armouring keel-free direct pendant | |
CN103967188A (en) | Special-shaped sculpture modeling ceiling assembled type installation structure | |
CN203499191U (en) | Tilted stone cladding structure | |
CN106522501A (en) | Super large-size stone wall surface dry-hanging system | |
CN206625432U (en) | Adjustable type lightgage steel joist | |
CN106522502A (en) | Super large plate width stone wall dry hanging system | |
CN214575243U (en) | Mounting structure of assembled wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |