CN106639162A - 一种基于bim的环保垫块标准化施工方法 - Google Patents
一种基于bim的环保垫块标准化施工方法 Download PDFInfo
- Publication number
- CN106639162A CN106639162A CN201611234033.8A CN201611234033A CN106639162A CN 106639162 A CN106639162 A CN 106639162A CN 201611234033 A CN201611234033 A CN 201611234033A CN 106639162 A CN106639162 A CN 106639162A
- Authority
- CN
- China
- Prior art keywords
- cushion block
- protective layer
- construction method
- bim
- environmental protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明公开了一种基于BIM的环保垫块标准化施工方法,根据设计图纸将构件进行划分归类;进行梁、板、柱建筑构件建模;对构件保护层的垫块位置进行审核优化;自动导出双环多用型环保保护层垫块排版图以及相应的垫块配置规格和构件对应明细表;双环多用型环保垫块保护层按照编码 进行集中堆放;整体吊运,在楼层按照施工流水段进行堆放;进行保护层施工和质量验收;混凝土构件浇筑完成后,采用测试仪非破损地检测钢筋的位置。优点:在减少能源消耗、项目精细化管理、施工过程模拟、空间碰撞检测、现场质量安全管理等方面可以发挥巨大价值。
Description
技术领域
本发明涉及一种基于BIM的环保垫块标准化施工方法,属于建筑技术领域。
背景技术
竖向构件钢筋混凝土是建筑物的承载力构件,精确控制好钢筋保护层厚度,具有确保结构的耐久性和延长结构的使用年限,降低投资成本和后期维护费用,有利于减少社会资源的消耗。如果钢筋混凝土构件的钢筋位置放置错误或者钢筋的保护层过大,会降低钢筋混凝土构件的承载能力。
水平构件钢筋混凝土是建筑物的承载力构件,精确控制好钢筋保护层厚度,具有提高构件抗拉强度,提高钢筋和混凝土的粘结力,这样既发挥了各自的受力性能,又能很好地协调工作,共同承担结构构件所承受的外部荷载。如果放置错误或者钢筋保护层过大,轻则降低了梁的承载能力,重则会发生重大事故。钢筋被包裹在混凝土构件中形成钝化保护膜,不与外界接触相对还比较安全,但如果钢筋保护层厚度过小,也就是钢筋过分靠近受拉区一侧,一方面容易造成钢筋露筋或钢筋受力时表面混凝土剥落,另一方面随着时间的推移,表面的混凝土将逐渐碳化,用不了多久,钢筋外混凝土就失去了保护作用,从而导致钢筋锈蚀,断面减小,强度降低,钢筋与混凝土之间失去粘结力,构件整体性受到破坏,严重时还会导致整个结构体系的破坏。
现有技术中不能有效控制构件水平和竖向钢筋位移的问题,从而不能够达到有效控制现浇构件钢筋保护层厚度的目的。
常用施工技术往往不能做到规范操作,特别是在混凝土现浇板浇捣过程中,尤其需要重视。往往是钢筋绑扎时位置都很正确,但一到浇捣时情况就变了样,不是人踩就是工器具压在上面,由此造成的结果是支撑钢筋的马墩被踩倒,混凝土上层钢筋弯曲变形,保护层的厚度也就得不到保证。
发明内容
本发明所要解决的技术问题是克服现有技术的缺陷,提供一种基于BIM的环保垫块标准化施工方法,根据构件类型,通过BIM技术设计放置环保垫块位置、数量和定位箍筋等措施,能够有效控制构件水平和竖向钢筋位移的问题,从而能够达到有效控制现浇构件钢筋保护层厚度的目的。
为解决上述技术问题,本发明提供一种基于BIM的环保垫块标准化施工方法,其特征是,包括如下步骤:
1)根据设计图纸将构件进行划分归类;
2)进行梁、板、柱建筑构件建模;
3)对构件保护层的垫块位置进行审核优化;
4)自动导出双环多用环保型保护层垫块排版图以及相应的垫块配置规格和构件对应明细表;
5)双环多用型环保保护层垫块按照梁、板、柱建筑构件编码进行集中堆放;
6)整体吊运,在楼层按照施工流水段进行堆放;
7)进行钢筋绑扎后放置保护层垫块施工和质量验收;
8)混凝土构件浇筑完成后,采用测试仪非破损地检测钢筋的位置。
进一步地,所述步骤2),首先根据建筑图纸,将整个建筑工程分解为各类构件,并通过三维构件模型,将它们的尺寸、体积、重量直接测量下来,以及采用的材料类型、型号记录下来,其次针对主要构件选择施工设备、机具,确定施工方法。
进一步地,所述步骤7)按照双环多用型环保垫块保护层排版图或者三维模型进行保护层施工和质量验收。
进一步地,所述测试仪采用符合国产标准的钢筋保护层测试仪。
进一步地, 所述双环多用型环保垫块保护层的构成包括如下步骤:
步骤一,垫块验收;步骤二,垫块安装;步骤三,垫块检查。
进一步地, 所述步骤一,在施工安装前,计算好构件所需使用的双环型环保保护层垫块数量、品种、规格并检查产品合格证、质量保证书、出库单以及产品功能技术性指标检测报告。
进一步地, 所述步骤二,在现浇构件钢筋绑扎验收通过后,根据预先设计好的安装垫块排版图进行垫块安装;包括基础底板保护层环保垫块安装和剪力墙和柱保护层环保垫块安装,同一水平方向的同一直径钢筋必须放置同一种规格的钢筋保护层环保垫块,对于容易碰损部位的钢筋保护层还必须用绑扎钢筋用的扎丝进行附加固定。
进一步地, 所述步骤三,查看已经安装好的竖向构件保护层环保垫块,是否有后到人员和工序施工过程中被碰坏的变形、裂缝、脱落的垫块,如果发现,应及时更换。
本发明所达到的有益效果:
本发明提供的基于BIM的环保垫块标准化施工方法,在减少能源消耗、项目精细化管理、施工过程模拟、空间碰撞检测、现场质量安全管理等方面可以发挥巨大价值;从施工质量对比来看,使用传统人工垫块容易破碎,脱落,偏移、变形等现象,从而不能够真正达到设计要求的保护层厚度;使用环保垫块能够提高工效和保证钢筋混凝土施工质量;本发明施工方法具有提高建筑工程质量、提高工程标准化程度的亮点;本发明通过采用BIM技术控制环保垫块间距、位置和数量,具有造价成本低、产品环保、价格低廉、易储存优点。 本发明通过采用圆心双环型构造具有承受力高、自锁定、不脱落、不破碎。
附图说明
图1是本发明的流程示意图。
具体实施方式
下面结合附图对本发明作进一步描述。以下实施例仅用于更加清楚地说明本发明的技术方案,而不能以此来限制本发明的保护范围。
一种基于BIM的环保垫块标准化施工方法,其特征是,包括如下步骤:
1)根据设计图纸将构件进行划分归类;
2)进行梁、板、柱建筑构件建模;
3)对构件保护层的垫块位置进行审核优化;
4)自动导出双环多用环保型保护层垫块排版图以及相应的垫块配置规格和构件对应明细表;
5)双环多用型保护层垫块按照梁、板、柱建筑构件编码进行集中堆放;
6)整体吊运,在楼层按照施工流水段进行堆放;
7)进行钢筋绑扎后放置保护层垫块施工和质量验收;
8)混凝土构件浇筑完成后,采用测试仪非破损地检测钢筋的位置。
本实施例中,所述步骤2),首先根据建筑图纸,将整个建筑工程分解为各类构件,并通过三维构件模型,将它们的尺寸、体积、重量直接测量下来,以及采用的材料类型、型号记录下来,其次针对主要构件选择施工设备、机具,确定施工方法。
本实施例中,所述步骤7)按照双环多用型环保垫块保护层排版图或者三维模型进行保护层施工和质量验收。
本实施例中,所述测试仪采用瑞士产S型钢筋保护层测试仪。
本实施例中, 所述双环多用型垫块保护层的构成包括如下步骤:
步骤一,垫块验收;步骤二,垫块安装;步骤三,垫块检查。
本实施例中, 所述步骤一,在施工安装前,计算好构件所需使用的双环型环保保护层垫块数量、品种、规格并检查产品合格证、质量保证书、出库单以及产品功能技术性指标检测报告。
本实施例中, 所述步骤二,在现浇构件钢筋绑扎验收通过后,根据预先设计好的安装垫块排版图进行垫块安装;包括基础底板保护层环保垫块安装和剪力墙和柱保护层环保垫块安装,同一水平方向的同一直径钢筋必须放置同一种规格的钢筋保护层环保垫块,对于容易碰损部位的钢筋保护层还必须用绑扎钢筋用的扎丝进行附加固定。
本实施例中, 所述步骤三,查看已经安装好的竖向构件保护层环保垫块,是否有后到人员和工序施工过程中被碰坏的变形、裂缝、脱落的垫块,如果发现,应及时更换。
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变形,这些改进和变形也应视为本发明的保护范围。
Claims (8)
1.一种基于BIM的环保垫块标准化施工方法,其特征是,包括如下步骤:
1)根据设计图纸将构件进行划分归类;
2)进行梁、板、柱建筑构件建模;
3)对构件保护层的垫块位置进行审核优化;
4)自动导出双环多用环保型保护层垫块排版图以及相应的垫块配置规格和构件对应明细表;
5)双环多用型环保保护层垫块按照梁、板、柱建筑构件编码进行集中堆放;
6)整体吊运,在楼层按照施工流水段进行堆放;
7)进行钢筋绑扎后放置保护层垫块施工和质量验收;
8)混凝土构件浇筑完成后,采用测试仪非破损地检测钢筋的位置。
2.根据权利要求1所述的一种基于BIM的环保垫块标准化施工方法,其特征是,所述步骤2),首先根据建筑图纸,将整个建筑工程分解为各类构件,并通过三维构件模型,将它们的尺寸、体积、重量直接测量下来,以及采用的材料类型、型号记录下来,其次针对主要构件选择施工设备、机具,确定施工方法。
3.根据权利要求1所述的一种基于BIM的环保垫块标准化施工方法,其特征是,所述步骤7)按照双环多用型环保垫块保护层排版图或者三维模型进行保护层施工和质量验收。
4.根据权利要求1所述的一种基于BIM的环保垫块标准化施工方法,其特征是,所述测试仪采用所述测试仪采用符合国产标准的钢筋保护层测试仪。
5. 根据权利要求1所述的一种基于BIM的环保垫块标准化施工方法,其特征是, 所述双环多用型环保垫块保护层的构成包括如下步骤:
步骤一,垫块验收;步骤二,垫块安装;步骤三,垫块检查。
6. 根据权利要求5所述的一种基于BIM的环保垫块标准化施工方法,其特征是, 所述步骤一,在施工安装前,计算好构件所需使用的双环型环保保护层垫块数量、品种、规格并检查产品合格证、质量保证书、出库单以及产品功能技术性指标检测报告。
7. 根据权利要求5所述的一种基于BIM的环保垫块标准化施工方法,其特征是, 所述步骤二,在现浇构件钢筋绑扎验收通过后,根据预先设计好的安装垫块排版图进行垫块安装;包括基础底板保护层环保垫块安装和剪力墙和柱保护层环保垫块安装,同一水平方向的同一直径钢筋必须放置同一种规格的钢筋保护层环保垫块,对于容易碰损部位的钢筋保护层还必须用绑扎钢筋用的扎丝进行附加固定。
8. 根据权利要求5所述的一种基于BIM的环保垫块标准化施工方法,其特征是, 所述步骤三,查看已经安装好的竖向构件保护层环保垫块,是否有后到人员和工序施工过程中被碰坏的变形、裂缝、脱落的垫块,如果发现,应及时更换。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611234033.8A CN106639162A (zh) | 2016-12-28 | 2016-12-28 | 一种基于bim的环保垫块标准化施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611234033.8A CN106639162A (zh) | 2016-12-28 | 2016-12-28 | 一种基于bim的环保垫块标准化施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106639162A true CN106639162A (zh) | 2017-05-10 |
Family
ID=58833234
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611234033.8A Pending CN106639162A (zh) | 2016-12-28 | 2016-12-28 | 一种基于bim的环保垫块标准化施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106639162A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108428079A (zh) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | 一种基于bim的装配式堆场管理方法及装置 |
CN112270034A (zh) * | 2020-11-24 | 2021-01-26 | 筑友智造科技投资有限公司 | 一种墙体拆分方法、装置及系统 |
CN112936559A (zh) * | 2021-03-16 | 2021-06-11 | 河南省公路工程局集团有限公司 | 一种基于全过程相伴的混凝土小型预制构件质量提升方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101301716B1 (ko) * | 2013-03-26 | 2013-08-30 | 박광춘 | 비정형 건축용 거푸집 제작방법 |
CN104314310A (zh) * | 2014-10-23 | 2015-01-28 | 中建三局第一建设工程有限责任公司 | 一种基于bim的砌块标准化施工方法 |
CN104631826A (zh) * | 2015-01-21 | 2015-05-20 | 中国十七冶集团有限公司 | 一种基于bim模型的施工总平面布置方法 |
CN106250638A (zh) * | 2016-08-04 | 2016-12-21 | 中建三局第建设工程有限责任公司 | 一种基于bim的顶模综合设计及应用方法 |
-
2016
- 2016-12-28 CN CN201611234033.8A patent/CN106639162A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101301716B1 (ko) * | 2013-03-26 | 2013-08-30 | 박광춘 | 비정형 건축용 거푸집 제작방법 |
CN104314310A (zh) * | 2014-10-23 | 2015-01-28 | 中建三局第一建设工程有限责任公司 | 一种基于bim的砌块标准化施工方法 |
CN104631826A (zh) * | 2015-01-21 | 2015-05-20 | 中国十七冶集团有限公司 | 一种基于bim模型的施工总平面布置方法 |
CN106250638A (zh) * | 2016-08-04 | 2016-12-21 | 中建三局第建设工程有限责任公司 | 一种基于bim的顶模综合设计及应用方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108428079A (zh) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | 一种基于bim的装配式堆场管理方法及装置 |
CN112270034A (zh) * | 2020-11-24 | 2021-01-26 | 筑友智造科技投资有限公司 | 一种墙体拆分方法、装置及系统 |
CN112936559A (zh) * | 2021-03-16 | 2021-06-11 | 河南省公路工程局集团有限公司 | 一种基于全过程相伴的混凝土小型预制构件质量提升方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105893689A (zh) | 一种桥梁可靠度预测方法及其养护方法 | |
CN106639162A (zh) | 一种基于bim的环保垫块标准化施工方法 | |
Harries et al. | Updated research for collision damage and repair of prestressed concrete beams | |
Keipour et al. | Structural behaviour of steel-timber versus steel-concrete composite joints with flush end plate | |
CN210002942U (zh) | 一种老建筑砖柱的改造结构 | |
Ahmed et al. | Steel post-and-beam barrier with GFRP-reinforced concrete curb and bridge deck connection | |
Pirayeh Gar | Structural performance of a full-depth precast bridge deck system prestressed and reinforced with AFRP bars | |
Agrawal et al. | Methodology for seismic vulnerability assessment of building stock in mega cities | |
Huo et al. | Experimental study and analytical study of push-out shear tests in Ultra Shallow Floor Beams | |
Heger | Public-safety issues in collapse of L'Ambiance Plaza | |
Dizhur et al. | Testing of an earthquakedamaged unreinforced masonry building | |
Bhattacharjee | Deterioration of concrete structures along with case studies in India | |
Brindley | Shear assessment and strengthening of reinforced concrete T-beams with externally bonded CFRP sheets | |
Dizhur et al. | Earthquake-damaged unreinforced masonry building tested in-situ | |
CN208415237U (zh) | 一种用于灌注桩试验的钢筋混凝土桩头 | |
Park | Improving Serviceability of Concrete Infrastructure using Prestressing Technique | |
Kanakubo et al. | Ductility of T-shape RC beames strengthened by CFRP sheet | |
Matos et al. | Structural assessment of a RC Bridge over Sororó river along the Carajás railway | |
Eubanks | Effect of Transverse Post-Tensioning on Moment Distribution Between Channel Girders | |
CN113668930B (zh) | 一种用于封闭式堆棚网架基础和挡墙结构的底板结构 | |
CN104532884A (zh) | 一种支墩外偏心堆载法基桩静载测试、压桩方法 | |
Chung et al. | Design considerations for concrete high-rise buildings | |
Cheng et al. | Risk Assessment Technology and Strength Reliability Analysis of Old Building Reconstruction | |
Tan | Detection, appraisal and strengthening of the support structure of a boiler fan in part II of a power plant | |
Hosainul Kabir | Load-slip behaviour of L-shape rebar shear connectors in steel-concrete composite members |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170510 |