Prior art keywords
shear
wall element
intermediate layer
wall
dark beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201611054466.5A
Other languages
Chinese (zh)
Inventor
张延年
肖雅乔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201611054466.5A priority Critical patent/CN106639041A/en
Publication of CN106639041A publication Critical patent/CN106639041A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/64Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete

Abstract

The invention relates to a vertical assembly type shear wall connecting system with hidden beams and hidden columns. The vertical assembly type shear wall connecting system comprises a bottom layer shear wall unit and a middle layer shear wall unit. The bottom of the bottom layer shear wall unit is flat, and reinforced concrete supports with cavities are separately arranged at the two ends of the upper portion of the bottom layer shear wall unit. Concrete blocks corresponding to the two ends of the upper portion of the bottom layer shear wall unit are separately arranged at the two ends of the bottom of the middle layer shear wall unit, and the top of the middle layer shear wall unit is provided with a reinforced concrete base the same as the top of the bottom layer shear wall unit. Hidden beam stirrups are reserved at the top of the bottom layer shear wall unit. Hidden beam stirrups are reserved at the top and the bottom of the middle layer shear wall unit. Hidden beam stirrups are reserved at the bottom of a top layer shear wall unit. The hidden beam stirrups of every two adjacent layer shear wall units are arranged in a staggered mode, and horizontal steel bars penetrate through the upper and lower layer staggered hidden beam stirrups. The upper and lower layer hidden columns are connected through sleeves and integrated through pouring. The vertical assembly type shear wall connecting system is good in integrity, definite in stress, convenient and rapid to construct and good in economic effect, labor cost is greatly reduced, and cost is greatly reduced.

Description

The vertical linked system of fabricated shear wall with dark beam sleeper
Technical field
The present invention relates to technical field of buildings, the vertical connector of fabricated shear wall of the dark beam sleeper of more particularly to a kind of band System.
Background technology
Into after 21st century, along with China's urbanization and the fast development of process of modernization, the energy and resource Not enough contradiction is also increasingly projected, and the form of green building and environmental protection is increasingly serious, and original foundation is in low price labour On the basis of building industry, with the disappearance of demographic dividend, labour cost constantly sharp rises, and construction cost continuous rise, tradition is built If the architecture quality of mode, cost and speed cannot meet the demand of modern social development, the industrialization of building is building industry Inevitable development direction, and the growth of explosion type will be welcome.
In the last few years China had put into effect the policy that some carry forward vigorously building industrialization process, and last year lives the portion's of building approval《Dress With formula concrete structure technique code》For professional standard, the topmost content of building industrialization is exactly the structure of Development of Novel System, the mode of construction modernized with factorial praluction, site assembly mounting replaces traditional mode of construction.
The current building industrialization of China quickly grows, but lies substantially in construction aspect, that is to say, that rigidly will be by One integral cast-in-situ building structure of traditional approach design splits and carry out after structural elements factorial praluction, assembled in situ formula peace Fill, rather than industrialized structural system is suitable to from research and development and start with, cause component standardization relatively low, component variability is big, the scale of construction Difficulty that is huge, increase manufacture, transport, installing, greatly improves on the contrary building cost, becomes the height in building construction End luxury goods.
In order to solve the above problems, a kind of new steel reinforced concrete shear walls plate assembled linked system is designed still very It is necessary.
The content of the invention
For the problems referred to above, the invention provides one kind can further improve its property indices, one is carried out to it The reinforcement of series is processed, and a kind of good integrity of exploitation, clear and definite power transmission, simple structure, the dark beam of safe and reliable, easy construction band are dark The vertical linked system of fabricated shear wall of post.
The technical solution used in the present invention is:A kind of fabricated shear wall vertical linked system of the dark beam sleeper of band, including Intermediate layer shear-wall element, bottom shear-wall element, intermediate layer shear-wall element sleeper vertical reinforcement, intermediate layer shear-wall element Top dark beam stirrup, the dark beam stirrup in intermediate layer shear-wall element bottom, intermediate layer shear-wall element apex cavity bearing, intermediate layer Shear-wall element bottom positioning concrete block, bottom shear-wall element sleeper vertical reinforcement, the dark beam in bottom shear-wall element top Stirrup, dark beam horizontal reinforcement, sleeve, armored concrete bearing, shear wall of the bottom shear-wall element with cavity are vertically distributed steel Muscle and shear wall inside stirrup;Intermediate layer shear-wall element apex cavity bearing and intermediate layer shear-wall element bottom positioning are mixed Solidifying soil block is respectively arranged at the upper and lower of intermediate layer shear-wall element, armored concrete of the bottom shear-wall element with cavity Bearing is located at the top of bottom shear-wall element, and intermediate layer shear-wall element and bottom shear-wall element pass through intermediate layer shear wall Unit bottom positioning concrete block is positioned in armored concrete bearing of the bottom shear-wall element with cavity and is attached, and connects Place's level is provided with two dark beam horizontal reinforcements, and the intermediate layer shear-wall element sleeper being provided with the middle of the shear-wall element of intermediate layer is vertical The bottom shear-wall element sleeper vertical reinforcement being provided with the middle of reinforcing bar and bottom shear-wall element is fixedly connected by sleeve;
The upper and lower of the intermediate layer shear-wall element is respectively equipped with the dark beam stirrup in intermediate layer shear-wall element top with The dark beam stirrup in interbed shear-wall element bottom, and intermediate layer shear-wall element inner transverse and crossed longitudinally be provided with inside shear wall Stirrup and the vertical distribution bar of shear wall;The dark beam stirrup in intermediate layer shear-wall element top is in the pre-buried of intermediate layer shear-wall element Part is connected with two row's shear walls inside stirrup, and is close to the evenly distributed bottom of the vertical distribution bar of shear wall;Intermediate layer shear wall The dark beam stirrup of unit bottom is connected in the pre-buried part of intermediate layer shear-wall element with two row's shear walls inside stirrup, and is close to cut The evenly distributed bottom of the vertical distribution bar of power wall;
The bottom of the bottom shear-wall element is flat, and top is provided with the dark beam stirrup in bottom shear-wall element top;Intermediate layer The dark beam stirrup in the junction intermediate layer shear-wall element bottom of shear-wall element and bottom shear-wall element and bottom shear wall list It is simultaneously uniform staggered that the dark beam stirrup in unit top is all connected with two dark beam horizontal reinforcements.
A kind of method of attachment of the vertical linked system of fabricated shear wall of the dark beam sleeper of band, comprises the steps
The installation of step 1 bottom shear-wall element:Find suitable location and bottom shear-wall element is installed into place;
Step 2 lifts middle shear-wall element;By the way that intermediate layer shear-wall element bottom positioning concrete block is positioned at into bottom It is in armored concrete bearing of the shear-wall element with cavity that the lifting of middle shear-wall element is in place;
The fixation of step 3 linked system;Using sleeve by intermediate layer shear-wall element sleeper vertical reinforcement and bottom shear wall list First sleeper Vertical bar connection is fixed, then dark beam horizontal reinforcement is installed into place;
Step 4 connects reinforcing bar:By the dark beam stirrup of the dark beam stirrup in intermediate layer shear-wall element bottom and bottom shear-wall element top Simultaneously colligation is contacted in dark beam horizontal reinforcement together;
Step 5 one-piece casting:The junction of middle shear-wall element and bottom shear-wall element is poured into strong concrete makes It is connected to become entirety.
As a kind of preferred technical scheme:The intermediate layer shear-wall element sleeper vertical reinforcement and bottom shear wall list First sleeper vertical reinforcement is 4 rectangular distributions and arranges.
As a kind of preferred technical scheme:The intermediate layer shear-wall element apex cavity bearing, intermediate layer shear wall The unit bottom positioning armored concrete bearing of concrete block and bottom shear-wall element with cavity is left and right and arranges.
The invention has the beneficial effects as follows:(1)Good integrity, easy construction, good economical benefit, cost, stress is greatly reduced Clearly, simple structure;(2)Each shear-wall element inside arranges sleeper and greatly improves the bearing capacity of itself;(3)By setting Put the connected mode of dark beam sleeper and combine the advantage of frame system, greatly improve the globality of connection.
Description of the drawings
Fig. 1 is that a kind of vertical linked system of fabricated shear wall of the dark beam sleeper of band is connected schematic diagram;
Fig. 2 is bottom shear-wall element front schematic view of the present invention;
Fig. 3 is bottom shear-wall element plane face of the present invention schematic diagram;
Fig. 4 is shear-wall element front schematic view in intermediate layer of the present invention;
Fig. 5 is intermediate layer shear-wall element plane face of the present invention schematic diagram;
Fig. 6 is the front schematic view of intermediate layer shear-wall element reinforcing bar arrangement;
In figure;1 intermediate layer shear-wall element, 2 bottom shear-wall elements, 3 intermediate layer shear-wall element sleeper vertical reinforcements, in 4 Interbed shear-wall element top dark beam stirrup, the dark beam stirrup in 5 intermediate layer shear-wall element bottoms, 6 intermediate layer shear-wall element tops Portion's cavity bearing, 7 intermediate layer shear-wall element bottoms positioning concrete block, 8 bottom shear-wall element sleeper vertical reinforcements, 9 bottoms The dark beam stirrup in story shear wall unit top, 10 dark beam horizontal reinforcements, 11 sleeves, 12 reinforcing bars of the bottom shear-wall element with cavity are mixed Solidifying soil bearing, the vertical distribution bar of 13 shear walls, 14 shear walls inside stirrup.
Specific embodiment
In order to further illustrate the present invention, below in conjunction with the accompanying drawings and embodiment is described in detail to the present invention, but not They can be interpreted as limiting the scope of the present invention.
Refer to the attached drawing, a kind of vertical linked system of fabricated shear wall of the dark beam sleeper of band, including intermediate layer shear wall list Unit 1, bottom shear-wall element 2, the dark beam hoop in intermediate layer shear-wall element sleeper vertical reinforcement 3, intermediate layer shear-wall element top Muscle 4, the dark beam stirrup 5 in intermediate layer shear-wall element bottom, intermediate layer shear-wall element apex cavity bearing 6, intermediate layer shear wall Unit bottom positioning concrete block 7, the dark beam stirrup in bottom shear-wall element sleeper vertical reinforcement 8, bottom shear-wall element top 9th, the armored concrete bearing 12, shear wall of dark beam horizontal reinforcement 10, sleeve 11, bottom shear-wall element with cavity is vertically distributed Reinforcing bar 13 and shear wall inside stirrup 14;Intermediate layer shear-wall element apex cavity bearing 6 and intermediate layer shear-wall element bottom Portion's positioning concrete block 7 is respectively arranged at the upper and lower of intermediate layer shear-wall element 1, and bottom shear-wall element is with cavity Armored concrete bearing 12 is located at the top of bottom shear-wall element 2, intermediate layer shear-wall element 1 and bottom shear-wall element 2 Concrete block 7 is positioned by intermediate layer shear-wall element bottom and is positioned at armored concrete of the bottom shear-wall element with cavity It is attached in seat 12, junction level is provided with two dark beam horizontal reinforcements 10, in being provided with the middle of intermediate layer shear-wall element 1 The bottom shear-wall element sleeper being provided with the middle of interbed shear-wall element sleeper vertical reinforcement 3 and bottom shear-wall element 2 is vertical Reinforcing bar 8 is fixedly connected by sleeve 11;
The upper and lower of the intermediate layer shear-wall element 1 is respectively equipped with the dark He of beam stirrup 4 in intermediate layer shear-wall element top The dark beam stirrup 5 in intermediate layer shear-wall element bottom, and the inner transverse of intermediate layer shear-wall element 1 and crossed longitudinally it is provided with shear wall Internal stirrup 14 and the vertical distribution bar 13 of shear wall;The dark beam stirrup 4 in intermediate layer shear-wall element top is in intermediate layer shear wall The pre-buried part of unit 1 is connected with two row's shear walls inside stirrup 14, and it is evenly distributed to be close to the vertical distribution bar 13 of shear wall Bottom;The dark beam stirrup 5 in intermediate layer shear-wall element bottom is inside the pre-buried part of intermediate layer shear-wall element 1 with two row's shear walls Stirrup 14 connects, and is close to the evenly distributed bottom of the vertical distribution bar 13 of shear wall;
The bottom of the bottom shear-wall element 2 is flat, and top is provided with the dark beam stirrup 9 in bottom shear-wall element top;It is middle The dark beam stirrup 5 in the junction intermediate layer shear-wall element bottom of story shear wall unit 1 and bottom shear-wall element 2 and bottom are sheared It is simultaneously uniform staggered that the dark beam stirrup 9 in wall unit top is all connected with two dark beam horizontal reinforcements 10.
A kind of method of attachment of the vertical linked system of fabricated shear wall of the dark beam sleeper of band, comprises the steps
The installation of step 1 bottom shear-wall element:Find suitable location and bottom shear-wall element 2 is installed into place;
Step 2 lifts middle shear-wall element;By the way that intermediate layer shear-wall element bottom positioning concrete block 7 is positioned at into bottom Middle shear-wall element 1 is lifted in armored concrete bearing 12 of the shear-wall element with cavity in place;
The fixation of step 3 linked system;Using sleeve 11 by intermediate layer shear-wall element sleeper vertical reinforcement 3 and bottom shear wall Unit sleeper vertical reinforcement 8 is connected, then dark beam horizontal reinforcement 10 is installed into place;
Step 4 connects reinforcing bar:By the dark beam stirrup of the dark beam stirrup 5 in intermediate layer shear-wall element bottom and bottom shear-wall element top 9 contact simultaneously colligation together in dark beam horizontal reinforcement 10;
Step 5 one-piece casting:The junction of middle shear-wall element 1 and bottom shear-wall element 2 is poured into strong concrete It is set to be connected to become entirety.
Described intermediate layer shear-wall element sleeper vertical reinforcement 3 and bottom shear-wall element sleeper vertical reinforcement 8 are 4 The rectangular distribution of root is arranged.
Described intermediate layer shear-wall element apex cavity bearing 6, intermediate layer shear-wall element bottom positioning concrete block 7 The armored concrete bearing 12 with cavity is left and right and arranges with bottom shear-wall element.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (4)

1. the vertical linked system of fabricated shear wall of the dark beam sleeper of a kind of band, it is characterised in that:Including intermediate layer shear wall list First (1), bottom shear-wall element (2), intermediate layer shear-wall element sleeper vertical reinforcement (3), intermediate layer shear-wall element top Dark beam stirrup (4), the dark beam stirrup in intermediate layer shear-wall element bottom(5), intermediate layer shear-wall element apex cavity bearing(6)、 Intermediate layer shear-wall element bottom positions concrete block(7), bottom shear-wall element sleeper vertical reinforcement(8), bottom shear wall The dark beam stirrup in unit top(9), dark beam horizontal reinforcement(10), sleeve(11), reinforced concrete of the bottom shear-wall element with cavity Native bearing(12), the vertical distribution bar of shear wall(13)And shear wall inside stirrup(14);Intermediate layer shear-wall element top Cavity bearing(6)Concrete block is positioned with intermediate layer shear-wall element bottom(7)It is respectively arranged at intermediate layer shear-wall element (1) Upper and lower, armored concrete bearing of the bottom shear-wall element with cavity(12)Positioned at bottom shear-wall element (2) Top, intermediate layer shear-wall element (1) and bottom shear-wall element (2) position concrete by intermediate layer shear-wall element bottom Block(7)It is positioned at armored concrete bearing of the bottom shear-wall element with cavity(12)Inside it is attached, junction level is provided with Two dark beam horizontal reinforcements(10), the intermediate layer shear-wall element sleeper vertical steel being provided with the middle of intermediate layer shear-wall element (1) The bottom shear-wall element sleeper vertical reinforcement being provided with the middle of muscle (3) and bottom shear-wall element (2)(8)By sleeve(11)Enter Row is fixedly connected;
The upper and lower of the intermediate layer shear-wall element (1) is respectively equipped with the dark beam stirrup in intermediate layer shear-wall element top And the dark beam stirrup in intermediate layer shear-wall element bottom (4)(5), and intermediate layer shear-wall element (1) inner transverse and crossed longitudinally It is provided with shear wall inside stirrup(14)With the vertical distribution bar of shear wall(13);The dark beam stirrup in intermediate layer shear-wall element top (4) in the pre-buried part of intermediate layer shear-wall element (1) and two row's shear walls inside stirrup(14)Connection, and it is perpendicular to be close to shear wall To distribution bar(13)Evenly distributed bottom;The dark beam stirrup in intermediate layer shear-wall element bottom(5)In intermediate layer shear-wall element (1) Pre-buried part and two row's shear walls inside stirrup(14)Connection, and it is close to the vertical distribution bar of shear wall(13)It is evenly distributed Bottom;
The bottom of the bottom shear-wall element (2) is flat, and top is provided with the dark beam stirrup in bottom shear-wall element top(9); The dark beam stirrup in the junction intermediate layer shear-wall element bottom of intermediate layer shear-wall element (1) and bottom shear-wall element (2)(5) With the dark beam stirrup in bottom shear-wall element top(9)It is all connected with two dark beam horizontal reinforcements(10)And it is uniform staggered.
2. the method for attachment of the vertical linked system of fabricated shear wall of the dark beam sleeper of a kind of band, it is characterised in that:Including as follows Step
The installation of step 1 bottom shear-wall element:Find suitable location and bottom shear-wall element (2) is installed into place;
Step 2 lifts middle shear-wall element;By the way that intermediate layer shear-wall element bottom is positioned into concrete block(7)It is positioned at bottom Armored concrete bearing of the story shear wall unit with cavity(12)It is interior by middle shear-wall element(1)Lifting is in place;
The fixation of step 3 linked system;Using sleeve(11)Intermediate layer shear-wall element sleeper vertical reinforcement (3) is cut with bottom Power wall unit sleeper vertical reinforcement(8)It is connected, then by dark beam horizontal reinforcement(10)Install in place;
Step 4 connects reinforcing bar:By the dark beam stirrup in intermediate layer shear-wall element bottom(5)With the dark beam hoop in bottom shear-wall element top Muscle(9)In dark beam horizontal reinforcement(10)Simultaneously colligation contact together;
Step 5 one-piece casting:By middle shear-wall element(1)High intensity is poured with the junction of bottom shear-wall element (2) to mix Solidifying soil makes it be connected to become entirety.
3. the vertical linked system of fabricated shear wall of the dark beam sleeper of a kind of band according to claim 1, it is characterised in that: The intermediate layer shear-wall element sleeper vertical reinforcement (3) and bottom shear-wall element sleeper vertical reinforcement(8)4 are in square Shape distribution is arranged.
4. the vertical linked system of fabricated shear wall of the dark beam sleeper of a kind of band according to claim 1, it is characterised in that: The intermediate layer shear-wall element apex cavity bearing(6), intermediate layer shear-wall element bottom positioning concrete block(7)And bottom Armored concrete bearing of the shear-wall element with cavity(12)It is the setting of left and right two ends.
CN201611054466.5A 2016-11-25 2016-11-25 Vertical assembly type shear wall connecting system with hidden beams and hidden columns Withdrawn CN106639041A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611054466.5A CN106639041A (en) 2016-11-25 2016-11-25 Vertical assembly type shear wall connecting system with hidden beams and hidden columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611054466.5A CN106639041A (en) 2016-11-25 2016-11-25 Vertical assembly type shear wall connecting system with hidden beams and hidden columns

Publications (1)

Publication Number Publication Date
CN106639041A true CN106639041A (en) 2017-05-10

Family

ID=58811910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611054466.5A Withdrawn CN106639041A (en) 2016-11-25 2016-11-25 Vertical assembly type shear wall connecting system with hidden beams and hidden columns

Country Status (1)

Country Link
CN (1) CN106639041A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086353A (en) * 2017-12-05 2018-05-29 中建五局第三建设有限公司 A kind of hollow wallboard spliced with cast-in-place hidden girder mixes prefabricated assembled pipe gallery and its construction method
CN108149706A (en) * 2017-12-05 2018-06-12 中建五局第三建设有限公司 A kind of cast-in-place hidden girder and the prefabricated assembled pipe gallery and its construction method of superimposed sheet splicing
CN108166525A (en) * 2017-12-05 2018-06-15 中建五局第三建设有限公司 A kind of half prefabricated assembled pipe gallery spliced with cast-in-place hidden girder and its construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086353A (en) * 2017-12-05 2018-05-29 中建五局第三建设有限公司 A kind of hollow wallboard spliced with cast-in-place hidden girder mixes prefabricated assembled pipe gallery and its construction method
CN108149706A (en) * 2017-12-05 2018-06-12 中建五局第三建设有限公司 A kind of cast-in-place hidden girder and the prefabricated assembled pipe gallery and its construction method of superimposed sheet splicing
CN108166525A (en) * 2017-12-05 2018-06-15 中建五局第三建设有限公司 A kind of half prefabricated assembled pipe gallery spliced with cast-in-place hidden girder and its construction method
CN108086353B (en) * 2017-12-05 2020-06-26 中建五局第三建设有限公司 Hollow wall plate mixed prefabricated assembly type comprehensive pipe gallery spliced by cast-in-place hidden beams and construction method thereof
CN108149706B (en) * 2017-12-05 2020-06-26 中建五局第三建设有限公司 Prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and laminated slabs and construction method thereof

Similar Documents

Publication Publication Date Title
CN107044175A (en) The vertical linked system of fabricated shear wall with concealed beam sleeper and its installation method
CN105839836B (en) A kind of precast concrete shear wall component and its construction method
CN110485553A (en) A kind of assembled architecture and its assembly method on prefabricated assembled basis
CN105625568B (en) Assembly concrete orthogonal spatial space lattice boxlike tube-in-tube structure
CN105625566B (en) Assembly concrete orthogonal-diagonal lattice space lattice box structure tube-in-tube structure
CN109267487A (en) A kind of long big section bent cap bracket system of overhanging
CN106639041A (en) Vertical assembly type shear wall connecting system with hidden beams and hidden columns
CN106437031A (en) One-step formed multi-layer prefabricated column with bracket as well as manufacturing method and construction method thereof
CN110965474A (en) Construction method of cable tower cross beam
CN105839784B (en) Assembled jacking type construction techniques
CN108867860A (en) A kind of precast reinforced concrete beam plate body system and prefabricated rod structure entirety assembling constructing method
CN206942245U (en) Prefabricated case beam tie with reinforcing bar construction frame
CN208328665U (en) A kind of full assembled light abutment
CN110206229A (en) A kind of concrete column splicing structure and its construction method
CN203583674U (en) Assembly type concrete anti-seismic beam column framework
CN109208823A (en) It is a kind of can quick assembling built-in steel-case formula steel core concrete column and its production technology
CN206267353U (en) A kind of vertical linked system of fabricated shear wall of the dark beam sleeper of band
CN104164882A (en) Construction method for building support structural beam foundation on slope and structure thereof
CN208502068U (en) A kind of partial precast assembly prestress girder with rolled steel section en cased in concrete
CN207647033U (en) A kind of precast reinforced basket structure
CN208347063U (en) The prefabricated double board wall units of one kind, shear-wall element and assembly concrete shear wall
CN206554310U (en) A kind of vertical linked system of the fabricated shear wall with concealed beam sleeper
CN206512923U (en) Multilayer prefabricated post of the one-shot forming with bracket
CN210597874U (en) Cast-in-place beam steel bar arrangement
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170510

WW01 Invention patent application withdrawn after publication