- CN106638692A CN106638692A CN201710016642.4A CN201710016642A CN106638692A CN 106638692 A CN106638692 A CN 106638692A CN 201710016642 A CN201710016642 A CN 201710016642A CN 106638692 A CN106638692 A CN 106638692A
- Authority
- CN
- China
- Prior art keywords
- box
- submerged tunnel
- tunnel
- pullover
- box girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/063—Tunnels submerged into, or built in, open water
- E02D29/067—Floating tunnels; Submerged bridge-like tunnels, i.e. tunnels supported by piers or the like above the water-bed
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0001—Rubbers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Abstract
The invention relates to a joint connecting mechanism of an immersed tunnel and belongs to the technical field of traffic. The joint connecting mechanism comprises an immersed tunnel box girder structure, a pile foundation, a spandrel girder, box girder end part pullover bases, rubber waterstops, pullover bolts and a cushion layer; the bottom of the immersed tunnel box girder structure is mutually matched with the spandrel girder; the bottom of the spandrel girder is provided with the pile foundation; two sides of the immersed tunnel box girder structure are provided with the box girder end part pullover bases; the rubber waterstops are embedded in the box girder end part pullover bases; the cushion layer is arranged between the two box girder end part pullover bases; the box girder end part pullover bases are positioned and fastened by virtue of the pullover bolts. The joint connecting mechanism of the immersed tunnel is low in construction difficulty, simple in process, high in construction speed and low in cost, is capable of avoiding problems existing in the prior art, and is beneficial to operation of underwater engineering.
Description
Technical field
The present invention relates to a kind of joint bindiny mechanism of submerged tunnel, belongs to technical field of transportation.
Background technology
China is vast in territory, and seashore line length, river, river, lake and island are numerous, many using to environment, landscape shadow in recent years
The little submerged tunnel mode of sound.Submerged tunnel joint waterproofing is one of key factor of whole engineering success or failure, conventional submerged tunnel
All it is embedded in the soil layer below the bottom, tunnel cross-section is big, joint stress is complicated, joint waterproofing complex process, operation are more, construction
Difficulty is big, long in time limit, cost is high.For under water the tunnel force modes without earthing differ completely with the tunnel for having earthing under water
Sample, therefore its joint should not indiscriminately imitate earthing submerged tunnel joint connection manner.
The content of the invention
Present invention aims to the defect and deficiency of prior art, there is provided a kind of difficulty of construction is little, process is simple,
Speed of application is fast, the joint bindiny mechanism of the submerged tunnel of low cost.
For achieving the above object, the technical solution used in the present invention is:It includes submerged tunnel box-beam structure, pile foundation, support
Beam, box beam end drawing pedestal, rubber fastening band, drawing bolt, cushion;The bottom of described submerged tunnel box-beam structure
Cooperate with joist;The bottom of described joist is provided with pile foundation;The both sides of described submerged tunnel box-beam structure are equipped with case
Beam end drawing pedestal;Rubber fastening band is inlaid with described box beam end drawing pedestal;Two box beam end drawing pedestals
Between be provided with cushion;And two box beam end drawing pedestals are positioned and fastened by drawing bolt.
Preferably, reserved drawing bolt hole on described box beam end drawing pedestal.
Preferably, described rubber fastening band is arranged on the inner side of reserved drawing bolt hole.
Preferably, the cross-sectional area of described submerged tunnel box-beam structure is more than or equal to 12 square metres.
Preferably, the bottom of described box beam end drawing pedestal cooperates with the bottom;The described water surface is under water
, there is a certain distance at the top of tunnel box-beam structure between submerged tunnel box-beam structure and the water surface.
During present invention operation, tunnel line plane, vertical line type are fitted according to underwater topography and line requirements;According to
Circuit is flat, vertical line type, and tunnel box-beam structure is divided into some sections, and every section of box beam length can be not less than 120m;Box beam is indirect
Head nearby arranges pile foundation and supporting plate, and supporting plate top surface absolute altitude is identical with tunnel structure floor level;In construction pile foundation and supporting plate simultaneously,
Prefabricated tunnel box beam;End drawing pedestal is simultaneously prefabricated with box beam, form overall;Waterstop is arranged on the outside of drawing pedestal;
After box beam is lifted on underwater pile foundation, by drawing bolt prefabricated case beam drawing is connected to form tunnel.
After said structure, the present invention has the beneficial effect that:A kind of joint connection machine of submerged tunnel of the present invention
Structure, difficulty of construction is little, process is simple, speed of application are fast, low cost, it is to avoid problems of the prior art, is conducive to water
The operation of lower engineering.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also
To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is the connection diagram of the present invention;
Fig. 2 is the A-A profiles of Fig. 1;
The schematic diagram of Fig. 3 raising middle flask beam end drawing pedestals of the present invention.
Description of reference numerals:
The 1- waters surface;2- is water-bed;3- submerged tunnel box-beam structures;4- pile foundations;5- joists;6- box beams end drawing pedestal;7- rubber
Waterstop;8- drawing bolts;9- cushions.
Specific embodiment
Below in conjunction with the accompanying drawings the present invention is further illustrated.
Referring to such as Fig. 1 -- shown in Fig. 3, this specific embodiment includes submerged tunnel box-beam structure 3, pile foundation 4, joist 5, case
Beam end drawing pedestal 6, rubber fastening band 7, drawing bolt 8, cushion 9;The bottom of described submerged tunnel box-beam structure 3
Cooperate with joist 5;The bottom of described joist 55 is provided with pile foundation 4;The both sides of described submerged tunnel box-beam structure 3 are all provided with
There is box beam end drawing pedestal 6;Rubber fastening band 7 is inlaid with described box beam end drawing pedestal 6;Draw two box beam ends
Close and be provided with cushion 9 between pedestal 6;And two box beam end drawing pedestals 6 are positioned and fastened by drawing bolt 8;It is described
Box beam end drawing pedestal 6 on reserve reserved drawing bolt hole;Described rubber fastening band 7 is arranged on reserved drawing bolt hole
Inner side;The cross-sectional area of described submerged tunnel box-beam structure 3 is more than or equal to 12 square metres;Described box beam end drawing base
The bottom of seat 6 cooperates with water-bed 2;The top of the described water surface 1 tunnel box-beam structure 3 under water, submerged tunnel box beam knot
There is a certain distance between structure 3 and the water surface 1.
When this specific embodiment is operated:
1st, tunnel line plane, vertical line type are fitted according to underwater topography and line requirements.
2nd, according to circuit is flat, vertical line type, tunnel box-beam structure 3 is divided into some sections, every section of box beam length can not be little
In 120m.
3rd, near joints arrange pile foundation 4 and supporting plate 5 between box beam, and the top surface absolute altitude of supporting plate 5 is identical with tunnel structure floor level.
4th, in construction pile foundation 4 and supporting plate 5 simultaneously, prefabricated tunnel box beam 3.
5th, it is end drawing pedestal 6 is simultaneously prefabricated with box beam 3, form overall.
6th, in the outside of drawing pedestal 3 arrangement waterstop.
7th, after box beam is lifted on underwater pile foundation, by drawing bolt 8 prefabricated case beam drawing is connected to form tunnel.
After said structure, this specific embodiment difficulty of construction is little, process is simple, speed of application fast, low cost, keeps away
Exempt from problems of the prior art, be conducive to the operation of Underwater Engineering.
The above, only to illustrate technical scheme and unrestricted, those of ordinary skill in the art are to this
Other modifications or equivalent that bright technical scheme is made, without departing from the spirit and scope of technical solution of the present invention,
All should cover in the middle of scope of the presently claimed invention.
Claims (5)
1. the joint bindiny mechanism of a kind of submerged tunnel, it is characterised in that:It comprising submerged tunnel box-beam structure, pile foundation, joist,
Box beam end drawing pedestal, rubber fastening band, drawing bolt, cushion;The bottom of described submerged tunnel box-beam structure with
Joist cooperates;The bottom of described joist is provided with pile foundation;The both sides of described submerged tunnel box-beam structure are equipped with box beam
End drawing pedestal;Rubber fastening band is inlaid with described box beam end drawing pedestal;Two box beam end drawing pedestals it
Between be provided with cushion;And two box beam end drawing pedestals are positioned and fastened by drawing bolt.
2. the joint bindiny mechanism of a kind of submerged tunnel according to claim 1, it is characterised in that:Described box beam end
Reserved drawing bolt hole on drawing pedestal.
3. the joint bindiny mechanism of a kind of submerged tunnel according to claim 1, it is characterised in that:Described rubber water-proof
Band is arranged on the inner side of reserved drawing bolt hole.
4. the joint bindiny mechanism of a kind of submerged tunnel according to claim 1, it is characterised in that:Described submerged tunnel
The cross-sectional area of box-beam structure is more than or equal to 12 square metres.
5. the joint bindiny mechanism of a kind of submerged tunnel according to claim 1, it is characterised in that:Described box beam end
The bottom of drawing pedestal cooperates with the bottom;The top of described water surface tunnel box-beam structure under water.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710016642.4A CN106638692A (en) | 2017-01-11 | 2017-01-11 | Joint connecting mechanism of immersed tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710016642.4A CN106638692A (en) | 2017-01-11 | 2017-01-11 | Joint connecting mechanism of immersed tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106638692A true CN106638692A (en) | 2017-05-10 |
Family
ID=58843589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710016642.4A Pending CN106638692A (en) | 2017-01-11 | 2017-01-11 | Joint connecting mechanism of immersed tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106638692A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11323977A (en) * | 1998-05-18 | 1999-11-26 | Taisei Corp | Water stop structure for underwater tunnel |
JP2000045306A (en) * | 1998-07-28 | 2000-02-15 | Taisei Corp | Launching tunnel directional controlling device |
CN102561371A (en) * | 2012-02-29 | 2012-07-11 | 中交一航局第五工程有限公司 | Steel caisson enclosure structure at island-tunnel combination part |
KR101355498B1 (en) * | 2012-11-16 | 2014-01-29 | 한국해양과학기술원 | Submerged tunnel module structure and construction method thereof using a reinforced concrete section with internally confined hollow |
CN103912016A (en) * | 2012-12-31 | 2014-07-09 | 中交一航局第二工程有限公司 | Pipe joint tensioning crimping method |
CN203924112U (en) * | 2014-06-24 | 2014-11-05 | 刘小沙 | Prefabricated pipe gallery |
CN105908785A (en) * | 2016-06-02 | 2016-08-31 | 中铁隧道集团二处有限公司 | Sunken pipe butt joint GINA water stop belt longitudinal limiting pull rod device under high water difference condition |
-
2017
- 2017-01-11 CN CN201710016642.4A patent/CN106638692A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11323977A (en) * | 1998-05-18 | 1999-11-26 | Taisei Corp | Water stop structure for underwater tunnel |
JP2000045306A (en) * | 1998-07-28 | 2000-02-15 | Taisei Corp | Launching tunnel directional controlling device |
CN102561371A (en) * | 2012-02-29 | 2012-07-11 | 中交一航局第五工程有限公司 | Steel caisson enclosure structure at island-tunnel combination part |
KR101355498B1 (en) * | 2012-11-16 | 2014-01-29 | 한국해양과학기술원 | Submerged tunnel module structure and construction method thereof using a reinforced concrete section with internally confined hollow |
CN103912016A (en) * | 2012-12-31 | 2014-07-09 | 中交一航局第二工程有限公司 | Pipe joint tensioning crimping method |
CN203924112U (en) * | 2014-06-24 | 2014-11-05 | 刘小沙 | Prefabricated pipe gallery |
CN105908785A (en) * | 2016-06-02 | 2016-08-31 | 中铁隧道集团二处有限公司 | Sunken pipe butt joint GINA water stop belt longitudinal limiting pull rod device under high water difference condition |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102383443B (en) | Connection structures between foundation pit support piles and outer walls of basement and construction method | |
CN105332417A (en) | Method for constructing prefabricated steel frame composite structure with concrete wrapped outside | |
CN103866817A (en) | Water intake pumping station | |
CN201567584U (en) | Prefabricated construction reinforced concrete cushion cap foundation | |
CN207092107U (en) | A kind of anti-subsidence structure using diaphram wall | |
CN202359566U (en) | Cofferdam for deep-water soft soil foundation construction of bridge | |
CN210127485U (en) | Concrete suction type caisson foundation and thin-wall pier stud connecting structure | |
CN104594360A (en) | Composite double-row pile foundation pit supporting structure | |
CN106522263A (en) | Construction method for wind power complete machine of structure composed of four barrel-type foundations and supported by concrete | |
CN201372441Y (en) | Bonded and unbonded prestressed concrete basement structure | |
CN105421477A (en) | Construction method for tower crane foundation | |
CN104060628A (en) | Manufacturing method and structure for basement floor without crack, leakage and with oversized area | |
CN206233656U (en) | Steel frame mill building structure | |
CN210529471U (en) | Bridge package mound on urban rail transit cable | |
CN106638692A (en) | Joint connecting mechanism of immersed tunnel | |
CN203531326U (en) | Structure of ultra-large area basement terrace free of cracks and leakage | |
CN202430742U (en) | Precast slab assembly soil retaining wall | |
CN210684719U (en) | Unloading type single-row pile supporting structure | |
CN105040730B (en) | Connection processing method for enclosure bored concrete pile and cellar structure floor slab in reversed foundation pit | |
CN209874039U (en) | Basement deformation joint structure | |
CN207211170U (en) | Steel cofferdam prestress anchoraging device | |
CN103397650B (en) | A kind of large-scale steel cylinder cofferdam structure | |
CN112095665A (en) | Water buoyancy balance construction method applied to subway upper cover | |
CN206655486U (en) | A kind of elongated steel column temporary fixing structure | |
CN204510231U (en) | A kind of Circular Pit is inverse makes retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190211 Address after: Room 2-3116, 88 Huanhan Road, Tianjin Free Trade Zone (Airport Economic Zone), Tianjin 300000 Applicant after: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd. Address before: 300000 Hebei Avenue, new Hongqiao, Hongqiao District, Tianjin City, No. 1 Applicant before: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170510 |
|
WD01 | Invention patent application deemed withdrawn after publication |