CN106638678B - A kind of underground structure inwall and diaphram wall overlapping surface construction and its construction method - Google Patents
A kind of underground structure inwall and diaphram wall overlapping surface construction and its construction method Download PDFInfo
- Publication number
- CN106638678B CN106638678B CN201510736401.8A CN201510736401A CN106638678B CN 106638678 B CN106638678 B CN 106638678B CN 201510736401 A CN201510736401 A CN 201510736401A CN 106638678 B CN106638678 B CN 106638678B
- Authority
- CN
- China
- Prior art keywords
- profiled sheet
- diaphram wall
- underground structure
- structure inwall
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Revetment (AREA)
Abstract
The invention belongs to underground engineering construction field more particularly to a kind of underground structure inwall and diaphram wall overlapping surface construction and its construction methods, it is characterised in that:Including underground structure inwall, diaphram wall, diaphram wall has been performed as its building enclosure on the outside of the underground structure inwall, the underground structure inwall, profiled sheet is equipped between diaphram wall, the profiled sheet is in concave-convex, concrete cover is equipped on the inside of the profiled sheet and diaphram wall between vertical reinforcement, it is mutually overlapped between the adjacent profiled sheet, fixing piece is equipped on the inside of the profiled sheet and diaphram wall between vertical reinforcement, the profiled sheet is connect with fixing piece, the steel reinforcement cage of the fixing piece and diaphram wall is welded and fixed.Due to being equipped with profiled sheet on the inside of diaphram wall so that underground structure inwall forms whole force structure component, while waterproof unit of the profiled sheet as underground structure inwall with diaphram wall.
Description
Technical field
The invention belongs to underground engineering construction fields, more particularly to one kind being suitable for subway station, underground parking garage and height
The underground structure inwall of the construction of underground structure of layer building and diaphram wall overlapping surface construction and its construction method.
Background technology
When having performed diaphram wall as its foundation pit enclosure structure on the outside of underground structure inwall, general underground structure
Design will consider that diaphram wall participates in underground structure stress, often carry out calculating design by composite wall or overlapping wall at present.Overlapping
Wall is that diaphram wall is poured underground structure inwall with after to form a whole force structure component, i.e., by manually by underground
Chisel makes diaphram wall be connected with underground structure inwall at male and fomale(M&F) or setting steel tie on the inside of diaphragm wall, and ties
The tension reinforcement of structure top plate, middle plate and bottom plate is attached by embedded bar connector and diaphram wall, diaphram wall
Positive pressure and shearing can be transmitted between underground structure inwall, general underground structure inwall thickness can use 400mm, fold
The bending stiffness for closing wall is larger, and the arrangement of reinforcement on the outside of underground structure inwall is less.
Composite wall refers to that watertight insulation is provided between diaphram wall and underground structure inwall, diaphram wall,
Underground structure inwall is two independent primary structure members, and underground structure liner wall thickness generally requires 700mm-800mm, composite wall
Bending stiffness it is smaller, arrangement of reinforcement is more on the outside of underground structure inwall;Watertight insulation and structure roof on the outside of inwall is anti-
Water layer, base plate waterproofing form an entirety, and the water resistance of composite wall is preferable.Diaphram wall only undertakes construction stage engineering
In support action, Transfer of Shear, structure roof, the steel bar stress of middle plate and bottom plate and diaphragm wall need not connect two components
It connects;In service stage, diaphram wall participates in structural anti-buoyancy effect.
According to《Urban track traffic design specification》, when superposed surfaces do not match lacing wire, diaphram wall medial surface dabbing is wanted
It asks:It digs out green stone to show up, male and fomale(M&F) mean depth 20mm.Diaphram wall medial surface digs male and fomale(M&F), needs a large amount of manpowers.By
There are new-old concretes to pour face between diaphram wall and structure inwall, and structure inwall is susceptible to crack, causes
Structure inwall percolating water, structure reinforcing bars easily corrode, and reduce the durability of structure.It is being completed the subway by overlapping wall design
In station, much there is structural percolating water, later stage Treatment Measures to Leakage is costly.
Invention content
Manpower needed for male and fomale(M&F) is performed in order to save diaphram wall, solves underground structure inwall percolating water not
Foot, the purpose of the present invention is to provide a kind of underground structure inwall and diaphram wall overlapping surface construction and its construction methods.
The technical solution adopted in the present invention is:
A kind of underground structure inwall overlaps surface construction with diaphram wall, it is characterised in that:Including underground structure liner
Wall, diaphram wall, the underground structure inwall outside have performed diaphram wall as its building enclosure, the underground knot
Profiled sheet is equipped between structure inwall, diaphram wall, the profiled sheet is in concave-convex, the diaphram wall inside
It is provided with vertical reinforcement on the inside of diaphram wall, coagulation is equipped between the profiled sheet and diaphram wall inside vertical reinforcement
Protective soil layer mutually overlaps between the adjacent profiled sheet, the profiled sheet and vertical reinforcement on the inside of diaphram wall
Between be equipped with fixing piece, the profiled sheet connect with fixing piece, and the steel reinforcement cage of the fixing piece and diaphram wall, which welds, to be consolidated
It is fixed.
The fixing piece is cableway or shaped steel.
The profiled sheet structure roof top surface absolute altitude located underground is between the absolute altitude of underground structure bottom plate bottom surface.
The profiled sheet indention.
The profiled sheet undulate, peak line, the hollow line of the profiled sheet are horizontally disposed.
The profiled sheet is rolled using galvanized steel plain sheet or general steel plate.
Profiled sheet wave height >=the 10mm is connected using pulling rivet between the profiled sheet.
It is connected by welding or fastener between the profiled sheet and fixing piece.
A kind of construction method of underground structure inwall and diaphram wall overlapping surface construction, which is characterized in that including with
Lower step:(1)It first presses usual method and makes diaphram wall steel reinforcement cage, several fixing pieces then are set in steel reinforcement cage top surface,
By being welded and fixed between fixing piece and diaphram wall steel reinforcement cage, finally profiled sheet is laid on fixing piece, die mould
It mutually overlaps between steel plate, is connected using pulling rivet between profiled sheet, by welding or tightly between profiled sheet and fixing piece
Firmware connects;(2)Soil body stage excavation in foundation pit often excavates one layer of earthwork, to profiled sheet surface on the inside of diaphram wall into
Row cleans, and rubber strip is laid between underground continuous wall connector or so profiled sheet, and rubber strip is overlapped with profiled sheet, and using close
Sealing adhering and sealing.
The step(2)In, transverse joint or vertical abutment joint are using welding between the profiled sheet in each width diaphragm wall
Or fluid sealant sealing.
Beneficial effects of the present invention are:
1, concave-convex profiled sheet is provided in the present invention on the inside of diaphram wall, self-assembling formation is concave-convex on the inside of diaphram wall
Face does not need artificial chisel diaphram wall superposed surfaces;
2, underground structure inwall and the quality of diaphram wall superposed surfaces are more reliable than artificial chisel male and fomale(M&F), shear bond strength
Bearing capacity significantly improves;
3, profiled sheet forms the steel plate waterproof layer on the outside of underground structure inwall, solves current underground structure overlapping
Wall is susceptible to percolating water phenomenon.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Specific implementation mode
The invention will be further described below in conjunction with the accompanying drawings:
In figure, 1- diaphram walls, 2- underground structure inwalls, 3- profiled sheets, 4- diaphram walls inside vertical steel
Muscle, 5- fixing pieces, 6- concrete covers, 7- pulling rivets.
Embodiment 1
As shown in Figure 1,2 outside of underground structure inwall has performed diaphram wall 1,1 joint form of diaphram wall is adopted
With cross steel plate, from the absolute altitude+0.1m of underground structure top board top surface between the absolute altitude -0.1m of underground structure bottom plate bottom surface,
1 inside of lower diaphragm wall is equipped with profiled sheet 3, and 1 inside of diaphram wall is provided with vertical reinforcement 4 on the inside of diaphram wall, pressure
The waveform of 3 concave-convex surface of shape steel plate, profiled sheet 3 is vertically continuous, and the peak line and hollow line of profiled sheet 3 are level,
30mm concrete covers 6 are equipped on the inside of profiled sheet 3 and diaphram wall between vertical reinforcement 4, profiled sheet 3 is using zinc-plated
Steel plate is rolled, 3 wave height 28mm of profiled sheet, is mutually overlapped between adjacent profiled sheet 3, and staking is used between profiled sheet 3
7 connection of nail;Several fixing pieces 5 are equipped on the inside of profiled sheet 3 and diaphram wall between vertical reinforcement 4, fixing piece 5, which is selected, to be erected
Reinforcing bar, cableway diameter 14mm, the steel reinforcement cage of cableway and diaphram wall 1 are welded and fixed, profiled sheet 3 and erection steel
Muscle is by being welded to connect.
Construction procedure:(1) steel reinforcement cage that usual method makes diaphram wall 1 is first pressed, then in steel reinforcement cage top surface along cross
Cableway is set to interval 0.7m, by being welded and fixed between cableway and the steel reinforcement cage of diaphram wall 1, if finally will
Dry block profiled sheet 3 is laid on cableway, and 20mm is overlapped between profiled sheet 3, pulling rivet is used between profiled sheet 3
7 connections, 7 spacing 0.25m of pulling rivet;(2) soil body stage excavation in foundation pit often excavates one layer of earthwork, to 1 inside of diaphram wall
3 surface of profiled sheet cleaned, vertical abutment joint is using sealing between the profiled sheet 3 of the inside of each width diaphram wall 1
Glue seals, and rubber strip is laid between 1 connector both sides profiled sheet 3 of diaphram wall, and rubber strip mutually overlaps simultaneously with profiled sheet 3
By sealing glue sticking, since 1 inside of diaphram wall is equipped with profiled sheet 3 so that 1 inner surface of diaphram wall is natural
Concave-convex wavy surface is formed, diaphram wall 1 forms whole force structure component, while die mould with underground structure inwall 2
Waterproof unit of the steel plate 3 as underground structure inwall 2.
Embodiment 2
As shown in Figure 1,2 outside of underground structure inwall has performed diaphram wall 1,1 joint form of diaphram wall is adopted
With cross steel plate, from the absolute altitude+0.1m of underground structure top board top surface between the absolute altitude -0.1m of underground structure bottom plate bottom surface,
1 inside of lower diaphragm wall is equipped with profiled sheet 3, and 1 inside of diaphram wall is provided with vertical reinforcement 4 on the inside of diaphram wall, pressure
The zigzag of 3 concave-convex surface of shape steel plate, profiled sheet 3 is vertically continuous, and the peak line and hollow line of profiled sheet 3 are level,
25mm concrete covers 6 are equipped on the inside of profiled sheet 3 and diaphram wall between vertical reinforcement 4, profiled sheet 3 is using common
Steel plate is rolled, 3 wave height 30mm of profiled sheet, is mutually overlapped between adjacent profiled sheet 3, and staking is used between profiled sheet 3
7 connection of nail;Several fixing pieces 5,5 selection type of fixing piece are equipped on the inside of profiled sheet 3 and diaphram wall between vertical reinforcement 4
Steel, shaped steel are equal leg angle, angle steel length of side 25mm, and the steel reinforcement cage of shaped steel and diaphram wall 1 is welded and fixed, profiled sheet 3 with
Shaped steel is connected by fastener.
Construction procedure:(1) steel reinforcement cage that usual method makes diaphram wall 1 is first pressed, then in steel reinforcement cage top surface along cross
Shaped steel is set to interval 0.5m, by being welded and fixed between shaped steel and the steel reinforcement cage of diaphram wall 1, finally by several pieces of die moulds
Steel plate 3 is laid on shaped steel, and 25mm is overlapped between profiled sheet 3, is connected using pulling rivet 7 between profiled sheet 3, pulling rivet
7 spacing 0.30m;(2) soil body stage excavation in foundation pit often excavates one layer of earthwork, to the profiled sheet 3 of 1 inside of diaphram wall
Surface is cleaned, and vertical abutment joint is sealed using fluid sealant between the profiled sheet 3 of 1 inside of each width diaphram wall, underground
Rubber strip is laid between 1 connector both sides profiled sheet 3 of diaphragm wall, rubber strip mutually overlaps with profiled sheet 3 and passes through fluid sealant
Bonding, since 1 inside of diaphram wall is equipped with profiled sheet 3 so that 1 inner surface self-assembling formation bumps of diaphram wall are sawed
Toothed surfaces, diaphram wall 1 forms whole force structure component with underground structure inwall 2, while profiled sheet 3 is as ground
The waterproof unit of lower structure inwall 2.
Embodiment 3
As shown in Figure 1,2 outside of underground structure inwall has performed diaphram wall 1,1 joint form of diaphram wall is adopted
With cross steel plate, from the absolute altitude+0.1m of underground structure top board top surface between the absolute altitude -0.1m of underground structure bottom plate bottom surface,
1 inside of lower diaphragm wall is equipped with profiled sheet 3, and 1 inside of diaphram wall is provided with vertical reinforcement 4 on the inside of diaphram wall, pressure
The waveform of 3 concave-convex surface of shape steel plate, profiled sheet 3 is vertically continuous, and the peak line and hollow line of profiled sheet 3 are level,
35mm concrete covers 6 are equipped on the inside of profiled sheet 3 and diaphram wall between vertical reinforcement 4, profiled sheet 3 is using common
Steel plate is rolled, 3 wave height 18mm of profiled sheet, is mutually overlapped between adjacent profiled sheet 3, and staking is used between profiled sheet 3
7 connection of nail;Several fixing pieces 5 are equipped on the inside of profiled sheet 3 and diaphram wall between vertical reinforcement 4, fixing piece 5, which is selected, to be erected
Reinforcing bar, cableway diameter 18mm, the steel reinforcement cage of cableway and diaphram wall 1 are welded and fixed, profiled sheet 3 and erection steel
Muscle is by being welded to connect.
Construction procedure:(1) steel reinforcement cage that usual method makes diaphram wall 1 is first pressed, then in steel reinforcement cage top surface along cross
Cableway is set to interval 0.9m, by being welded and fixed between cableway and the steel reinforcement cage of diaphram wall 1, if finally will
Dry block profiled sheet 3 is laid on cableway, and 15mm is overlapped between profiled sheet 3, pulling rivet is used between profiled sheet 3
7 connections, 7 spacing 0.20m of pulling rivet;(2) soil body stage excavation in foundation pit often excavates one layer of earthwork, to 1 inside of diaphram wall
3 surface of profiled sheet cleaned, vertical abutment joint is using sealing between the profiled sheet 3 of the inside of each width diaphram wall 1
Glue seals, and rubber strip is laid between 1 connector both sides profiled sheet 3 of diaphram wall, and rubber strip mutually overlaps simultaneously with profiled sheet 3
By sealing glue sticking, since 1 inside of diaphram wall is equipped with profiled sheet 3 so that 1 inner surface of diaphram wall is natural
Concave-convex wavy surface is formed, diaphram wall 1 forms whole force structure component, while die mould with underground structure inwall 2
Waterproof unit of the steel plate 3 as underground structure inwall 2.
3 embodiments of the present invention are described in detail above, but the content is only the preferable implementation of the present invention
Example should not be construed as limiting the practical range of the present invention.It is all according to all the changes and improvements made by the present patent application range
Deng should all still fall within the scope of the patent of the present invention.
Claims (10)
1. a kind of underground structure inwall overlaps surface construction with diaphram wall, it is characterised in that:Including underground structure inwall,
Diaphram wall, the underground structure inwall outside have performed diaphram wall as its building enclosure, the underground structure
Profiled sheet is equipped between inwall, diaphram wall, the profiled sheet is in concave-convex, and the profiled sheet connects with underground
It is equipped with concrete cover between continuous side vertical reinforcement within the walls, is mutually overlapped between the adjacent profiled sheet, the die mould
Fixing piece is equipped on the inside of steel plate and diaphram wall between vertical reinforcement, the profiled sheet is connect with fixing piece, the fixation
The steel reinforcement cage of part and diaphram wall is welded and fixed.
2. a kind of underground structure inwall according to claim 1 overlaps surface construction with diaphram wall, it is characterised in that:
The fixing piece is cableway or shaped steel.
3. a kind of underground structure inwall according to claim 1 overlaps surface construction with diaphram wall, it is characterised in that:
The profiled sheet structure roof top surface absolute altitude located underground is between the absolute altitude of underground structure bottom plate bottom surface.
4. a kind of underground structure inwall according to claim 1 overlaps surface construction with diaphram wall, it is characterised in that:
The profiled sheet indention.
5. a kind of underground structure inwall according to claim 1 overlaps surface construction with diaphram wall, it is characterised in that:
The profiled sheet undulate, peak line, the hollow line of the profiled sheet are horizontally disposed.
6. a kind of underground structure inwall according to claim 1 overlaps surface construction with diaphram wall, it is characterised in that:
The profiled sheet is rolled using galvanized steel plain sheet or general steel plate.
7. a kind of underground structure inwall according to claim 5 overlaps surface construction with diaphram wall, it is characterised in that:
Profiled sheet wave height >=the 10mm is connected using pulling rivet between the profiled sheet.
8. a kind of underground structure inwall according to claim 1 overlaps surface construction with diaphram wall, it is characterised in that:
It is connected by welding or fastener between the profiled sheet and fixing piece.
9. the construction method of a kind of underground structure inwall and diaphram wall overlapping surface construction, which is characterized in that including following
Step:(1)First press usual method make diaphram wall steel reinforcement cage, then steel reinforcement cage top surface be arranged fixing piece, fixing piece with
By being welded and fixed between diaphram wall steel reinforcement cage, finally profiled sheet is laid on fixing piece, between profiled sheet
It mutually overlaps, is connected using pulling rivet between profiled sheet, profiled sheet is connect with fixing piece;(2)Soil body layering is opened in foundation pit
It digs, often excavates one layer of earthwork, profiled sheet surface on the inside of diaphram wall is cleaned, underground continuous wall connector or so die mould
Rubber strip is laid between steel plate, rubber strip is overlapped with profiled sheet, and uses fluid sealant adhering and sealing.
10. the construction method of a kind of underground structure inwall according to claim 9 and diaphram wall overlapping surface construction,
It is characterized in that:The step(2)In, transverse joint or vertical abutment joint are using weldering between the profiled sheet in each width diaphragm wall
It connects or fluid sealant seals.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510736401.8A CN106638678B (en) | 2015-11-03 | 2015-11-03 | A kind of underground structure inwall and diaphram wall overlapping surface construction and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510736401.8A CN106638678B (en) | 2015-11-03 | 2015-11-03 | A kind of underground structure inwall and diaphram wall overlapping surface construction and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106638678A CN106638678A (en) | 2017-05-10 |
CN106638678B true CN106638678B (en) | 2018-10-16 |
Family
ID=58810422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510736401.8A Active CN106638678B (en) | 2015-11-03 | 2015-11-03 | A kind of underground structure inwall and diaphram wall overlapping surface construction and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106638678B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113756322A (en) * | 2021-09-01 | 2021-12-07 | 珠海华发城市研究院有限公司 | Construction method for reserved occlusal surface of underground engineering laminated structure |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07166539A (en) * | 1993-12-17 | 1995-06-27 | Takenaka Komuten Co Ltd | Construction method for steel framed reinforced concrete continuous underground wall |
CN101096850A (en) * | 2006-06-29 | 2008-01-02 | 邹新建 | Plastics water discharge plate application method for underground engineering wall surface, bottom plating and top board |
CN101892667A (en) * | 2010-07-23 | 2010-11-24 | 中国建筑第二工程局有限公司 | Foundation pit support device and construction method |
CN103015431A (en) * | 2012-12-04 | 2013-04-03 | 北京建材地质工程公司 | Foundation pit supporting method for manual dig-hole cement-soil steel pile |
CN103669698A (en) * | 2013-12-24 | 2014-03-26 | 初明进 | Prefabricated concrete component with connecting rings |
CN203583493U (en) * | 2013-09-29 | 2014-05-07 | 中国一冶集团有限公司 | Combined lattice steel frame spray anchoring foundation pit supporting structure |
CN205100244U (en) * | 2015-11-03 | 2016-03-23 | 中铁隧道勘测设计院有限公司 | Underground structure inwall and underground continuous wall coincide face structure |
-
2015
- 2015-11-03 CN CN201510736401.8A patent/CN106638678B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07166539A (en) * | 1993-12-17 | 1995-06-27 | Takenaka Komuten Co Ltd | Construction method for steel framed reinforced concrete continuous underground wall |
CN101096850A (en) * | 2006-06-29 | 2008-01-02 | 邹新建 | Plastics water discharge plate application method for underground engineering wall surface, bottom plating and top board |
CN101892667A (en) * | 2010-07-23 | 2010-11-24 | 中国建筑第二工程局有限公司 | Foundation pit support device and construction method |
CN103015431A (en) * | 2012-12-04 | 2013-04-03 | 北京建材地质工程公司 | Foundation pit supporting method for manual dig-hole cement-soil steel pile |
CN203583493U (en) * | 2013-09-29 | 2014-05-07 | 中国一冶集团有限公司 | Combined lattice steel frame spray anchoring foundation pit supporting structure |
CN103669698A (en) * | 2013-12-24 | 2014-03-26 | 初明进 | Prefabricated concrete component with connecting rings |
CN205100244U (en) * | 2015-11-03 | 2016-03-23 | 中铁隧道勘测设计院有限公司 | Underground structure inwall and underground continuous wall coincide face structure |
Also Published As
Publication number | Publication date |
---|---|
CN106638678A (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101787742B (en) | Planted roof soil lower deformation joint construction structure and construction method thereof | |
CN106869315B (en) | Concrete-filled steel tubular frame and its construction method with presstressed reinforcing steel | |
CN206874310U (en) | Be applicable to high-pressure rich water district tunnel decompression drainage device | |
CN103225285B (en) | A kind of steel membrane rock | |
CN107687166A (en) | Diaphram wall is anti-to stream, water-impervious I-shaped steel joint structure and construction method | |
CN208280185U (en) | A kind of post-cast strip advanced water-stopping construction | |
CN211037072U (en) | Piping lane bottom plate waterproof construction | |
CN106869169A (en) | A kind of three-dimensional interval construction method of underground pipe gallery warehouse | |
CN205100244U (en) | Underground structure inwall and underground continuous wall coincide face structure | |
CN105113435A (en) | Culvert mouth of corrugated steel pipe culvert | |
CN105862912B (en) | A kind of agent on crack resistance of concrete sliding pile panelling construction method | |
CN110593320A (en) | Early sealing structure for outer wall post-cast strip and construction method thereof | |
CN201330400Y (en) | Lapping type combined steel plate cofferdam | |
CN107859059A (en) | Prefabricated sandwich side wall and prefabricated overlapping bottom plate connecting joint structure and its construction method | |
CN202689047U (en) | Waterproof structure applied to construction joint in fabricated tube section of immersed tube | |
CN106638678B (en) | A kind of underground structure inwall and diaphram wall overlapping surface construction and its construction method | |
CN211395768U (en) | Outer wall post-cast strip is enclosed construction in advance | |
CN209669813U (en) | A kind of water delivery analysis on aqueduct structure seam leakage reparation structure | |
CN209144647U (en) | A kind of combined planar load-bearing steel plate of high intensity | |
CN208122872U (en) | For Tunnel corrugated steel plate | |
CN105780758A (en) | Underground structure liner wall and underground continuous wall superposed surface structure and construction method thereof | |
CN205714225U (en) | A kind of railway culvert, tunnel defect wavy metal culvert pipe liner bracing means | |
CN105937248B (en) | Agent structure section construction and temporary plugging wall joint processing method | |
CN212357961U (en) | Partially unbonded grouting corrugated pipe prefabrication, assembling and connecting structure | |
CN105317021B (en) | A kind of connection method of variable cross-section continuous rigid frame aqueduct and structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190214 Address after: 300000 Tianjin Free Trade Test Zone (Airport Economic Zone) No. 36 West Central Road Patentee after: CHINA RAILWAY LIUYUAN GROUP CO., LTD. Address before: No. 1 Hebei street, Hongqiao District, Tianjin City, Tianjin Patentee before: Zhongtie Tunnel Survey and Design Inst., Ltd. |
|