CN106638321A - Truss suspending structure for beam body construction - Google Patents

Truss suspending structure for beam body construction Download PDF

Info

Publication number
CN106638321A
CN106638321A CN201611227787.0A CN201611227787A CN106638321A CN 106638321 A CN106638321 A CN 106638321A CN 201611227787 A CN201611227787 A CN 201611227787A CN 106638321 A CN106638321 A CN 106638321A
Authority
CN
China
Prior art keywords
truss
bailey
beam body
english
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611227787.0A
Other languages
Chinese (zh)
Other versions
CN106638321B (en
Inventor
卢九章
周明亮
赵明
杨青柏
朱旭阳
苏毅杰
姜小明
来井孝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Bridge Management Maintenance Group Co., Ltd.
Company limited of BJRB RuiTong Maintenance Center
Beijing Municipal Road and Bridge Co Ltd
Original Assignee
Co Ltd Of Bjrb Ruitong Maintenance Center
BEIJING MUNICIPAL BRIDGE MANAGEMENT MAINTENANCE GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Co Ltd Of Bjrb Ruitong Maintenance Center, BEIJING MUNICIPAL BRIDGE MANAGEMENT MAINTENANCE GROUP Co Ltd filed Critical Co Ltd Of Bjrb Ruitong Maintenance Center
Priority to CN201611227787.0A priority Critical patent/CN106638321B/en
Publication of CN106638321A publication Critical patent/CN106638321A/en
Application granted granted Critical
Publication of CN106638321B publication Critical patent/CN106638321B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to the technical field of beam body construction, and in particular relates to a truss suspending structure for beam body construction. The structure comprises two fixed mechanisms which are symmetrically arranged on two sides of a beam body; each of the fixed mechanisms comprises a triangular truss, a Bailey beam and a corbel support, the corbel support is fixedly arranged on a pier stud below the beam body, the Bailey beam is horizontally arranged on the corbel support, the triangular truss is vertically arranged on the Bailey beam, the bottom edge of the triangular truss is arranged along the length direction of the Bailey beam and a plurality of brackets are arranged along the length direction of the bottom edge of the triangular truss; each of the brackets comprises two hanging bands and a cross beam which is arranged between the two hanging bands, the two hanging bands are arranged along the width direction of the triangular truss, the upper ends of the hanging bands are connected to the bottom edge of the triangular truss while the lower ends are connected to the cross beam, and the cross beam is arranged below the Bailey beam to suspend the Bailey beam. The truss suspending structure adopts the triangular trusses, the hanging bands and the cross beams to suspend the Bailey beams, so that the structure is relatively simple and convenient to mount and detach.

Description

Truss overhung construction is used in a kind of beam body construction
Technical field
The present invention relates to beam body technical field of construction, more particularly to truss overhung construction is used in a kind of construction of beam body.
Background technology
Newly, reconstruct the more existing means of transportation engineering project of bridge span gradually to increase, in addition China's road network is gradually improved, in order to Reduce and take up an area, reduce rational cost, accordingly increased the difficulty of construction of bridge, the span and across footpath of bridge coping are increasingly Greatly, bridge depth of beam more and more higher, the degree-of-difficulty factor of bridge rack construction is increasing.
Bridge coping mainly using vase bent cap and gate-type bent cap form, bent cap length from 16.5 meters to 45.7 meters, Sectional dimension is 2.6 × 3 meters, the forms such as 3 × 3.6 meters, and cantilever design length is from 1.58 meters to 9 meters.Bridge pier column height From 35 meters to 60 meters, bridge, job site place are limited, it is impossible to set up framed bent, further, since the span and height of bent cap It is larger, generally adopt bowl button support, steel pipe column bracket to there is potential safety hazard, using height-limited system, make in work progress Had high demands with place, and construction period is long, and operating expenses is high.
The content of the invention
(1) technical problem to be solved
The technical problem to be solved in the present invention is to solve existing beam body to construct without place, and ordinary stent cannot be set up, existing There is mounting system to meet construction requirement problem.
(2) technical scheme
In order to solve above-mentioned technical problem, the invention provides truss overhung construction, including two are used in a kind of construction of beam body The symmetrical fixed mechanism located at beam body both sides, the fixed mechanism includes English truss, Bailey beam and angle-table bracket, the ox On the pier stud that leg support is fixed on below the beam body, the Bailey beam level on the angle-table bracket, the triangle Truss it is vertical in the Bailey beam, the base of the English truss is arranged along the length direction of the Bailey beam, and edge Multiple brackets are provided with below the base of the English truss, the bracket includes two suspender belts and between two suspender belts Crossbeam, and two suspender belts arrange along the width of the English truss, and the upper end of the suspender belt and the triangle purlin The base connection of frame, lower end is connected with the crossbeam, and the crossbeam is used to suspend the shellfish thunder in midair located at the lower section of the Bailey beam Beam.
Wherein, two Bailey beams in two fixed mechanisms are connected by pulling force bar assembly.
Wherein, the upper end of the suspender belt is connected with the base of the English truss by securing member.
Wherein, the upper end of the suspender belt is bolted with the base of the truss.
Wherein, the lower end of the suspender belt is provided with mounting groove, and the end of the crossbeam is inserted in the mounting groove.
Wherein, the base of the English truss is provided with two brackets, and two brackets are respectively arranged on the triangle purlin The two ends on frame base.
Wherein, multiple English trusses are provided with per Bailey beam described in root.
Wherein, it is provided with support member between the angle-table bracket and the Bailey beam.
Wherein, the support member include sand bucket and above the sand bucket every beam.
Wherein, also including the power transmission pillar being vertically arranged, the upper end of the power transmission pillar and the base of the English truss Connection, the lower end of the power transmission pillar is connected with described every beam.
(3) beneficial effect
The above-mentioned technical proposal of the present invention has the advantage that:Truss overhung construction is used in the beam body construction that the present invention is provided, Including two symmetrical fixed mechanisms located at beam body both sides, fixed mechanism includes English truss, Bailey beam and angle-table bracket, ox On the pier stud that leg support is fixed on below beam body, Bailey beam level on angle-table bracket, English truss it is vertical located at shellfish On Lei Liang, the base of English truss is arranged along the length direction of Bailey beam, and is provided with multiple below the base of English truss Bracket, the bracket includes two suspender belts and the crossbeam between two suspender belts, and two suspender belts are along the triangle purlin The width of frame is arranged, and the upper end of the suspender belt is connected with the base of the English truss, and lower end is connected with the crossbeam, Crossbeam suspends in midair located at the lower section of Bailey beam to Bailey beam.English truss, suspender belt and crossbeam are adopted in the truss suspension gear The suspention to Bailey beam is realized, its structure is relatively simple, is easily installed and dismantles, and greatlys save the engineering time.
Except it is described above present invention solves the technical problem that, constitute technical scheme technical characteristic and have this Outside the advantage that the technical characteristic of a little technical schemes is brought, what other technical characteristics and these technical characteristics of the invention were brought Advantage, will combine accompanying drawing and further illustrate.
Description of the drawings
Fig. 1 is a kind of front view of beam body construction truss overhung construction provided in an embodiment of the present invention;
Fig. 2 is a kind of side view of beam body construction truss overhung construction provided in an embodiment of the present invention;
Fig. 3 is the attachment structure schematic diagram of English truss provided in an embodiment of the present invention, bracket and Bailey beam;
Fig. 4 is the attachment structure schematic diagram of English truss provided in an embodiment of the present invention, bracket and power transmission pillar.
In figure:1:English truss;2:Bailey beam;3:Ox foot support;4:Suspender belt;5:Crossbeam;6:Beam body;7:Pier stud;8:Draw Power bar assembly;9:Bracing frame;10:Power transmission pillar;101:Bracing frame;102:The base of English truss.
Specific embodiment
To make purpose, technical scheme and the advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than the embodiment of whole.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained on the premise of creative work is not made, belongs to the scope of protection of the invention.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Company ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or be integrally connected;Can Being to be mechanically connected, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
Additionally, in describing the invention, unless otherwise stated, " multiple ", " many ", " multigroup " be meant that two or Two or more, " several ", " some ", " some groups " are meant that one or more.
As shown in Figures 1 to 4, truss overhung construction, including two are used in a kind of beam body construction provided in an embodiment of the present invention The symmetrical fixed mechanism located at beam body both sides, fixed mechanism includes English truss 1, Bailey beam 2 and angle-table bracket 3, bracket Frame 3 is fixed on the pier stud 7 of the lower section of beam body 6, the level of Bailey beam 2 on angle-table bracket 3, English truss 1 is vertical to be located at In Bailey beam 2, the base of English truss 2 is arranged along the length direction of Bailey beam 2, and along the lower section on the base 102 of English truss Multiple brackets are provided with, bracket includes two suspender belts 4 and the crossbeam between two suspender belts 45, and two suspender belts 4 are along described three The width of angle truss 1 is oppositely arranged, and suspender belt 4 passes through Bailey beam 2, and the upper end of suspender belt 4 to connect with the base 102 of English truss Connect, lower end is connected with crossbeam 5, crossbeam 5 is used to suspend the Bailey beam 2 in midair perpendicular to Bailey beam 2 located at the lower section of Bailey beam 2.Should The suspention to Bailey beam 2 is realized using English truss 1, suspender belt 4 and crossbeam 5 in truss suspension gear, its structure is relatively simple, just In installation and removal, the engineering time is greatlyd save.
Further, two Bailey beams 2 are connected by pulling force bar assembly 8, and pulling force bar assembly 8 is arranged perpendicular to Bailey beam. Pulling force bar assembly includes stayed mast and securing member, and rubbish bar sequentially passes through two Bailey beams, then by securing member and stayed mast Be oppositely arranged two Bailey beams 2 are connected.
Further, the upper end of suspender belt 4 is connected with the base 102 of English truss by securing member.In the present embodiment, hang It is bolted with the base 102 of English truss with 4 upper end.
Further, the lower end of suspender belt 4 is provided with mounting groove, and the end of crossbeam 5 is inserted in mounting groove, crossbeam 5 and suspender belt 4 It is attached by the way of grafting, is easily installed and dismantles, further saves the engineering time.
Further, the lower section of English truss 1 is provided with two brackets, and two brackets are respectively arranged on the two of English truss base End.
Further, every Bailey beam 2 is provided with multiple English trusses 1, length of the multiple English trusses 1 along Bailey beam 2 Direction is arranged, it is adaptable to the construction of large span beam body.
Further, support member 9 is provided between angle-table bracket 3 and Bailey beam 2.In the present embodiment, support member 9 include every Beam and located at the sand bucket below beam.
Further, also including the power transmission pillar 10 being vertically arranged, the upper end of power transmission pillar 10 and the base of English truss 102 connections, the lower end of power transmission pillar 10 be connected every beam, the two ends of power transmission pillar can pass through bolt respectively with English truss, Every beam connection, or power transmission pillar is connected to into English truss and every boom support by way of welding.Outside English truss Shape is isosceles triangle, is internally provided with bracing frame 9, and bracing frame 9 is arranged along the center line of English truss 1, and bracing frame 9 is by 4 The rectangular frame of root montant and Duo Gen cross bars composition, montant is connected between the hypotenuse of English truss 1 and base, and cross bar is connected to Between montant, the quantity of power transmission pillar 9 is 4, and 4 power transmission pillars 9 are arranged point-blank respectively with 4 montants, are used for The stress of dispersion English truss 1.
When in use, composition Bailey beam can be sequentially connected using many Bailey brackets, spiral shell is passed through between adjacent Bailey beam Tether and connect.
In sum, a kind of beam body construction truss overhung construction provided in an embodiment of the present invention, including two symmetrical Located at the fixed mechanism of beam body both sides, fixed mechanism includes English truss, Bailey beam and angle-table bracket, and angle-table bracket is fixed on beam On pier stud below body, Bailey beam level on angle-table bracket, English truss it is vertical in Bailey beam, English truss Base arrange along the length direction of Bailey beam, and the length direction along the base of English truss is provided with multiple brackets, bracket bag Two suspender belts and the crossbeam between two suspender belts are included, and two suspender belts set relatively along the width of the English truss Put, suspender belt passes through Bailey beam, and the upper end of suspender belt is connected with the base of English truss, and lower end is connected with crossbeam, beam vertical in Bailey beam is used to suspend the Bailey beam in midair located at the lower section of the Bailey beam.English truss is adopted in the truss suspension gear, is hung Band and crossbeam realize the suspention to Bailey beam, and its structure is relatively simple, is easily installed and dismantles, and greatlys save the engineering time.
Finally it should be noted that:Above example only to illustrate technical scheme, rather than a limitation;Although The present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used To modify to the technical scheme described in foregoing embodiments, or equivalent is carried out to which part technical characteristic; And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and Scope.

Claims (10)

1. truss overhung construction is used in a kind of beam body construction, it is characterised in that:Including two symmetrical fixations located at beam body both sides Mechanism, the fixed mechanism includes English truss, Bailey beam and angle-table bracket, and the angle-table bracket is fixed on the beam body lower section Pier stud on, the Bailey beam level on the angle-table bracket, the English truss it is vertical located at the Bailey beam On, the base of the English truss is arranged along the length direction of the Bailey beam, and along the lower section on the base of the English truss Multiple brackets are provided with, the bracket includes two suspender belts and the crossbeam between two suspender belts, and two suspender belts are along institute The width for stating English truss is arranged, and the upper end of the suspender belt is connected with the base of the English truss, lower end with it is described Crossbeam connects, and the crossbeam is used to suspend the Bailey beam in midair located at the lower section of the Bailey beam.
2. truss overhung construction is used in beam body construction according to claim 1, it is characterised in that:In two fixed mechanisms Two Bailey beams connected by pulling force bar assembly.
3. truss overhung construction is used in beam body construction according to claim 1, it is characterised in that:The upper end of the suspender belt and institute The base for stating English truss is connected by securing member.
4. truss overhung construction is used in beam body construction according to claim 3, it is characterised in that:The upper end of the suspender belt and institute The base for stating truss is bolted.
5. truss overhung construction is used in beam body construction according to claim 1, it is characterised in that:The lower end of the suspender belt is provided with Mounting groove, the end of the crossbeam is inserted in the mounting groove.
6. truss overhung construction is used in beam body construction according to claim 1, it is characterised in that:The base of the English truss Two brackets are provided with, two brackets are respectively arranged on the two ends on the English truss base.
7. truss overhung construction is used in beam body construction according to claim 1, it is characterised in that:Set on per Bailey beam described in root There are multiple English trusses.
8. truss overhung construction is used in beam body construction according to claim 1, it is characterised in that:The angle-table bracket with it is described Support member is provided between Bailey beam.
9. truss overhung construction is used in beam body construction according to claim 8, it is characterised in that:The support member includes sand bucket With above the sand bucket every beam.
10. truss overhung construction is used in beam body construction according to claim 9, it is characterised in that:Also include what is be vertically arranged Power transmission pillar, the upper end of the power transmission pillar is connected with the base of the English truss, the lower end of the power transmission pillar with it is described Every beam connection.
CN201611227787.0A 2016-12-27 2016-12-27 A kind of beam body construction truss overhung construction Active CN106638321B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611227787.0A CN106638321B (en) 2016-12-27 2016-12-27 A kind of beam body construction truss overhung construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611227787.0A CN106638321B (en) 2016-12-27 2016-12-27 A kind of beam body construction truss overhung construction

Publications (2)

Publication Number Publication Date
CN106638321A true CN106638321A (en) 2017-05-10
CN106638321B CN106638321B (en) 2018-11-02

Family

ID=58831783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611227787.0A Active CN106638321B (en) 2016-12-27 2016-12-27 A kind of beam body construction truss overhung construction

Country Status (1)

Country Link
CN (1) CN106638321B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3881598B2 (en) * 2002-06-21 2007-02-14 オリエンタル建設株式会社 Composite truss segment and truss bridge with suspension cable using the same and its construction method
CN101994293A (en) * 2010-11-11 2011-03-30 中铁六局集团有限公司 High pier coping construction method
CN203514200U (en) * 2013-09-11 2014-04-02 中铁上海工程局有限公司 Pin rod support for bridge capping beam construction
CN204455869U (en) * 2015-02-10 2015-07-08 中交一航局第一工程有限公司 A kind of sections pier shaft docking operation workbench
CN106120559A (en) * 2016-06-14 2016-11-16 江苏燕宁建设工程有限公司 A kind of bridge limited bracket construction method and bridge
CN206346122U (en) * 2016-12-27 2017-07-21 北京市政路桥管理养护集团有限公司 Truss overhung construction is used in a kind of beam body construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3881598B2 (en) * 2002-06-21 2007-02-14 オリエンタル建設株式会社 Composite truss segment and truss bridge with suspension cable using the same and its construction method
CN101994293A (en) * 2010-11-11 2011-03-30 中铁六局集团有限公司 High pier coping construction method
CN203514200U (en) * 2013-09-11 2014-04-02 中铁上海工程局有限公司 Pin rod support for bridge capping beam construction
CN204455869U (en) * 2015-02-10 2015-07-08 中交一航局第一工程有限公司 A kind of sections pier shaft docking operation workbench
CN106120559A (en) * 2016-06-14 2016-11-16 江苏燕宁建设工程有限公司 A kind of bridge limited bracket construction method and bridge
CN206346122U (en) * 2016-12-27 2017-07-21 北京市政路桥管理养护集团有限公司 Truss overhung construction is used in a kind of beam body construction

Also Published As

Publication number Publication date
CN106638321B (en) 2018-11-02

Similar Documents

Publication Publication Date Title
CN202688888U (en) Deck type reversely hung template hanging frame
CN201284551Y (en) Suspension type simple platform for work high above ground
CN206346122U (en) Truss overhung construction is used in a kind of beam body construction
CN206298834U (en) A kind of end bay construction of cast-in-place box girders section bed die system
CN107419665A (en) A kind of method of large-span steel girder hoisting appliance and its hoisting steel beam
CN106638321A (en) Truss suspending structure for beam body construction
CN205329550U (en) Suspension bridge catwalk system
CN101831872B (en) Front and rear fulcrum combined cradle
CN202000262U (en) Bridge triangular hanging basket
CN209722771U (en) A kind of bridge construction Hanging Basket
CN205663282U (en) Light -duty lattice formula steel column of large capacity
CN207143742U (en) A kind of large-span steel girder hoisting appliance
CN205591115U (en) Suspension type catwalk veil installing the system
CN210766395U (en) Bridge edge guardrail template structure
CN205443950U (en) Put more energy into interim support system of string of combined bridge rigidity span wire
CN209243589U (en) A kind of English truss in cantilever box girder construction Hanging Basket
CN210238296U (en) Large tower crane wall-attached space steel truss foundation
CN203188109U (en) Multi-span ground anchor type suspension bridge
CN206707239U (en) A kind of elevator Integral hoisting operating platform
CN206655455U (en) A kind of pier stud reinforcing bar binding platform keel shoe
CN219604147U (en) Multifunctional maintenance hanging basket
CN208474640U (en) A kind of novel process pipe-hanger support
CN205874986U (en) Combination hoisting gate frame
CN208565825U (en) A kind of process pipe installation cable-stayed type pipe frame structure
CN219157423U (en) Foldable box girder diaphragm construction hanging basket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181109

Address after: 101399 No. 6 Qianfu Street, Beiwu Town, Shunyi District, Beijing

Co-patentee after: Company limited of BJRB RuiTong Maintenance Center

Patentee after: Beijing Municipal Bridge Management Maintenance Group Co., Ltd.

Co-patentee after: Beijing Municipal Road and Bridge Co., Ltd.

Address before: 101399 No. 6 Qianfu Street, Beiwu Town, Shunyi District, Beijing

Co-patentee before: Company limited of BJRB RuiTong Maintenance Center

Patentee before: Beijing Municipal Bridge Management Maintenance Group Co., Ltd.

TR01 Transfer of patent right