CN106638269A - Temporary arc bridge facing traffic jam problem caused by city competing - Google Patents

Temporary arc bridge facing traffic jam problem caused by city competing Download PDF

Info

Publication number
CN106638269A
CN106638269A CN201710076358.6A CN201710076358A CN106638269A CN 106638269 A CN106638269 A CN 106638269A CN 201710076358 A CN201710076358 A CN 201710076358A CN 106638269 A CN106638269 A CN 106638269A
Authority
CN
China
Prior art keywords
bridge
floors
floor
interim
interim arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710076358.6A
Other languages
Chinese (zh)
Other versions
CN106638269B (en
Inventor
蔡舒祺
郭永安
佘昊
白易初
朱洪波
杨龙祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Post and Telecommunication University
Nanjing University of Posts and Telecommunications
Original Assignee
Nanjing Post and Telecommunication University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Post and Telecommunication University filed Critical Nanjing Post and Telecommunication University
Priority to CN201710076358.6A priority Critical patent/CN106638269B/en
Publication of CN106638269A publication Critical patent/CN106638269A/en
Application granted granted Critical
Publication of CN106638269B publication Critical patent/CN106638269B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to the technical field of bridge building and provides a temporary arc bridge facing a traffic jam problem caused by city competing. The temporary arc bridge comprises bridge floors, bridge handrails, bridge piers and buckle locks; a temporary arc bridge body is formed by splicing and fixing the two bridge floors, one end of each bridge floor is placed on the ground, and the other end of each bridge floor is oppositely connected with the other bridge floor; the two bridge floors are fixedly connected in the opposite-connecting position by using the buckle locks, the bridge handrails are fixed on the two sides of the bridge floors and can be bolded towards the bridge floors, and the bridge floors can further be downwards folded for storing; each buckle lock comprises an upper clamping plate, a lower clamping plate and a fixing bolt, and during using, the opposite-connecting position of the two bridge floors is clamped by the upper clamping plates and the lower clamping plates and the two bridge floors are fixed together in a pressed mode through the fixing bolts; and the bridge piers are each of a telescopic structure and located below the opposite-connecting position of the two bridge floors to support the bridge body, and a pressure testing alertor is installed at the ends, being placed on the ground, of the bridge floors. Through the temporary arc bridge, competing is normally conducted under the precondition that daily traffic is not influenced.

Description

A kind of interim arch bridge towards city race traffic jam issue
Technical field
The invention belongs to bridge construction technical field, and in particular to a kind of solution is asked because of the traffic congestion that city race is caused The temporary bridge of topic.
Background technology
Bridge, refers generally to be erected in rivers,lakes and seas, the structures for making traffic etc. smoothly to pass through.It is modern to adapt to The transportation industry of high speed development, bridge be also extended to across mountain stream, unfavorable geology or meet other traffic needs and set up make Current more easily building.
The bridge great majority generally seen at present are heavier concrete bridge, and these bridge structures are firm, load-bearing big, It is widely used across in river, valley, and city intersection system.But, sometimes, for example, temporary road Maintenance, road cleaning, the interim occupancy of road etc., in order to alleviate traffic problems, need the quick and convenient structure that frugally builds a bridge, And after the road is clear, these bridges will easily be removed and can reused.In this case, temporary bridge compares concrete bridge With significant advantage.
Nowadays, as people increase to the enthusiasm of sports, the situation that athletic competition is held in city is more and more, For example, city marathon, city bicycles match, footrace grand prix etc., these contests generally take up a large amount of urban roads, easily make Into traffic jam issue, affect people trip.It is the optimum method for solving this problem to build temporary bridge.Although now There are various temporary bridges in Jing, but, mostly for the temporary bridge that pedestrian or non-motor vehicle are current, vehicle pass-through still has a lot It is difficult.
The present invention provides a kind of interim arch bridge, its install convenient, convenient disassembly, and stabilized structure, uniform force, holds Gravity is big.
The content of the invention:
In order to solve above-mentioned technical problem, the present invention provides a kind of interim arch towards city race traffic jam issue Bridge, the arch bridge can simultaneously realize the smoothly current of vehicle.The arch bridge with all motor vehicle users as service object, by taking Build interim arch bridge and solve traffic problems, and equipped with pressure sensor, the pressure suffered by interim arch bridge can be learnt, prevent interim arch bridge It is impaired, so as to avoid user from expending the excessive time on highway.This product is related to the multi-part of arch bridge and decomposes and build, arch bridge Design structure.The technical method of the present invention is as described below.
The present invention provides a kind of interim arch bridge towards city race traffic jam issue, and the interim arch bridge includes bridge Face, bridge railings, bridge pier and padlock.The pontic of the interim arch bridge is formed by two section bridge floor splicing fixations, one end of the bridge floor Ground is placed on, the other end is relative with another bridge floor to be connect, and two bridge floors are fixedly connected in joint with padlock.The bridge railings The both sides of bridge floor are fixed on, and can be folded to bridge floor, the bridge floor can also be folded down storage.The padlock includes upper folder Plate, lower plate and fixing bolt, when using, train wheel bridge and lower plate clamp the joint of two bridge floors, by fixing bolt It is fixed together.The bridge pier is Collapsible structure, positioned at the lower section of two bridge floor joints, supports pontic.The bridge Face is additionally provided with pressure detecting alarm in the one end for being placed on ground.
Interim arch bridge of the present invention, across playing area road, can be supplied on the premise of not affecting playing area sportsman current Passing through for vehicle, realizes while the athletic competition of host city, does not affect the unimpeded of traffic.Meanwhile, pressure detecting is reported to the police Device, can detect the pressure suffered by interim arch bridge, and when pressure exceedes the warning value of setting alarm signal is sent, and forbid the car to enter It is interior, Damage of arch is prevented, and then ensure the safety of human life, and increase the service life.
Each component of the interim arch bridge adopts steel construction, to ensure to have enough weight capacities.
The splicing of bridge floor for convenience, the joint of two bridge floors of the interim arch bridge can arrange groove-projection docking Structure, pushes in projection alignment indentation in splicing, realizes the splicing of bridge floor, then installing tache lock is fixed.Groove-projection docking Structure can make the splicing of bridge floor tightr, and easily realize the conduction of power, can make full use of the characteristic of arch dispersion force, make Obtain interim arch bridge and obtain bigger weight capacity.
The joint of two bridge floors of the interim arch bridge may also be employed bolt and fix docking structure, two bridge floor docking End, have can partly overlapping jigsaw, jigsaw is provided with corresponding bolt hole, and installation bolt is capable of achieving the docking of two bridge floors.
The train wheel bridge of the padlock and the two ends of lower plate are provided with bolt hole, for installing fixing bolt.In train wheel bridge and After lower plate is installed to above and below bridge floor joint, by fixing bolt through train wheel bridge and the bolt hole of lower plate, and Screwing bolts, can be achieved with the fixing function of padlock.In order to prevent the generation or so or the changing of the relative positions in front and back of two bridge floors, can be by upper folder Plate and lower plate arrange concavity, and spill length is suitable with bridge width, for accommodating bridge floor joint, prevent generation between two bridge floors The left and right changing of the relative positions;Can with bridge floor and the train wheel bridge contacted with bridge floor and lower plate correspondence position arrange block-groove structure, After padlock is clamped, bridge floor will not slide with train wheel bridge and lower plate, the changing of the relative positions before and after preventing from occurring between two bridge floors.
The bridge pier includes multiple hollow metal cylinders being nested together and strip-shaped bracket, hollow metal cylinder Two ends are provided with multigroup jack corresponding two-by-two, and every group of jack is not interfered with each other in the horizontal direction, and the strip-shaped bracket can be inserted Enter jack and through hollow metal cylinder.Each component of the bridge pier is deposited and transported in the way of intussusception when not using; Assembling is when using, and metal cylinder is nested together according to size headtotail and is directed at corresponding jack, the maximum metal of diameter Cylinder is placed on bottom, then strip-shaped bracket insertion jack is passed through into metal cylinder, so as to by connected head-to-tail two Metal cylinder is fixed and supported.After all connected head-to-tail metal cylinders are installed, the assembling of bridge pier is completed.
When actually used, the interim arch bridge is by truck transport to the place for needing to arrange temporary bridge.Will using crane The bridge floor folded up launches, and one end of bridge floor is fixed on ground, controls its other end and docked, during docking under every piece of pontic Supporting load-carrying, the hydraulically extensible bar is integrally fixed on truck transporting bridge piece hydraulically extensible bar of Fang Peiyou.Next will The bridge railings of folding is opened.Then portable bridge pier and bridge floor are assembled.Finally two bridge floors are carried out using padlock solid It is fixed.After interim arch bridge assembling is finished, truck leaves, and arch bridge can be tested and worked.
The present invention has the advantages that:
1st, the interim arch bridge structure is simple, easily assembling, convenient transportation, can fast erecting complete, relieve traffic congestion in time; 2nd, arch bridge has domes, firm in structure, and bearing capacity is big, and is provided with pressure detecting alarm, it is to avoid overweight vehicle is by making Into bridge damage;3rd, only one of which bridge pier, does not interfere with the current of track athlete and staff and vehicle.
Description of the drawings
Fig. 1 is schematic diagram when two bridge floors are docked in the embodiment of the present invention;
Fig. 2 is the schematic diagram used after interim arch bridge assembling completely in the embodiment of the present invention;
Fig. 3 is the structure and scheme of installation of the padlock in the embodiment of the present invention;
Fig. 4 is the storage of the bridge pier in the embodiment of the present invention and scheme of installation;
Fig. 5 is the flow chart that interim arch bridge is installed in the embodiment of the present invention;
Fig. 6 is the docking structure schematic diagram of two bridge floors in the embodiment of the present invention.
Wherein, 1- bridge floors, 11- pressure detecting alarms, 2- bridge railings, 3- bridge piers, 31- metal cylinders, 32- strips Frame, 33- jacks, 4- padlocks, 41- train wheel bridges, 42- lower plates, 43- fixing bolts.
Specific embodiment
Technical scheme is illustrated with reference to specific embodiments and the drawings.
Embodiment 1
As depicted in figs. 1 and 2, a kind of interim arch bridge towards city race traffic jam issue, the interim arch bridge bag Include bridge floor 1, bridge railings 2, bridge pier 3 and padlock 4.The pontic of the interim arch bridge by two section bridge floors 1 splice it is fixed formed, the bridge The one end in face 1 is placed on ground, and the other end is relative with another bridge floor to be connect, and two bridge floors are fixedly connected in joint padlock 4. The bridge railings 2 is fixed on the both sides of bridge floor 1, and can fold to bridge floor 1, and the bridge floor 1 can also be folded down storage.Institute Padlock 4 is stated including train wheel bridge 41, lower plate 42 and fixing bolt 43, when using, train wheel bridge 41 and lower plate 42 are by two bridge floors Joint clamp, be fixed together by fixing bolt 43.The bridge pier 3 is Collapsible structure, positioned at two bridge floors 1 The lower section of joint, supports pontic.The bridge floor 1 is additionally provided with pressure detecting alarm 11 in the one end for being placed on ground.
When actually used, the interim arch bridge is by truck transport to the place for needing to arrange temporary bridge.Will using crane The bridge floor 1 folded up launches, and then controls it and is docked.Next the bridge railings 2 of folding is opened.Then by movable type Bridge pier 3 is assembled with bridge floor 1.Finally two bridge floors 1 are fixed using padlock 4.So far interim arch bridge is completed. Its installation procedure is as shown in Figure 5.
The joint of two bridge floors 1 of the interim arch bridge fixes docking structure using bolt, and two bridge floor butt ends have Can partly overlapping jigsaw, jigsaw is provided with corresponding bolt hole, and installation bolt is capable of achieving the docking of two bridge floors, such as Fig. 6 It is shown.
As shown in figure 4, the bridge pier 3 includes multiple hollow metal cylinders 31 being nested together and strip-shaped bracket 32, The two ends of hollow metal cylinder 31 are provided with multigroup corresponding jack 33 two-by-two, and every group of jack 33 be not mutual in the horizontal direction Interference, the strip-shaped bracket 32 can be inserted into jack 33 and through hollow metal cylinder 31.The each group of the bridge pier 3 when not using Part is deposited and transported in the way of intussusception;When assembling is used, metal cylinder 31 be nested together according to size headtotail and Corresponding jack 33 is directed at, the maximum metal cylinder 31 of diameter is placed on bottom, then strip-shaped bracket 32 is inserted into jack 33 pass through metal cylinder 31, so as to connected head-to-tail two metal cylinders 31 are fixed into support.Will be all connected head-to-tail After metal cylinder 31 is installed, the assembling of bridge pier 3 is completed.
As shown in figure 3, the two ends of the train wheel bridge 41 of the padlock 4 and lower plate 42 are provided with bolt hole, for installing fixation Bolt 43.After train wheel bridge 41 and lower plate 42 are installed to above and below bridge floor joint, fixing bolt 43 is passed through upper The bolt hole of clamping plate 41 and lower plate 42, and screwing bolts 43, can be achieved with the fixing function of padlock 4.In order to prevent two bridges Face 1 is slided, and train wheel bridge 41 and lower plate 42 are arranged into concavity, and spill length is suitable with bridge width, for accommodating bridge floor 1 Joint, prevents from being slided between two bridge floors 1.
Each component of the interim arch bridge adopts steel construction, to ensure to have enough weight capacities.
Above-mentioned interim arch bridge assumed above the road of playing area, and from playing area side of leading the way opposite side is crossed, and bridge lower section is for fortune Mobilization, race officials etc. pass through, and bridge top is available for the single vehicle pass-through of urban district common vehicle.Can set up at same crossing Many interim arch bridges, to facilitate vehicle two way.The interim arch bridge is realized while the athletic competition of host city, not shadow Ring the unimpeded of traffic.Meanwhile, pressure detecting alarm 11 can detect the pressure suffered by interim arch bridge, and in pressure setting is exceeded Alarm signal is sent during warning value, forbids the car to enter interior, prevent Damage of arch, and then ensured the safety of human life, and prolongation uses the longevity Life.

Claims (9)

1. a kind of interim arch bridge towards city race traffic jam issue, the interim arch bridge includes bridge floor, bridge railings, bridge pier And padlock;The pontic of the interim arch bridge is formed by two section bridge floor splicing fixations, and one end of the bridge floor is placed on ground, another End is relative with another bridge floor to be connect, and two bridge floors are fixedly connected in joint with padlock;The bridge railings is fixed on the two of bridge floor Side, and can fold to bridge floor, the bridge floor can also be folded down storage;The padlock includes train wheel bridge, lower plate and consolidates Determine bolt, when using, train wheel bridge and lower plate clamp the joint of two bridge floors, and by fixing bolt one is pressed abd fixed on Rise;The bridge pier is Collapsible structure, positioned at the lower section of two bridge floor joints, supports pontic;The bridge floor is being placed on ground The one end in face is additionally provided with pressure detecting alarm.
2. interim arch bridge according to claim 1, it is characterised in that:Each component of the interim arch bridge adopts steel construction.
3. interim arch bridge according to claim 1, it is characterised in that:The joint of two bridge floors of the interim arch bridge is Groove-projection docking structure or bolt docking structure.
4. interim arch bridge according to claim 1, it is characterised in that:The train wheel bridge of the padlock and the two ends of lower plate set There is bolt hole, for installing fixing bolt.
5. interim arch bridge according to claim 1, it is characterised in that:The padlock train wheel bridge and lower plate are arranged to recessed Shape, spill length is suitable with bridge width, for accommodating bridge floor joint.
6. interim arch bridge according to claim 1, it is characterised in that:In bridge floor and the train wheel bridge contacted with bridge floor and lower folder Block-groove structure is set on plate correspondence position.
7. interim arch bridge according to claim 1, it is characterised in that:The pressure detecting alarm, can detect interim arch Pressure suffered by bridge, when pressure exceedes the warning value of setting alarm signal is sent, and prevents Damage of arch.
8. interim arch bridge according to claim 1, it is characterised in that:The bridge pier include it is multiple be nested together it is hollow Metal cylinder and strip-shaped bracket, the two ends of hollow metal cylinder are provided with multigroup jack corresponding two-by-two, and every group of jack exists Do not interfere with each other in horizontal direction, the strip-shaped bracket can be inserted into jack and pass through hollow metal cylinder.
9. interim arch bridge according to claim 8, it is characterised in that:Each component of the bridge pier is with intussusception when not using Mode is deposited and transported;When assembling is used, metal cylinder is nested together according to size headtotail and is directed at corresponding slotting Hole, the maximum metal cylinder of diameter is placed on bottom, then strip-shaped bracket insertion jack is passed through into metal cylinder, so as to Connected head-to-tail two metal cylinders are fixed and is supported;After all connected head-to-tail metal cylinders are installed, bridge pier is completed Assembling.
CN201710076358.6A 2017-02-13 2017-02-13 A kind of interim arch bridge towards city race traffic jam issue Active CN106638269B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710076358.6A CN106638269B (en) 2017-02-13 2017-02-13 A kind of interim arch bridge towards city race traffic jam issue

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710076358.6A CN106638269B (en) 2017-02-13 2017-02-13 A kind of interim arch bridge towards city race traffic jam issue

Publications (2)

Publication Number Publication Date
CN106638269A true CN106638269A (en) 2017-05-10
CN106638269B CN106638269B (en) 2018-05-04

Family

ID=58845714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710076358.6A Active CN106638269B (en) 2017-02-13 2017-02-13 A kind of interim arch bridge towards city race traffic jam issue

Country Status (1)

Country Link
CN (1) CN106638269B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489077A (en) * 2017-08-15 2017-12-19 李露青 A kind of people's car Integral type timesharing viaduct
CN112431110A (en) * 2020-10-16 2021-03-02 杨同伟 Temporary viaduct for road repair road section passing

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1072979A (en) * 1992-12-04 1993-06-09 乔海兵 Movable detachable highway cross-over bridge
CN2258193Y (en) * 1996-12-03 1997-07-23 乌日 Combined vehicle type overpass
JPH1088518A (en) * 1996-09-13 1998-04-07 Yasuhiro Niizawa High level part of overbridge and over-road bridge
KR20060061030A (en) * 2004-12-01 2006-06-07 주식회사 선영 An curving arch-bridge
CN202131562U (en) * 2011-07-11 2012-02-01 王金 Vehicle-mounted building block emergency overpass
CN103758024A (en) * 2014-01-15 2014-04-30 云南昆钢钢结构有限公司 Quick assembling and disassembling steel-structure pedestrian overpass
CN204401393U (en) * 2014-12-12 2015-06-17 刘华强 Portable dismantled and assembled road interim road and bridge
CN206521686U (en) * 2017-02-13 2017-09-26 南京邮电大学 A kind of interim arch bridge towards city race traffic jam issue

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1072979A (en) * 1992-12-04 1993-06-09 乔海兵 Movable detachable highway cross-over bridge
JPH1088518A (en) * 1996-09-13 1998-04-07 Yasuhiro Niizawa High level part of overbridge and over-road bridge
CN2258193Y (en) * 1996-12-03 1997-07-23 乌日 Combined vehicle type overpass
KR20060061030A (en) * 2004-12-01 2006-06-07 주식회사 선영 An curving arch-bridge
CN202131562U (en) * 2011-07-11 2012-02-01 王金 Vehicle-mounted building block emergency overpass
CN103758024A (en) * 2014-01-15 2014-04-30 云南昆钢钢结构有限公司 Quick assembling and disassembling steel-structure pedestrian overpass
CN204401393U (en) * 2014-12-12 2015-06-17 刘华强 Portable dismantled and assembled road interim road and bridge
CN206521686U (en) * 2017-02-13 2017-09-26 南京邮电大学 A kind of interim arch bridge towards city race traffic jam issue

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489077A (en) * 2017-08-15 2017-12-19 李露青 A kind of people's car Integral type timesharing viaduct
CN107489077B (en) * 2017-08-15 2020-08-21 台州市荣创电子有限公司 Man-vehicle integrated time-sharing overpass
CN112431110A (en) * 2020-10-16 2021-03-02 杨同伟 Temporary viaduct for road repair road section passing

Also Published As

Publication number Publication date
CN106638269B (en) 2018-05-04

Similar Documents

Publication Publication Date Title
CN206521686U (en) A kind of interim arch bridge towards city race traffic jam issue
CN106638269B (en) A kind of interim arch bridge towards city race traffic jam issue
CN104631300B (en) A kind of Single column pier beam bridge antidumping bearing capacity computation method
US4649588A (en) Elevated bikeway
CN108316126A (en) A kind of mechanized bridge can mortise transfer bridge across
CN110258396A (en) A kind of modular multistage cushion bumper guardrail
CN107345384B (en) Multipurpose steel box girder plate
CN108166377B (en) A kind of folding combined temporary bridge device
CN104514202B (en) A kind of Single column pier beam bridge antidumping reinforcement means
CN204551224U (en) Emergent shunting portable bridge
CN215887883U (en) Combined pedestrian obstacle avoidance ladder bridge
CN111472256B (en) Foldable intelligent bridge
CN211498488U (en) Highway and railway dual-purpose bridge movable railway hard protection platform
CN205024591U (en) Logical pier is robbed to motor -driven formula
CN210529489U (en) Bridge overhauls device
RU149997U1 (en) MOBILE SPAN STRUCTURE OF THE BRIDGE
CN201351262Y (en) Light self-balancing assembly car platform bridge
CN2312243Y (en) Quick assemblage overcross bridge for highway
CN111794079A (en) Temporary bridge capable of passing through vehicles based on bridge construction
KR100958410B1 (en) Transit of the petal at the rivers breast wall and the bridge back spatial-temporal that transit back
CN204728190U (en) A kind of portable steel bridge
CN220079734U (en) Anti-collision buffer guardrail for bridge of municipal engineering
CN221193011U (en) Road bridge construction support frame
CN201169922Y (en) Safety device of high layer posts subsection butt-joint operation
CN209669735U (en) Anti-theft type crossing warning system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Guo Yongan

Inventor after: She Hao

Inventor after: Bai Yichu

Inventor after: Li Ruichao

Inventor after: Chen Zifei

Inventor after: Zhu Yimeng

Inventor before: Cai Shuqi

Inventor before: Guo Yongan

Inventor before: She Hao

Inventor before: Bai Yichu

Inventor before: Zhu Hongbo

Inventor before: Yang Longxiang

GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170510

Assignee: Nanjing Chulian Information Technology Co.,Ltd.

Assignor: NANJING University OF POSTS AND TELECOMMUNICATIONS

Contract record no.: X2020980007042

Denomination of invention: A temporary arch bridge for traffic congestion in urban competition

Granted publication date: 20180504

License type: Common License

Record date: 20201023

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170510

Assignee: Nanjing Shanyechu Agriculture and Forestry Technology Co.,Ltd.

Assignor: NANJING University OF POSTS AND TELECOMMUNICATIONS

Contract record no.: X2023980051072

Denomination of invention: A Temporary Arch Bridge for Urban Competition Traffic Congestion

Granted publication date: 20180504

License type: Common License

Record date: 20231209