CN106633939B - A kind of warm mixed epoxy bitumen and preparation method thereof - Google Patents

A kind of warm mixed epoxy bitumen and preparation method thereof Download PDF

Info

Publication number
CN106633939B
CN106633939B CN201510729514.5A CN201510729514A CN106633939B CN 106633939 B CN106633939 B CN 106633939B CN 201510729514 A CN201510729514 A CN 201510729514A CN 106633939 B CN106633939 B CN 106633939B
Authority
CN
China
Prior art keywords
warm
component
mixed
epoxy resin
catalyst
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510729514.5A
Other languages
Chinese (zh)
Other versions
CN106633939A (en
Inventor
张静
陈保莲
傅丽
范思远
李志军
宁爱民
程国香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Fushun Research Institute of Petroleum and Petrochemicals
Original Assignee
China Petroleum and Chemical Corp
Sinopec Fushun Research Institute of Petroleum and Petrochemicals
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Fushun Research Institute of Petroleum and Petrochemicals filed Critical China Petroleum and Chemical Corp
Priority to CN201510729514.5A priority Critical patent/CN106633939B/en
Publication of CN106633939A publication Critical patent/CN106633939A/en
Application granted granted Critical
Publication of CN106633939B publication Critical patent/CN106633939B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Compositions Of Macromolecular Compounds (AREA)
  • Epoxy Resins (AREA)

Abstract

The invention discloses a kind of warm mixed epoxy bitumens and preparation method thereof.The warm mixed epoxy bitumen includes tri- kinds of components of A, B, C, and component A therein is warm-mixed asphalt, and warm-mixed asphalt includes warm-mixing agent and matrix pitch;B component is composition epoxy resin;Component C is curing agent.The warm-mixing agent preparation method is: under the action of catalyst, macromolecule alkane first reacts to obtain intermediate with halogen simple substance;Aromatic naphtha reacts to obtain aromatic hydrocarbons complexing components with complex compound under the action of catalyst;Then aromatic hydrocarbons complexing components reacted with intermediate, cure to obtain the warm-mixing agent.The high temperature performance that warm-mixing agent used in warm mixed epoxy bitumen of the invention can not only play warm mix effect to pitch, take into account pitch, and the thermal stability of pitch can be improved, improve anti-aging property, the melting temperature and viscosity at this temperature for reducing pitch, reduce the occurrence quantity of pernicious gas and are conducive to construct.

Description

A kind of warm mixed epoxy bitumen and preparation method thereof
Technical field
The present invention relates to a kind of pitches, and in particular to a kind of warm mixed epoxy bitumen and preparation method thereof.
Background technique
With being continuously increased for highway mileage, highway bridge quantity also increases therewith.However, also exposing some ask Topic, wherein being accounted for disease caused by the water-proof tack coat failure between bridge deck pavement and between pave-load layer and panel larger Ratio causes attention of the people to bridge deck pavement material and technique.As bridge floor interlaminar bonding material, by adding in pitch Add bituminous epoxy obtained from epoxy resin that there is preferable effect.However, the viscosity due to bituminous epoxy is larger, in construction It is required that construction temperature is higher, also there is certain operable time, so increasing difficulty of construction;In addition, adding in pitch After adding epoxy resin, pitch can be made to become fragile, flexibility is deteriorated, bad with the followability of bridge panel.In order to solve these problems, Warm mix technology need to be taken to reduce the construction temperature of bituminous epoxy, and improve flexibility.
There are mainly three types of modes for warm-mixed asphalt technology: first is that using the higher emulsified asphalt of evaporated residue content, 80 DEG C~120 DEG C at a temperature of with building stones mix, which is about 30 DEG C~50 DEG C low compared with the temperature of hot asphalt;Second is that being mixed in mixing Water (or aqueous solution of surfactant) and pitch are added simultaneously in mix tank when material, due to the presence of water, make asphalt foaming, Reach viscosity reducing effect.But above two method can generate a large amount of vapor, easily cause equipment corrosion, stone also frequently occurs Powder conglomeration even causes mixing equipment blockage problem, makes troubles to production.Further, since remaining non-volatile moisture is retained in In mixture, mixture initial performance will affect.The third method is that warm-mixing agent is added in pitch in advance, then take with The same production method of common hot-mix asphalt mixture is easy to be received by production unit convenient for operation.This kind of method passes through Warm-mixing agent is added in pitch in advance, reduces the high temperature viscosity of pitch, changes the viscosity-temperature curve of pitch, to reduce drip The green mix temperature with building stones, reaches warm mix effect.But presently used warm-mixing agent leads to while reducing asphalt high-temperature viscosity The reduction that often can also cause 60 DEG C of viscosity of pitch, makes the high-temperature stability of asphalt incur loss;Or on the contrary, not dropping When low 60 DEG C of viscosity, the loss of pitch ductility can be caused, to reduce the cryogenic property of pitch.In short, presently used Warm-mixing agent is while making pitch reach warm mix effect, is high-temperature behavior to lose pitch or cryogenic property as cost 's.
CN102443239A describes a kind of oil-resistant road asphalt modifier and preparation method thereof.Oil resistivity road drip Green modifying agent includes 20~50 parts of styrene-ethylene/butylene-styrene block copolymer (SEBS), polyolefin tree by weight 10~30 parts of rouge, 15~45 parts of macromolecule wax, rich in 10~30 parts of oil of aromatic hydrocarbons extraction.Wherein macromolecule wax is Fischer-Tropsch wax, is rich in Aromatic hydrocarbons extraction oil is furfural extract oil or phenol treating extraction oil.Preparation method is: material is launched in proportion to twin-screw 120 DEG C~200 DEG C of extrusion temperature, oil-resistant road asphalt modifier is made in stretching and granulation in extruder.The patent introduction it is resistance to Oiliness asphalt modifier is to develop for for pitch used in the places such as parking lot, airplane parking area in order to improve its oil resistivity A kind of modifying agent, for the warm mix effect of pitch, there is no enough attention, in the process of development, only with twin-screw Extruder has carried out simple extrusion mixing, due to unsaturated bond limited amount on polymer molecule used, in Screw Extrusion Only have a small amount of graft reaction in the process, enough chemical reactions does not occur, substantially a kind of simple physical mixed is right It is very limited in the warm mix effect of pitch.
102061098 A of CN describes a kind of asphalt mixture warm-mixing modifier and preparation method thereof.It is by following quality The composition of part is made, fischer-tropsch wax: 50~85 parts, flexibilizing agent: and 15~50 parts, polyacid: 0~10 part, synthetic resin: 0~20 Part, petchem: 0~5 part.Wherein, synthetic resin is polyisobutene of the molecular weight between 400~5000.Preparation method: (1) each component is weighed in mass ratio;(2) each component is melted and is stirred at 120 DEG C~130 DEG C, be allowed to be sufficiently mixed It is even to get the asphalt mixture warm-mixing modifier.In the warm-mixing agent development process, there is no changing to react between each component, Only simple physical mixed.Although the mix temperature of pitch can be reduced, the ductility of pitch will receive loss i.e. Asphalt is easy to happen cold cracking, causes asphalt thermal stability and low-temperature cracking-resistance bad, so that pitch is mixed There is track and cracking and accelerates damage in solidifying soil surface surface layer.
CN101735623A discloses a kind of warm mixed epoxy bitumen material and preparation method thereof, including component A and B component.A Group is divided into epoxy resin, and B component includes pitch 40wt%~83wt%, maleic anhydride 5wt%~20wt%, 9- octadecenyl amine 10wt%~30wt%, poly sebacic polyanhydride or poly- azelaic acid acid anhydride 2wt%~10wt%;The mass ratio of component A and B component be 1:3~ 5.8.Medium temperature mix can be used, reduce gas discharge when construction, while it is short to solve general bituminous epoxy operable time Problem.But when preparing B component, maleic anhydride is added in pitch and needs to stir 4~6 hours, then also needs to add Add other components, preparation time is too long, influences production efficiency.In addition, bituminous epoxy is although can be improved Coating combination, pitch Pitch can be made to become fragile after middle addition epoxy resin, flexibility is deteriorated.
CN 104591605A discloses a kind of Warm-Mix Bitumen Mixture and preparation method thereof, in warm-mixed asphalt preparation process The middle warm-mixing agent special using one kind, and the mix and forming temperature of asphalt are reduced, less pernicious gas occurrence quantity.But In the preparation process of warm-mixing agent, not only intermediate reaction speed is slower, and intermediate activity it is lower, cause intermediate with The extent of reaction of aromatic naphtha, reaction depth are also not easily controlled, and obtained warm-mixing agent property is unstable, are affected in pitch Application effect.In addition, having also appeared the poor problem of anti-aging property if warm-mixing agent is used in bituminous epoxy.
During preparation flexibility good bituminous epoxy, warm mix technology would generally reduce by 60 DEG C of viscosity of pitch or prolong Elongation, to affect the high-temperature stability or low temperature anti-cracking performance of asphalt.It would therefore be highly desirable to develop one kind, both The problem that can solve bituminous epoxy flexibility difference, can also solve the problems, such as high and low temperature service performance and aging.
Summary of the invention
In view of the deficiencies in the prior art, the present invention provides a kind of warm mixed epoxy bitumens and preparation method thereof.Temperature of the invention In mixed epoxy bitumen preparation process, a kind of special warm-mixing agent is used, improves the flexibility of bituminous epoxy, but also have to pitch The construction temperature for having good warm mix effect, asphalt being effectively reduced, has taken into account the high temperature performance of pitch, while can also The thermal stability of pitch is improved, anti-aging property is improved.
The present invention provides a kind of warm mixed epoxy bitumen, the warm mixed epoxy bitumen includes tri- kinds of components of A, B, C, therein Component A is warm-mixed asphalt, and warm-mixed asphalt includes warm-mixing agent and matrix pitch;It includes FT, halogen list that the warm-mixing agent, which prepares raw material, Matter, aromatic naphtha, complex compound, the first catalyst, the second catalyst, wherein the FT is a kind of macromolecule mixed alkanes, carbon number It is 30~150, preferably 30~130;
B component is composition epoxy resin;
Component C is curing agent.
The complex compound includes: [Cu (NH3)4]SO4、[Pt(NH3)2]Cl2、K[Pt(C2H4)Cl3]、K4[Fe(CN)6]、K3 [Fe(CN)6]、Fe4[Fe(CN)6]3、Ni(CO)4、[Co(NH3)5Cl]SO4、(NH4)3[Cr(NCS)6At least one of].
First catalyst is selected from anhydrous CuCl2, anhydrous MnCl2, anhydrous CrCl3, anhydrous NiCl2At least one of.
Second catalyst is selected from least one of Ni metal, Fe, Zn, Cr, Ni.
The dosage of the complex compound is by weight 3%~9% of arene content in aromatic naphtha.
The dosage of first catalyst is by weight the 0.3%~0.9% of FT.
The dosage of second catalyst is by weight 0.3%~0.9% of arene content in aromatic naphtha.
The dosage of the halogen simple substance is 0.12~0.75 times of FT molal quantity, preferably 0.3~0.5 times, FT and aromatic hydrocarbons The weight ratio of oil is (1~7): (7~1).
Additive amount of the warm-mixing agent in warm-mixed asphalt is 0.4wt%~10wt% of warm-mixed asphalt weight, preferably 0.5wt%~7.0wt%.
The FT is to carry out a kind of macromolecule alkane that synthetic reaction obtains again after coal gasification, or using natural gas as raw material Carry out a kind of macromolecule alkane that synthetic reaction obtains;The halogen simple substance is that one of fluorine, chlorine, bromine simple substance state aromatic naphtha For a kind of component rich in aromatic hydrocarbons, to be that the line extraction oil that subtracts four, furfural extract oil, phenol treating extraction be oily, cycle oil Slurry etc.;Arene content in the aromatic naphtha is the wt% of 57 wt%~78, the preferably wt% of 60 wt%~75.
Matrix pitch of the present invention can choose the asphalt of various crude oil and different process production, as straight run drips One or more of blueness, oxidized asphalt, solvent deoiling pitch or blend asphalt.
The preparation process of the warm-mixing agent includes: halogen to be introduced in the presence of the first catalyst, instead for after FT heating melting Should after obtain intermediate;Complex compound and the second catalyst are added into aromatic naphtha, and constant temperature stirs, aromatic hydrocarbons complexing is obtained after reaction Component;Then by above-mentioned intermediate and aromatic hydrocarbons complexing components hybrid reaction, curing, the warm-mixing agent is obtained.
The preparation process of the warm-mixing agent includes:
(1) mixing macromolecule alkane heating melting is placed in closed container, maintains the temperature at 400 DEG C ~ 480 DEG C, makes The space of reaction vessel is full of nitrogen, and pressure is made to be maintained at 3 ~ 5MPa, and halogen simple substance is passed through in the macromolecule alkane of melting, And in the presence of the first catalyst, 30~60min of reaction obtains intermediate;
(2) complex compound and the second catalyst are added into aromatic naphtha, constant temperature is stirred to react at a temperature of 270 DEG C ~ 350 DEG C 120 ~ 180min obtains aromatic hydrocarbons complexing components;
(3) the aromatic hydrocarbons complexing components are added in above-mentioned intermediate, make 350 DEG C ~ 400 DEG C of temperature, makes full of nitrogen Pressure is maintained at 2 ~ 4MPa, and 60 ~ 120min of isothermal reaction obtains a kind of dope;
(4) after reaction, by this dope at 120 DEG C ~ 160 DEG C of temperature, 60 ~ 100 min are cured, obtain the temperature Mix agent.
In warm-mixing agent, B component is composition epoxy resin, in parts by weight includes: 100 parts of epoxy resin, diluent 15~60 parts, 10~30 parts of flexibilizing agent, 0~40 part of fiber.
Epoxy resin described in B component composition epoxy resin include: atmosphere base propane glycidyl ether epoxy resin, Bi-phenolic Methan e tetraglycidel ether epoxy resin, polyphenol base propane tetraglycidel ether epoxy resin, aliphatic glycidyl ether ring The mixture of one or more of oxygen resin, glycidyl ester type epoxy resin, glycidyl amine type epoxy resin;
Diluent described in B component composition epoxy resin includes: diglycidyl ether, polyglycidyl ether, epoxy Propane butyl ether, propylene oxide phenyl ether, diepoxy propane ethylether, three propylene oxide propyl ethers, ethyl alcohol, acetone, benzene, first One or more of benzene, dimethylbenzene mixture;
Flexibilizing agent described in B component composition epoxy resin includes: polysulfide rubber, polyamide, phenolic resin, gathers One or more of the tertiary butyraldehyde of vinyl alcohol, furfural resin mixture;
Fiber described in B component composition epoxy resin includes: asbestos fibre and/or glass fibre.
In warm-mixing agent, component C is curing agent, comprising: ethylenediamine, m-phenylene diamine (MPD), benzene dimethylamine, polyamide, divinyl One or more of triamine mixture.
The ratio between the dosage of the component A and B component, A:B by weight=(3~7): 1;The dosage of component C is by weight Meter is 0.40%~1.20% of the content of epoxy resin in B component, preferably 0.48%~1.05%.
Component A preparation method is the following steps are included: be heated to 130 DEG C~160 DEG C for matrix pitch, after melting completely, Warm-mixing agent is added while stirring, is stirred 30min~60min, is obtained component A warm-mixed asphalt.
The preparation method of B component composition epoxy resin is the following steps are included: first by epoxy resin, diluent, flexibilizing agent 50 DEG C~80 DEG C are heated to, is then mixed and stirred for uniformly, finally adding fiber in proportion, be stirred for uniformly.
The present invention also provides a kind of preparation methods such as above-mentioned warm mixed epoxy bitumen, comprising the following steps: by component A Be heated to 110 DEG C~130 DEG C, B component be heated to 50 DEG C~80 DEG C, then B component is added in component A while stirring, is stirred Mixing the time is at least 30min, obtains the mixture of component A and B component;C group is added in the mixture of component A and B component again Point, 3~10min is stirred, to obtain the warm mixed epoxy bitumen.
Warm mixed epoxy bitumen of the present invention compared with prior art, has the advantages that
1, warm mixed epoxy bitumen of the present invention not only improves the flexibility of previous bituminous epoxy, improves and bridge face The followability of plate, but also preparation and the construction temperature of bituminous epoxy can be reduced, reduce the occurrence quantity of pernicious gas, favorably In environmental protection and construction.
2, the warm-mixing agent used in the present invention is homemade warm-mixing agent, and intermediate is prepared under higher temperature, pressure and is increased Add the first catalyst, not only shorten the reaction time, but also can steadily control reaction process, is easy to hold the property of intermediate Can, the warm-mixing agent performance made is stablized.
3, during preparing warm-mixing agent, complex compound is added in aromatic naphtha in advance, under the second catalyst action, is promoted The compatibility of complex compound and aromatic naphtha simultaneously carries out local reaction, generates aromatic hydrocarbons complexing components;After being added to intermediate, complex compound Play catalytic action, the second catalyst is played to complex compound reinforcing effect, so that aromatic hydrocarbons complexing components and intermediate be promoted to carry out Reaction, by control complex compound, the second catalyst amount and reaction time and temperature, so that the extent of reaction is controllable;Finally carry out Curing, obtained warm-mixing agent not only has warm mix effect to pitch, has taken into account the high temperature performance of pitch, but also also improves drip Green thermal stability, improves anti-aging property.
4, the warm-mixing agent preparation process used in the present invention carries out in closed container, non-environmental-pollution problem.
Specific embodiment
Below with reference to the embodiment technical solution that the present invention will be described in detail, but the present invention is not limited to following embodiments.Wherein, The wt% being related to is mass fraction.
Embodiment 1
(1) warm-mixing agent is prepared
1. the mixed alkanes that synthetic reaction obtains are carried out after weighing 100kg coal gasification again, the carbon numbers of mixed alkanes is 30~ 60, mixed alkanes are heated to 480 DEG C, add the anhydrous CuCl of 0.3kg catalyst2, it is placed in closed container, at a temperature of keeping this 89 moles of chlorine is introduced, and being passed through nitrogen makes the pressure of reaction vessel be maintained at 3MPa, reaction 30min obtains intermediate -1;
2. weighing the line that subtracts four that arene content is 70 wt% extracts oil 700kg out, thereto complex compound [the Cu of addition 44.1kg (NH3)4]SO4With the catalyst Cu of 4.41kg, in another closed container and it is heated to 350 DEG C, constant temperature is anti-at this temperature 180min is answered, aromatic hydrocarbons complexing components -1 are obtained;
3. aromatic hydrocarbons complexing components -1 are added in above-mentioned intermediate -1, make 400 DEG C of temperature, keep pressure full of nitrogen A kind of dope -1 is obtained in 2MPa, isothermal reaction 60min;
4. curing 60 min by dope -1 at 120 DEG C of temperature, obtaining warm-mixing agent -1 used in the present invention.Each component is matched Than being shown in Table 1.
(2) component A warm-mixed asphalt is prepared
The warm-mixing agent -1 for weighing 7kg is added to No. 50 solvent deoilings of husky Crude Oil that weight is 93 kg, temperature is 160 DEG C In pitch, 60 min are stirred, obtain component A warm-mixed asphalt (number A-1) used in the present invention, the property of warm-mixed asphalt is shown in Table 2.
(3) B component composition epoxy resin is prepared
Weigh atmosphere base propane glycidyl ether epoxy resin 100kg, 15 kg of diluent diglycidyl ether, flexibilizing agent 10 kg of polysulfide rubber, is heated to 50 DEG C, stirs evenly after mixing;Then 40 kg of asbestos fibre is weighed, above-mentioned mixing is added to It in object, stirs evenly, obtains B component composition epoxy resin (number B-1) used in the present invention.
(4) warm mixed epoxy bitumen is prepared
Weigh curing agent ethylene diamine 0.48kg spare (number C-1).
The A-1 for weighing 30 kg is heated to 130 DEG C;The B-1 for weighing 10 kg is heated to 50 DEG C;While stirring by B-1 It is added in A-1, after all additions, stirring 30min;Then it is further continued for adding above-mentioned load weighted C-1, stir 3min obtains warm mixed epoxy bitumen of the present invention.The service condition of warm mixed epoxy bitumen is shown in Table 3.
Embodiment 2
(1) warm-mixing agent is prepared
1. the mixed alkanes that synthetic reaction obtains are carried out after weighing 350kg coal gasification again, the carbon numbers of mixed alkanes is 30~ Mixed alkanes are heated to 400 DEG C, add the anhydrous MnCl of 3.15kg catalyst by 130 mixed alkanes2, it is placed in closed container, It keeps introducing 116 moles of chlorine at a temperature of this, and being passed through nitrogen makes the pressure of reaction vessel be maintained at 5MPa, reacts 60min Obtain intermediate -2;
2. weighing the catalytic cracked oil pulp 100kg that arene content is 63 wt%, the complex compound K of 1.9kg is added thereto4 [Fe(CN)6] and 0.19kg catalyst Fe, in another closed container and be heated to 270 DEG C, constant temperature is anti-at this temperature 120min is answered, aromatic hydrocarbons complexing components -2 are obtained;
3. aromatic hydrocarbons complexing components -2 are added in above-mentioned intermediate -2, make 350 DEG C of temperature, keep pressure full of nitrogen A kind of dope -2 is obtained in 4MPa, isothermal reaction 120min;
4. curing 100 min by dope -2 at 160 DEG C of temperature, obtaining warm-mixing agent -2 used in the present invention.Each component is matched Than being shown in Table 1.
(2) component A warm-mixed asphalt is prepared
Warm-mixing agent -2 0.5kg are weighed, No. 90 oxidation drips of LIAOHE CRUDE that weight is 99.5 kg, temperature is 140 DEG C are added to In blueness, 40min is stirred, obtains component A warm-mixed asphalt (number A-2) used in the present invention, the property of warm-mixed asphalt is shown in Table 2.
(3) B component composition epoxy resin is prepared
Weigh glycidyl ester type epoxy resin 100kg, 60 kg of diluent epoxy propane butyl ether, flexibilizing agent phenolic aldehyde tree 30 kg of rouge, is heated to 80 DEG C, stirs evenly after mixing, obtains B component composition epoxy resin (number B- used in the present invention 2).
(4) warm mixed epoxy bitumen is prepared
It is spare (number C-2) to weigh curing agent benzene dimethylamine 1.05kg.
The A-2 for weighing 70 kg is heated to 115 DEG C;The B-2 for weighing 10 kg is heated to 80 DEG C;B-2 is added while stirring It is added in A-2, after all additions, stirring 60min;Then above-mentioned load weighted C-2 is added, 9min is stirred, obtains this Invention warm mixed epoxy bitumen.The service condition of warm mixed epoxy bitumen is shown in Table 3.
Embodiment 3
(1) warm-mixing agent is prepared
The mixed alkanes that synthetic reaction obtains are carried out by raw material of natural gas 1. weighing 100kg, the carbon number of mixed alkanes is 70~90, mixed alkanes are heated to 440 DEG C, add the anhydrous NiCl of 0.6kg catalyst2It is placed in closed container, keeps this temperature Degree is lower to introduce 31 moles of fluorine, and being passed through nitrogen makes the pressure of reaction vessel be maintained at 4MPa, and reaction 45min obtains intermediate- 3;
2. weighing the phenol treating that arene content is 78wt% extracts oil 350kg out, the complex compound [Ni of 16.4kg is added thereto (CO)4] and 1.64kg catalyst n i, in another closed container and be heated to 310 DEG C, isothermal reaction at this temperature 160min obtains aromatic hydrocarbons complexing components -3;
3. aromatic hydrocarbons complexing components -3 are added in above-mentioned intermediate -3, make 375 DEG C of temperature, keep pressure full of nitrogen A kind of dope -3 is obtained in 3MPa, isothermal reaction 90min;
4. curing 80 min by dope -3 at 140 DEG C of temperature, obtaining warm-mixing agent -3 used in the present invention.Each component is matched Than being shown in Table 1.
(2) component A warm-mixed asphalt is prepared
Warm-mixing agent -3 4kg are weighed, No. 70 blend asphalts of Tahe Crude Oil that weight is 96 kg, temperature is 150 DEG C are added to In, 50min is stirred, obtains component A warm-mixed asphalt (number A-3) used in the present invention, the property of warm-mixed asphalt is shown in Table 2.
(3) B component composition epoxy resin is prepared
Glycidyl amine type epoxy resin 100kg, 38 kg of diluent dimethylbenzene, 20 kg of flexibilizing agent furfural resin are weighed, 65 DEG C are heated to, is stirred evenly after mixing;Then 20 kg of glass fibre is weighed, Xu is added in said mixture slowly, and stirring is equal It is even, obtain B component composition epoxy resin (number B-3) used in the present invention.
(4) warm mixed epoxy bitumen is prepared
It is spare (number C-3) to weigh curing agent polyamide 0.78kg.
The A-3 for weighing 50 kg is heated to 120 DEG C;The B-3 for weighing 10 kg is heated to 65 DEG C;While stirring by B-3 It is added in A-3, after all additions, stirring 45min;Then above-mentioned load weighted C-3 is added, 6min is stirred, obtains Warm mixed epoxy bitumen of the present invention.The service condition of warm mixed epoxy bitumen is shown in Table 3.
Embodiment 4
(1) warm-mixing agent is prepared
The mixed alkanes that synthetic reaction obtains are carried out by raw material of natural gas 1. weighing 700kg, the carbon number of mixed alkanes is 110~130, mixed alkanes are heated to 400 DEG C, add the anhydrous CrCl of 2.1kg catalyst3, it is placed in closed container, keeps this At a temperature of introduce 115 moles of bromine, and being passed through nitrogen makes the pressure of reaction vessel be maintained at 4MPa, and reaction 45min obtains centre Body -4;
2. weighing the furfural extract oil 100kg that arene content is 57wt%, the complex compound of 1.7kg is added thereto (NH4)3[Cr(NCS)6] and 0.17kg catalyst Cr, in another closed container and be heated to 310 DEG C, at this temperature Isothermal reaction 160min obtains aromatic hydrocarbons complexing components -4;
3. aromatic hydrocarbons complexing components -4 are added in above-mentioned intermediate -4, make 375 DEG C of temperature, keep pressure full of nitrogen A kind of dope -4 is obtained in 3MPa, isothermal reaction 90min;
4. curing 80 min by dope -4 at 140 DEG C of temperature, obtaining warm-mixing agent -4 used in the present invention.Each component is matched Than being shown in Table 1.
(2) component A warm-mixed asphalt is prepared
Warm-mixing agent -4 1kg are weighed, No. 110 straight asphaltes of Oman's crude oil that weight is 99kg, temperature is 120 DEG C are added to In, 30 min are stirred, obtain component A warm-mixed asphalt (number A-4) used in the present invention, the property of warm-mixed asphalt is shown in Table 2.
(3) B component composition epoxy resin is prepared
Weigh aliphatic glycidyl ether epoxy resin 60kg and Bi-phenolic Methan e tetraglycidel ether epoxy resin 40kg, dilute Release agent diepoxy propane ethylether 25 kg and 20 kg of toluene, 10 kg of flexibilizing agent polyamide and the tertiary butyraldehyde 5 of polyvinyl alcohol Kg is heated to 60 DEG C, stirs evenly after mixing;Then 1 kg of glass fibre is weighed, is added in said mixture, stirring is equal It is even, obtain B component composition epoxy resin (number B-4) used in the present invention.
(4) warm mixed epoxy bitumen is prepared
M-phenylene diamine (MPD) 0.5kg and diethylenetriamine 0.4kg are weighed, is uniformly mixed spare (number C-4) as curing agent.
The A-4 for weighing 60 kg is heated to 110 DEG C;The B-4 for weighing 10 kg is heated to 55 DEG C;While stirring by B-4 It is added in A-4, after all additions, stirring 40min;Then above-mentioned load weighted C-4 is added, 4min is stirred, obtains Warm mixed epoxy bitumen of the present invention.The service condition of warm mixed epoxy bitumen is shown in Table 3.
Comparative example 1
(1) prepare warm-mixing agent (according to the method in CN 104591605A)
It is 110~130 by carbon number, the macromolecule for carrying out synthetic reaction by raw material of natural gas and obtaining that weight is 700kg Alkane heating melting is placed in closed container, is heated to 400 DEG C, keeps the bromine simple substance of 115 moles of introducing at a temperature of this, stirring 180min obtains intermediate;The furfural extract oil 100kg that arene content is 57wt% is weighed, in another closed container 150 DEG C are heated to, adds the anhydrous FeCl of 0.17kg thereto3, stir 30min.Then by above-mentioned centre under stirring Body is injected in furfural extract oil with mist, after all spraying into, 150 DEG C of constant temperature, is stirred to react 180min, is compared Warm-mixing agent.Each group distribution ratio is shown in Table 1.
(2) component A warm-mixed asphalt (number W-1) is prepared according to the identical method of the embodiment of the present invention 4;
(3) B component composition epoxy resin is prepared according to the identical method of the embodiment of the present invention 4;
(4) warm mixed epoxy bitumen is prepared according to the identical method of the embodiment of the present invention 4.
Comparative example 2
It weighs 1000g and carries out the mixed alkanes that synthetic reaction obtains by raw material of natural gas, the carbon number of mixed alkanes is 110 ~130, it is added in No. 110 straight asphaltes of Oman's crude oil that weight is 100kg, temperature is 120 DEG C, stirs 30 min, obtain A kind of its property of warm-mixed asphalt (number W-2) is shown in Table 2;Then B component epoxy is prepared according to the identical method of the embodiment of the present invention 4 Resin combination and component C curing agent;Warm mixed epoxy bitumen, service condition are prepared according to the identical method of the embodiment of the present invention 4 It is shown in Table 4.
Comparative example 3
The furfural extract oil 1000g for being 57wt% by arene content, is added to that weight is 100 kg, temperature is 120 DEG C No. 110 straight asphaltes of Oman's crude oil in, stir 30min, obtain a kind of warm-mixed asphalt (number W-3), property is shown in Table 2;So B component composition epoxy resin and component C curing agent are prepared according to the identical method of the embodiment of the present invention 4 afterwards;According to the present invention The identical method of embodiment 4 prepares warm mixed epoxy bitumen, and service condition is shown in Table 4.
Comparative example 4
Weigh the furfural essence that 875g carries out FT and the arene content that synthetic reaction obtains by raw material of natural gas as 57wt% System extraction oil 125g, while being directly appended in No. 110 straight asphaltes of Oman's crude oil that weight is 100kg, temperature is 120 DEG C, Stirring 30 minutes, obtains a kind of warm-mixed asphalt (number W-4), property is shown in Table 2;Then identical according to the embodiment of the present invention 4 Method prepares B component composition epoxy resin and component C curing agent;Warm mix is prepared according to the identical method of the embodiment of the present invention 4 Bituminous epoxy, service condition are shown in Table 4.
Comparative example 5
0.9 kg of 10 kg of composition epoxy resin (B-4) and curing agent (C-4) in the embodiment of the present invention 4 is weighed, directly In No. 110 matrix pitches of Oman's crude oil that the temperature for being added to 60 kg is 130 DEG C, 4min is stirred, a kind of bituminous epoxy is obtained (number W-5), property are shown in Table 2, and service condition is shown in Table 4.
Table 1 prepares warm-mixing agent component proportion
Embodiment 1 Embodiment 2 Embodiment 3 Embodiment 4 Comparative example 1
Weight/kg of mixed alkanes 100 350 100 700 700
Halogen simple substance molal quantity 89 116 31 115 115
- 1 weight of catalyst/kg 0.3 3.15 0.6 2.1 -
Weight/kg of aromatic naphtha 700 100 350 100 100
Arene content/wt% in aromatic naphtha 70 63 78 57 57
Complex compound weight/kg 44.1 1.9 16.4 1.7 -
- 2 weight of catalyst/kg 4.41 0.19 1.64 0.17 -
Catalyst weight/kg - - - - 0.17
The property of the component A warm-mixed asphalt of the present invention of table 2 and matrix pitch and comparative example pitch compares
50 in sand# A-1 The Liaohe River 90# A-2 Tahe 70# A-3
Pitch amount/kg - 93 - 99.5 - 96
Warm mix dosage/g - 7000 - 500 - 4000
FT amount/g - - - - - -
Aromatic hydrocarbons oil mass/g - - - - - -
Needle penetration/0.1mm 56 58 95 95 73 73
Softening point/DEG C 50.4 59.6 44.0 56.5 51 59
10 DEG C of ductility/cm 26 112 87 > 150 67 > 150
60 DEG C of viscosity/Pa.s 335 359 115 173 357 379
120 DEG C of viscosity/mPa.s 1148 667 813 469 1022 589
135 DEG C of viscosity/mPa.s 570 316 385 224 484 290
150 DEG C of viscosity/mPa.s 304 170 191 111 240 150
165 DEG C of viscosity/mPa.s 150 86 90 59 113 74
180 DEG C of viscosity/mPa.s 79 44 43 29 54 39
Film experiment
Mass change/wt% 0.5 0.01 0.8 0.02 0.6 0.01
Penetration ratio/% 63 73 57 66 61 69
Remain 10 DEG C of ductility/cm 4 21 8 44 6 37
Table 2 continues component A warm-mixed asphalt of the present invention and matrix pitch and the property of comparative example pitch compares
Oman 110# A-4 W-1 W-2 W-3 W-4
Pitch amount/kg - 99 99 99 99 99
Warm mix dosage/kg - 1 1 - - -
FT amount/kg - - - 1 - 0.875
Aromatic hydrocarbons oil mass/kg - - - - 1 0.125
Needle penetration/0.1mm 108 107 106 92 117 111
Softening point/DEG C 43.6 51.0 45.2 43.1 40.0 42.0
10 DEG C of ductility/cm > 150 > 150 > 150 63 110 70
60 DEG C of viscosity/Pa.s 123 168 151 133 101 113
120 DEG C of viscosity/mPa.s 498 261 296 421 377 333
135 DEG C of viscosity/mPa.s 255 133 147 247 198 182
150 DEG C of viscosity/mPa.s 143 62 78 158 135 118
165 DEG C of viscosity/mPa.s 78 31 38 73 71 67
180 DEG C of viscosity/mPa.s 48 17 20 42 41 38
Film experiment
Mass change/wt% 0.9 0.03 1.6 1.2 1.9 1.7
Penetration ratio/% 55 62 47 43 41 45
Remain 10 DEG C of ductility/cm 10 60 7 3 10 5
As can be seen from Table 2, the high temperature viscosity of warm-mixed asphalt of the present invention is all significantly lower than corresponding matrix pitch, thus favorably In the construction temperature for reducing pitch.For warm-mixed asphalt of the present invention compared with corresponding matrix pitch, needle penetration is essentially identical, soft Change point and 60 DEG C of viscosity are improved significantly, 10 DEG C of ductilities significantly increase, and illustrate that warm-mixed asphalt of the present invention not only can reach warm mix Effect, and corresponding matrix pitch is better than in terms of high-temperature stability and low temperature ductility.
By comparing example as it can be seen that directly simply FT and/or extraction oil are added in matrix pitch, pitch warm mix is imitated The improvement of fruit, it is good not as good as warm mix effect of the present invention, but also the loss of ductility or the decline of 60 DEG C of viscosity can be caused, or even can lead Cause asphaltic nature that cannot reach the technical requirements of " standard specification for construction and acceptance of highway asphalt pavement " JTG F40-2004.
It is compared by film experimental result as it can be seen that anti-aging using the obtained warm mix Sulphur asphalt of warm-mixing agent of the invention Performance is significantly better than the pitch of any comparative example, i.e., warm-mixing agent of the present invention improves pitch while realizing warm mix effect Thermal stability improves the ageing resistance of pitch, and warm-mixing agent used in comparative example -1 has the anti-aging property of pitch Negative effect.
The service condition of the warm mixed epoxy bitumen of the present invention of table 3
Property Embodiment 1 Embodiment 2 Embodiment 3 Embodiment 4
Construction temperature/DEG C 80~110 70~95 85~105 70~90
At 20 DEG C, with steel plate adhesion strength/MPa 3.57 3.42 3.65 3.37
At 50 DEG C, with steel plate adhesion strength/MPa 1.26 1.27 1.29 1.25
Embrittlement temperature/DEG C -19 -22 -20 -23
The service condition of 4 comparative example bituminous epoxy of table
Property Comparative example 1 Comparative example 2 Comparative example 3 Comparative example 4 Comparative example 5
Construction temperature/DEG C 100~115 120~140 110~130 110~125 110~130
At 20 DEG C, with steel plate adhesion strength/MPa 2.77 0.97 1.01 2.15 2.14
At 50 DEG C, with steel plate adhesion strength/MPa 1.02 0.09 0.12 0.81 0.83
Embrittlement temperature/DEG C -14 -9 -11 -10 -12
By the comparison of table 3 and 4 as it can be seen that the construction temperature of warm mixed epoxy bitumen of the present invention is substantially reduced, pernicious gas can be reduced Occurrence quantity is conducive to construct;It is significantly greater than comparative example with the caking property of floorings, embrittlement temperature is significantly lower than comparative example, explanation When warm mixed epoxy bitumen of the present invention is as bridge floor interlaminar bonding material, either cohesive force or flexible aspect better than compares Example.Also illustrate the present invention due to having used special warm-mixing agent, the pitch anti-aging property made improves, and service performance is also corresponding It is improved.

Claims (17)

1. a kind of warm mixed epoxy bitumen, it is characterised in that: the warm mixed epoxy bitumen includes tri- kinds of components of A, B, C, A group therein It is divided into warm-mixed asphalt, warm-mixed asphalt includes warm-mixing agent and matrix pitch;The warm-mixing agent prepare raw material include FT, halogen simple substance, Aromatic naphtha, complex compound, the first catalyst, the second catalyst, wherein the FT is a kind of macromolecule mixed alkanes, carbon number 30 ~150, the complex compound includes: [Cu (NH3)4]SO4、[Pt(NH3)2]Cl2、K[Pt(C2H4)Cl3]、K4[Fe(CN)6]、K3[Fe (CN)6]、Fe4[Fe(CN)6]3、Ni(CO)4、[Co(NH3)5Cl]SO4、(NH4)3[Cr(NCS)6At least one of], described One catalyst is selected from anhydrous CuCl2, anhydrous MnCl2, anhydrous CrCl3, anhydrous NiCl2At least one of, second catalyst Selected from least one of Ni metal, Fe, Zn, Cr, Ni;
The dosage of the complex compound is by weight 3%~9% of arene content in aromatic naphtha;The dosage of the halogen simple substance is The weight ratio of 0.12~0.75 times of FT molal quantity, FT and aromatic naphtha is (1~7): (7~1);The use of first catalyst Amount is by weight the 0.3%~0.9% of FT;The dosage of second catalyst is by weight arene content in aromatic naphtha 0.3%~0.9%;
B component is composition epoxy resin;
Component C is curing agent;
The ratio between the dosage of the component A and B component, A:B by weight=(3~7): 1;The dosage of component C by weight, It is 0.40%~1.20% of the content of epoxy resin in B component.
2. warm mixed epoxy bitumen according to claim 1, it is characterised in that: the carbon number is 30~130.
3. warm mixed epoxy bitumen according to claim 1, it is characterised in that: the dosage of the halogen simple substance is FT molal quantity 0.3~0.5 times.
4. warm mixed epoxy bitumen according to claim 1, it is characterised in that: addition of the warm-mixing agent in warm-mixed asphalt Amount is 0.4wt%~10wt% of warm-mixed asphalt weight.
5. warm mixed epoxy bitumen according to claim 1, it is characterised in that: addition of the warm-mixing agent in warm-mixed asphalt Amount is 0.5wt%~7.0wt% of warm-mixed asphalt weight.
6. warm mixed epoxy bitumen according to claim 1, it is characterised in that: the FT be carry out after coal gasification synthesizing again it is anti- A kind of macromolecule alkane that should be obtained, or a kind of macromolecule alkane that synthetic reaction obtains is carried out by raw material of natural gas;Institute Stating halogen simple substance is one of fluorine, chlorine, bromine simple substance;The aromatic naphtha is a kind of component rich in aromatic hydrocarbons.
7. warm mixed epoxy bitumen according to claim 1, it is characterised in that: the arene content in the aromatic naphtha is 57 The wt% of wt%~78.
8. warm mixed epoxy bitumen according to claim 1, it is characterised in that: the arene content in the aromatic naphtha is 60 The wt% of wt%~75.
9. warm mixed epoxy bitumen according to any one of claims 1 to 8, it is characterised in that: the preparation of the warm-mixing agent Journey includes: to obtain intermediate after reaction for halogen after FT heating melting, is introduced in the presence of the first catalyst;Into aromatic naphtha Complex compound and the second catalyst are added, and constant temperature stirs, and aromatic hydrocarbons complexing components are obtained after reaction;Then by above-mentioned intermediate and virtue Hydrocarbon complexing components hybrid reaction, curing, obtain the warm-mixing agent.
10. warm mixed epoxy bitumen according to any one of claims 1 to 8, it is characterised in that: the preparation of the warm-mixing agent Process includes:
(1) mixing macromolecule alkane heating melting is placed in closed container, maintains the temperature at 400 DEG C ~ 480 DEG C, makes to react The space of container is full of nitrogen, and pressure is made to be maintained at 3 ~ 5MPa, and halogen simple substance is passed through in the macromolecule alkane of melting, and In the presence of first catalyst, 30~60min of reaction obtains intermediate;
(2) complex compound and the second catalyst are added into aromatic naphtha, at a temperature of 270 DEG C ~ 350 DEG C constant temperature be stirred to react 120 ~ 180min obtains aromatic hydrocarbons complexing components;
(3) the aromatic hydrocarbons complexing components are added in above-mentioned intermediate, make 350 DEG C ~ 400 DEG C of temperature, makes pressure full of nitrogen It is maintained at 2 ~ 4MPa, 60 ~ 120min of isothermal reaction obtains a kind of dope;
(4) after reaction, by this dope at 120 DEG C ~ 160 DEG C of temperature, 60 ~ 100 min are cured, obtain the warm mix Agent.
11. warm mixed epoxy bitumen according to any one of claims 1 to 8, it is characterised in that: B component is epoxy resin group Object is closed, in parts by weight includes: 100 parts of epoxy resin, 15~60 parts of diluent, 10~30 parts of flexibilizing agent, 0~40 part of fiber.
12. warm mixed epoxy bitumen according to claim 11, it is characterised in that: described in B component composition epoxy resin Epoxy resin include: atmosphere base propane glycidyl ether epoxy resin, Bi-phenolic Methan e tetraglycidel ether epoxy resin, polyphenol Base propane tetraglycidel ether epoxy resin, aliphatic glycidyl ether epoxy resin, glycidyl ester type epoxy resin, shrink are sweet The mixture of one or more of oleyl amine type epoxy resin;
Diluent described in B component composition epoxy resin includes: diglycidyl ether, polyglycidyl ether, propylene oxide Butyl ether, propylene oxide phenyl ether, diepoxy propane ethylether, three propylene oxide propyl ethers, ethyl alcohol, acetone, benzene, toluene, two One or more of toluene mixture;
Flexibilizing agent described in B component composition epoxy resin includes: polysulfide rubber, polyamide, phenolic resin, polyethylene One or more of the tertiary butyraldehyde of alcohol, furfural resin mixture;
Fiber described in B component composition epoxy resin includes: asbestos fibre and/or glass fibre.
13. warm mixed epoxy bitumen according to any one of claims 1 to 8, it is characterised in that: component C is curing agent, packet It includes: one or more of ethylenediamine, m-phenylene diamine (MPD), benzene dimethylamine, polyamide, diethylenetriamine mixture.
14. warm mixed epoxy bitumen according to any one of claims 1 to 8, it is characterised in that: the dosage of the component C It by weight, is 0.48%~1.05% of the content of epoxy resin in B component.
15. warm mixed epoxy bitumen according to any one of claims 1 to 8, it is characterised in that: component A preparation method includes Following steps: being heated to 130 DEG C~160 DEG C for matrix pitch, after melting completely, add warm-mixing agent while stirring, stirring 30min~60min obtains component A warm-mixed asphalt.
16. warm mixed epoxy bitumen according to any one of claims 1 to 8, it is characterised in that: B component epoxy composite The preparation method of object the following steps are included: epoxy resin, diluent, flexibilizing agent are first heated to 50 DEG C~80 DEG C, then by than Example is mixed and stirred for uniformly, finally adding fiber, is stirred for uniformly.
17. a kind of preparation method of warm mixed epoxy bitumen described in claim 1-16 any one, it is characterised in that including with Lower step: by component A be heated to 110 DEG C~130 DEG C, B component be heated to 50 DEG C~80 DEG C, then B component is added while stirring It is added in component A, mixing time is at least 30min, obtains the mixture of component A and B component;Again in the mixed of component A and B component It closes and adds component C in object, stir 3~10min, to obtain the warm mixed epoxy bitumen.
CN201510729514.5A 2015-11-02 2015-11-02 A kind of warm mixed epoxy bitumen and preparation method thereof Active CN106633939B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510729514.5A CN106633939B (en) 2015-11-02 2015-11-02 A kind of warm mixed epoxy bitumen and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510729514.5A CN106633939B (en) 2015-11-02 2015-11-02 A kind of warm mixed epoxy bitumen and preparation method thereof

Publications (2)

Publication Number Publication Date
CN106633939A CN106633939A (en) 2017-05-10
CN106633939B true CN106633939B (en) 2019-05-17

Family

ID=58809618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510729514.5A Active CN106633939B (en) 2015-11-02 2015-11-02 A kind of warm mixed epoxy bitumen and preparation method thereof

Country Status (1)

Country Link
CN (1) CN106633939B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106633935B (en) * 2015-11-02 2019-05-21 中国石油化工股份有限公司 Warm mixed epoxy bitumen and preparation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102532920A (en) * 2010-12-17 2012-07-04 中国石油天然气股份有限公司 Warm mixed asphalt cement and preparation method thereof
KR101178221B1 (en) * 2012-04-24 2012-08-29 주식회사 대운 Modifier for warm asphalt, manufacturing method of this and the asphalt mixture with this, manufacturing method of the same
CN103113752A (en) * 2013-03-05 2013-05-22 南京大学 High-performance epoxy resin asphalt warm mixing agent and preparation method thereof
CN104591605A (en) * 2015-01-16 2015-05-06 辽宁兆利高新路面材料有限公司 Warm-mix asphalt mixture and preparation method thereof
CN104609790A (en) * 2015-01-16 2015-05-13 辽宁兆利高新路面材料有限公司 Warm mixing type anti-rutting asphalt mixture and preparation method thereof
CN106633935A (en) * 2015-11-02 2017-05-10 中国石油化工股份有限公司 Warm mix epoxy asphalt and preparation method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102532920A (en) * 2010-12-17 2012-07-04 中国石油天然气股份有限公司 Warm mixed asphalt cement and preparation method thereof
KR101178221B1 (en) * 2012-04-24 2012-08-29 주식회사 대운 Modifier for warm asphalt, manufacturing method of this and the asphalt mixture with this, manufacturing method of the same
CN103113752A (en) * 2013-03-05 2013-05-22 南京大学 High-performance epoxy resin asphalt warm mixing agent and preparation method thereof
CN104591605A (en) * 2015-01-16 2015-05-06 辽宁兆利高新路面材料有限公司 Warm-mix asphalt mixture and preparation method thereof
CN104609790A (en) * 2015-01-16 2015-05-13 辽宁兆利高新路面材料有限公司 Warm mixing type anti-rutting asphalt mixture and preparation method thereof
CN106633935A (en) * 2015-11-02 2017-05-10 中国石油化工股份有限公司 Warm mix epoxy asphalt and preparation method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
有机降粘温拌沥青的研究进展;尚丽娜 等;《石油沥青》;20091225;第23卷(第6期);第6-10页

Also Published As

Publication number Publication date
CN106633939A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN104591605B (en) A kind of Warm-Mix Bitumen Mixture and preparation method thereof
CN103773009B (en) A kind of preparation method of high-viscosity modified asphalt
CN106633935B (en) Warm mixed epoxy bitumen and preparation method thereof
CN103773008A (en) High-viscosity modified asphalt and preparation method thereof
CN106630759B (en) Warm mixed epoxy bitumen mixture and preparation method thereof
CN106633947B (en) A kind of warm mix polymer modified asphalt and preparation method thereof
CN106630760B (en) A kind of warm mixed epoxy bitumen mixture and preparation method thereof
CN108395707B (en) A kind of patching material of Colorful Asphalt Pavement and preparation method thereof
CN106630763B (en) Warm mix polymer modified asphalt mixture and preparation method thereof
CN106633939B (en) A kind of warm mixed epoxy bitumen and preparation method thereof
CN108395708B (en) Caulking material for color asphalt pavement and preparation method thereof
CN106630765B (en) Warm-mix hard asphalt mixture and preparation method thereof
CN113860798A (en) Asphalt pavement pit repairing material and preparation method thereof
CN114426411B (en) Pavement repair material and preparation method and application thereof
CN105585860A (en) Warm mix asphalt and preparation method thereof
CN106630762B (en) A kind of warm mix polymer modified asphalt mixture and preparation method thereof
CN105585859A (en) Warm mix agent as well as preparation method and application thereof
CN106633944B (en) Asphalt warm-mix agent, preparation method and application
CN106630766A (en) Warm-mix sulfur asphalt mixture and preparation method thereof
CN115925323B (en) Long-holding and health-maintenance-free epoxy asphalt recycling mixture and preparation method thereof
CN106633943B (en) A kind of Warm-mix hard asphalt and preparation method thereof
CN106633948B (en) Warm mix polymer modified asphalt and preparation method thereof
CN106633945B (en) Warm mix Sulphur asphalt and preparation method thereof
CN106633949B (en) Warm-mix hard asphalt and preparation method thereof
CN106630764B (en) A kind of Warm-mix hard asphalt mixture and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant