CN106630759B - Warm mixed epoxy bitumen mixture and preparation method thereof - Google Patents

Warm mixed epoxy bitumen mixture and preparation method thereof Download PDF

Info

Publication number
CN106630759B
CN106630759B CN201510728410.2A CN201510728410A CN106630759B CN 106630759 B CN106630759 B CN 106630759B CN 201510728410 A CN201510728410 A CN 201510728410A CN 106630759 B CN106630759 B CN 106630759B
Authority
CN
China
Prior art keywords
warm
component
mixed
epoxy
epoxy resin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510728410.2A
Other languages
Chinese (zh)
Other versions
CN106630759A (en
Inventor
范思远
陈保莲
张静
傅丽
李志军
宁爱民
程国香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Fushun Research Institute of Petroleum and Petrochemicals
Original Assignee
China Petroleum and Chemical Corp
Sinopec Fushun Research Institute of Petroleum and Petrochemicals
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Fushun Research Institute of Petroleum and Petrochemicals filed Critical China Petroleum and Chemical Corp
Priority to CN201510728410.2A priority Critical patent/CN106630759B/en
Publication of CN106630759A publication Critical patent/CN106630759A/en
Application granted granted Critical
Publication of CN106630759B publication Critical patent/CN106630759B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B26/00Compositions of mortars, concrete or artificial stone, containing only organic binders, e.g. polymer or resin concrete
    • C04B26/02Macromolecular compounds
    • C04B26/26Bituminous materials, e.g. tar, pitch
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B24/00Use of organic materials as active ingredients for mortars, concrete or artificial stone, e.g. plasticisers
    • C04B24/40Compounds containing silicon, titanium or zirconium or other organo-metallic compounds; Organo-clays; Organo-inorganic complexes
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B40/00Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
    • C04B40/0028Aspects relating to the mixing step of the mortar preparation
    • C04B40/0039Premixtures of ingredients
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/0075Uses not provided for elsewhere in C04B2111/00 for road construction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Inorganic Chemistry (AREA)
  • Compositions Of Macromolecular Compounds (AREA)
  • Epoxy Resins (AREA)

Abstract

The invention discloses a kind of warm mixed epoxy bitumen mixtures and preparation method thereof.The warm mixed epoxy bitumen mixture, in terms of mixture weight percent, including following components:The warm mixed epoxy bitumen 4.0%~6.0%, miberal powder 1.0%~3.0% gather materials 91.0%~95.0%, wherein including tri- kinds of components of A, B, C, component A therein is warm-mixed asphalt, and warm-mixed asphalt includes warm-mixing agent and matrix pitch;B component is composition epoxy resin;Component C is curing agent.The warm-mixing agent preparation method is:Under the action of catalyst, first intermediate is obtained by the reaction with halogen simple substance in macromolecule alkane;Aromatic naphtha is uniformly mixed with complex compound to obtain aromatic hydrocarbons complexing components;After being then added to intermediate, under the catalytic action of complex compound, aromatic hydrocarbons complexing components obtain the warm-mixing agent used in the present invention with intermediate reaction.Epoxy asphalt mixture of the present invention not only there is good Marshall stability, Rut resistance and water resistant to encroach on ability.

Description

Warm mixed epoxy bitumen mixture and preparation method thereof
Technical field
The present invention relates to a kind of asphalts, and in particular to a kind of warm mixed epoxy bitumen mixture and preparation method thereof.
Background technology
With being continuously increased for highway mileage, highway bridge quantity also increases therewith.It is asked however, also exposing some Topic, wherein being accounted for disease caused by the water-proof tack coat failure between bridge deck pavement and between pave-load layer and panel larger Ratio causes attention of the people to bridge deck pavement material and technique.As bridge floor interlaminar bonding material, by adding in pitch Add bituminous epoxy obtained from epoxy resin that there is preferable effect.However, the viscosity due to bituminous epoxy is larger, in construction It is required that construction temperature is higher, also there is certain operable time, so increasing difficulty of construction;In addition, adding in pitch After adding epoxy resin, pitch can be made to become fragile, flexibility is deteriorated, bad with the followability of bridge panel.In order to solve these problems, Warm mix technology need to be taken to reduce the construction temperature of bituminous epoxy, and improve flexibility.
There are mainly three types of modes for warm-mixed asphalt technology:First, the higher emulsified asphalt of evaporated residue content is used, 80 DEG C~120 DEG C at a temperature of with building stones mix, which is about 30 DEG C~50 DEG C low compared with the temperature of hot asphalt;Second is that being mixed in mixing Water when material(Or the aqueous solution of surfactant)It is added simultaneously in mix tank with pitch, due to the presence of water, makes asphalt foaming, Reach viscosity reducing effect.But above two method will produce a large amount of vapor, easily causes equipment corrosion, stone also frequently occurs Powder conglomeration even causes mixing equipment blockage problem, makes troubles to production.Further, since remaining non-volatile moisture is retained in In mixture, mixture initial performance can be influenced.The third method is that warm-mixing agent is added in pitch in advance, then take with The same mode of production of common hot-mix asphalt mixture, it is easy to operation, it is easy to be received by production unit.This kind of method passes through Warm-mixing agent is added in pitch in advance, reduces the high temperature viscosity of pitch, changes the viscosity-temperature curve of pitch, to reduce drip The green mix temperature with building stones reaches warm mix effect.But presently used warm-mixing agent leads to while reducing asphalt high-temperature viscosity The reduction that often can also cause 60 DEG C of viscosity of pitch, makes the high-temperature stability of asphalt incur loss;Or on the contrary, not dropping When low 60 DEG C of viscosity, the loss of pitch ductility can be caused, to reduce the cryogenic property of pitch.In short, presently used Warm-mixing agent is while so that pitch is reached warm mix effect, is high-temperature behavior to lose pitch or cryogenic property as cost 's.
CN102443239A describes a kind of oil-resistant road asphalt modifier and preparation method thereof.The oil resistivity road drips Green modifying agent includes 20~50 parts of styrene-ethylene/butylene-styrene block copolymer (SEBS), polyolefin tree by weight 10~30 parts of fat, 15~45 parts of macromolecule wax are rich in 10~30 parts of aromatic hydrocarbons tapped oil.Wherein macromolecule wax is Fischer-Tropsch wax, is rich in Aromatic hydrocarbons tapped oil is furfural extract oil or phenol treating tapped oil.Preparation method is:Material is launched in proportion and arrives twin-screw Oil-resistant road asphalt modifier is made in stretching and granulation in extruder, 120 DEG C~200 DEG C of extrusion temperature.The patent introduction it is resistance to Oiliness asphalt modifier is to be developed for for the pitch used in the places such as parking lot, airplane parking area in order to improve its oil resistivity A kind of modifying agent, for the warm mix effect of pitch, there is no enough attention, in the process of development, only with twin-screw Extruder has carried out simple extrusion mixing, due to unsaturated bond limited amount on polymer molecule used, in Screw Extrusion Only have a small amount of graft reaction in the process, enough chemical reactions does not occur, substantially a kind of simple physical mixed is right It is very limited in the warm mix effect of pitch.
102061098 A of CN describe a kind of asphalt mixture warm-mixing modifier and preparation method thereof.It is by following masses The composition of part is made, fischer-tropsch wax:50~85 parts, flexibilizing agent:15~50 parts, polyacid:0~10 part, synthetic resin:0~20 Part, petchem:0~5 part.Wherein, synthetic resin is polyisobutene of the molecular weight between 400~5000.Preparation method: (1) each component is weighed in mass ratio;(2) each component is melted and is stirred at 120 DEG C~130 DEG C, be allowed to be sufficiently mixed It is even to get the asphalt mixture warm-mixing modifier.In the warm-mixing agent development process, without sending out biochemical reaction between each component, Only simple physical mixed.Although the mix temperature of pitch can be reduced, the ductility of pitch can incur loss i.e. Asphalt is easy to happen cold cracking, causes asphalt thermal stability and low-temperature cracking-resistance bad, so that pitch is mixed There is track and cracking and accelerates damage in solidifying soil surface face layer.
CN101735623A discloses a kind of warm mixed epoxy bitumen material and preparation method thereof, including component A and B component.A Group is divided into epoxy resin, and B component includes pitch 40wt%~83wt%, maleic anhydride 5wt%~20wt%, 9- octadecenyl amines 10wt%~30wt%, poly sebacic polyanhydride or poly- azelaic acid acid anhydride 2wt%~10wt%;The mass ratio of component A and B component is 1:3~ 5.8.Medium temperature mix can be used, reduce gas discharge when construction, while it is short to solve general bituminous epoxy operable time Problem.But when preparing B component, maleic anhydride is added in pitch and needs stirring 4~6 hours, then also need to add Add other components, preparation time is too long, influences production efficiency.In addition, bituminous epoxy is although Coating combination, pitch can be improved Pitch can be made to become fragile after middle addition epoxy resin, flexibility is deteriorated.
CN 104591605A disclose a kind of Warm-Mix Bitumen Mixture and preparation method thereof, in warm-mixed asphalt preparation process It is middle and to reduce the mix and forming temperature of asphalt using a kind of special warm-mixing agent, less pernicious gas occurrence quantity.But Be warm-mixing agent preparation process in, not only intermediate reaction speed is slower, and intermediate activity it is relatively low, cause intermediate with The extent of reaction of aromatic naphtha, reaction depth are also not easily controlled, and obtained warm-mixing agent property is unstable, affects in pitch Application effect.If in addition, by warm-mixing agent in bituminous epoxy, having also appeared the poor problem of anti-aging property.
During preparation flexibility good bituminous epoxy, warm mix technology would generally reduce by 60 DEG C of viscosity of pitch or prolong Degree of stretching, to affect the high-temperature stability or low temperature anti-cracking performance of asphalt.It would therefore be highly desirable to develop one kind, both Can solve the problem of that bituminous epoxy flexibility is poor can also solve high and low temperature performance and aging.
Invention content
In view of the deficiencies in the prior art, the present invention provides a kind of warm mixed epoxy bitumen mixtures and preparation method thereof.This Invention epoxy asphalt mixture not only there is good Marshall stability, Rut resistance and water resistant to encroach on ability.
The present invention provides a kind of warm mixed epoxy bitumen mixtures, in terms of mixture weight percent, including following components:
The warm mixed epoxy bitumen 4.0%~6.0%
Miberal powder 1.0%~3.0%
Gather materials 91.0%~95.0%
Wherein, the warm mixed epoxy bitumen includes tri- kinds of components of A, B, C, and component A therein is warm-mixed asphalt, warm-mixed asphalt Including warm-mixing agent and matrix pitch;The warm-mixing agent prepares raw material and includes FT, halogen simple substance, aromatic naphtha, complex compound, catalyst, The wherein FT is a kind of macromolecule mixed alkanes, and carbon number is 30~150, preferably 30~130;
B component is composition epoxy resin;
Component C is curing agent.
The complex compound includes:[Cu(NH3)4]SO4、[Pt(NH3)2]Cl2、K[Pt(C2H4)Cl3]、K4[Fe(CN)6]、K3 [Fe(CN)6]、Fe4[Fe(CN)6]3、Ni(CO)4、[Co(NH3)5Cl]SO4、(NH4)3[Cr(NCS)6At least one of].
The catalyst is selected from anhydrous CuCl2, anhydrous MnCl2, anhydrous CrCl3, anhydrous NiCl2At least one of.
The dosage of the complex compound is by weight 3%~9% of arene content in aromatic naphtha.
The dosage of the catalyst is by weight the 0.3%~0.9% of FT.
The dosage of the halogen simple substance is 0.12~0.75 times of FT molal quantitys, preferably 0.3~0.5 times, FT and aromatic hydrocarbons The weight ratio of oil is (1~7):(7~1).
Additive amount of the warm-mixing agent in warm-mixed asphalt is 0.4wt%~10wt% of warm-mixed asphalt weight, preferably 0.5wt%~7.0wt%.
The FT is to carry out a kind of macromolecule alkane that synthetic reaction obtains again after coal gasification, or using natural gas as raw material Carry out a kind of macromolecule alkane that synthetic reaction obtains;The halogen simple substance is that a kind of in fluorine, chlorine, bromine simple substance states aromatic naphtha For a kind of component rich in aromatic hydrocarbons, to be subtract four line tapped oil, furfural extract oil, phenol treating tapped oil, cycle oil Slurry etc.;Arene content in the aromatic naphtha is the wt% of 57 wt%~78, the preferably wt% of 60 wt%~75.
Matrix pitch of the present invention can select the asphalt that various crude oil and different process produce, as straight run drips One or more of blueness, oxidized asphalt, solvent deoiling pitch or blend asphalt.
The preparation process of the warm-mixing agent includes:After FT heating meltings, halogen is introduced in the presence of a catalyst, after reaction Obtain intermediate;Complex compound and constant temperature stirring are added into aromatic naphtha, obtain aromatic hydrocarbons complexing components;Then by above-mentioned intermediate with Aromatic hydrocarbons complexing components hybrid reaction obtains the warm-mixing agent.
The preparation process of the warm-mixing agent includes:
(1)Mixing macromolecule alkane heating melting is placed in closed container, 400 DEG C ~ 480 DEG C is maintained the temperature at, makes The space of reaction vessel is full of nitrogen, and pressure is made to be maintained at 3 ~ 5MPa, and halogen simple substance is passed through in the macromolecule alkane of melting, And in the presence of a catalyst, 30~60min of reaction obtains intermediate;
(2)Complex compound is added into aromatic naphtha, constant temperature stirs 120 ~ 180min at a temperature of 270 DEG C ~ 350 DEG C, obtains virtue Hydrocarbon complexing components;
(3)The aromatic hydrocarbons complexing components are added in above-mentioned intermediate, it is 350 DEG C ~ 400 DEG C to make temperature, is made full of nitrogen Pressure is maintained at 2 ~ 4MPa, and 60 ~ 120min of isothermal reaction obtains the warm-mixing agent.
In warm-mixing agent, B component is composition epoxy resin, includes in parts by weight:100 parts of epoxy resin, diluent 15~60 parts, 10~30 parts of flexibilizing agent, 0~40 part of fiber.
Epoxy resin described in B component composition epoxy resin includes:Atmosphere base propane glycidyl ether epoxy resin, Bi-phenolic Methan e tetraglycidel ether epoxy resin, polyphenol base propane tetraglycidel ether epoxy resin, aliphatic glycidyl ether ring The mixture of one or more of oxygen resin, glycidyl ester type epoxy resin, glycidyl amine type epoxy resin;
Diluent described in B component composition epoxy resin includes:Diglycidyl ether, polyglycidyl ether, epoxy Propane butyl ether, propylene oxide phenyl ether, diepoxy propane ethylether, three propylene oxide propyl ethers, ethyl alcohol, acetone, benzene, first One or more of benzene, dimethylbenzene mixture;
Flexibilizing agent described in B component composition epoxy resin includes:Polysulfide rubber, phenolic resin, gathers polyamide One or more of the tertiary butyraldehyde of vinyl alcohol, furfural resin mixture;
Fiber described in B component composition epoxy resin includes:Asbestos fibre and/or glass fibre.
In warm-mixing agent, component C is curing agent, including:Ethylenediamine, m-phenylene diamine (MPD), benzene dimethylamine, polyamide, divinyl One or more of triamine mixture.
The ratio between the dosage of the component A and B component, by weight A:B=(3~7):1;The dosage of component C is by weight Gauge is 0.40%~1.20% of the content of epoxy resin in B component, preferably 0.48%~1.05%.
Component A preparation method includes the following steps:Matrix pitch is heated to 130 DEG C~160 DEG C, after complete melting, Warm-mixing agent is added while stirring, is stirred 30min~60min, is obtained component A warm-mixed asphalt.
The preparation method of B component composition epoxy resin includes the following steps:First by epoxy resin, diluent, flexibilizing agent 50 DEG C~80 DEG C are heated to, is then mixed and stirred for uniformly, finally adding fiber in proportion, be stirred for uniformly.
The present invention also provides a kind of preparation methods such as above-mentioned warm mixed epoxy bitumen mixture, include the following steps: By component A be heated to 110 DEG C~130 DEG C, B component be heated to 50 DEG C~80 DEG C, B component is then added to A groups while stirring In point, mixing time is at least 30min, obtains the mixture of component A and B component;Again in the mixture of component A and B component Component C is added, 3~10min is stirred, to obtain the warm mixed epoxy bitumen, then by warm mix ring at 70 DEG C~110 DEG C Oxygen pitch, gather materials, miberal powder stirs evenly to get to warm mixed epoxy bitumen mixture.
Warm mixed epoxy bitumen mixture of the present invention compared with prior art, has the following advantages that:
1, the present invention adds warm mixed epoxy bitumen in warm mixed epoxy bitumen mixture, not only improves bituminous epoxy mixing Marshall stability, Rut resistance and the water resistant of material encroach on ability, but also can reduce construction temperature, reduce pernicious gas Occurrence quantity is good for the environment and constructs.
2, warm mixed epoxy bitumen mixture of the present invention not only improves previous epoxy using special asphalt warm-mix agent The flexibility of pitch improves the followability with bridge panel, but also can reduce preparation and the construction temperature of bituminous epoxy, The occurrence quantity for reducing pernicious gas is good for the environment and constructs.
3, the warm-mixing agent used in the present invention is homemade warm-mixing agent, and intermediate is prepared under higher temperature, pressure and is increased Add catalyst, not only shorten the reaction time, but also can steadily control reaction process, is easy to hold the performance of intermediate, make Obtained warm-mixing agent performance is stablized.
4, during preparing warm-mixing agent, in advance in aromatic naphtha add complex compound and be sufficiently mixed uniformly, complex compound with Aromatic naphtha carries out local reaction, aromatic hydrocarbons complexing components is generated, after being then then added to intermediate, in the catalytic action of complex compound Under, aromatic hydrocarbons complexing components are reacted with intermediate, by controlling complex compound and reaction time and temperature so that the extent of reaction can Control, obtained warm-mixing agent not only has warm mix effect to pitch, has taken into account the high temperature performance of pitch, but also also improves pitch Thermal stability, improve anti-aging property.
5, the warm-mixing agent preparation process used in the present invention carries out in closed container, non-environmental-pollution problem.
Specific implementation mode
With reference to the embodiment technical solution that the present invention will be described in detail, but the present invention is not limited to following embodiments.Wherein, The wt% being related to is mass fraction.
Embodiment 1
(1)Prepare warm-mixing agent
1. the mixed alkanes that synthetic reaction obtains are carried out after weighing 100kg coal gasifications again, the carbon numbers of mixed alkanes is 30~ 60, mixed alkanes are heated to 480 DEG C, the anhydrous CuCl of addition 0.3kg catalyst2, it is placed in closed container, at a temperature of keeping this 89 moles of chlorine is introduced, and being passed through nitrogen makes the pressure of reaction vessel be maintained at 3MPa, reaction 30min obtains intermediate -1;
2. weighing the line tapped oil 700kg that subtracts four that arene content is 70 wt%, the complex compound [Cu of 44.1kg is added thereto (NH3)4]SO4, in another closed container and 350 DEG C are heated to, constant temperature stirs 180min at this temperature, obtains aromatic hydrocarbons network It is combined point -1;
3. aromatic hydrocarbons complexing components -1 are added in above-mentioned intermediate -1, it is 400 DEG C to make temperature, so that pressure is kept full of nitrogen The warm-mixing agent used in the present invention is obtained in 2MPa, isothermal reaction 60min.Each group distribution ratio is shown in Table 1.
(2)Prepare component A warm-mixed asphalt
The warm-mixing agent for weighing 7kg is added to No. 50 solvent deoiling drips of husky Crude Oil that weight is 93 kg, temperature is 160 DEG C In blueness, 60 min are stirred, the component A warm-mixed asphalt used in the present invention is obtained(Number A-1), the property of warm-mixed asphalt is shown in Table 2.
(3)Prepare B component composition epoxy resin
Weigh atmosphere base propane glycidyl ether epoxy resin 100kg, 15 kg of diluent diglycidyl ether, flexibilizing agent 10 kg of polysulfide rubber, is heated to 50 DEG C, is stirred evenly after mixing;Then 40 kg of asbestos fibre is weighed, above-mentioned mixing is added to It in object, stirs evenly, obtains the B component composition epoxy resin used in the present invention(Number B-1).
(4)Prepare warm mixed epoxy bitumen
It is spare to weigh curing agent ethylene diamine 0.48kg(Number C-1).
The A-1 for weighing 30 kg is heated to 130 DEG C;The B-1 for weighing 10 kg is heated to 50 DEG C;While stirring by B-1 It is added in A-1, waits for after all adding, stir 30min;Then it is further continued for adding above-mentioned load weighted C-1, stir 3min obtains warm mixed epoxy bitumen of the present invention.The service condition of warm mixed epoxy bitumen is shown in Table 3.
(5)Prepare epoxy asphalt mixture
According to warm mixed epoxy bitumen, gather materials, the mass ratio of miberal powder be 4: 95 :1 ratio, weigh warm mixed epoxy bitumen, Gather materials, miberal powder and be heated to 110 DEG C.Above-mentioned material is added in stirred tank together, is stirred 2 minutes, mixture is released.Then Various bitumen mixture specimens are prepared into, performance of asphalt mixture evaluation experimental is carried out, the results are shown in Table 5.
Embodiment 2
(1)Prepare warm-mixing agent
1. the mixed alkanes that synthetic reaction obtains are carried out after weighing 350kg coal gasifications again, the carbon numbers of mixed alkanes is 30~ Mixed alkanes are heated to 400 DEG C, the anhydrous MnCl of addition 3.15kg catalyst by 130 mixed alkanes2, it is placed in closed container, It keeps introducing 116 moles of chlorine at a temperature of this, and being passed through nitrogen makes the pressure of reaction vessel be maintained at 5MPa, reacts 60min Obtain intermediate -2;
2. weighing the catalytic cracked oil pulp 100kg that arene content is 63 wt%, the complex compound K of 1.9kg is added thereto4 [Fe(CN)6], in another closed container and 270 DEG C are heated to, constant temperature stirs 120min at this temperature, obtains aromatic hydrocarbons network It is combined points -2;
3. aromatic hydrocarbons complexing components -2 are added in above-mentioned intermediate -2, it is 350 DEG C to make temperature, so that pressure is kept full of nitrogen The warm-mixing agent used in the present invention is obtained in 4MPa, isothermal reaction 120min.Each group distribution ratio is shown in Table 1.
(2)Prepare component A warm-mixed asphalt
0.5kg warm-mixing agents are weighed, No. 90 oxidized asphalts of LIAOHE CRUDE that weight is 99.5 kg, temperature is 140 DEG C are added to In, 40min is stirred, the component A warm-mixed asphalt used in the present invention is obtained(Number A-2), the property of warm-mixed asphalt is shown in Table 2.
(3)Prepare B component composition epoxy resin
Weigh glycidyl ester type epoxy resin 100kg, 60 kg of diluent epoxy propane butyl ether, flexibilizing agent phenolic aldehyde tree 30 kg of fat, is heated to 80 DEG C, is stirred evenly after mixing, obtains the B component composition epoxy resin used in the present invention(Number B- 2).
(4)Prepare warm mixed epoxy bitumen
It is spare to weigh curing agent benzene dimethylamine 1.05kg(Number C-2).
The A-2 for weighing 70 kg is heated to 115 DEG C;The B-2 for weighing 10 kg is heated to 80 DEG C;B-2 is added while stirring It is added in A-2, waits for after all adding, stir 60min;Then above-mentioned load weighted C-2 is added, 9min is stirred, obtains this Invention warm mixed epoxy bitumen.The service condition of warm mixed epoxy bitumen is shown in Table 3.
(5)Prepare epoxy asphalt mixture
In this step, warm mixed epoxy bitumen, gather materials, the mass ratio of miberal powder be 6: 91 :3 ratio weighs warm mix ring The step of oxygen pitch gathers materials, miberal powder and is heated to 70 DEG C, the other the same as in Example 1(5), to obtain epoxy asphalt mixture, so After be prepared into various bitumen mixture specimens, carry out performance of asphalt mixture evaluation experimental, the results are shown in Table 5.
Embodiment 3
(1)Prepare warm-mixing agent
1. weigh 100kg carries out the mixed alkanes that synthetic reaction obtains by raw material of natural gas, the carbon number of mixed alkanes is 70~90, mixed alkanes are heated to 440 DEG C, the anhydrous NiCl of addition 0.6kg catalyst2It is placed in closed container, keeps this temperature Degree is lower to introduce 31 moles of fluorine, and being passed through nitrogen makes the pressure of reaction vessel be maintained at 4MPa, and reaction 45min obtains intermediate- 3;
2. weighing the phenol treating tapped oil 350kg that arene content is 78wt%, the complex compound [Ni of 16.4kg is added thereto (CO)4], in another closed container and 310 DEG C are heated to, constant temperature stirs 160min at this temperature, obtains aromatic hydrocarbons complexing Component -3;
3. aromatic hydrocarbons complexing components -3 are added in above-mentioned intermediate -3, it is 375 DEG C to make temperature, so that pressure is kept full of nitrogen The warm-mixing agent used in the present invention is obtained in 3MPa, isothermal reaction 90min.Each group distribution ratio is shown in Table 1.
(2)Prepare component A warm-mixed asphalt
4kg warm-mixing agents are weighed, are added in No. 70 blend asphalts of Tahe Crude Oil that weight is 96 kg, temperature is 150 DEG C, 50min is stirred, the component A warm-mixed asphalt used in the present invention is obtained(Number A-3), the property of warm-mixed asphalt is shown in Table 2.
(3)Prepare B component composition epoxy resin
Glycidyl amine type epoxy resin 100kg, 38 kg of diluent dimethylbenzene, 20 kg of flexibilizing agent furfural resin are weighed, 65 DEG C are heated to, is stirred evenly after mixing;Then 20 kg of glass fibre is weighed, Xu is added in said mixture slowly, and stirring is equal It is even, obtain the B component composition epoxy resin used in the present invention(Number B-3).
(4)Prepare warm mixed epoxy bitumen
It is spare to weigh curing agent polyamide 0.78kg(Number C-3).
The A-3 for weighing 50 kg is heated to 120 DEG C;The B-3 for weighing 10 kg is heated to 65 DEG C;While stirring by B-3 It is added in A-3, waits for after all adding, stir 45min;Then above-mentioned load weighted C-3 is added, 6min is stirred, obtains Warm mixed epoxy bitumen of the present invention.The service condition of warm mixed epoxy bitumen is shown in Table 3.
(5)Prepare epoxy asphalt mixture
The step of this step is with embodiment 1(5), to obtain epoxy asphalt mixture, it is mixed to be then prepared into various pitches Material test specimen is closed, performance of asphalt mixture evaluation experimental is carried out, the results are shown in Table 5.
Embodiment 4
(1)Prepare warm-mixing agent
1. weigh 700kg carries out the mixed alkanes that synthetic reaction obtains by raw material of natural gas, the carbon number of mixed alkanes is 110~130, mixed alkanes are heated to 400 DEG C, the anhydrous CrCl of addition 2.1kg catalyst3, it is placed in closed container, keeps this At a temperature of introduce 115 moles of bromine, and being passed through nitrogen makes the pressure of reaction vessel be maintained at 4MPa, and reaction 45min obtains centre Body -4;
2. weighing the furfural extract oil 100kg that arene content is 57wt%, the complex compound of 1.7kg is added thereto (NH4)3[Cr(NCS)6], in another closed container and 310 DEG C are heated to, constant temperature stirs 160min at this temperature, obtains Aromatic hydrocarbons complexing components -4;
3. aromatic hydrocarbons complexing components -4 are added in above-mentioned intermediate -4, it is 375 DEG C to make temperature, so that pressure is kept full of nitrogen The warm-mixing agent used in the present invention is obtained in 3MPa, isothermal reaction 90min.Each group distribution ratio is shown in Table 1.
(2)Prepare component A warm-mixed asphalt
1kg warm-mixing agents are weighed, are added in No. 110 straight asphaltes of Oman's crude oil that weight is 99kg, temperature is 120 DEG C, 30 min are stirred, the component A warm-mixed asphalt used in the present invention is obtained(Number A-4), the property of warm-mixed asphalt is shown in Table 2.
(3)Prepare B component composition epoxy resin
Weigh aliphatic glycidyl ether epoxy resin 60kg and Bi-phenolic Methan e tetraglycidel ether epoxy resin 40kg, dilute Release agent diepoxy propane ethylether 25 kg and 20 kg of toluene, 10 kg of flexibilizing agent polyamide and the tertiary butyraldehyde of polyvinyl alcohol 5 Kg is heated to 60 DEG C, is stirred evenly after mixing;Then 1 kg of glass fibre is weighed, is added in said mixture, stirring is equal It is even, obtain the B component composition epoxy resin used in the present invention(Number B-4).
(4)Prepare warm mixed epoxy bitumen
M-phenylene diamine (MPD) 0.5kg and diethylenetriamine 0.4kg are weighed, is uniformly mixed spare as curing agent(Number C-4).
The A-4 for weighing 60 kg is heated to 110 DEG C;The B-4 for weighing 10 kg is heated to 55 DEG C;While stirring by B-4 It is added in A-4, waits for after all adding, stir 40min;Then above-mentioned load weighted C-4 is added, 4min is stirred, obtains Warm mixed epoxy bitumen of the present invention.The service condition of warm mixed epoxy bitumen is shown in Table 3.
(5)Prepare epoxy asphalt mixture
The step of this step is with embodiment 1(5), to obtain epoxy asphalt mixture, it is mixed to be then prepared into various pitches Material test specimen is closed, performance of asphalt mixture evaluation experimental is carried out, the results are shown in Table 5.
Comparative example 1
(1)Prepare warm-mixing agent(According to the method in CN 104591605A)
It is 110~130 by carbon number, the macromolecule for carrying out synthetic reaction by raw material of natural gas and obtaining that weight is 700kg Alkane heating melting is placed in closed container, is heated to 400 DEG C, keeps the bromine simple substance of 115 moles of introducing at a temperature of this, stirring 180min obtains intermediate;The furfural extract oil 100kg that arene content is 57% is weighed, is added in another closed container Heat adds the anhydrous FeCl of 0.17kg thereto to 150 DEG C3, stir 30min.Then by above-mentioned intermediate under stirring It is injected in furfural extract oil with mist, after all spraying into, 150 DEG C of constant temperature is stirred to react 180min, obtains comparison temperature Mix agent.Each group distribution ratio is shown in Table 1.
(2)Component A warm-mixed asphalt is prepared according to 4 identical method of the embodiment of the present invention(Number W-1);
(3)B component composition epoxy resin is prepared according to 4 identical method of the embodiment of the present invention;
(4)Warm mixed epoxy bitumen is prepared according to 4 identical method of the embodiment of the present invention.
(5)Warm mixed epoxy bitumen mixture is prepared according to 4 identical method of the embodiment of the present invention.
Comparative example 2
It weighs 1000g and carries out the mixed alkanes that synthetic reaction obtains by raw material of natural gas, the carbon number of mixed alkanes is 110 ~130, it is added in No. 110 straight asphaltes of Oman's crude oil that weight is 100kg, temperature is 120 DEG C, stirs 30 min, obtain A kind of warm-mixed asphalt(Number W-2), property is shown in Table 2;Then B component ring is prepared according to 4 identical method of the embodiment of the present invention Epoxy resin composition and component C curing agent;Warm mixed epoxy bitumen is prepared according to 4 identical method of the embodiment of the present invention, uses feelings Condition is shown in Table 4.The preparation method of asphalt obtains asphalt with embodiment 4, is then prepared into various asphalts Test specimen carries out performance of asphalt mixture evaluation experimental, the results are shown in Table 6.
Comparative example 3
By the furfural extract oil 1000g that arene content is 57wt%, it is added to that weight is 100 kg, temperature is 120 DEG C No. 110 straight asphaltes of Oman's crude oil in, stir 30min, obtain a kind of warm-mixed asphalt(Number W-3), property is shown in Table 2;So Afterwards B component composition epoxy resin and component C curing agent are prepared according to 4 identical method of the embodiment of the present invention;According to the present invention 4 identical method of embodiment prepares warm mixed epoxy bitumen, and service condition is shown in Table 4.The same embodiment of preparation method of asphalt 4, asphalt is obtained, various bitumen mixture specimens are then prepared into, carries out performance of asphalt mixture evaluation experimental, as a result It is shown in Table 6.
Comparative example 4
Weigh the furfural essence that 875g carries out FT and the arene content that synthetic reaction obtains by raw material of natural gas as 57wt% Tapped oil 125g processed, while being directly appended in No. 110 straight asphaltes of Oman's crude oil that weight is 100kg, temperature is 120 DEG C, Stirring 30 minutes, obtains a kind of warm-mixed asphalt(Number W-4), property is shown in Table 2;Then identical according to the embodiment of the present invention 4 Method prepares B component composition epoxy resin and component C curing agent;Warm mix is prepared according to 4 identical method of the embodiment of the present invention Bituminous epoxy, service condition are shown in Table 4.The preparation method of asphalt obtains asphalt, then prepares with embodiment 4 At various bitumen mixture specimens, performance of asphalt mixture evaluation experimental is carried out, the results are shown in Table 6.
Comparative example 5
Weigh the composition epoxy resin in the embodiment of the present invention 4(B-4)10 kg and curing agent(C-4)0.9 kg, directly In No. 110 matrix pitches of Oman's crude oil that the temperature for being added to 60 kg is 130 DEG C, 4min is stirred, a kind of bituminous epoxy is obtained (Number W-5), property is shown in Table 2, and service condition is shown in Table 4.It is mixed to obtain pitch with embodiment 4 for the preparation method of asphalt Material is closed, various bitumen mixture specimens are then prepared into, performance of asphalt mixture evaluation experimental is carried out, the results are shown in Table 6.
Table 1 prepares warm-mixing agent component proportion
Embodiment 1 Embodiment 2 Embodiment 3 Embodiment 4 Comparative example 1
Weight/kg of mixed alkanes 100 350 100 700 700
Halogen simple substance molal quantity 89 116 31 115 115
Catalyst weight/kg 0.3 3.15 0.6 2.1 -
Weight/kg of aromatic naphtha 700 100 350 100 100
Arene content/wt% in aromatic naphtha 70 63 78 57 57
Complex compound weight/kg 44.1 1.9 16.4 1.7 -
Catalyst weight/kg - - - - 0.17
2 component A warm-mixed asphalt of the present invention of table is compared with the property of matrix pitch and comparative example pitch
50 in sand# A-1 The Liaohe River 90# A-2 Tahe 70# A-3
Pitch amount/kg - 93 - 99.5 - 96
Warm mix dosage/g - 7000 - 500 - 4000
FT amounts/g - - - - - -
Aromatic hydrocarbons oil mass/g - - - - - -
Needle penetration/0.1mm 56 57 95 94 73 72
Softening point/DEG C 50.4 56.6 44.0 56.1 51 58
10 DEG C of ductility/cm 26 108 87 > 150 67 > 150
60 DEG C of viscosity/Pa.s 335 349 115 169 357 373
120 DEG C of viscosity/mPa.s 1148 672 813 473 1022 598
135 DEG C of viscosity/mPa.s 570 329 385 232 484 296
150 DEG C of viscosity/mPa.s 304 177 191 118 240 156
165 DEG C of viscosity/mPa.s 150 87 90 61 113 76
180 DEG C of viscosity/mPa.s 79 45 43 31 54 40
Film is tested
Mass change, % 0.5 0.08 0.8 0.09 0.6 0.06
Penetration ratio, % 63 73 57 66 61 69
Remain 10 DEG C of ductility/cm 4 21 8 44 6 37
Table 2 continues component A warm-mixed asphalt of the present invention and is compared with the property of matrix pitch and comparative example pitch
Oman 110# A-4 W-1 W-2 W-3 W-4
Pitch amount/kg - 99 99 99 99 99
Warm mix dosage/kg - 1 1 - - -
FT amounts/kg - - - 1 - 0.875
Aromatic hydrocarbons oil mass/kg - - - - 1 0.125
Needle penetration/0.1mm 108 105 106 92 127 111
Softening point/DEG C 43.6 48.2 45.2 48.1 40.0 45.0
10 DEG C of ductility/cm > 150 > 150 > 150 63 > 150 120
60 DEG C of viscosity/Pa.s 123 162 151 163 101 133
120 DEG C of viscosity/mPa.s 498 271 296 421 277 333
135 DEG C of viscosity/mPa.s 255 143 147 199 138 182
150 DEG C of viscosity/mPa.s 143 72 78 128 75 118
165 DEG C of viscosity/mPa.s 78 34 38 53 36 47
180 DEG C of viscosity/mPa.s 48 19 20 32 19 28
Film is tested
Mass change, % 0.9 0.07 1.6 1.2 1.9 1.7
Penetration ratio, % 55 62 47 43 41 45
Remain 10 DEG C of ductility/cm 10 60 7 3 10 5
Continued by table 2 as it can be seen that the high temperature viscosity of warm-mixed asphalt of the present invention is all significantly lower than corresponding matrix pitch, to have Conducive to the construction temperature of reduction pitch.For warm-mixed asphalt of the present invention compared with corresponding matrix pitch, needle penetration is essentially identical, Softening point and 60 DEG C of viscosity are improved significantly, and 10 DEG C of ductilities significantly increase, and illustrate that warm-mixed asphalt of the present invention not only can reach temperature Effect is mixed, and is better than corresponding matrix pitch in terms of high-temperature stability and low temperature ductility.
By comparing example as it can be seen that directly simply FT and/or tapped oil are added in matrix pitch, pitch warm mix is imitated The improvement of fruit but also can cause the loss of ductility or the decline of 60 DEG C of viscosity, or even can lead be not as good as warm mix effect of the present invention Cause asphaltic nature that cannot reach《Standard specification for construction and acceptance of highway asphalt pavement》The technology requirement of JTG F40-2004.
It is compared by film experimental result as it can be seen that the obtained warm mix Sulphur asphalt of warm-mixing agent using the present invention is anti-aging Performance is significantly better than the pitch of any comparative example, i.e., warm-mixing agent of the present invention improves pitch while realizing warm mix effect Thermal stability makes the ageing resistance of pitch be improved, and the warm-mixing agent used in comparative example -1 has the anti-aging property of pitch Negative effect.
The service condition of 3 warm mixed epoxy bitumen of the present invention of table
Property Embodiment 1 Embodiment 2 Embodiment 3 Embodiment 4
Construction temperature/DEG C 90~120 80~110 90~115 80~100
At 20 DEG C, with steel plate adhesion strength/MPa 3.32 3.31 3.43 3.27
At 50 DEG C, with steel plate adhesion strength/MPa 1.16 1.17 1.19 1.17
Embrittlement temperature/DEG C -17 -202 -19 -22
The service condition of 4 comparative example bituminous epoxy of table
Property Comparative example 1 Comparative example 2 Comparative example 3 Comparative example 4 Comparative example 5
Construction temperature/DEG C 100~115 120~140 110~130 110~125 110~130
At 20 DEG C, with steel plate adhesion strength/MPa 2.77 0.97 1.01 2.15 2.14
At 50 DEG C, with steel plate adhesion strength/MPa 1.02 0.09 0.12 0.81 0.83
Embrittlement temperature/DEG C -14 -9 -11 -10 -12
By the comparison of table 3 and 4 as it can be seen that the construction temperature of warm mixed epoxy bitumen of the present invention is substantially reduced, pernicious gas can be reduced Occurrence quantity is conducive to construct;It is significantly greater than comparative example with the caking property of floorings, embrittlement temperature is significantly lower than comparative example, explanation When warm mixed epoxy bitumen of the present invention is as bridge floor interlaminar bonding material, either cohesive force or flexible aspect better than compares Example.Also illustrate the present invention due to the use of special warm-mixing agent, so as to get pitch anti-aging property improve, performance is also corresponding It is improved.
5 mix material proportioning of the present invention of table and property
Property Embodiment 1 Embodiment 2 Embodiment 3 Embodiment 4 Code requirement value
Aggregate grading AC-13 AC-13 AC-13 AC-13
Gather materials dosage/kg 95 91 95 95
Warm mixed epoxy bitumen dosage/kg 4 6 4 4
Miberal powder dosage/kg 1 3 1 1
Properties of Asphalt Mixture
Marshall stability, kN 18.5 15.1 19.8 16.1 Not less than 8
Flow valuve, mm 2.8 2.1 2.9 2.2 1.5~4.5
Soak residual stability ratio, % 89.4 88.8 85.1 86.1 Not less than 75
Track dynamic stability, secondary/mm 4710 4818 4980 4693 Not less than 1800
Freeze-thaw split retained strength ratio, % 83.5 85.5 88.0 87.0 Not less than 70
Girder low-temperature bending failure strain, μ ε 2227 2335 2192 2232 Not less than 2000
6 comparative example mix material proportioning of table and property
Property Comparative example 1 Comparative example 2 Comparative example 3 Comparative example 4 Code requirement value
Aggregate grading AC-13 AC-13 AC-13 AC-13
Gather materials dosage/kg 95 95 95 95
Warm mixed epoxy bitumen dosage/kg 4 4 4 4
Miberal powder dosage/kg 1 1 1 1
Properties of Asphalt Mixture
Marshall stability, kN 11.6 8.4 8.8 10.6 Not less than 8
Flow valuve, mm 2.2 2.5 2.3 2.4 1.5~4.5
Soak residual stability ratio, % 83.1 76.6 76.1 76.8 Not less than 75
Track dynamic stability, secondary/mm 2203 1653 1811 2184 Not less than 1800
Freeze-thaw split retained strength ratio, % 79.0 75.3 74.3 73.3 Not less than 70
Girder low-temperature bending failure strain, μ ε 1835 1970 1808 1490 Not less than 2000
By table 5 and 6 as it can be seen that after warm mixed epoxy bitumen of the present invention is added in asphalt, have to Properties of Asphalt Mixture It is obviously improved, especially Rut resistance and water resistant infringement ability significantly improves.

Claims (19)

1. a kind of warm mixed epoxy bitumen mixture, it is characterised in that:In terms of mixture weight percent, including following components:
The warm mixed epoxy bitumen 4.0%~6.0%
Miberal powder 1.0%~3.0%
Gather materials 91.0%~95.0%
Wherein, the warm mixed epoxy bitumen includes tri- kinds of components of A, B, C, and component A therein is warm-mixed asphalt, and warm-mixed asphalt includes Warm-mixing agent and matrix pitch;The warm-mixing agent prepares raw material and includes FT, halogen simple substance, aromatic naphtha, complex compound, catalyst, wherein The FT is a kind of macromolecule mixed alkanes, and carbon number is 30~150;
The dosage of the halogen simple substance is 0.12~0.75 times of FT molal quantitys, and the weight ratio of FT and aromatic naphtha is (1~7):(7 ~1);The dosage of the complex compound is by weight 3%~9% of arene content in aromatic naphtha;The dosage of the catalyst, with Weight meter is the 0.3%~0.9% of FT;
B component is composition epoxy resin;
Component C is curing agent;
The ratio between the dosage of the component A and B component, by weight A:B=(3~7):1;The dosage of component C by weight, It is 0.40%~1.20% of the content of epoxy resin in B component.
2. warm mixed epoxy bitumen mixture according to claim 1, it is characterised in that:The carbon number is 30~130.
3. warm mixed epoxy bitumen mixture according to claim 1, it is characterised in that:The complex compound includes:[Cu (NH3)4]SO4、[Pt(NH3)2]Cl2、K[Pt(C2H4)Cl3]、K4[Fe(CN)6]、K3[Fe(CN)6]、Fe4[Fe(CN)6]3、Ni (CO)4、[Co(NH3)5Cl]SO4、(NH4)3[Cr(NCS)6At least one of].
4. warm mixed epoxy bitumen mixture according to claim 1, it is characterised in that:The catalyst is selected from anhydrous CuCl2, anhydrous MnCl2, anhydrous CrCl3, anhydrous NiCl2At least one of.
5. warm mixed epoxy bitumen mixture according to claim 1, it is characterised in that:The dosage of the halogen simple substance is FT 0.3~0.5 times of molal quantity.
6. warm mixed epoxy bitumen mixture according to claim 1, it is characterised in that:The warm-mixing agent is in warm-mixed asphalt Additive amount be warm-mixed asphalt weight 0.4wt%~10wt%.
7. warm mixed epoxy bitumen mixture according to claim 6, it is characterised in that:The warm-mixing agent is in warm-mixed asphalt Additive amount be warm-mixed asphalt weight 0.5wt%~7.0wt%.
8. warm mixed epoxy bitumen mixture according to claim 1, it is characterised in that:The FT is carried out again after coal gasification A kind of macromolecule alkane that synthetic reaction obtains, or carry out a kind of macromolecule alkane that synthetic reaction obtains by raw material of natural gas Hydrocarbon;The halogen simple substance is one kind in fluorine, chlorine, bromine simple substance;The aromatic naphtha is a kind of component rich in aromatic hydrocarbons.
9. warm mixed epoxy bitumen mixture according to claim 1, it is characterised in that:Arene content in the aromatic naphtha For the wt% of 57 wt%~78.
10. warm mixed epoxy bitumen mixture according to claim 9, it is characterised in that:Aromatic hydrocarbons in the aromatic naphtha contains Amount is the wt% of 60 wt%~75.
11. according to the warm mixed epoxy bitumen mixture described in claim 1-10 any one, it is characterised in that:The warm-mixing agent Preparation process include:After FT heating meltings, halogen is introduced in the presence of a catalyst, intermediate is obtained after reaction;To aromatic hydrocarbons Complex compound is added in oil, and constant temperature is uniformly mixed to obtain aromatic hydrocarbons complexing components;Then above-mentioned intermediate and aromatic hydrocarbons are complexed Component hybrid reaction obtains the warm-mixing agent.
12. according to the warm mixed epoxy bitumen mixture described in claim 1-10 any one, it is characterised in that:The warm-mixing agent Preparation process include:
(1)Mixing macromolecule alkane heating melting is placed in closed container, 400 DEG C ~ 480 DEG C is maintained the temperature at, makes reaction The space of container is full of nitrogen, and pressure is made to be maintained at 3 ~ 5MPa, and halogen simple substance is passed through in the macromolecule alkane of melting, and In the presence of catalyst, 30~60min of reaction obtains intermediate;
(2)Complex compound is added into aromatic naphtha, constant temperature is stirred to react 120 ~ 180min at a temperature of 270 DEG C ~ 350 DEG C, obtains virtue Hydrocarbon complexing components;
(3)The aromatic hydrocarbons complexing components are added in above-mentioned intermediate, it is 350 DEG C ~ 400 DEG C to make temperature, makes pressure full of nitrogen It is maintained at 2 ~ 4MPa, 60 ~ 120min of isothermal reaction obtains the warm-mixing agent.
13. according to the warm mixed epoxy bitumen mixture described in claim 1-10 any one, it is characterised in that:B component is ring Epoxy resin composition includes in parts by weight:100 parts of epoxy resin, 15~60 parts of diluent, 10~30 parts of flexibilizing agent, fiber 0 ~40 parts.
14. warm mixed epoxy bitumen mixture according to claim 13, it is characterised in that:B component composition epoxy resin Described in epoxy resin include:Atmosphere base propane glycidyl ether epoxy resin, Bi-phenolic Methan e diglycidyl ether epoxy tree Fat, polyphenol base propane tetraglycidel ether epoxy resin, aliphatic glycidyl ether epoxy resin, glycidyl ester type epoxy tree The mixture of one or more of fat, glycidyl amine type epoxy resin;
Diluent described in B component composition epoxy resin includes:Diglycidyl ether, polyglycidyl ether, propylene oxide Butyl ether, propylene oxide phenyl ether, diepoxy propane ethylether, three propylene oxide propyl ethers, ethyl alcohol, acetone, benzene, toluene, two One or more of toluene mixture;
Flexibilizing agent described in B component composition epoxy resin includes:Polysulfide rubber, polyamide, phenolic resin, polyethylene One or more of the tertiary butyraldehyde of alcohol, furfural resin mixture;
Fiber described in B component composition epoxy resin includes:Asbestos fibre and/or glass fibre.
15. according to the warm mixed epoxy bitumen mixture described in claim 1-10 any one, it is characterised in that:Component C is solid Agent, including:One or more of ethylenediamine, m-phenylene diamine (MPD), benzene dimethylamine, polyamide, diethylenetriamine mixture.
16. according to the warm mixed epoxy bitumen mixture described in claim 1-10 any one, it is characterised in that:The C groups The dosage divided is 0.48%~1.05% of the content of epoxy resin in B component by weight.
17. according to the warm mixed epoxy bitumen mixture described in claim 1-10 any one, it is characterised in that:It is prepared by component A Method includes the following steps:Matrix pitch is heated to 130 DEG C~160 DEG C, after complete melting, adds warm mix while stirring Agent stirs 30min~60min, obtains component A warm-mixed asphalt.
18. according to the warm mixed epoxy bitumen mixture described in claim 1-10 any one, it is characterised in that:B component epoxy The preparation method of resin combination includes the following steps:Epoxy resin, diluent, flexibilizing agent are first heated to 50 DEG C~80 DEG C, Then it is mixed and stirred for uniformly, finally adding fiber in proportion, be stirred for uniformly.
19. a kind of preparation method of the warm mixed epoxy bitumen mixture described in claim 1-18 any one, it is characterised in that Include the following steps:By component A be heated to 110 DEG C~130 DEG C, B component be heated to 50 DEG C~80 DEG C, then while stirring by B Component is added in component A, and mixing time is at least 30min, obtains the mixture of component A and B component;Again in component A and B groups Component C is added in the mixture divided, stirs 3~10min, to obtain the warm mixed epoxy bitumen, then 70 DEG C~110 At DEG C by warm mixed epoxy bitumen, gather materials, miberal powder stirs evenly to get to warm mixed epoxy bitumen mixture.
CN201510728410.2A 2015-11-02 2015-11-02 Warm mixed epoxy bitumen mixture and preparation method thereof Active CN106630759B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510728410.2A CN106630759B (en) 2015-11-02 2015-11-02 Warm mixed epoxy bitumen mixture and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510728410.2A CN106630759B (en) 2015-11-02 2015-11-02 Warm mixed epoxy bitumen mixture and preparation method thereof

Publications (2)

Publication Number Publication Date
CN106630759A CN106630759A (en) 2017-05-10
CN106630759B true CN106630759B (en) 2018-10-12

Family

ID=58809353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510728410.2A Active CN106630759B (en) 2015-11-02 2015-11-02 Warm mixed epoxy bitumen mixture and preparation method thereof

Country Status (1)

Country Link
CN (1) CN106630759B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268434B (en) * 2017-06-27 2019-03-08 长安大学 One kind being suitable for damp and hot high temperature area Steel Bridge Deck flexibility paving structure and construction method
CN110790533A (en) * 2019-10-17 2020-02-14 张海龙 Epoxy asphalt concrete for roads and bridges and preparation method thereof
CN116535136B (en) * 2023-03-21 2024-04-26 湖北省交通规划设计院股份有限公司 Plant-mixed hot regenerated epoxy asphalt mixture and preparation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061098A (en) * 2010-11-25 2011-05-18 重庆鹏方路面工程技术研究院有限公司 Asphalt mixture warm-mixing modifier and preparation method thereof
CN102795808A (en) * 2011-05-23 2012-11-28 河源海川科技有限公司 Warm mix asphalt and preparation method thereof
CN106630760A (en) * 2015-11-02 2017-05-10 中国石油化工股份有限公司 Warm-mixing epoxy asphalt mixture and preparation method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061098A (en) * 2010-11-25 2011-05-18 重庆鹏方路面工程技术研究院有限公司 Asphalt mixture warm-mixing modifier and preparation method thereof
CN102795808A (en) * 2011-05-23 2012-11-28 河源海川科技有限公司 Warm mix asphalt and preparation method thereof
CN106630760A (en) * 2015-11-02 2017-05-10 中国石油化工股份有限公司 Warm-mixing epoxy asphalt mixture and preparation method thereof

Also Published As

Publication number Publication date
CN106630759A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN104591605B (en) A kind of Warm-Mix Bitumen Mixture and preparation method thereof
CN103773008B (en) A kind of high-viscosity modified asphalt and preparation method thereof
CN103773009B (en) A kind of preparation method of high-viscosity modified asphalt
CN106630759B (en) Warm mixed epoxy bitumen mixture and preparation method thereof
CN108192363B (en) Preparation technology and low-temperature performance improvement method of waterborne epoxy resin modified emulsified asphalt
CN106633935B (en) Warm mixed epoxy bitumen and preparation method thereof
CN106630763B (en) Warm mix polymer modified asphalt mixture and preparation method thereof
CN106633947B (en) A kind of warm mix polymer modified asphalt and preparation method thereof
CN113860798B (en) Asphalt pavement pit repairing material and preparation method thereof
CN106630760B (en) A kind of warm mixed epoxy bitumen mixture and preparation method thereof
CN106633939B (en) A kind of warm mixed epoxy bitumen and preparation method thereof
CN105585860B (en) A kind of warm-mixed asphalt and preparation method thereof
CN108624067A (en) A kind of warm mix flame-retardant pitch and preparation method thereof
CN106630766B (en) Warm mix Sulphur asphalt mixture and preparation method thereof
CN105585859B (en) Asphalt warm-mix agent and its preparation method and application
CN106630765B (en) Warm-mix hard asphalt mixture and preparation method thereof
CN106630762B (en) A kind of warm mix polymer modified asphalt mixture and preparation method thereof
CN106633944B (en) Asphalt warm-mix agent, preparation method and application
CN106630764B (en) A kind of Warm-mix hard asphalt mixture and preparation method thereof
CN106633943A (en) Warm mix hard asphalt, and preparation method thereof
CN108624066A (en) A kind of warm mix colored synthesis pitch and preparation method thereof
CN106633948B (en) Warm mix polymer modified asphalt and preparation method thereof
CN106633945B (en) Warm mix Sulphur asphalt and preparation method thereof
CN106633949B (en) Warm-mix hard asphalt and preparation method thereof
CN106633929B (en) A kind of asphalt warm-mix agent, preparation method and application

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant