CN106631152A CN201611236475.6A CN201611236475A CN106631152A CN 106631152 A CN106631152 A CN 106631152A CN 201611236475 A CN201611236475 A CN 201611236475A CN 106631152 A CN106631152 A CN 106631152A
Authority
CN
China
Prior art keywords
concrete
sand
temperature
performance concrete
ballastless track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611236475.6A
Other languages
Chinese (zh)
Inventor
廖召权
申剑
陈立家
吴秀雄
孙长金
王进虎
李帅
刘孙武
冉龙华
杨延伟
张修立
李建业
张伟
吴振鑫
聂晓兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority to CN201611236475.6A priority Critical patent/CN106631152A/en
Publication of CN106631152A publication Critical patent/CN106631152A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B40/00Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
    • C04B40/02Selection of the hardening environment
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B14/00Use of inorganic materials as fillers, e.g. pigments, for mortars, concrete or artificial stone; Treatment of inorganic materials specially adapted to enhance their filling properties in mortars, concrete or artificial stone
    • C04B14/02Granular materials, e.g. microballoons
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B40/00Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
    • C04B40/02Selection of the hardening environment
    • C04B40/0277Hardening promoted by using additional water, e.g. by spraying water on the green concrete element
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/005Making of concrete parts of the track in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a method for making high-performance concrete for a high-speed railway ballastless track through manufactured sand. The method comprises quality requirement and control method of the manufactured sand used for the ballastless track high-performance concrete, mixed proportion design control, mixing process control, pouring and curing control, wherein the general principles such as low binding material content, low sand rate, low slump and high gas content are followed during mixed proportion design; good grading of the manufactured sand is required, the fineness modulus is controlled to 2.8-3.3, and the stone powder content in the washed manufactured sand is controlled to 5-8%; the mud content of the manufactured sand is controlled in a 'secondary processing' manner, namely that clean mother rock is firstly screened for performing aggregate processing, and then clean aggregate is selected for producing the manufactured sand, wherein the MB value detection result is required to be less than 1.40 during the mud content control of the manufactured sand. According to the process, the problem in the existing mountainous area that the cost is too high because high-performance concrete for CRTS-I type high-speed railway ballastless track base plates and roadbed slabs is prepared by generally adopting river sand is effectively solved.

Description

Artificial sand prepares ballastless track of high-speed railway high performance concrete technique
Technical field
The present invention relates to a kind of interval and yard (containing Cha Qu) unballasted track bed plate and road bed board high performance concrete work Skill, it is adaptable to the construction site of Bi-Block Slab Track in High Speed Railway bedplate and road bed board.
Background technology
High-speed railway interval and yard (containing Cha Qu) unballasted track bed plate and railway roadbed board concrete are a kind of quality controls The high performance concrete having high demands, design strength is C40T2, it is desirable to which aggregate is evenly distributed, without isolation bleeding(That is concrete cast Uniform state should be in after vibration compacting), the later stage is without cracking, good endurance etc..Concrete Quality Control for convenience, at present Generally prepared using river sand, mountain area is rare due to river sand, concrete production cost is too high.Artificial sand material source is widely distributed, processing Cost of transportation is relatively low, but due to being affected by many factors, the concrete of preparation will reach above-mentioned requirements many difficulties, except Outside possessing the artificial sand of stable performance to ensure concrete quality, in addition it is also necessary to ripe construction technology.Artificial sand high-performance The construction quality of concrete is inseparable with concrete self performance and construction technology etc..From the point of view of site operation situation, be from Artificial sand crudy and control method, mix-design control, to mix and stir process control, cast, this five aspect of maintenance control next Ensure the construction quality of concrete.
The content of the invention
The technical problem to be solved in the present invention is:A kind of artificial sand is provided and prepares ballastless track of high-speed railway high-performance coagulation Earth process, with overcome mountain construction present in prior art generally using river sand prepare the type high-speed railway double-block types of CRTS- I without The deficiency such as high cost caused by tiny fragments of stone, coal, etc. rail bed plate and road bed board high performance concrete.
Technical scheme proposed by the present invention is:It is required with artificial chiltern amount and is controlled including non-fragment orbit high performance concrete Method processed, mix-design are controlled, mix and stir process control, cast, maintenance control;Low glue material, low sand are observed during mix-design Rate, low slump, the overall principle of high air content;Artificial sand requires level with good, modulus of fineness control 2.8~3.3, manually Content of stone powder is controlled 5%~8% after sand washing;The clay content of artificial sand is controlled using " secondary operation " mode, i.e., first screens dry Net parent rock carries out rubble processing, then carries out artificial sand production again from clean rubble;The control of artificial sand clay content is required MB values testing result is less than 1.40.
Preferential using heating to mixing water during winter construction, the water temperature after heating is controlled at 50 DEG C~70 DEG C; Rubble, sand shift to an earlier date 2 days and are put into feed bin, mix and stir that front temperature is not less than 0 DEG C, additive is placed on storehouse inside holding and do not crystallize;During stirring Between extend 50% compared with normal temperature construction, actual control is in 3min.
Concrete out-of-machine temperature is not less than 10 DEG C;Strength grade is C40 water-binder ratio≤0.40, and slump control exists Below 140mm, air content is controlled 3.0~4.0%.
Under conditions of environment temperature is more than 30 DEG C, the slump is not more than 160mm.
Concrete coordinates hopper construction using straddle truck;Summer pours selection of time in every daily temperature relatively low time period, pours Environment temperature is built no more than 30 DEG C;Winter was selected in every daily temperature higher time period, when ambient air temperature is less than 3 DEG C, should be stopped Only roadbed and bridge section non-fragment orbit concrete are poured into a mould.
Stratified continuous pouring is carried out during concreting, process of wiping one's face is carried out after pouring in time, number of times of wiping one's face is no less than 4 Time.
Concrete is reached after pre-hardening state, that is, start atomized water spray maintenance, when concrete final set, is changed to watering maintenance, and And cover.
During concrete curing, it is desirable to which road bed board surface temperature is not less than 5 DEG C;When temperature is less than 5 DEG C, does not adopt and water Natural curing method;When run into temperature for three days on end less than 5 DEG C, snow, freezing weather when, take addition cotton-wadded quilt, or set up guarantor Warm canopy, or be equipped with firing equipment carry out it is warming, it is ensured that concrete is not endured cold.
By adopting above scheme, solve mountain construction and generally the type high-speed railway double-block types of CRTS- I are prepared using river sand High cost problem caused by unballasted track bed plate and road bed board high performance concrete, not only ensure that high performance concrete Quality, and greatly reduce concrete production cost.
Specific embodiment
Embodiments of the invention:This technique includes interval and yard (containing Cha Qu) non-fragment orbit high performance concrete with manually Sand quality requirement and quality of production control method, mix-design are controlled, mix and stir process control, cast, maintenance control.Specifically such as Under:
Firstth, the level of sand is with the whether reasonable combination property for directly influencing concrete batching system.Rational sand level is matched somebody with somebody, can be with The water consumption of mix is reduced, mobility, uniformity and density preferably concrete is obtained, while reach saving cement Effect.Concrete workability using especially thick sand mixing is poor, and mix is easily separated, and concrete water bleeding is larger, adopts Although the concrete workability that fine sand or ultra fine sand are prepared is good, its specific surface area is big, and Water usage and cement amount increase, and mix Solidifying soil is easy to crack.And adopt modulus of fineness good for 2.8~3.3 grades of concrete workabilities with good medium coarse sand mixing, by force Degree is also higher.
Because non-fragment orbit concrete combination property has high demands, cement amount is not high during mix-design.Stone flour is used as one Inert material is planted, fineness very little not only supplements the fine grained lacked in concrete, reduces bleeding and isolation;And stone flour Slurry with glue material forms flexibility, increased the slurry amount of concrete, improve the workability of concrete;Stone flour is controlled 5%~8% Less are affected on the properties of concrete;If being less than 5%, with the system of processing of current common configuration, washing must be just increased Dynamics, the direct result for causing is that the modulus of fineness of sand can increase, and level can be produced not with substantially variation to the workability of concrete The impact of profit;When more than 8%, can substantially increase the risk of later concrete cracking.
Secondth, containing mud all it is greatly injury to high performance concrete indices in artificial sand, not only intensity can be significantly Bottom reduces, and durability cannot ensure at all, and the impact to additive is also clearly, causes concrete batching system workability Difference, site operation is difficult.Therefore, the artificial sand that non-fragment orbit concrete construction is adopted need to strictly control clay content, i.e. MB values Testing result is necessarily less than 1.40, is not otherwise allowed for non-fragment orbit concrete mixing.In order to preferably control containing for artificial sand Mud amount, adopts " secondary operation " mode, control to make sand clay content by oneself, i.e., first screening clean parent rock carries out rubble processing, then Artificial sand production is carried out from clean rubble, so as to avoid problem of the artificial sand containing mud.
3rd, in order to preferably control concrete quality, it is ensured that concrete durability, " three are had to comply with during mix-design Low one high (low glue material, low sand coarse aggregate ratio, low slump, high air content)" the overall principle, scene using hanging coordinate hopper construction, Pumping construction technique is not considered in principle.
4th, the concreting in cold weather preferentially employs and mixing water is heated, the water temperature control after heating System is at 50 DEG C~70 DEG C.
Rubble, sand also take measures ensure its do not endure cold, temperature more than 0 DEG C, in order to ensure into the aggregate of mixer Without ice cube, snow group.All material need to shift to an earlier date 2 days and be put into feed bin.Feed bin draining is unobstructed, it is impossible to produce seeping phenomenon, sleet sky Gas forbids charging.
Additive is placed in storehouse and is incubated, it is ensured that additive is not crystallized, and forbids taking direct heating measure.
Proper extension concrete mixing time, mixing time extends 50% compared with normal temperature construction, and actual control is in 3min.
Appropriate adjustment feeding sequence, is sequentially the water for first throwing aggregate and heated, after stirring, adds water mud stirring. Heated water is avoided to produce " false set " phenomenon with cement directly contact.
Plus the monitoring of reinforced concrete out-of-machine temperature, it is desirable to it is daily to be no less than 2 times per shift, when temperature is relatively low, per shift No less than 3 times.Ensureing that concrete out-of-machine temperature is minimum can not be less than 10 DEG C.
Strictly detect machine concrete batching system performance, the water-cement ratio of selection of small(Strength grade is C40 concrete glues Than≤0.40)And the slump, in below 140mm, under conditions of environment temperature is more than 30 DEG C, the slump is little for slump control In 160mm.Air content is controlled 3.0~4.0%.
Strict control additive quality, from stay-in-grade product, makes between additive and cement and mineral admixture With good compatibility, forbid using with the different additive of function.Plus the compatibility test of strength water-reducing agent and Binder Materials, Changes in weather situation is paid close attention to, additive component is suitably adjusted according to environmental condition, and is carried out live match ratio and tested Just allow to use after confirmatory test is qualified, emphasis ensures that water-reducing rate, air content and slump-loss meet and requires.
5th, summer pour selection of time in every daily temperature relatively low time period, pour environment temperature no more than 30 DEG C, the winter Season was selected in every daily temperature higher time period, when ambient air temperature is less than 3 DEG C, if without targetedly antifreezing measures, should stop Only roadbed and bridge section non-fragment orbit concrete are poured into a mould.When the concrete of mixing slump-loss occurs soon or rapid hardening etc. occurs now As taking the measure such as be finely adjusted to admixture dosage in time, it is ensured that enter mould concrete quality.
Require to detect construction environment and concrete temperature on time in work progress, it is desirable to which per work team, observation is no less than 2 times, when When running into special circumstances, the observation frequency is increased, at least ensure every two hours observational record 1 time.
When pouring, stratified continuous pouring is carried out, it is ensured that same position is completed by teams and groups' primary concreting.
The uniformity of the live cloth of strict control, forbids carrying out being drawn concrete with making rod firm by ramming, and carries out place of wiping one's face in time Reason, number of times of wiping one's face is no less than 4 times, it is ensured that real outer beautiful in concrete.
6th, the strong of design requirement is reached within the age of regulation to ensure the non-fragment orbit concrete for having poured Degree, and prevent contraction fissure, it is necessary to conscientiously carry out maintenance work.
After non-fragment orbit concrete reaches pre-hardening state, that is, start fog curing, when concrete final set, be changed to watering Maintenance, and cover.Because non-fragment orbit concrete construction is related to the varying environments such as roadbed, bridge, tunnel, it is also desirable to for not Same environment formulates maintenance process.When temperature is less than 5 DEG C, natural curing method of watering is not adopted.
Non-fragment orbit is adopted in road bed board, base plate face overlying lid geotextiles, and maintenance of sprinkling water.When running into temperature continuous 3 It less than 5 DEG C, snow, freeze etc. extreme weather when, take addition cotton-wadded quilt, set up roof insulating, and be equipped with the measures such as firing equipment Carry out warming, it is ensured that concrete is not endured cold.
It is identical with mixing water need for curing concrete water, it is to avoid to cause concrete damage.
During concrete curing, it is desirable to which road bed board surface temperature is not less than 5 DEG C.
In a word, non-fragment orbit Performance of Artificial Sand High Performance Concrete construction is the very strong construction technology of a specific aim.With routine Concrete construction method is compared, and quality requirement is high.Because the factors such as execution conditions restriction affect, construction equipment, the original for being adopted Material, concrete mix, construction and management, construction method and normal concrete are different.Each link in construction It is required for strict standard, earnestly implements, especially to control with raw material, mix-design, construction organization requirement is all very high, no Then the construction quality of concrete cannot be guaranteed, and easily causes concrete construction difficulty, isolates uneven, cracking, poor durability A series of problems, such as, can cause to directly affect to traffic safety from now on.But, as long as we strengthen links management, completely The concrete for meeting design requirement can be produced with artificial sand, so as to reduce the purpose of cost.

Claims (8)

1. a kind of artificial sand prepares ballastless track of high-speed railway high performance concrete technique, it is characterised in that:It is included without tiny fragments of stone, coal, etc. rail Road high performance concrete is required with artificial chiltern amount and control method, mix-design control, mixes and stirs process control, cast, foster Shield control;During mix-design in accordance with low glue material, low sand coarse aggregate ratio, low slump, high air content the overall principle;Artificial sand requires level With good, 2.8~3.3, content of stone powder is controlled 5%~8% after artificial sand washing for modulus of fineness control;Using " secondary operation " Mode controls the clay content of artificial sand, i.e., first screening clean parent rock carries out rubble processing, is then entered again from clean rubble Row artificial sand is produced;The control of artificial sand clay content requires that MB values testing result is less than 1.40.
2. artificial sand according to claim 1 prepares ballastless track of high-speed railway high performance concrete technique, and its feature exists In:Preferential using heating to mixing water during winter construction, the water temperature after heating is controlled at 50 DEG C~70 DEG C;Rubble, Sand shifts to an earlier date 2 days and is put into feed bin, mixes and stirs that front temperature is not less than 0 DEG C, additive is placed on storehouse inside holding and do not crystallize;Mixing time is more normal Temperature construction extends 50%, and actual control is in 3min.
3. artificial sand according to claim 1 prepares ballastless track of high-speed railway high performance concrete technique, and its feature exists In:Concrete out-of-machine temperature is not less than 10 DEG C;Strength grade is C40 water-binder ratio≤0.40, and the slump is controlled in 140mm Hereinafter, air content is controlled 3.0~4.0%.
4. the artificial sand according to claim 1 or 3 prepares ballastless track of high-speed railway high performance concrete technique, its feature It is:Under conditions of environment temperature is more than 30 DEG C, the slump is not more than 160mm.
5. artificial sand according to claim 1 prepares ballastless track of high-speed railway high performance concrete technique, and its feature exists In:Concrete coordinates hopper construction using straddle truck;Summer pours selection of time in every daily temperature relatively low time period, pours environment Temperature is no more than 30 DEG C;Winter was selected in every daily temperature higher time period, when ambient air temperature is less than 3 DEG C, should stop roadbed With the cast of bridge section non-fragment orbit concrete.
6. artificial sand according to claim 1 prepares ballastless track of high-speed railway high performance concrete technique, and its feature exists In:Stratified continuous pouring is carried out during concreting, process of wiping one's face is carried out after pouring in time, number of times of wiping one's face is no less than 4 times.
7. artificial sand according to claim 1 prepares ballastless track of high-speed railway high performance concrete technique, and its feature exists In:Concrete is reached after pre-hardening state, that is, start atomized water spray maintenance, when concrete final set, is changed to watering maintenance, and is covered Lid.
8. the artificial sand according to claim 1 or 7 prepares ballastless track of high-speed railway high performance concrete technique, its feature It is:During concrete curing, it is desirable to which road bed board surface temperature is not less than 5 DEG C;When temperature is less than 5 DEG C, does not adopt and water certainly So maintenance process;When run into temperature for three days on end less than 5 DEG C, snow, freezing weather when, take addition cotton-wadded quilt, or set up insulation Canopy, or be equipped with firing equipment carry out it is warming, it is ensured that concrete is not endured cold.
CN201611236475.6A 2016-12-28 2016-12-28 Method for making high-performance concrete for high-speed railway ballastless track through manufactured sand Pending CN106631152A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611236475.6A CN106631152A (en) 2016-12-28 2016-12-28 Method for making high-performance concrete for high-speed railway ballastless track through manufactured sand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611236475.6A CN106631152A (en) 2016-12-28 2016-12-28 Method for making high-performance concrete for high-speed railway ballastless track through manufactured sand

Publications (1)

Publication Number Publication Date
CN106631152A true CN106631152A (en) 2017-05-10

Family

ID=58832048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611236475.6A Pending CN106631152A (en) 2016-12-28 2016-12-28 Method for making high-performance concrete for high-speed railway ballastless track through manufactured sand

Country Status (1)

Country Link
CN (1) CN106631152A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922236A (en) * 2010-07-21 2010-12-22 中铁二十局集团第四工程有限公司 The C50 made sand ultra-high pump concrete construction method
CN102797358A (en) * 2012-08-31 2012-11-28 中铁二十局集团有限公司 Construction technique for ultralow-temperature high-property concrete for railway construction in frigid areas
CN104416675A (en) * 2013-09-02 2015-03-18 青岛兴河建材有限公司 Manufacturing process of pre-tensioned prestressed centrifugal concrete square pile

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922236A (en) * 2010-07-21 2010-12-22 中铁二十局集团第四工程有限公司 The C50 made sand ultra-high pump concrete construction method
CN102797358A (en) * 2012-08-31 2012-11-28 中铁二十局集团有限公司 Construction technique for ultralow-temperature high-property concrete for railway construction in frigid areas
CN104416675A (en) * 2013-09-02 2015-03-18 青岛兴河建材有限公司 Manufacturing process of pre-tensioned prestressed centrifugal concrete square pile

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘娟红等: "《绿色高性能混凝土技术与工程应用》", 31 January 2011, 中国电力出版社 *
谭洪光等: "《预拌混凝土使用技术》", 31 October 2015, 中国建材工业出版社 *

Similar Documents

Publication Publication Date Title
CN104402339B (en) The constructional method of pervious concrete
CN101922236B (en) C50 machine-made sand ultra-high pump concrete construction method
CN104278598B (en) A kind of self-compaction bituminous concrete water-protected enclosure layer and construction method thereof
CN108101456A (en) A kind of big water absorption rate coarse aggregate high-performance marine concrete and its construction
CN102584140A (en) Anti-crack concrete for wharf surface layer and preparation method for anti-crack concrete for wharf surface layer
CN104404850A (en) Method for improving bending tensile strength and durability of cement concrete for road
CN109914178A (en) A kind of biological enzyme curing materials integration paved roads construction method
CN108609955B (en) T-shaped beam concrete and construction method thereof
CN107867815A (en) A kind of concrete and its construction technology
CN105837096B (en) A kind of concrete production technology
RU2281356C1 (en) Ground consolidation composition and method of its usage for road building
CN111517734A (en) Low-crack cement stable-graded broken stone base material and preparation and construction methods thereof
CN110482965A (en) Strength grade is the water conservancy project entity structure high performance concrete and its construction method of C30~C40
CN107630395A (en) A kind of maize straw regenerates the permeable Footpath brick of lightweight aggregate concrete
CN108486963A (en) Non-fragment orbit guarded drainage subgrade bed structure and its laying method
CN103204648A (en) High-strength permeable fiber concrete and preparation method thereof
CN108675711A (en) Ready-mixed concrete construction method under high and cold alternate freezing and thawing environment
CN109797620A (en) A kind of Heavy Traffic globality Rut resistance road paving structure based on composite material
CN102351477B (en) Mixture for preparing C55 high-intensity ultra-high-pumping concrete
CN109437757A (en) A kind of preparation method of pervious concrete
CN109083024A (en) A kind of construction technology of the modification coating for highway bridge floor
CN109704690A (en) A kind of concrete and its construction method inhibiting frozen swell and melt settlement
CN111270565A (en) Ballastless track in high-speed rail turnout area and anti-cracking construction method thereof
CN109160787B (en) Porous water-permeable environment-friendly diluted asphalt cold-patch material and preparation method thereof
CN101429746B (en) Road paving method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170510