CN106629506A - Lifting and installing device for urban comprehensive pipe rack prefabricated part - Google Patents

Lifting and installing device for urban comprehensive pipe rack prefabricated part Download PDF

Info

Publication number
CN106629506A
CN106629506A CN201510436968.3A CN201510436968A CN106629506A CN 106629506 A CN106629506 A CN 106629506A CN 201510436968 A CN201510436968 A CN 201510436968A CN 106629506 A CN106629506 A CN 106629506A
Authority
CN
China
Prior art keywords
raising
lifting
weight
prefabricated component
piping lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510436968.3A
Other languages
Chinese (zh)
Inventor
石昀卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Qianshuo Technology Co Ltd
Original Assignee
Beijing Qianshuo Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Qianshuo Technology Co Ltd filed Critical Beijing Qianshuo Technology Co Ltd
Priority to CN201510436968.3A priority Critical patent/CN106629506A/en
Publication of CN106629506A publication Critical patent/CN106629506A/en
Pending legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The invention discloses a lifting and installing device for an urban comprehensive pipe rack prefabricated part. The lifting and installing device comprises automatic hydraulic cylinders 1, a bearing beam 4, roller sets 5 and reset sliding wheels 6. The high-bearing rail wheels can be used for pushing an adjusting device in a maneuvering manner to penetrate the urban comprehensive pipe rack prefabricated part with a hollow cavity; a stretching handle is shaken; the bearing beam 4 is transversely stretched, unfolded and lifted and is placed to the middle position of the inner cavity of the urban comprehensive pipe rack prefabricated part; a control button of an automatic hydraulic cylinder control system is pressed; a pump station and the four automatic hydraulic cylinders 1 are started to ascend; when the top roller set 5 of the bearing beam 4 device makes contact with the inner wall of the urban comprehensive pipe rack prefabricated part, weight lifting and micro movement adjustment can be conducted; and the end portion of each roller set 5 is provided with one reset sliding wheel 6, a steel wire rope is connected to the tail ends of roller shaft heads of the two roller sets 5 on the single edge, so that during each time of micro movement adjustment, after the roller sets 5 and moved weights are moved together, the roller sets 5 reset. The lifting and installing device has the beneficial effects that the structural is simple and reasonable, the weight of the device is small, operation is controllable, and the safety performance is high, and therefore the lifting and installing device will be widely applied and popularized in the aspect of lifting large weights with hollow cavities and the aspect of micro movement adjustment.

Description

City integrated piping lane prefabricated component raising and installation equipment
Technical field
The present invention relates to a kind of building structural member mounting process tooling device, city integrated piping lane prefabricated component raising and installation equipment, it is the equipment in lifting territory, all exceed a kind of functional device of common hoisting heavy for the volume and weight of this middle cavity of city integrated piping lane prefabricated component, for this kind of weight raising and mobile adjustment and installation docking.
Background technology
With the development need that city size is built, city integrated piping lane prefabricated component plays new specific function, but traditional transport of the middle cavity weight of these concrete and raising are still carried out using crane and fork car, crane it is bulky, equipment movement needs larger space, and the safety problem of personnel cannot be guaranteed when weight is lifted, City Building is built up, transformation project urban construction narrow space, hoisting machine cannot move into construction sometimes, there is the not enough present situation of tonnage in forklift, using forklift, due to the tonnage of weight it is larger, the lifting power of forklift not enough will be lifted by crane toward contact by crane, need movement or also need to both when lifting by crane cavity weight in these while carrying out just making city integrated piping lane prefabricated component raising and mobile adjustment, so that this kind of weight cannot effective precise displacement, it is efficiently completed movement.The city integrated piping lane prefabricated component raising of the present invention and mobile adjusting device are to overcome the bulky of crane using high-power automatic hydraulic system, it is again flexible with fork car, and according to weight of object tonnage characteristic Design, meet the functional requirement of this city integrated piping lane prefabricated component raising and mobile adjustment.
The content of the invention
The technical problem to be solved in the invention, overcome the shortcomings of prior art background of constructing, there is provided a kind of simple and reasonable, the lighter mounting process tooling device of own wt, the city integrated piping lane prefabricated component raising and installation equipment of the present invention are a kind of raising of the city integrated piping lane prefabricated component of middle cavity and mobile adjustment and install the service of connection devices.
The city integrated piping lane prefabricated component raising and installation equipment of the present invention, including automatic liquid cylinder pressure 1, motor-driven bearing track wheel 2, spandrel girder 4 and roller set 5, reset pulley 6, stretching reductor 11 and the sprocket wheel of transverse wire lever 7 combination unit.As preferred, described motor-driven bearing track wheel 2 supports spandrel girder 4, four electrohydraulic cylinders 1 can the city integrated piping lane prefabricated component of effectively efficient raising, inner chamber is pushed up in four groups of roller sets 5 contact raising that top is installed on cavity weight, automatically adjust four hydraulic cylinders one of them, can adjust that weight is levelling and fine motion displacement, meet the installation of city integrated piping lane prefabricated component to connection function.
The city integrated piping lane prefabricated component raising and installation equipment of the present invention, as preferred, automatically adjusting for described raising is provided with four groups of roller sets 5 on four hydraulic cylinders, for the weight of hypervolume excess weight is moved, the coefficient of rolling friction of roller set 5 is little, the simple of mobile change, motive force can be made also to realize weight movement adjustment without sufficiently large.
The city integrated piping lane prefabricated component raising and installation equipment of the present invention, as preferred, described motor-driven high-mechanic rail wheel 2, can be in the controllable movement of regulation walking position of the hollow intracavity of city integrated piping lane prefabricated component, raising weight and movement, the motor-driven effect of high-mechanic rail wheel 2 can be to move freely equipment, and operation operation is controllable.
The city integrated piping lane prefabricated component raising and installation equipment of the present invention, as preferred, it is closed configuration under the described normality of device spandrel girder 4, manual rocking-turn stretching handle 8, the drive sprocket 10 of stretching reductor 11 end is allowed to drive chain 9 to transfer power on the stretching reductor 11 of the other end of spandrel girder 4 and lower portion, transverse wire lever 7 is set to be stretched to the regulation walking position of motor-driven bearing track wheel 2, to horizontal spreading raising and device for moving and adjusting.Reversely rocking-turn stretching handle 8, can make equipment close up removal.
The city integrated piping lane prefabricated component raising and installation equipment of the present invention, as preferred, the end of described roller set 5 is installed by a reset pulley 6, the rod spindle nose end of monolateral two groups of roller sets 5 can be connected to steel wire rope, when making mobile adjustment every time, roller set 5 and by mobile weight together move after, carry out roller set 5 and reset.The end crank of shake reset pulley 6, steel wire rope just pulls roller set 5 to retract original position, can carry out being used when next raising and mobile adjustment action.
The city integrated piping lane prefabricated component raising of the present invention and installation equipment have simple and reasonable, the lighter advantage of own wt, the characteristics of operate controllable, security performance is high and by the extensively popularization and application in terms of the large and heavy objects of cavity and mobile adjustment in raising.
Description of the drawings:
Accompanying drawing 1 is the schematic front view of this equipment
1 in figure, electrohydraulic cylinder, 2, motor-driven bearing track wheel, 3, support supporting leg, 4, spandrel girder, 5, roller set, 6, reset pulley,
Accompanying drawing 2 is the schematic side view of this device
1 in figure, electrohydraulic cylinder, 2, motor-driven bearing track wheel, 3, support supporting leg, 4, spandrel girder, 5, roller set, 6, reset pulley, 7, transverse wire lever, 8, stretching handle, 9, chain, 10, drive sprocket, 11, stretch reductor
Specific embodiment:
Technological means, creation characteristic, reached purpose and effect to make present invention realization is easy to understand, and with reference to specific embodiment, the present invention is expanded on further.The city integrated piping lane prefabricated component raising of the present invention and equipment is installed, specific implementation method is:Installation equipment is adjusted using the motor-driven promotion of motor-driven bearing track wheel,Through the city integrated piping lane prefabricated component of middle cavity,Shake stretching handle 8,Cross directional stretch launches raising spandrel girder 4,It is placed on the track travel position of city integrated piping lane prefabricated component inner chamber,Locking nut,Make the integraty of whole spandrel girder 4 optimal,Press the control knob of automatic liquid cylinder pressure control system,Start pumping plant and four raisings of automatic liquid cylinder pressure 1,When top roller set 5 touches the inwall of city integrated piping lane prefabricated component,Can be carried out raising weight and mobile adjustment,Raising weight and mobile adjustment will first determine the direction of movement,Can only be toward a direction movement,Namely toward the direction locking of another city integrated piping lane prefabricated component for installing docking,Can not inverse motion,Effectively adjustment controls each electrohydraulic cylinder stroke,Prevent city integrated piping lane prefabricated component from removing from equipment,Cause danger.A reset pulley 6 is installed in the end of roller set 5, with steel wire rope the rod spindle nose end of monolateral two groups of roller sets 5 is connected to, when making every time mobile adjustment, roller set 5 and after being moved together by mobile weight carries out roller set 5 and resets.The city integrated piping lane prefabricated component raising of the present invention and device for moving and adjusting have simple and reasonable, and own wt is lighter, the characteristics of operate controllable, security performance is high and by wide popularization and application.
The ultimate principle and principal character and advantages of the present invention of the present invention has been shown and described above.It should be understood by those skilled in the art that; the present invention is not restricted to the described embodiments; merely illustrating the principles of the invention described in above-described embodiment and description; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements are both fallen within scope of the claimed invention.The claimed scope of the invention is by appending claims and its equivalent thereof.

Claims (4)

1. the city integrated piping lane prefabricated component raising of the present invention and install equipment, it is characterized in that, including automatic liquid cylinder pressure 1, motor-driven bearing track wheel 2, spandrel girder 4 and roller set 5, reset pulley 6, stretching reductor 11 and the equipment of the sprocket wheel of transverse wire lever 7 combination, spandrel girder 4 is supported using using motor-driven bearing track wheel 2, four electrohydraulic cylinders 1 can the city integrated piping lane prefabricated component of effectively efficient raising, push up on cavity weight in four groups of roller sets 5 contact raising that top is installed, automatically adjust four hydraulic cylinders one of them, can adjust that weight is levelling and shift position, the installation of city integrated piping lane prefabricated component is met to connection function.
2. city integrated piping lane prefabricated component raising according to claim 1 and install equipment, it is characterized in that, automatically adjusting for described employing raising is provided with four groups of roller sets 5 on four hydraulic cylinders, for the weight of hypervolume excess weight is moved, the coefficient of rolling friction of roller set 5 is little, the simple of mobile change, motive force can be made also to realize weight movement adjustment without sufficiently large.
3. city integrated piping lane prefabricated component raising according to claim 1 and install equipment, it is characterized in that, it is closed configuration under the described equipment normality, manual rocking-turn stretching handle 8, the drive sprocket 10 of stretching reductor 11 end is allowed to drive chain 9 to transfer power on the stretching reductor 11 of the other end of spandrel girder 4 and lower portion, transverse wire lever 7 is set to be stretched to the walking position for being fixed to bearing track wheel, to horizontal spreading raising and device for moving and adjusting, reversely rocking-turn stretching handle 8, can make equipment close up removal.
4. city integrated piping lane prefabricated component raising according to claim 1 and install equipment, it is characterized in that, the end of described roller set 5 is installed by a reset pulley 6, the rod spindle nose end of monolateral two groups of roller sets 5 can be connected to steel wire rope, when making every time mobile adjustment using this architectural feature, roller set 5 and after being moved together by mobile weight carries out roller set 5 and resets, the end crank of shake reset pulley 6, steel wire rope just pulls roller set 5 to retract original position.
CN201510436968.3A 2015-07-23 2015-07-23 Lifting and installing device for urban comprehensive pipe rack prefabricated part Pending CN106629506A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510436968.3A CN106629506A (en) 2015-07-23 2015-07-23 Lifting and installing device for urban comprehensive pipe rack prefabricated part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510436968.3A CN106629506A (en) 2015-07-23 2015-07-23 Lifting and installing device for urban comprehensive pipe rack prefabricated part

Publications (1)

Publication Number Publication Date
CN106629506A true CN106629506A (en) 2017-05-10

Family

ID=58815194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510436968.3A Pending CN106629506A (en) 2015-07-23 2015-07-23 Lifting and installing device for urban comprehensive pipe rack prefabricated part

Country Status (1)

Country Link
CN (1) CN106629506A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109295999A (en) * 2018-10-10 2019-02-01 中铁工程机械研究设计院有限公司 Prefabricated assembled pipe gallery fitting machine and its construction method
KR102240577B1 (en) * 2020-10-20 2021-04-14 박근우 Piping structure for building and method of setting up the same

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002085456A (en) * 2000-09-11 2002-03-26 Syntex Kk Lift for wheelchair to get over level difference by itself
CN2869322Y (en) * 2005-12-23 2007-02-14 于海滨 Portal frame tunnel lining form trolley
CN201942480U (en) * 2011-01-28 2011-08-24 南京奥特电气有限公司 Toothed plate meshed type heavy-load pipeline lifting and supporting device
CN202624176U (en) * 2012-05-21 2012-12-26 西安建筑科技大学 Auxiliary supporting device for vehicle and movable engineering machinery
CN104775614A (en) * 2015-03-18 2015-07-15 成都绿迪科技有限公司 Fixed bracket of adjustable cast-in-place slab mold
CN204938875U (en) * 2015-07-23 2016-01-06 北京谦硕科技有限公司 City integrated piping lane preformed part hoists and erecting equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002085456A (en) * 2000-09-11 2002-03-26 Syntex Kk Lift for wheelchair to get over level difference by itself
CN2869322Y (en) * 2005-12-23 2007-02-14 于海滨 Portal frame tunnel lining form trolley
CN201942480U (en) * 2011-01-28 2011-08-24 南京奥特电气有限公司 Toothed plate meshed type heavy-load pipeline lifting and supporting device
CN202624176U (en) * 2012-05-21 2012-12-26 西安建筑科技大学 Auxiliary supporting device for vehicle and movable engineering machinery
CN104775614A (en) * 2015-03-18 2015-07-15 成都绿迪科技有限公司 Fixed bracket of adjustable cast-in-place slab mold
CN204938875U (en) * 2015-07-23 2016-01-06 北京谦硕科技有限公司 City integrated piping lane preformed part hoists and erecting equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109295999A (en) * 2018-10-10 2019-02-01 中铁工程机械研究设计院有限公司 Prefabricated assembled pipe gallery fitting machine and its construction method
CN109295999B (en) * 2018-10-10 2024-05-28 中铁科工集团装备工程有限公司 Prefabricated assembled comprehensive pipe rack mounting machine and construction method thereof
KR102240577B1 (en) * 2020-10-20 2021-04-14 박근우 Piping structure for building and method of setting up the same

Similar Documents

Publication Publication Date Title
CN204938875U (en) City integrated piping lane preformed part hoists and erecting equipment
CN108005687B (en) Separated tunnel steel arch installing device
CN101979803B (en) Method for mounting prefabricated members of roof or floor in place and mounting equipment
CN106593469A (en) Trolley for construction of inverted arch
CN106629506A (en) Lifting and installing device for urban comprehensive pipe rack prefabricated part
CN205223976U (en) Irrigation gallery concrete slipform device
CN204794599U (en) Motor is decided rotor punching and is folded pressure elevating gear
CN212670638U (en) Automatic walking type movable formwork suitable for construction of box type pipe gallery partition plate
CN203497936U (en) Device for lifting heated steel pipe
CN211368408U (en) Bridge erecting equipment for road and bridge construction
CN204002842U (en) In full section, slide rail moves steel form carrier
CN202324682U (en) Large-load translational thruster
CN110745151A (en) Mining hydraulic trackless self-moving equipment train
CN110668320A (en) Hoisting device for building
CN110883920B (en) Prefabricated T roof beam self-propelled hydraulic pressure template device and template system
CN211523211U (en) Pile extractor for hydraulic engineering
CN103184878B (en) Method for improving second lining construction efficiency in tunnel widening section
CN211333771U (en) Prefabricated T roof beam self-propelled hydraulic pressure template
CN110424344A (en) A kind of hydraulic mobile jumbo of Varied section and operating method
CN207330229U (en) Electric pole Special lifting device
CN206220975U (en) A kind of chassis for inverted arch construction
CN205889484U (en) Highway precast box girder template hydraulic pressure has that rail is whole pacifies dismouting and put
CN110714480A (en) Construction method of pipe gallery
CN212399906U (en) Assembling and disassembling die trolley for box girder outer side template
CN203256624U (en) Hanging basket hydraulic advancing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170510

WD01 Invention patent application deemed withdrawn after publication