CN106627676B - A kind of dynamic allocation method of the resources control of zone controller - Google Patents

A kind of dynamic allocation method of the resources control of zone controller Download PDF

Info

Publication number
CN106627676B
CN106627676B CN201611132369.3A CN201611132369A CN106627676B CN 106627676 B CN106627676 B CN 106627676B CN 201611132369 A CN201611132369 A CN 201611132369A CN 106627676 B CN106627676 B CN 106627676B
Authority
CN
China
Prior art keywords
zone controller
controller
resources control
train
fault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611132369.3A
Other languages
Chinese (zh)
Other versions
CN106627676A (en
Inventor
郜春海
刘波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Traffic Control Technology TCT Co Ltd
Original Assignee
Traffic Control Technology TCT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Traffic Control Technology TCT Co Ltd filed Critical Traffic Control Technology TCT Co Ltd
Priority to CN201611132369.3A priority Critical patent/CN106627676B/en
Publication of CN106627676A publication Critical patent/CN106627676A/en
Application granted granted Critical
Publication of CN106627676B publication Critical patent/CN106627676B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/30Trackside multiple control systems, e.g. switch-over between different systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The present invention provides a kind of dynamic allocation method of the resources control of zone controller, in CBTC systems, if a certain zone controller breaks down, do not break down then and adjacent another zone controller obtains the resources control of fault zone controller, and relevant device in the fault zone controller compass of competency and operation are controlled to the train in the controller compass of competency of fault zone according to the resources control;If the zone controller to break down recovers normal, recover normal zone controller and obtain its resources control, and control the relevant device of its administration and run to train in its compass of competency.Cause train in the region because of single zone controller failure The present invention reduces train or subsequently pass through train degraded running or the hard brake stop in the region etc., improve the efficiency of operation of whole operating line, and when being safeguarded to some zone controller progress ad hoc inspection and repair, whole circuit normal operation is not influenced.

Description

A kind of dynamic allocation method of the resources control of zone controller
Technical field
The present invention relates to urban track traffic control field, and in particular to a kind of resources control of zone controller moves State distribution method.
Background technology
In existing CBTC systems, the relevant equipment of overspeed protection includes Vehicle Controller equipment (VOBC), trackside Zone controller equipment (ZC), interlock device (CI), trackside other equipment and communication equipment (DCS), trackside other equipment are main Including semaphore, meter shaft, track switch etc..
In CBTC systems, the VOBC of train regularly sends its positional information to zone controller ZC.Region control Interlock device CI is arranged in positional information that device ZC is reported according to communication train and region within the jurisdiction route, trackside equipment Orbit occupancy/free message of offer, switch status information etc., are that the communication train in its control range calculates mobile authorization (MA).Train is according to from the received mobile authorization information of zone controller ZC, section occupied information, semaphore state, track switch shape The information such as state, calculating speed protection curve simultaneously carry out velocity protection.This means ATP on car and ground ATP (zone controller) Between periodical communication, management and the Separation control of more trains are realized by ground installation.
Current track traffic CBTC systems have following defect in terms of zone controller system design:Zone controller Fixed control is one or more to fix interlock device, trackside equipment etc., and control is fixed, and can not be transferred;Single Region control Device failure, directly results in the region or enters the train degraded running or hard brake stop in the region, seriously affect fortune Seek efficiency;The zone controller overhaul of the equipments time is dumb, and after train can only be waited offline or when equipment fault could overhaul.
The content of the invention
For in the prior art the defects of, the present invention provides a kind of dynamically distributes side of the resources control of zone controller Method, reduces train because single zone controller failure causes train in the region or is subsequently transported by the train degradation in the region Row or hard brake stop etc., improve the efficiency of operation of whole operating line, and interim when being carried out to some zone controller During repair and maintenance, whole circuit normal operation is not influenced.
In order to solve the above technical problems, the present invention provides following technical scheme:
On the one hand, the present invention provides a kind of dynamic allocation method of the resources control of zone controller, including:
In CBTC systems, if a certain zone controller breaks down, another zone controller not broken down obtains The resources control for the zone controller that must be broken down, and the Region control that this breaks down is controlled according to the resources control Relevant device in device compass of competency and operation are to the train in the compass of competency of the zone controller to break down;
Wherein, another zone controller is:Region control communicate with the zone controller to break down and adjacent Device processed;
Another zone controller, which obtains the resources control, to be included:Another zone controller active detecting is simultaneously Force to obtain the resources control, alternatively, the zone controller to break down is interacted with another zone controller Transfer the resources control.
Further, the method further includes:
If the zone controller to break down recovers normal, recover normal zone controller and controlled with another region Device interaction processed, obtains the resources control of the normal zone controller of recovery, and controls its pipe based on the resources control Relevant device in the range of linchpin and operation are to the train in its compass of competency.
Further, if a certain zone controller breaks down, another zone controller obtains the region broken down The resouce controller power of controller, including:
Fault zone controller sends the resource control of the fault zone controller to adjacent non-faulting zone controller Make the Handoff Request of power;
If the Handoff Request is successfully transmitted to non-faulting zone controller, the non-faulting zone controller is according to institute State the resources control that Handoff Request obtains the fault zone controller;
The non-faulting zone controller is according to the resources control of the fault zone controller, to the fault zone Relevant device and operation to the train in the controller compass of competency of fault zone in controller compass of competency are controlled;
Wherein, fault zone controller is the zone controller to break down, and non-faulting zone controller is that event does not occur Another zone controller of barrier;
The Handoff Request includes the status information of the relevant device in the fault zone controller compass of competency.
Further, if a certain zone controller breaks down, another zone controller obtains the region broken down The resouce controller power of controller, including:
Fault zone controller sends the resource control of the fault zone controller to adjacent non-faulting zone controller Make the Handoff Request of power;
If the Handoff Request sends failure, the non-faulting zone controller is forced to obtain the fault zone control The resources control of device;
The non-faulting zone controller is according to the resources control of the fault zone controller, to the fault zone Relevant device and operation to the train in the controller compass of competency of fault zone in controller compass of competency are controlled;
Wherein, fault zone controller is the zone controller to break down, and non-faulting zone controller is that event does not occur Another zone controller of barrier;
The Handoff Request includes the status information of the relevant device in the fault zone controller compass of competency.
Further, if the Handoff Request is successfully transmitted to non-faulting zone controller, the non-faulting area Domain controller obtains the resources control of the fault zone controller according to the Handoff Request;Including:
If the Handoff Request is successfully transmitted to non-faulting zone controller, the non-faulting zone controller is to described Fault zone controller, which is sent, transfers confirmation message;
The fault zone controller receives the transfer confirmation message, wherein, the transfer confirmation message is included to institute State acquisition license and itself working status of the non-faulting zone controller of the resources control of fault zone controller;
The fault zone controller cuts off its resources control and to the non-faulting according to the transfer confirmation message Zone controller sends resources control and has cut off information;
The non-faulting zone controller has cut off information according to the Handoff Request and resources control, receives the event Hinder the resources control of zone controller.
Further, if the Handoff Request sends failure, the non-faulting zone controller is forced to obtain institute The resources control of fault zone controller is stated, including:
If the Handoff Request sends failure and the non-faulting zone controller detects adjacent zone controller hair Failure is given birth to, then the non-faulting zone controller judges whether its own has the resources control of acquisition fault zone controller Authority;
If the non-faulting zone controller has the authority for the resources control for obtaining the fault zone controller, institute Non-faulting zone controller is stated to force to obtain the resources control of the fault zone controller, meanwhile, the fault zone control Device processed switches to state to be repaired.
Further, the non-faulting zone controller is according to the resources control of the fault zone controller, to institute State relevant device in the controller compass of competency of fault zone and operation to the train in the controller compass of competency of fault zone into Row control, including:
The non-faulting zone controller controls the faulty section according to the resources control of the fault zone controller Relevant device in domain controller compass of competency, and operation is obtained to the train in the compass of competency of the fault zone controller Relevant information;
The non-faulting zone controller determines that operation to the fault zone controls according to the relevant information of the train The mobile authorization of train in the compass of competency of device;
The train mobile authorization is sent to operation to the fault zone controller by the non-faulting zone controller Compass of competency in train, and with the train Vehicle Controller communicate to connect, which is controlled.
Further, if the zone controller that breaks down recovers normal, recover normal zone controller with Another zone controller interaction, obtains the resources control for recovering normal zone controller, including:
If the zone controller that breaks down recovers normal, recover normal zone controller to occupying its resources control Another zone controller of power sends resources control and recaptures request;
Another zone controller recaptures request according to the resources control received, cuts off described recover normally Zone controller resources control;
The normal zone controller of recovery obtains its resources control.
Further, another zone controller recaptures request according to the resources control received, cuts off institute The resources control for recovering normal zone controller is stated, including:
Another zone controller recaptures request according to the resources control received, recovers normal to described Zone controller sends resources control information;
It is described to recover normal zone controller according to the resources control information, obtain and occupy its resources control The ID number of another zone controller;
It is described to recover normal zone controller to another zone controller transmission returning control order;
Another zone controller cuts off the normal zone controller of recovery according to the returning control order Resources control.
Further, it is described and relevant device in its compass of competency and operation are controlled to its pipe based on the resources control Train in the range of linchpin, including:
It is described to recover normal zone controller according to its resources control to the relevant device progress in its compass of competency Control;
It is described to recover normal zone controller calculating operation to the mobile authorization of the train in its compass of competency;
And the train mobile authorization is sent to operation to its compass of competency by the normal zone controller of recovery Interior train, and communicated to connect with the Vehicle Controller on the train, which is controlled.
As shown from the above technical solution, the dynamically distributes side of the resources control of a kind of zone controller of the present invention Method, in CBTC systems, if a certain zone controller breaks down, another zone controller not broken down is occurred The resources control of the zone controller of failure, and control the zone controller to break down to administer according to the resources control In the range of relevant device and operation to the train in the compass of competency of the zone controller to break down;Wherein, another region Controller is:Zone controller communicate with the zone controller to break down and adjacent;Another zone controller is provided Source control includes:Another zone controller active detecting and the resources control obtained, alternatively, the Region control to break down Device interacts the resources control transferred with another zone controller;Reduce train because single zone controller failure causes the area Train or subsequently pass through the train degraded running or hard brake stop etc. in the region in domain, improve the fortune of whole operating line Efficiency is sought, and when being safeguarded to some zone controller progress ad hoc inspection and repair, does not influence whole circuit normal operation.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is attached drawing needed in technology description to be briefly described, it should be apparent that, drawings in the following description are the present invention Some embodiments, for those of ordinary skill in the art, without creative efforts, can also basis These attached drawings obtain other attached drawings.
Fig. 1 is CBTC systems car ground interaction figure in the prior art;
Fig. 2 is a kind of a kind of specific embodiment of the dynamic allocation method of the resources control of zone controller of the present invention Flow diagram;
Fig. 3 is a kind of flow diagram of embodiment of step 100 in dynamic allocation method of the invention;
Fig. 4 is the flow diagram of the another embodiment of step 100 in dynamic allocation method of the invention;
Fig. 5 is the flow diagram of step 200 in dynamic allocation method of the invention;
Fig. 6 is the ground of the traditional vehicle after zone controller failure communication scheme in concrete application example.
Fig. 7 is the new technology train-ground communication schematic diagram after zone controller failure of the invention in concrete application example;
Fig. 8 is resources control transfer figure between zone controller of the invention in concrete application example.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, clear, complete description is carried out to the technical solution in the embodiment of the present invention, it is clear that described embodiment is Part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art All other embodiments obtained without creative efforts, belong to the scope of protection of the invention.
In CBTC systems, the VOBC of train regularly sends its positional information to zone controller ZC.Region control Interlock device CI is arranged in positional information that device ZC is reported according to communication train and region within the jurisdiction route, trackside equipment Orbit occupancy/free message of offer, switch status information etc., are that the communication train in its control range calculates mobile authorization (MA).Referring to Fig. 1, train is according to from the received mobile authorization information of zone controller ZC, section occupied information, semaphore shape The information such as state, switch status, calculating speed protection curve simultaneously carry out velocity protection.This means ATP on car and ground ATP (areas Domain controller) between periodical communication, management and the Separation control of more trains are realized by ground installation.
Each subsystem function is as follows in CBTC systems:
1st, Vehicle Controller VOBC:Vehicle Controller makes full use of wireless communication transmissions means, in real time carry out train with The two-way communication of zone controller, positional information is sent to zone controller so that follow-up train will be seen that front train fortune Row actual interval distance, by calculating, follow-up train can provide optimal braking curve, improve the section traffic capacity.Region Controller can transmit vehicle operation forward box speed limit situation to vehicle-mounted signal device in real time, instruct train to be limited by circuit Condition is run, and substantially increases train operational safety.
2nd, zone controller:It is the trackside part of overspeed protection subsystem in CBTC.Zone controller is mainly responsible for basis Orbit occupancy/free time that the route and trackside equipment that the positional information and interlock device that communication train is reported are arranged provide Information, is that the communication train in its control range calculates mobile authorization (MA), ensures the safety of communication train in its control area Operation.
(1) train is obtained by train-ground communication network in real time in real time with the communication train two-way communication run in circuit Position, passes through COMPREHENSIVE CALCULATING so that follow-up train can understand front train operation actual interval distance in time, improve section and lead to Row ability;
(2) vehicle operation forward box speed limit situation, including track switch, semaphore etc. are transmitted to vehicle-mounted signal device in real time The state of barrier, instructs train to be run by circuit restrictive condition, substantially increases train operational safety;
(3) obtain section occupancy/free time of circuit in real time with interlock system two-way communication by backbone network, be row Route situation that car gather goes out, switch status, semaphore state;And interlocking signalling command information etc. is supplied to aid in its complete Into route gather, the functions such as cancellation are handled, improve efficiency of operation.
3rd, interlock:Realize state control, the state acquisition function of ground installation in its control area, and ensure train route Correct interlock connection between upper curtate, track switch, semaphore.
4、DCS:Data communication system, realizes the backbone network and vehicle-ground wireless communication system of the network service of ground installation.
Current track traffic CBTC systems have following defect in terms of zone controller system design:Zone controller Fixed control is one or more to fix interlock device, trackside equipment etc., and control is fixed, and can not be transferred;Single Region control Device failure, directly results in the region or enters the train degraded running or hard brake stop in the region, seriously affect fortune Seek efficiency;The zone controller overhaul of the equipments time is dumb, and after train can only be waited offline or when equipment fault could overhaul.
Difference lies in the present invention is in some zone controller failure, by the region with prior art scheme by the present invention The control of interlock device and other trackside equipments (semaphore, meter shaft, track switch etc.) in controller compass of competency is moved rapidly The zone controller for giving adjacent normal operation near it is managed so that train is in fault zone controller original control zone It is interior, communicate with transfer side's zone controller, obtain the train MA information that transfer side's zone controller calculates, and front rail Road line information, track switch information and signal lamp information etc..When train is run in the region, it will not be led because of zone controller failure Running train hard brake stop or degraded running are caused, remains to keep normal operation.Recover normal in the fault zone controller When, to transfer side's zone controller application resources control, the control in the region is obtained again.
In the present solution, by carrying out interlock device between fault zone controller and adjacent transfer side's zone controller Transferred with other trackside equipment controls, reduce train because single zone controller failure causes train or follow-up in the region By the train degraded running in the region or hard brake stop etc., improve the efficiency of operation of whole operating line, and when pair When some zone controller progress ad hoc inspection and repair is safeguarded, whole circuit normal operation is not influenced.
The embodiment of the present invention one provides a kind of a kind of tool of dynamic allocation method of the resources control of zone controller Body embodiment.The dynamic allocation method specifically includes following content:
Step 100:In CBTC systems, if a certain zone controller breaks down, another region for not breaking down Controller obtains the resouce controller power of the zone controller to break down, and controls this to break down according to the resources control Zone controller compass of competency in relevant device and operation to the row in the compass of competency of the zone controller to break down Car.
In the above, another zone controller is:Area communicate with the zone controller to break down and adjacent Domain controller;Another zone controller, which obtains resources control, to be included:Another zone controller active detecting simultaneously forces to obtain money Source control, alternatively, the zone controller to break down interacts handover resource control with another zone controller, and by the event Hinder zone controller administration former control zone in trackside equipment resources control to adjacent non-faulting zone controller into Before row is transferred, fault zone controller is first detected adjacent zone controller, until detecting that non-faulting region is controlled After device processed, then the resources control of the trackside equipment into its former control zone of transfer, wherein, relevant device is trackside equipment, example Such as include:Other trackside equipments such as interlock device and semaphore, meter shaft, track switch etc., are only a kind of citing herein, in of the invention Relevant device be not limited only to a kind of this situation.
As can be seen from the above description, the embodiment of the present invention is realized when a certain zone controller breaks down, and is not occurred Failure and adjacent another zone controller carry out the zone controller to break down the acquisition of resources control, reduce row Car is because single zone controller failure causes train in the region or subsequently passes through the train degraded running in the region or urgent system Dynamic parking etc., improves the efficiency of operation of whole operating line, and when being safeguarded to some zone controller progress ad hoc inspection and repair, Whole circuit normal operation is not influenced.
The present invention provides a kind of dynamic allocation method of the resources control of zone controller.Referring to Fig. 2, in step On the basis of 100, which further includes following content:
Step 200:If the zone controller to break down recovers normal, recover normal zone controller and another area Domain controller interacts, and obtains the resources control for recovering normal zone controller, and control its pipe based on the resources control Relevant device in the range of linchpin and operation are to the train in its compass of competency.
In this step, after the fault recovery of fault zone controller is normal, fault zone controller is to non-faulting area Domain controller asks for the resources control of the trackside equipment in its former control zone and according to the money of the trackside equipment in former control zone Source control is controlled operation to the train in former control zone, while recovers normal fault zone controller and obtaining again After the resources control for taking the trackside equipment in former control zone, the control of non-faulting zone controller excision cause barrier zone controller The resources control of trackside equipment in area processed.
As can be seen from the above description, the dynamic allocation method of the zone controller in the embodiment of the present invention reduce train because Single zone controller failure causes train in the region or subsequently stops by the train degraded running or emergency braking in the region Car etc., improves the efficiency of operation of whole operating line, and when carrying out ad hoc inspection and repair to some zone controller and safeguarding, not shadow Ring whole circuit normal operation.
In a kind of optional embodiment, one kind the present invention provides step 100 in above-mentioned dynamic allocation method is specific Embodiment.Referring to Fig. 3, which specifically includes following content:
Step 101a:Fault zone controller sends the money of fault zone controller to adjacent non-faulting zone controller The Handoff Request of source control.
In this step, when some zone controller in CBTC systems breaks down, fault zone controller according to The resources control generation handover resource control request of trackside equipment in the former control zone of the fault zone controller administration, And send the request of handover resource control to adjacent non-faulting zone controller, wherein, handover resource control request bag Include the Handoff Request of the resources control of the fault zone controller and the status information of whole trackside equipments in former control zone.
Step 102a:If Handoff Request is successfully transmitted to non-faulting zone controller, non-faulting zone controller to therefore Hinder zone controller and send transfer confirmation message.
Step 103a:Fault zone controller, which receives, transfers confirmation message, and fault zone controller is according to transfer confirmation letter Breath, which cuts off its resources control and sends resources control to non-faulting zone controller, has cut off information.
In this step, transferring confirmation message includes acquisition license to the resources control of fault zone controller and non- Itself working status of fault zone controller;
Step 104a:Non-faulting zone controller has cut off information according to Handoff Request and resources control, receives failure The resources control of zone controller.
Step 105a:Non-faulting zone controller controls fault zone according to the resources control of fault zone controller Relevant device in controller compass of competency, and operation is obtained to the correlation of the train in the compass of competency of fault zone controller Information.
Step 106a:Non-faulting zone controller determines operation to fault zone controller according to the relevant information of train The mobile authorization of train in compass of competency.
Step 107a:Train mobile authorization is sent to operation to the pipe of fault zone controller by non-faulting zone controller Train in the range of linchpin, and communicated to connect with the Vehicle Controller on the train, which is controlled.
In above steps, fault zone controller is the zone controller to break down, non-faulting zone controller For another zone controller not broken down;Handoff Request includes the relevant device in the controller compass of competency of fault zone Status information.
As can be seen from the above description, the zone controller in the embodiment of the present invention is rapid to attempt to provide after breaking down Source control is transferred to adjacent non-faulting zone controller, is changed zone controller fixation administration in traditional CBTC systems and is referred to The trackside equipments such as fixed one or several interlocking, track switch, semaphores, and not alterability the characteristics of, to be dynamically adapted region The compass of competency of controller;Realize the money that the trackside equipment in former control zone is successfully obtained in non-faulting zone controller at the same time After the control of source, non-faulting zone controller is controlled according to the resources control of the trackside equipment in former control zone with operation to original Train in area communicates, ensure that resources control transfer successfully after CBTC systems in train operation security and can By property.
In a kind of optional embodiment, the present invention provides second of tool of step 100 in above-mentioned dynamic allocation method Body embodiment.Referring to Fig. 4, which specifically includes following content:
Step 101b:Fault zone controller sends the money of fault zone controller to adjacent non-faulting zone controller The Handoff Request of source control.
Step 102b:If Handoff Request sends failure and non-faulting zone controller detects adjacent zone controller hair Failure is given birth to, then non-faulting zone controller judges whether its own has the power for the resources control for obtaining fault zone controller Limit.
Step 103b:If not fault zone controller has the authority for the resources control for obtaining fault zone controller, then Non-faulting zone controller is forced to obtain the resources control of fault zone controller, meanwhile, fault zone controller switches to State to be repaired.
Step 104b:Non-faulting zone controller controls fault zone according to the resources control of fault zone controller Relevant device in controller compass of competency, and operation is obtained to the correlation of the train in the compass of competency of fault zone controller Information.
Step 105b:Non-faulting zone controller determines operation to fault zone controller according to the relevant information of train The mobile authorization of train in compass of competency.
Step 106b:Train mobile authorization is sent to operation to the pipe of fault zone controller by non-faulting zone controller Train in the range of linchpin, and communicated to connect with the Vehicle Controller on the train, which is controlled.
In above-mentioned steps, fault zone controller is the zone controller to break down, and non-faulting zone controller is Another zone controller not broken down;Handoff Request includes the shape of the relevant device in the controller compass of competency of fault zone State information.Interacting the detailed process sent is:If not fault zone controller does not receive the shifting that the fault zone controller is sent Hand over resources control request and detect that adjacent fault zone controller breaks down, then non-faulting zone controller judges it Itself whether there is the authority for the resources control for obtaining fault zone controller;If not fault zone controller has acquisition faulty section The authority of the resources control of domain controller, then non-faulting zone controller is directly to the former control zone of fault zone controller acquisition The resources control of interior trackside equipment;Non-faulting zone controller is according to the resources control of the trackside equipment in former control zone Trackside equipment in fault zone is controlled;And non-faulting zone controller is according to the trackside equipment in former control zone Resources control, recalculate the mobile authorization of train in former control zone;Non-faulting zone controller is by train mobile authorization Train is sent to, with running to the communication connection of the Vehicle Controller on the train in former control zone.Wherein, handover resource control Request includes whole trackside equipments in the Handoff Request and former control zone of the resources control of the trackside equipment in former control zone Status information.As can be seen from the above description, the embodiment of the present invention is realized controls in non-faulting zone controller and fault zone Situations such as device communication overtime processed and caused by when sending failure, the trackside that fault zone controller is forced to obtain in former control zone is set Standby resources control so that operation communicates to the train in former control zone with the non-faulting zone controller so that money After source control transfers failure, the security and reliability of train operation in CBTC systems are still ensured that.
In a kind of optional embodiment, one kind the present invention provides step 200 in above-mentioned dynamic allocation method is specific Embodiment.Referring to Fig. 5, which specifically includes following content:
Step 201:If the zone controller that breaks down recovers normal, recover normal zone controller to occupying it Another zone controller of resources control sends resources control and recaptures request.
Step 202:Another zone controller recaptures request according to the resources control received, to the normal region of recovery Controller sends resources control information.
Step 203:Recover normal zone controller and its resources control is occupied according to resources control information, acquisition The ID number of another zone controller.
Step 204:Recover normal zone controller and send returning control order to another zone controller.
Step 205:Another zone controller recovers the money of normal zone controller according to returning control order, excision Source control.
Step 206:Recover normal zone controller according to its resources control to the relevant device in its compass of competency It is controlled.
Step 207:Recover normal zone controller and calculate operation to the mobile authorization of the train in its compass of competency.
Step 208:Recover normal zone controller train mobile authorization is sent in operation to its compass of competency Train, and communicated to connect with the Vehicle Controller on the train, which is controlled.
In step 201 to 208, the detailed process of switching is:Non-faulting zone controller is according to the resource control received Weight processed obtains request, and the resources control information of itself is sent to non-faulting zone controller;Cause hinder zone controller according to Resources control information is received, inquiry occupies the non-faulting region control of the resources control of the trackside equipment in its former control zone The ID number of device processed;Cause hinders zone controller and sends returning control order to non-faulting zone controller;Control in non-faulting region Device processed cuts off the resources control of the trackside equipment in former control zone according to returning control order, wherein, abandon resources control What power information included resources control abandons confirmation message, trackside equipment information and train information;Cause hinders zone controller The resources control of the trackside equipment in former control zone is reacquired, and according to the resources control of the trackside equipment in former control zone Power is controlled the trackside equipment in former control zone;Cause barrier zone controller recalculates the train in its former control zone Mobile authorization;And train mobile authorization is sent to train by cause barrier zone controller, with running to the row in former control zone Vehicle Controller communication connection on car.
As can be seen from the above description, by the fault recovery in fault zone controller it is normal after, fault zone control thinks highly of The new resources control for obtaining the trackside equipment in former control zone, can maximumlly meet the optimal dynamic of each zone controller Distribution, reduces the control load of single zone controller.
For further description this programme, the present invention also provides a kind of fault zone controller and non-faulting Region control The concrete application example of dynamic allocation method is carried out between device.Referring to Fig. 6 and 7, which specifically includes following step Suddenly:
1st, this programme system architecture
Fig. 6 is traditional train-ground communication after zone controller failure, due to ZC2 failures, in communicating between vehicle-mounted VOBC and ZC2 It is disconnected, in the compass of competency of ZC2, train can only degraded running, be downgraded to ITC ranks from CBTC ranks.
Fig. 7 is new technology train-ground communication after zone controller failure, in communicating between ZC2 failures, vehicle-mounted VOBC and ZC2 Have no progeny, ZC2 transfers its control to ZC3, and vehicle-mounted VOBC communicates with ZC3, is controlled by ZC3 in original ZC2 compasss of competency Train with CBTC ranks run.
This programme is applied in rail traffic signal system, and based on CBTC system architectures, in trackside, train overspeeding protection sets During standby-zone controller failure, the equipment such as the train in the controller control range of fault zone, trackside can be provided into Mobile state Source control weight distribution.
The technical program can be transferred rapidly in the controller compass of competency of fault zone in some zone controller failure The trackside equipment such as train, interlock device information gives adjacent normal region controller so that in the region train need not degrade or Hard brake stop etc., keeps normal operation, not because of the single failure of trackside zone controller, reduces the operational efficiency of train.
2nd, the technical program dynamic resource reassigns process
The technical program recovers latter two normal stage, description according to after zone controller failure and fault zone controller Process is reassigned into Mobile state to train and trackside equipment resource.
After zone controller failure:
After some zone controller breaks down, its adjacent area controller obtains the resources control of the zone controller The process of power is divided into two types:
2-1, fault zone controller are largely divided into 4 actively to adjacent normal region controller handover resource control Step,
(1) when some zone controller finds faults itself, judge the state of adjacent area controller (it is, sentencing Whether disconnected adjacent area controller is normal), to adjacent normal region controller, (zone controller inquiry direction can pass through data Configured, such as inquired about to the left, or inquired about to the right) application control transfer, and by the controller compass of competency of fault zone Trackside equipment status information be sent to the adjacent normal region controller of pre- transfer at the same time.
(2) the adjacent normal region controller transferred in advance obtains the resource Handoff Request of fault zone controller, replies to Fault zone controller has known Handoff Request and itself working status, and prepares to receive the resources control of fault zone controller Power.
(3) fault zone controller receives the reply of the adjacent normal region controller of pre- transfer, the control of disengagement failure region System power resources control, the order reply for having cut off resources control is sent to the normal adjacent area controller transferred in advance.
(4) the normal adjacent area controller transferred in advance obtains the resources control excision order of fault zone controller, The MA information of train in cause barrier zone controller administration is recalculated, which is sent to corresponding train, and from respective column Car obtains train position information etc., and the equipment such as the trackside track switch in cause barrier zone controller compass of competency, semaphore are carried out Control, idiographic flow is referring to Fig. 8.
2nd, fault zone controller fails solicited message being sent to adjacent normal region controller, just power-off or cannot be just When often communicating with adjacent area controller, if adjacent normal region controller is detecting and fault zone controller communication abnormality Or time-out, force to obtain the resources control of fault zone controller, and normally take over the resource control of the fault zone controller System power, normal communication is carried out with the train in the fault zone controller compass of competency, to the fault zone controller administration model Trackside equipment in enclosing is controlled.Comprise the following steps that:
(1) normal region controller communicates with adjacent area controller, and detection determines whether communication abnormality or super When fault zone controller.
(2) if detect with adjacent area controller communication abnormality or time-out, judge local area domain controller whether have rob Take the authority of the resources control of communication abnormality or the zone controller of time-out by force.
(3) if possessing authority, communicate with the train in the administration of abnormal area controller, interlock device etc., it is different to obtain this Control in normal zone controller compass of competency, it is (super when communicating with fault zone controller to obtain train in the compass of competency Spend some fixed cycle, which is less than time-out and judges the cycle, attempts to communicate with pre- handover region controller), interlock device etc. Status information.According to train position information and trackside line information, the mobile authorization MA of train in the section is calculated, and is sent Rate curve calculating is carried out to train, while control command etc. is sent to trackside equipment.
After 3. fault zone controller recovers normal:
After fault zone controller recovers normal, apply for that the process of resources control is as follows again:
(1) fault zone controller ZC1 fault recoveries, communication request is sent to adjacent area controller.
(2) controller ZC1 in fault zone obtains the resources control information of adjacent area controller, inquiry control cause barrier The ID number of the adjacent handover region controller ZC2 of resources control in zone controller compass of competency.
(3) zone controller ZC1 applies withdrawing cause barrier zone controller ZC1 to the adjacent controller ZC2 of handover region Resources control.
(4) resources control of the adjacent controller ZC2 of handover region receptions cause barrier zone controller ZC1, which is withdrawn, asks Ask, reply the resources control information for preparing excision cause barrier zone controller ZC1, by the pipe of cause barrier zone controller ZC1 Train, trackside equipment information are replied in the lump in the range of linchpin.
(5) zone controller ZC1 receives the abstention information and cause barrier Region control of the adjacent controller ZC2 of handover region Train, trackside information in the administration of device ZC1, recalculate the train mobile authorization MA in compass of competency and are sent to train, together When control the equipment such as trackside track switch, semaphore, and transfer successful information to zone controller ZC2.
(6) zone controller ZC2 receives zone controller ZC1 and transfers successful information, cuts off and hinders Region control to cause The resources control of device administrative area.
As can be seen from the above description, this concrete application example dynamic adjustment region controller is to tracksides such as interlocking, track switch, semaphores The compass of competency of equipment;In single zone controller failure, transfer fault zone controller resources control to it is adjacent just Normal zone controller;Fault zone controller can regain former resources control after fault recovery;Specially:
1st, change zone controller in tradition CBTC systems fix one or several specified interlock devices of administration, track switch, The trackside equipments such as semaphore, and not alterability the characteristics of, to be dynamically adapted the compass of competency of zone controller.
2nd, in single zone controller failure, not because of the resources control of dynamic adjustment region controller, train is influenced Normal operation, do not reduce the efficiency of operation of circuit so that train is not because single zone controller failure causes the administration section Degradation, hard brake stop etc..
3rd, because that there can be the compass of competency of dynamic adjustment region controller, system maintenance time point is limited and requires to reduce, The incidence of incipient fault is reduced, improves the operational efficiency of circuit.
Above example is merely to illustrate technical scheme, rather than its limitations;Although with reference to the foregoing embodiments The present invention is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to foregoing each implementation Technical solution described in example is modified, or carries out equivalent substitution to which part technical characteristic;And these are changed or replace Change, the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical solution.

Claims (10)

  1. A kind of 1. dynamic allocation method of the resources control of zone controller, it is characterised in that including:
    In CBTC systems, if a certain zone controller breaks down, another zone controller not broken down is sent out The resources control of the zone controller of raw failure, and the zone controller pipe that this breaks down is controlled according to the resources control Relevant device in the range of linchpin and operation are to the train in the compass of competency of the zone controller to break down;
    Wherein, another zone controller is:Zone controller communicate with the zone controller to break down and adjacent;
    Another zone controller, which obtains the resources control, to be included:Another zone controller active detecting is simultaneously forced The resources control is obtained, alternatively, the zone controller to break down interacts transfer with another zone controller The resources control.
  2. 2. according to the method described in claim 1, it is characterized in that, the method further includes:
    If the zone controller to break down recovers normal, recover normal zone controller and another zone controller Interaction, obtains the resources control for recovering normal zone controller, and controls it to administer model based on the resources control Interior relevant device and operation are enclosed to the train in its compass of competency.
  3. 3. according to the method described in claim 2, it is characterized in that, if a certain zone controller breaks down, another region Controller obtains the resources control of the zone controller to break down, including:
    Fault zone controller sends the resources control of the fault zone controller to adjacent non-faulting zone controller Handoff Request;
    If the Handoff Request is successfully transmitted to non-faulting zone controller, the non-faulting zone controller is according to the shifting Hand over the resources control of fault zone controller described in acquisition request;
    The non-faulting zone controller controls the fault zone according to the resources control of the fault zone controller Relevant device and operation to the train in the controller compass of competency of fault zone in device compass of competency are controlled;
    Wherein, the fault zone controller is the zone controller to break down, and the non-faulting zone controller is not send out Another zone controller of raw failure;
    The Handoff Request includes the status information of the relevant device in the fault zone controller compass of competency.
  4. 4. according to the method described in claim 2, it is characterized in that, if a certain zone controller breaks down, another region Controller obtains the resources control of the zone controller to break down, including:
    Fault zone controller sends the resources control of the fault zone controller to adjacent non-faulting zone controller Handoff Request;
    If the Handoff Request sends failure, the non-faulting zone controller is forced to obtain the fault zone controller Resources control;
    The non-faulting zone controller controls the fault zone according to the resources control of the fault zone controller Relevant device and operation to the train in the controller compass of competency of fault zone in device compass of competency are controlled;
    Wherein, fault zone controller is the zone controller to break down, and non-faulting zone controller does not break down Another zone controller;
    The Handoff Request includes the status information of the relevant device in the fault zone controller compass of competency.
  5. 5. if according to the method described in claim 3, it is characterized in that, the Handoff Request is successfully transmitted to non-faulting area Domain controller, then the non-faulting zone controller resource control of the fault zone controller is obtained according to the Handoff Request Power processed includes:
    If the Handoff Request is successfully transmitted to non-faulting zone controller, the non-faulting zone controller is to the failure Zone controller, which is sent, transfers confirmation message;
    The fault zone controller receives the transfer confirmation message, wherein, the transfer confirmation message is included to the event Hinder acquisition license and itself working status of the non-faulting zone controller of the resources control of zone controller;
    The fault zone controller cuts off its resources control and to the non-faulting region according to the transfer confirmation message Controller sends resources control and has cut off information;
    The non-faulting zone controller has cut off information according to the Handoff Request and resources control, receives the faulty section The resources control of domain controller.
  6. 6. if according to the method described in claim 4, it is characterized in that, Handoff Request transmission failure, described non- Fault zone controller is forced to obtain the resources control of the fault zone controller, including:
    If the Handoff Request sends failure and the non-faulting zone controller detects that event occurs for adjacent zone controller Hinder, then the non-faulting zone controller judges whether its own has the power for the resources control for obtaining fault zone controller Limit;
    If the non-faulting zone controller has the authority for the resources control for obtaining the fault zone controller, described non- Fault zone controller is forced to obtain the resources control of the fault zone controller, meanwhile, the fault zone controller Switch to state to be repaired.
  7. 7. the method according to claim 5 or 6, it is characterised in that the non-faulting zone controller is according to the failure The resources control of zone controller, to the relevant device in the fault zone controller compass of competency and runs to faulty section Train in domain controller compass of competency is controlled, including:
    The non-faulting zone controller controls the fault zone to control according to the resources control of the fault zone controller Relevant device in device compass of competency processed, and operation is obtained to the phase of the train in the compass of competency of the fault zone controller Close information;
    The non-faulting zone controller determines operation to the fault zone controller according to the relevant information of the train The mobile authorization of train in compass of competency;
    The train mobile authorization is sent to operation to the pipe of the fault zone controller by the non-faulting zone controller Train in the range of linchpin, and communicated to connect with the Vehicle Controller on the train, which is controlled.
  8. 8. according to the method described in claim 2, it is characterized in that, if the zone controller that breaks down recovers normal, Then recover normal zone controller to interact with another zone controller, obtain the normal zone controller of recovery Resources control, including:
    If the zone controller that breaks down recovers normal, recover normal zone controller to occupying its resources control Another zone controller sends resources control and recaptures request;
    Another zone controller recaptures request according to the resources control received, cuts off the normal area of recovery The resources control of domain controller;
    The normal zone controller of recovery obtains its resources control.
  9. 9. according to the method described in claim 8, it is characterized in that, another zone controller is according to the money received Source control recaptures request, cuts off the resources control for recovering normal zone controller, including:
    Another zone controller recaptures request according to the resources control received, recovers normal region to described Controller sends resources control information;
    It is described to recover normal zone controller according to the resources control information, obtain and occupy the described of its resources control The ID number of another zone controller;
    It is described to recover normal zone controller to another zone controller transmission returning control order;
    Another zone controller cuts off the money for recovering normal zone controller according to the returning control order Source control.
  10. 10. according to the method described in claim 9, it is characterized in that, it is described and based on the resources control control its administer model Interior relevant device and operation are enclosed to the train in its compass of competency, including:
    The normal zone controller of recovery is controlled the relevant device in its compass of competency according to its resources control;
    It is described to recover normal zone controller calculating operation to the mobile authorization of the train in its compass of competency;
    And the train mobile authorization is sent in operation to its compass of competency by the normal zone controller of recovery Train, and communicated to connect with the Vehicle Controller on the train, which is controlled.
CN201611132369.3A 2016-12-09 2016-12-09 A kind of dynamic allocation method of the resources control of zone controller Active CN106627676B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611132369.3A CN106627676B (en) 2016-12-09 2016-12-09 A kind of dynamic allocation method of the resources control of zone controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611132369.3A CN106627676B (en) 2016-12-09 2016-12-09 A kind of dynamic allocation method of the resources control of zone controller

Publications (2)

Publication Number Publication Date
CN106627676A CN106627676A (en) 2017-05-10
CN106627676B true CN106627676B (en) 2018-05-08

Family

ID=58825453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611132369.3A Active CN106627676B (en) 2016-12-09 2016-12-09 A kind of dynamic allocation method of the resources control of zone controller

Country Status (1)

Country Link
CN (1) CN106627676B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109760719A (en) * 2017-11-09 2019-05-17 许昌许继软件技术有限公司 A kind of urban track traffic comprehensive monitoring system control authority hand-over method
FR3075742B1 (en) * 2017-12-22 2020-01-10 Alstom Transport Technologies METHOD FOR RESETTING A ZONE CONTROLLER AND ASSOCIATED SYSTEM FOR AUTOMATIC TRAIN CONTROL
CN112639649B (en) * 2018-09-04 2024-04-12 村田机械株式会社 Conveying vehicle system
CN109677461A (en) * 2018-11-14 2019-04-26 浙江众合科技股份有限公司 Truck traffic train control system based on block chain technology
CN112572542B (en) * 2019-09-30 2022-09-30 西门子交通有限责任公司 Automatic train protection system and method
CN115465338A (en) * 2022-09-20 2022-12-13 上海富欣智能交通控制有限公司 Method for dynamically selecting administrator and control system
CN115503791B (en) * 2022-09-22 2024-04-30 交控科技股份有限公司 Train operation method, device, equipment and medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1148396A1 (en) * 2000-04-22 2001-10-24 Siemens Schweiz AG Monitoring of computernetwork
CN103029723A (en) * 2012-12-24 2013-04-10 北京交控科技有限公司 Mixing method of movement authorities during zone switching
JP5465059B2 (en) * 2010-03-30 2014-04-09 東日本旅客鉄道株式会社 Track circuit fault location identification device
CN103723168A (en) * 2013-12-18 2014-04-16 北京交控科技有限公司 CBTC train number window and track section occupancy synchronous display system
CN104149822A (en) * 2014-08-08 2014-11-19 国电南瑞科技股份有限公司 Train tracking method based on information redundancy
CN104859686A (en) * 2015-05-25 2015-08-26 新誉集团有限公司 Punctual train control system in CBTC fault mode and control method of punctual train control system in CBTC fault mode
CN105373116A (en) * 2015-11-24 2016-03-02 北京交控科技股份有限公司 Regional controller fault display method and device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0234806B2 (en) * 1984-06-21 1990-08-07 Tetsudo Sogo Gijutsu Kenkyusho DOJIKUKEEBURUKIDENKAIRONOKOSHOTENHYOTEIHOHO

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1148396A1 (en) * 2000-04-22 2001-10-24 Siemens Schweiz AG Monitoring of computernetwork
JP5465059B2 (en) * 2010-03-30 2014-04-09 東日本旅客鉄道株式会社 Track circuit fault location identification device
CN103029723A (en) * 2012-12-24 2013-04-10 北京交控科技有限公司 Mixing method of movement authorities during zone switching
CN103723168A (en) * 2013-12-18 2014-04-16 北京交控科技有限公司 CBTC train number window and track section occupancy synchronous display system
CN104149822A (en) * 2014-08-08 2014-11-19 国电南瑞科技股份有限公司 Train tracking method based on information redundancy
CN104859686A (en) * 2015-05-25 2015-08-26 新誉集团有限公司 Punctual train control system in CBTC fault mode and control method of punctual train control system in CBTC fault mode
CN105373116A (en) * 2015-11-24 2016-03-02 北京交控科技股份有限公司 Regional controller fault display method and device

Also Published As

Publication number Publication date
CN106627676A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106627676B (en) A kind of dynamic allocation method of the resources control of zone controller
US7201350B2 (en) Signaling safety system
CN109693690B (en) Magnetic suspension running control system
CN101537846B (en) Method and system for controlling automatic route selection on railway vehicle
CN101941452B (en) Train operation control method, device, vehicle-mounted equipment and train operation control system
CN102233886B (en) CTCS (China Train Control System)-2 train operation control system
CN112406959B (en) Train operation control mode switching method suitable for flexible marshalling
CN106564517B (en) A kind of hot backup redundancy signal system of system-level isomery
WO2012155835A1 (en) Ctcs -3 train operation control system
CN102248958A (en) Railway train safety monitoring processing method based on radio block center (RBC)
CN110254406A (en) A kind of train grade brake force management method
CN101537847B (en) Implementation method of train operation control system with time speed of 200 to 350 kilometers
CN113562023A (en) Communication-based train operation control method with train positioning and integrity judgment
CN104583052A (en) Train control system and train control method
CN112550379B (en) Moving block train operation control method based on section direction control
CN204355082U (en) A kind of tramway train main track interlocking of signals control system
CN114475724B (en) Train control method and system for providing train control data for LKJ-equipped train
CN206704207U (en) Movable block degraded running system
CN111806484A (en) Train door and platform door fault isolation control method, device and system
CN110049468B (en) Train-ground wireless communication system of medium-high speed maglev train
CN108116447A (en) A kind of processing method for track circuit shunting badness
CN111806523A (en) FZL300 type full-automatic operation system
CN111874036A (en) Tramcar autonomous operation control system based on car-to-car communication
CN114604300A (en) FAO remote driving system based on 5G technology
CN115782846B (en) Method and device for controlling train safety braking by using partition operation control system to master control

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant