CN106627671B - A kind of rail traffic construction personnel safety pre-warning system and method - Google Patents

A kind of rail traffic construction personnel safety pre-warning system and method Download PDF

Info

Publication number
CN106627671B
CN106627671B CN201610958143.2A CN201610958143A CN106627671B CN 106627671 B CN106627671 B CN 106627671B CN 201610958143 A CN201610958143 A CN 201610958143A CN 106627671 B CN106627671 B CN 106627671B
Authority
CN
China
Prior art keywords
construction
personnel
unit
distance
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610958143.2A
Other languages
Chinese (zh)
Other versions
CN106627671A (en
Inventor
张强
张建明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Traffic Control Technology TCT Co Ltd
Original Assignee
Traffic Control Technology TCT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Traffic Control Technology TCT Co Ltd filed Critical Traffic Control Technology TCT Co Ltd
Priority to CN201610958143.2A priority Critical patent/CN106627671B/en
Publication of CN106627671A publication Critical patent/CN106627671A/en
Application granted granted Critical
Publication of CN106627671B publication Critical patent/CN106627671B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning, or like safety means along the route or between vehicles or vehicle trains
    • B61L23/06Control, warning, or like safety means along the route or between vehicles or vehicle trains for warning men working on the route

Abstract

The present invention provides a kind of rail traffic construction personnel safety pre-warning system and methods, the system includes the range finder module of real-time detection construction point safe construction range boundary and row vehicle headway in traveling, safe construction range boundary between train in traveling at a distance between distance reach safety distance threshold when to warning module send out alarm evacuation order, and it sends personnel to construction point safety clearance module and goes out the clear message processing module for checking order, the warning module of alarm prompt is sent out according to the alarm evacuation order received and the construction point safety clearance module of situation is withdrawn according to the personnel within the scope of detection safe construction.This method installs ranging and source of early warning respectively in vehicle and construction point, reminds personnel and vehicle distances in real time when vehicle is close.This system and method are in such a way that complete and automatic construction personnel's pre-alarming system is alerted instead of protoplast's work, and prealarming process is accurate, timely and reliable, effectively prevent safety accident caused by neglecting due to personnel.

Description

A kind of rail traffic construction personnel safety pre-warning system and method
Technical field
The present invention relates to safety of urban transit to take precautions against field, and in particular to a kind of rail traffic construction personnel is pre- safely Alert system and method.
Background technology
In urban track traffic, rail traffic construction personnel, generally can profit when constructing in the running track of train It is constructed with the interval time of operation, that is, skylight operation, meanwhile, in order to ensure the safety of construction period personnel, also be It prevents the construction time of construction equipment and personnel from influencing vehicle more than skylight operation time and passing through, needs to apply rail traffic Worker person carries out Train Approaching early warning, and dredges construction personnel and equipment and withdrawn in time by preceding in train.
Currently, carrying out the method for Train Approaching early warning to rail traffic construction personnel as construction point and signaling at stations at the scene Security protection supervisory staff is equipped in canyon, wherein security protection supervisory staff in signaling at stations room grasps with signalling arrangement Make personnel's real-time communication by vehicle condition and notify construction point, construction point security protection supervisory staff is responsible for before vehicle passes through Construction personnel is evacuated, and clears up circuit legacy devices, signaling at stations equipment operator lets pass AT STATION when passing through vehicle, just opens The security protection supervisory staff of beginning notice section operation, and the vehicle advanced positions shown in moment attention equipment, simultaneously Vehicle location is notified to Field Force, needs to show by signalling arrangement, signaling at stations operating personnel observation, safety inspection people The serial links such as member's communication.However, since the process is personnel monitoring, and at present under the conditions of signalling arrangement, vehicle location is only Display easily causes personnel's wrong report to fail to report and will can not withdraw in time message transmission asking to each construction personnel to section Topic, even results in accident.
Invention content
For the defects in the prior art, a kind of rail traffic construction personnel safety pre-warning system of present invention offer and side Method, in such a way that complete and automatic construction personnel's pre-alarming system is alerted instead of protoplast's work, and prealarming process it is accurate, in time and Reliably, safety accident caused by neglecting due to personnel is effectively prevented.
In order to solve the above technical problems, the present invention provides following technical scheme:
On the one hand, the present invention provides a kind of rail traffic construction personnel safety pre-warning systems, including:Information processing mould Block, and range finder module, construction point safety clearance module and the warning module with message processing module communication connection respectively;
The range finder module, between train in the boundary of the safe construction range of detection construction point in real time and traveling Distance, and by the boundary of the safe construction range between train in traveling at a distance from be sent in real time described information handle mould Block;
Described information processing module, the distance value for being sent in the range finder module received are equal to safe distance threshold When value, alarm evacuation order is sent out to the warning module, while sending personnel to the construction point safety clearance module and going out clearly Check order;
The warning module, for sending out alarm prompt according to the alarm evacuation order received, to inform construction Personnel withdraw from construction point;
The construction point safety clearance module is ordered for going out clear check according to the personnel received, described in detection Personnel within the scope of safe construction withdraw situation and testing result are sent to message processing module in real time.
Further, the range finder module includes:It is arranged on the direction to the car side of the safe construction range of the construction point Construction point distance measuring unit at boundary and the vehicle odometry unit being arranged on the headstock that This train is bound for XXX;
The construction point distance measuring unit is used to carry out time synchronization with the vehicle odometry unit and to the vehicle odometry When unit sends the arrival of the transmitted in both directions between broadcast request, and the acquisition vehicle odometry unit and construction point distance measuring unit Between it is poor, and at a distance from determining the vehicle odometry unit between construction point distance measuring unit according to the reaching time-difference;
The vehicle odometry unit is used to carry out time synchronization with the construction point distance measuring unit, and to the construction point Distance measuring unit sends broadcast return information.
Further, the construction point distance measuring unit includes:Time synchronizing signal transmission sub-unit, broadcast request send son Unit and apart from determination subelement;
The time synchronizing signal transmission sub-unit is used for the vehicle odometry unit sending time synchronizing signal;
The broadcast request transmission sub-unit is used to reply receiving the time synchronization that the vehicle odometry unit beams back After signal, broadcast request is sent to the vehicle odometry unit;
It is described to be used for after receiving the broadcast return information that the vehicle odometry unit is beamed back apart from determination subelement, root According to the reaching time-difference of the transmitted in both directions between the vehicle odometry unit and construction point distance measuring unit, the vehicle odometry list is obtained Member between construction point distance measuring unit at a distance from.
Further, the vehicle odometry unit includes:Time synchronization return signal transmission sub-unit and broadcast back to letter in reply Cease transmission sub-unit;
The time synchronization return signal transmission sub-unit is used for according to the time synchronizing signal that receives, to described Construction point distance measuring unit sends the time synchronization return signal;
The broadcast return information transmission sub-unit is used for according to the broadcast request is received, to the construction point ranging Unit sends the broadcast return information.
Further, described information processing module includes:Range information receiving unit and command sending unit;
The safe construction range that the range information receiving unit is sent for range finder module described in real-time reception Direction to the car boundary is at a distance from traveling between train;
The command sending unit is used in the direction to the car boundary of the safe construction range and traveling between train Distance between distance when reaching safety distance threshold, send out alarm evacuation order to the warning module, while applying to described Work point safety clearance module sends personnel and goes out clear inspection order.
Further, the construction point safety clearance module includes:The multiple personnel's ranging lists communicated to connect between each other Member and wireless distance finding unit;
Each personnel's distance measuring unit is separately positioned on whole construction personnel of the safe construction range;
Each wireless distance finding unit is separately positioned on each boundary of the safe construction range so that each described wireless The detection range of distance measuring unit composition is overlapped with the safe construction range;
The wireless distance finding unit is used to go out clear check according to the personnel received and order, and positions the safe construction Whole personnel's distance measuring unit in range, and whether the construction personnel within the scope of safe construction described in real-time judge all removes From;
If the construction personnel of the safe construction range does not withdraw all, the wireless distance finding unit is at described information Reason module sends personnel and does not withdraw information so that described information processing module is not withdrawn information according to the personnel and continued to described Warning module sends out alarm evacuation order;
If the construction personnel of the safe construction range all withdraws, the wireless distance finding unit is handled to described information Module sends personnel and successfully withdraws information so that described information processing module is successfully withdrawn information according to the personnel and stopped to institute It states warning module and sends out alarm evacuation order.
Further, the warning module includes:Multiple personnel's Alarm Units and whole audience Alarm Unit;
Each personnel's Alarm Unit is separately positioned on each construction personnel within the scope of the safe construction, and institute Personnel's Alarm Unit is stated for sending out vibrations alarm prompt according to the alarm evacuation order that receives;
Each whole audience Alarm Unit is separately positioned on each boundary of the safe construction range, and the whole audience alerts Unit is used to send out sound-light alarm prompt according to the alarm evacuation order received, so that construction personnel withdraws construction Point.
Further, personnel's distance measuring unit is co-located on same equipment body with personnel's Alarm Unit In, and the equipment body is worn on the construction personnel.On the other hand, the present invention also provides a kind of rail traffics Construction personnel's safe early warning method, including:
The direction to the car boundary of the safe construction range of detection construction point is at a distance from traveling between train in real time;
Reach safe distance threshold at a distance from traveling between train in the direction to the car boundary of the safe construction range When value, sends out alarm evacuation order to the construction point and personnel go out clear check and order;
Alarm prompt is sent out according to the alarm evacuation order received so that construction personnel withdraws construction point;
And go out clear check according to the personnel and the personnel within the scope of the detection safe construction is ordered to withdraw situation, and Judge whether to continue to send out alarm prompt according to testing result.
Further, the direction to the car boundary of the safe construction range of the construction point is at a distance from traveling between train Acquisition process include:
To two of the direction to the car boundary of the train and the safe construction range that are separately positioned on direction to the car Distance measuring unit carries out time synchronization;The safe construction range of train and the construction point is obtained according to the result of the time synchronization Direction to the car boundary between transmitted in both directions reaching time-difference;
The direction to the car boundary of train and the safe construction range of the construction point is determined according to the reaching time-difference Between distance.
As shown from the above technical solution, a kind of rail traffic construction personnel safety pre-warning system of the present invention and side Method, by detecting the range finder module of row vehicle headway in construction point safe construction range boundary and traveling in real time, in safe construction The boundary of range between train in traveling at a distance between distance send out alarm to warning module when reaching safety distance threshold Evacuation order, and go out the clear message processing module for checking order, according to detection peace to construction point safety clearance module transmission personnel Personnel in full boundary of works area withdraw the construction point safety clearance module of situation and are sent out according to the alarm evacuation order received The setting of the warning module of alarm prompt;Using complete and automatic construction personnel's pre-alarming system instead of protoplast's work alarm side Formula, and prealarming process is accurate, timely and reliable, effectively prevents safety accident caused by neglecting due to personnel, and then ensure Rail traffic stable and reliable operation.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is the present invention Some embodiments for those of ordinary skill in the art without creative efforts, can also basis These attached drawings obtain other attached drawings.
Fig. 1 is a kind of structural schematic diagram of rail traffic construction personnel safety pre-warning system in the embodiment of the present invention one;
Fig. 2 is the structural schematic diagram of the range finder module 20 in the early warning system in the embodiment of the present invention two;
Fig. 3 is the structural schematic diagram of the message processing module 10 in the early warning system in the embodiment of the present invention three;
Fig. 4 is the structural schematic diagram of the construction point safety clearance module 30 in the early warning system in the embodiment of the present invention four;
Fig. 5 is the structural schematic diagram of the warning module 40 in the early warning system in the embodiment of the present invention five;
Fig. 6 is the structural schematic diagram of the early warning system in the concrete application example of the present invention;
Fig. 7 is that distance obtains between the vehicle odometry unit 22 in the concrete application example of the present invention and construction point distance measuring unit 21 Logical schematic;
Fig. 8 is a kind of flow diagram of rail traffic construction personnel safe early warning method of the present invention.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical solution in the embodiment of the present invention carries out clear, complete description, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art The every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
The embodiment of the present invention one provides a kind of rail traffic construction personnel safety pre-warning system.Referring to Fig. 1, the early warning system System specifically includes following content:
Message processing module 10, and pacify respectively with the range finder module 20 of the communication connection of message processing module 10, construction point Full limit module 30 and warning module 40.
Range finder module 20 is arranged for detecting the direction to the car boundary of safe construction range of construction point in real time with traveling The distance in workshop, and the direction to the car boundary of safe construction range is sent to information in real time at a distance from traveling between train Processing module 10.
In this module, range finder module 20 in real time detection construction point safe construction range direction to the car boundary with to The distance between the train of construction point traveling, and with the direction to the car by safe construction range of regular hour regular periodicity Boundary is sent to message processing module 10 in real time at a distance from traveling between train, wherein the sending cycle of information is according to reality Border situation is set as fixed value, such as 2 seconds/time, can also preset a time rule according to the distance of distance, such as in safety When the direction to the car boundary of boundary of works area is more than 1km at a distance from traveling between train, every 3 seconds to message processing module 10 A distance value is sent, when distance is less than 1km, a distance value was sent to message processing module 10 every 1 second.
Message processing module 10, the distance value for being sent in the range finder module 20 received are equal to safe distance threshold When value, alarm evacuation order is sent out to warning module 40, while going out clear inspection to 30 transmission personnel of construction point safety clearance module Order.
In this module, safe construction range that message processing module 10 is sent in the range finder module 20 that receives When direction to the car boundary reaches safety distance threshold at a distance from traveling between train, message processing module 10 is to warning module 40 send out alarm evacuation order, while message processing module 10 goes out clear check to 30 transmission personnel of construction point safety clearance module and orders It enables;Wherein, safety distance threshold is according to the preset enough construction personnel of actual conditions withdraw, equipment is withdrawn and reaction time etc. Temporal summation.
Construction point safety clearance module 30 orders for going out clear check according to the personnel received, detects safe construction model Personnel in enclosing withdraw situation.
In this module, construction point safety clearance module 30 goes out according to the personnel that the message processing module 10 received is sent Clear to check order, the personnel detected within the scope of safe construction withdraw situation, and testing result is sent to information processing mould in real time Block 10 so that message processing module 10 can judge whether to continue to send to alert to warning module 40 to withdraw life according to testing result It enables.
Warning module 40, for sending out alarm prompt according to the alarm evacuation order that receives, with inform construction personnel from Construction point is withdrawn.
In this module, warning module 40 sends out alarm according to the alarm evacuation order that message processing module 10 is sent and carries Show, to inform that construction personnel withdraws from construction point.
As can be seen from the above description, the embodiment of the present invention is realized in vehicle approach construction point, reminds personnel and vehicle in real time Distance, avoids linking up and failing to report repeatedly;Vehicle can be accurately positioned at a distance from construction point, the personnel of accurately controlling withdraw in advance Amount;And after sending out early warning, check whether personnel empty in limit;Effectively prevent safety caused by neglecting due to personnel Accident.
Second embodiment of the present invention provides a kind of specific embodiments of the range finder module 20 in above-mentioned early warning system.Referring to figure 2, which specifically includes following content:
Be arranged the direction to the car boundary of the safe construction range of the construction point construction point distance measuring unit 21 and set Set the vehicle odometry unit 22 on the headstock that This train is bound for XXX.
After construction point distance measuring unit 21 carries out time synchronization with vehicle odometry unit 22, obtain and construction point distance measuring unit 21 Between transmitted in both directions reaching time-difference, and vehicle odometry unit 22 and construction point distance measuring unit 21 are determined according to reaching time-difference Between distance;Wherein, further include in construction point distance measuring unit 21:Time synchronizing signal transmission sub-unit 211, broadcast request are sent Subelement 212 and apart from determination subelement 213.
Time synchronizing signal transmission sub-unit 211 is used for 22 sending time synchronizing signal of vehicle odometry unit.
Broadcast request transmission sub-unit 212 is used in the time synchronization return signal for receiving vehicle odometry unit 22 and beaming back Afterwards, broadcast request is sent to vehicle odometry unit 22.
It is used for after receiving the broadcast return information that vehicle odometry unit 22 is beamed back apart from determination subelement 213, according to With the reaching time-difference of the transmitted in both directions of vehicle odometry unit 22, obtain at a distance between vehicle odometry unit 22.
After vehicle odometry unit 22 is used to carry out time synchronization with construction point distance measuring unit 21, to construction point distance measuring unit 21 Send broadcast return information;Wherein, vehicle odometry unit 22 includes:Time synchronization return signal transmission sub-unit 221 and wide Broadcast return information transmission sub-unit 222.
Time synchronization return signal transmission sub-unit 221 is used for according to time synchronizing signal is received, to construction point ranging 21 sending time of unit synchronizes return signal;
The broadcast request that broadcast return information transmission sub-unit 222 is received for basis, to construction point distance measuring unit 21 Send broadcast return information.
In range finder module 20, vehicle odometry unit 22 is mounted on headstock, by measuring and construction point range finder module The reaching time-difference of transmitted in both directions, construction point distance measuring unit 21 send out time synchronization and receive the reply of vehicle odometry unit 22, Broadcast singal is sent out with rear vehicle, and construction point distance measuring unit 21 carries out arrival time comparison after receiving, and then measures and vehicle Distance.CSS (linear frequency modulation spread spectrum) wireless distance findings mode may be used wherein in vehicle odometry unit 22, true according to the time difference During set a distance, the speed of train is sent to construction point distance measuring unit 21, construction point ranging list by vehicle odometry unit 22 Member 21 according to the real-time speed of train and time difference received, be calculated construction point distance measuring unit 21 and train head ( The distance between it is exactly vehicle odometry unit 22).
As can be seen from the above description, the embodiment of the present invention it is accurate and timely obtain between the train in traveling and construction point away from From, and can the distance be sent to message processing module 10 in time so that subsequently the alarm of construction personnel is played accurately Base support effect so that construction personnel and equipment are withdrawn in time, and ensure that the trouble-free operation of train.
The embodiment of the present invention three provides a kind of specific embodiment of the message processing module 10 in above-mentioned early warning system.Ginseng See Fig. 3, which specifically includes following content:
Range information receiving unit 11 and command sending unit 12.
The direction to the car for the safe construction range that range information receiving unit 11 is sent for real-time reception range finder module 20 Boundary is at a distance from traveling between train.
Command sending unit 12 is used for the direction to the car boundary in safe construction range at a distance from traveling between train Between distance when reaching safety distance threshold, send out alarm evacuation order to warning module 40, while to construction point safety clearance 30 transmission personnel of module, which go out clear check, to be ordered.
As can be seen from the above description, the message processing module 10 in the embodiment of the present invention, which realizes, no longer continues to use traditional safety Supervisory practice is protected, security protection supervisory staff need not be disposed AT STATION, safe early warning is simplified and assign flow, reduce ditch Logical cost, vehicle are independently sent close to information, and construction point independently receives, and avoid safety accident caused by personnel's carelessness.
The embodiment of the present invention four provides a kind of specific reality of the construction point safety clearance module 30 in above-mentioned early warning system Apply example.Referring to Fig. 4, which specifically includes following content:
The multiple personnel's distance measuring units 31 and wireless distance finding unit 32 communicated to connect between each other;
Everyone's distance measuring unit 31 is separately positioned on whole construction personnel of safe construction range;
Each wireless distance finding unit 32 is separately positioned on each boundary of safe construction range so that each wireless distance finding unit 32 The detection range of composition is overlapped with safe construction range;
Wireless distance finding unit 32 is used to go out clear check according to the personnel received and order, complete in positioning security boundary of works area Portion's personnel's distance measuring unit 31, and whether the construction personnel within the scope of real-time judge safe construction all withdraws.
If the construction personnel within the scope of the safe construction does not withdraw all, the wireless distance finding unit 32 is to the letter Breath 10 transmission personnel of processing module do not withdraw information so that described information processing module 10 according to the personnel do not withdraw information after Continue to the warning module 40 and sends out alarm evacuation order.
If the construction personnel within the scope of the safe construction all withdraws, the wireless distance finding unit 32 is to described information 10 transmission personnel of processing module successfully withdraw information so that described information processing module 10 successfully withdraws information according to the personnel Stop sending out alarm evacuation order to the warning module 40.
The embodiment of the present invention five provides a kind of specific embodiment of the warning module 40 in above-mentioned early warning system.Referring to figure 5, which specifically includes following content:
Multiple personnel's Alarm Units 41 and whole audience Alarm Unit 42;
Everyone's Alarm Unit 41 is separately positioned on each construction personnel within the scope of safe construction, and personnel alert Unit 41 is used to send out vibrations alarm prompt according to the alarm evacuation order received.
Each whole audience Alarm Unit 42 is separately positioned on each boundary of safe construction range, and whole audience Alarm Unit 42 is used for Sound-light alarm prompt is sent out according to the alarm evacuation order received, so that construction personnel withdraws construction point, wherein a people Member's distance measuring unit 31 is co-located on personnel's Alarm Unit 41 in same equipment body, and the equipment body is worn on and is applied With worker person.
As can be seen from the above description, the embodiment of the present invention is avoided using two kinds of alarm modes due to single alert mode failure Caused by warning information the problem of can not assigning, accused instead of protoplast's work using complete and automatic construction personnel's pre-alarming system Police's formula, and prealarming process is accurate, timely and reliable, effectively prevents safety accident caused by neglecting due to personnel, in turn It ensure that the stable and reliable operation of rail traffic.
It is described in detail for the method to the present invention more further, this law is bright to provide a kind of rail traffic construction personnel The concrete application example of safety pre-warning system.Detailed process is as follows:
1. equipment forms:
Vehicle odometry unit 22, construction point distance measuring unit 21, construction point safety clearance module 30, warning module 40, information Processing module 10, and equipment framework is referring to Fig. 6.
2. each functions of modules:
(1) vehicle odometry unit 22:
Vehicle odometry unit 22 is mounted on headstock, is used to receive the time synchronization letter that construction point distance measuring unit 21 is sent out Number and turnaround time synchronizing signal;Meanwhile it receiving broadcast singal that construction point distance measuring unit 21 is sent out and replying broadcast singal.It applies Work point distance measuring unit 21 sends out time synchronization and receives the reply of vehicle odometry unit 22, sends out broadcast singal with rear vehicle, applies Work point distance measuring unit 21 carries out arrival time comparison after receiving, and then measures at a distance from vehicle.Vehicle odometry unit 22 can In a manner of using CSS (linear frequency modulation spread spectrum) wireless distance finding.
(2) construction point distance measuring unit 21:
Construction point distance measuring unit 21 is located at the edge of the direction to the car of construction point, also uses CSS wireless distance finding modes, It receives time synchronization that vehicle sends out, broadcast singal and reply, carry out arrival time comparison, measure at a distance from vehicle.
Distance measuring method therein is referring to Fig. 7:Construction point distance measuring unit 21 sends out time synchronization information, vehicle odometry list first Member 22 receives the backward construction point distance measuring unit 21 turnaround time synchronizing information of time synchronization information, to construction point ranging list Time synchronization between member 21 and vehicle odometry unit 22.Later, construction point distance measuring unit 21 is sent to vehicle odometry unit 22 again Broadcast message, vehicle odometry unit 22 return to broadcast message to construction point distance measuring unit 21, root according to the broadcast message received Broadcast message is received according to construction point distance measuring unit 21 and vehicle odometry unit 22 and is broadcasted the time difference of return information, and according to Vehicle odometry unit 22 is sent to the speed of the train of construction point distance measuring unit 21, and construction point distance measuring unit 21 and vehicle is calculated Between distance measuring unit 22 (namely the boundary of the headstock of the direction to the car of train and the direction to the car of safe construction range it Between) distance.
(3) construction point safety clearance module 30:
Construction point safety clearance module 30 is included in four CSS wireless distance finding modules of the periphery setting of construction area, profit With 4 CSS wireless distance finding module composition rectangle measured zones, the personnel in localization region by way of three-point fix.Personnel take The warning module 40 of band includes CSS distance measurement functions, and personnel's distance within the scope of 30 measured zone of construction point safety clearance module passes through Whether three-point fix inspection personnel is in bounds.When vehicle arrival need to withdraw apart from when, message processing module 10 is sent out out It is clear to check request, construction point safety clearance module 30 check whether personnel go out clearly in bounds.
(4) warning module 40:
Warning module 40 includes two kinds, and one kind is placed in beside construction area, and construction personnel is prompted by sound-light alarm, and one Kind is carried by construction personnel, passes through vibration prompt construction personnel.Warning module 40 receives what message processing module 10 transmitted Early warning is withdrawn when vehicle reaches close to early warning value by sound-light alarm, vibration prompt personnel.Use two kinds of warning modules 40 Purpose be to prevent single module failure from causing warning information that can not assign.
(5) message processing module 10:
The ranging information that construction point distance measuring unit 21 transmits, including uplink and downlink train are received and handled, is connect reaching vehicle After nearly threshold value of warning, personnel are issued by warning module 40 and withdraw early warning, then by safety clearance module check personnel whether Go out clearly, early warning is persistently carried out if not going out clearly.
In this specific example, distance is calculated by reaching time-difference between vehicle and construction point;Construction point safety clearance is logical Cross personnel in TDOA hyperbolic fix limits;Warning module 40 receives safety clearance scanning early warning and vehicle close to early warning simultaneously.
As can be seen from the above description, this specific example has the advantages that:
1. device configuration is flexible:
Equipment can quickly be arranged in construction point, build safety clearance.
Construction personnel carries warning module 40, you can receives vehicle close to early warning and the clear early warning of bound.
Circuit and vehicle install vehicle odometry unit 22 and construction point distance measuring unit 21 respectively, can be to owning in traffic coverage Construction point is carried out close to early warning.
2. not needing station placement security protection supervisory staff:
Traditional security protection supervisory practice is not continued to use, therefore need not dispose security protection supervisory staff AT STATION, letter Safe early warning is changed and has assigned flow, reduced communication cost, vehicle is independently sent close to information, and construction point independently receives, and avoids Safety accident caused by personnel's carelessness.
3. vehicle is flexible close to early warning and application commander:
Suitable for common railway, high-speed railway, the working scenes such as urban track traffic.
Vehicle close to during, autonomous to send close to information, approach setting independently receives information and handles.
Further, the present invention also provides a kind of rail traffic construction personnel safe early warning methods should referring to Fig. 8 Method for early warning specifically comprises the following steps:
Step 100:In detecting the direction to the car boundary of the safe construction range of construction point in real time and travelling between train Distance.
Step 200:The direction to the car boundary of safe construction range reach at a distance from traveling between train safety away from When from threshold value, sends out alarm evacuation order to construction point and personnel go out clear check and order.
Step 300:Alarm prompt is sent out according to the alarm evacuation order received so that construction personnel withdraws construction Point.
Step 400:Going out clear check according to the personnel orders the personnel within the scope of the detection safe construction to withdraw situation, And judge whether to continue to send out alarm prompt according to testing result.
Wherein, acquisition of the direction to the car boundary of the safe construction range of construction point at a distance from traveling between train Journey includes:
To two of the direction to the car boundary of the train and the safe construction range that are separately positioned on direction to the car Distance measuring unit carries out time synchronization;Obtained according to the result of the time synchronization safe construction range of train and construction point come The reaching time-difference of transmitted in both directions between the boundary of vehicle direction, and determine according to reaching time-difference the safety of train and construction point Distance between the boundary of boundary of works area.
As can be seen from the above description, the embodiment of the present invention is realized in vehicle approach construction point, reminds personnel and vehicle in real time Distance, avoids linking up and failing to report repeatedly;Vehicle can be accurately positioned at a distance from construction point, the personnel of accurately controlling withdraw in advance Amount;And after sending out early warning, check whether personnel empty in limit;Effectively prevent safety caused by neglecting due to personnel Accident.
Above example is only used to illustrate the technical scheme of the present invention, rather than its limitations;Although with reference to the foregoing embodiments Invention is explained in detail, it will be understood by those of ordinary skill in the art that:It still can be to aforementioned each implementation Technical solution recorded in example is modified or equivalent replacement of some of the technical features;And these are changed or replace It changes, the spirit and scope for various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution.

Claims (10)

1. a kind of rail traffic construction personnel safety pre-warning system, which is characterized in that including:Message processing module, and respectively With range finder module, construction point safety clearance module and the warning module of message processing module communication connection;
The range finder module, the direction to the car boundary and train in traveling of the safe construction range for detecting construction point in real time Between distance, and the direction to the car boundary of the safe construction range is sent to institute in real time at a distance from traveling between train State message processing module;
Described information processing module, the distance value for being sent in the range finder module received are equal to safety distance threshold When, alarm evacuation order is sent out to the warning module, while sending personnel to the construction point safety clearance module and going out clear inspection Look into order;
The warning module, for sending out alarm prompt according to the alarm evacuation order received, to inform construction personnel It is withdrawn from construction point;
The construction point safety clearance module orders for going out clear check according to the personnel received, detects the safety Personnel in boundary of works area withdraw situation and testing result are sent to message processing module in real time;
The construction point safety clearance module includes:The multiple personnel's distance measuring units and wireless distance finding list communicated to connect between each other Member;
Each personnel's distance measuring unit is separately positioned on each construction personnel within the scope of the safe construction;
Each wireless distance finding unit is separately positioned on each boundary of the safe construction range so that each wireless distance finding The detection range of unit composition is overlapped with the safe construction range;
The wireless distance finding unit is used to go out clear check according to the personnel received and order, and positions the safe construction range Interior whole personnel's distance measuring unit, and whether the construction personnel within the scope of safe construction described in real-time judge all withdraws;
If the construction personnel within the scope of the safe construction does not withdraw all, the wireless distance finding unit is handled to described information Module sends personnel and does not withdraw information so that described information processing module is not withdrawn information according to the personnel and continued to described pre- Alert module sends out alarm evacuation order.
2. system according to claim 1, which is characterized in that the range finder module includes:It is arranged in the construction point The construction point distance measuring unit of the direction to the car boundary of safe construction range and the vehicle being arranged on the headstock that This train is bound for XXX Distance measuring unit;
The construction point distance measuring unit is used to carry out time synchronization with the vehicle odometry unit and to the vehicle odometry unit Broadcast request is sent, and obtains the arrival time of the transmitted in both directions between the vehicle odometry unit and construction point distance measuring unit Difference, and at a distance from determining the vehicle odometry unit between construction point distance measuring unit according to the reaching time-difference;
The vehicle odometry unit is used to carry out time synchronization with the construction point distance measuring unit, and to the construction point ranging Unit sends broadcast return information.
3. system according to claim 2, which is characterized in that the construction point distance measuring unit includes:Time synchronizing signal Transmission sub-unit, broadcast request transmission sub-unit and apart from determination subelement;
The time synchronizing signal transmission sub-unit is used for the vehicle odometry unit sending time synchronizing signal;
The broadcast request transmission sub-unit is used in the time synchronization return signal for receiving the vehicle odometry unit and beaming back Afterwards, broadcast request is sent to the vehicle odometry unit;
It is described to be used for after receiving the broadcast return information that the vehicle odometry unit is beamed back apart from determination subelement, according to institute The reaching time-difference for stating the transmitted in both directions between vehicle odometry unit and construction point distance measuring unit, obtain the vehicle odometry unit with Distance between construction point distance measuring unit.
4. system according to claim 3, which is characterized in that the vehicle odometry unit includes:Time synchronization replys letter Number transmission sub-unit and broadcast return information transmission sub-unit;
The time synchronization return signal transmission sub-unit is used for according to the time synchronizing signal received, to the construction Point distance measuring unit sends the time synchronization return signal;
The broadcast return information transmission sub-unit is used for according to the broadcast request is received, to the construction point distance measuring unit Send the broadcast return information.
5. system according to claim 1, which is characterized in that described information processing module includes:Range information receives single Member and command sending unit;
The safe construction range that the range information receiving unit is sent for range finder module described in real-time reception carrys out vehicle Direction boundary is at a distance from traveling between train;
The command sending unit be used in the direction to the car boundary of the safe construction range and traveling between train away from When from reaching safety distance threshold, alarm evacuation order is sent out to the warning module, while to the construction point safety clearance Module sends personnel and goes out clear inspection order.
6. system according to claim 1, which is characterized in that
If the construction personnel within the scope of the safe construction all withdraws, the wireless distance finding unit handles mould to described information Block sends personnel and successfully withdraws information so that described information processing module is successfully withdrawn information according to the personnel and stopped to described Warning module sends out alarm evacuation order.
7. system according to claim 6, which is characterized in that the warning module includes:Multiple personnel's Alarm Units and Whole audience Alarm Unit;
Each personnel's Alarm Unit is separately positioned on each construction personnel within the scope of the safe construction, and the people Member's Alarm Unit is used to send out vibrations alarm prompt according to the alarm evacuation order received;
Each whole audience Alarm Unit is separately positioned on each boundary of the safe construction range, and the whole audience Alarm Unit For sending out sound-light alarm prompt according to the alarm evacuation order received, so that construction personnel withdraws construction point.
8. system according to claim 7, which is characterized in that personnel's distance measuring unit is alerted with a personnel Unit is co-located in same equipment body, and the equipment body is worn on the construction personnel.
9. a kind of rail traffic construction personnel safe early warning method, which is characterized in that including:
The direction to the car boundary of the safe construction range of detection construction point is at a distance from traveling between train in real time;
When the direction to the car boundary of the safe construction range reaches safety distance threshold at a distance from traveling between train, Alarm evacuation order is sent out to the construction point and personnel go out clear check and order;
Alarm prompt is sent out according to the alarm evacuation order received so that construction personnel withdraws construction point;
And go out clear check within the scope of the order detection safe construction according to the personnel using construction point safety clearance module Personnel withdraw situation;
Judge whether to continue to send out alarm prompt according to testing result;
The construction point safety clearance module includes:The multiple personnel's distance measuring units and wireless distance finding list communicated to connect between each other Member;
Each personnel's distance measuring unit is separately positioned on each construction personnel within the scope of the safe construction;
Each wireless distance finding unit is separately positioned on each boundary of the safe construction range so that each wireless distance finding The detection range of unit composition is overlapped with the safe construction range;
The wireless distance finding unit is used to go out clear check according to the personnel received and order, and positions the safe construction range Interior whole personnel's distance measuring unit, and whether the construction personnel within the scope of safe construction described in real-time judge all withdraws;
If the construction personnel within the scope of the safe construction does not withdraw all, the wireless distance finding unit sends personnel and does not withdraw Information;
The personnel sent according to the wireless distance finding unit do not withdraw delivering and alert evacuation order.
10. according to the method described in claim 9, it is characterized in that, the direction to the car of the safe construction range of the construction point Acquisition process of the boundary at a distance from traveling between train include:
Two rangings to the train and the direction to the car boundary of the safe construction range that are separately positioned on direction to the car Unit carries out time synchronization;
The direction to the car boundary of train and the safe construction range of the construction point is obtained according to the result of the time synchronization Between transmitted in both directions reaching time-difference;
Between the direction to the car boundary for determining the safe construction range of train and the construction point according to the reaching time-difference Distance.
CN201610958143.2A 2016-10-27 2016-10-27 A kind of rail traffic construction personnel safety pre-warning system and method Active CN106627671B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610958143.2A CN106627671B (en) 2016-10-27 2016-10-27 A kind of rail traffic construction personnel safety pre-warning system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610958143.2A CN106627671B (en) 2016-10-27 2016-10-27 A kind of rail traffic construction personnel safety pre-warning system and method

Publications (2)

Publication Number Publication Date
CN106627671A CN106627671A (en) 2017-05-10
CN106627671B true CN106627671B (en) 2018-09-04

Family

ID=58821184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610958143.2A Active CN106627671B (en) 2016-10-27 2016-10-27 A kind of rail traffic construction personnel safety pre-warning system and method

Country Status (1)

Country Link
CN (1) CN106627671B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110871826B (en) * 2018-09-04 2021-08-10 比亚迪股份有限公司 Train positioning control system and method
CN109561388B (en) * 2018-12-20 2020-10-27 交控科技股份有限公司 Station personnel protection alarm processing method and device
CN109741631A (en) * 2019-02-01 2019-05-10 南京沃旭通讯科技有限公司 A kind of relative position detection device and its working method
CN110654423A (en) * 2019-10-17 2020-01-07 中铁第五勘察设计院集团有限公司 Railway operation safety early warning method, equipment and system and GNSS receiver
CN110654424A (en) * 2019-10-17 2020-01-07 中铁第五勘察设计院集团有限公司 Wearable intelligent terminal for railway operation and safety early warning system
CN110654425A (en) * 2019-10-17 2020-01-07 中铁第五勘察设计院集团有限公司 Railway operation mobile intelligent terminal and safety early warning system
CN112459143A (en) * 2020-12-09 2021-03-09 中煤浙江勘测设计有限公司 Construction site safety scheduling method, system and device after foundation pit risk monitoring
CN114333353B (en) * 2021-12-11 2023-09-08 深圳市雄鹰环境产业有限公司 Intelligent sanitation management method, system, terminal and storage medium based on Internet of things
CN114495421B (en) * 2021-12-30 2022-09-06 山东奥邦交通设施工程有限公司 Intelligent open type road construction operation monitoring and early warning method and system
CN116834803A (en) * 2023-07-22 2023-10-03 杭州雷艺电器工程有限公司 Solar train approach warning system, module, method and storage medium
CN117261967A (en) * 2023-09-19 2023-12-22 广州博湖安全科技有限公司 Train approach alarm system

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3198872B2 (en) * 1995-05-12 2001-08-13 三菱電機株式会社 Train approach warning device
JP4232015B2 (en) * 2003-07-24 2009-03-04 西日本旅客鉄道株式会社 Train approach warning system
JP2006188151A (en) * 2005-01-06 2006-07-20 Daitetsu Kogyo Kk Train approach alarming system
KR100998221B1 (en) * 2008-12-22 2010-12-03 한국철도기술연구원 Portable warning system of train approach
KR101255556B1 (en) * 2009-09-22 2013-04-17 한국전자통신연구원 Apparatus and Method for notifying a train approach
CN104029697B (en) * 2014-03-28 2016-10-05 杭州地方铁路开发有限公司 Construction of railways joint control acousto-optic precaution device
CN104210513B (en) * 2014-04-03 2016-06-01 河南思维自动化设备股份有限公司 Train is close to distant early warning method and system thereof
NL2014693B1 (en) * 2015-04-22 2017-01-18 Dual Inventive Holding B V A train monitoring system for monitoring at least a portion of a rail track for rail track workers, as well as a train detection unit, signaling unit, network router and safety helmet for such a train monitoring system.

Also Published As

Publication number Publication date
CN106627671A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106627671B (en) A kind of rail traffic construction personnel safety pre-warning system and method
CA2701244C (en) System and method to determine train location in a track network
US8157218B2 (en) Railway vehicle detection
CN107161175A (en) A kind of monitoring and warning system of railroad train and construction maintenance
CN104884331B (en) Urban railway transit train Anticollision information system
CN110435718A (en) Vehicle ground institutional operation security protection system and method
US3772640A (en) Vehicle control system with vehicle location error checking means
CN109649439B (en) Train approach early warning method, device, equipment and computer readable storage medium
JP5012568B2 (en) Train approach warning system
US20230022877A1 (en) Method and monitoring system for determining a position of a rail vehicle
CN107804344A (en) A kind of method and system of mobile authorization during shunting service
AU2013207603B2 (en) Apparatus and method for monitoring the condition of railway tracks
AU2015202578A1 (en) Improved safety system for railroad personnel
RU2583011C1 (en) System for alerting workers on railway tracks on approaching rolling stock
KR20120057683A (en) System and method to alarm for access of train
CN110654423A (en) Railway operation safety early warning method, equipment and system and GNSS receiver
US20190337543A1 (en) Automated testing and reporting of timely activation of crossing warning equipment based on data originated from a real-time train tracking system
CN110133697A (en) A kind of high-precision localization method of GPS based on RSU detection technique
CN104960548A (en) Operation protective method and system based on comparison between track occupation and operation position
KR20120057684A (en) System and method to protect an accident of train
JP2005219707A (en) Train position acquiring system, train position information providing system, and train approach alarm system
CN111959562A (en) Safety protection early warning method, device and system for railway on-road operators
CN107878514A (en) A kind of safe processing method and system of train automatic Pilot ATO equipment faults
JP3519042B2 (en) Warning method for railway
CN208630623U (en) A kind of non-centralized interlocking area shunting service prevention and control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant