CN106625169B - A kind of working method of building bar high efficiency derusting device - Google Patents
A kind of working method of building bar high efficiency derusting device Download PDFInfo
- Publication number
- CN106625169B CN106625169B CN201611029195.8A CN201611029195A CN106625169B CN 106625169 B CN106625169 B CN 106625169B CN 201611029195 A CN201611029195 A CN 201611029195A CN 106625169 B CN106625169 B CN 106625169B
- Authority
- CN
- China
- Prior art keywords
- treatment box
- belt pulley
- lead screw
- bearing seat
- shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B24—GRINDING; POLISHING
- B24B—MACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
- B24B27/00—Other grinding machines or devices
- B24B27/033—Other grinding machines or devices for grinding a surface for cleaning purposes, e.g. for descaling or for grinding off flaws in the surface
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B24—GRINDING; POLISHING
- B24B—MACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
- B24B27/00—Other grinding machines or devices
- B24B27/0076—Other grinding machines or devices grinding machines comprising two or more grinding tools
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B24—GRINDING; POLISHING
- B24B—MACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
- B24B41/00—Component parts such as frames, beds, carriages, headstocks
- B24B41/005—Feeding or manipulating devices specially adapted to grinding machines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B24—GRINDING; POLISHING
- B24B—MACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
- B24B47/00—Drives or gearings; Equipment therefor
- B24B47/10—Drives or gearings; Equipment therefor for rotating or reciprocating working-spindles carrying grinding wheels or workpieces
- B24B47/12—Drives or gearings; Equipment therefor for rotating or reciprocating working-spindles carrying grinding wheels or workpieces by mechanical gearing or electric power
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B24—GRINDING; POLISHING
- B24B—MACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
- B24B55/00—Safety devices for grinding or polishing machines; Accessories fitted to grinding or polishing machines for keeping tools or parts of the machine in good working condition
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B24—GRINDING; POLISHING
- B24B—MACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
- B24B55/00—Safety devices for grinding or polishing machines; Accessories fitted to grinding or polishing machines for keeping tools or parts of the machine in good working condition
- B24B55/06—Dust extraction equipment on grinding or polishing machines
Abstract
The present invention relates to a kind of derusting device more particularly to a kind of building bar high efficiency derusting devices.The technical problem to be solved in the present invention is to provide a kind of building bar high efficiency derusting devices that rust cleaning efficiency is high.In order to solve the above-mentioned technical problem, the present invention provides such a building bar high efficiency derusting devices, include treatment box, servo motor, the first flat belt, the first small belt pulley, first bearing seat, the first nut, the first lead screw, link block, second nut etc.;Fixing device includes electric pushrod and briquetting, it is provided with through-hole in treatment box left wall and right wall, through-hole inner top is equipped with electric pushrod, and electric pushrod bottom end is equipped with briquetting, and bottom is equipped with servo motor, first bearing seat and second bearing seat successively from left to right in treatment box.Simple, the low manufacture cost of device and device effect easy to operate that invention achieves the structures of rust cleaning efficiency height, device.
Description
Technical field
The present invention relates to a kind of derusting device more particularly to a kind of building bar high efficiency derusting devices.
Background technology
Reinforcing bar refers to that armored concrete is used and prestressed reinforced concrete steel, cross section are circle, is sometimes band
There is the rectangular of fillet.Including plain bar, Ribbed Bar, twisted bar.Concrete reinforcement steel refers to that armored concrete is matched
The vertical bar or wire rod shape steel of muscle, shape are divided into two kinds of plain bar and deformed bar, and the condition of delivery is that vertical bar and disk are justified
Two kinds.
Derusting method can be divided into four classes, and one is hand cleaning, secondly be chemical derusting, thirdly be ultrasonic cleaning,
Four be mechanical derusting.
Mostly by being accomplished manually, artificial derusting haves the shortcomings that rust cleaning efficiency is low for building bar derusting at present, therefore there is an urgent need for
Design a kind of building bar high efficiency derusting device that rust cleaning efficiency is high.
Invention content
(1) technical problems to be solved
The present invention is in order to overcome current building bar derusting mostly by being accomplished manually, the low disadvantage of artificial rust cleaning efficiency, this
Technical problems to be solved by the inivention are to provide a kind of building bar high efficiency derusting device that rust cleaning efficiency is high.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a building bar high efficiency derusting device, packets
Treatment box, servo motor, the first flat belt, the first small belt pulley, first bearing seat, the first nut, the first lead screw, connection are included
Block, the second nut, the second lead screw, second bearing seat, the first wire brush, the second big belt pulley, the second flat belt, the second belt lace
Wheel, fixing device, the second wire brush, 3rd bearing seat, the first big belt pulley, first rotating shaft, first bevel gear, fourth bearing
Seat, 5th bearing seat, the second shaft, second bevel gear, third shaft and third wire brush;Treatment box left wall is equipped with right wall
Fixing device, fixing device include electric pushrod and briquetting, are provided with through-hole in treatment box left wall and right wall, through-hole inner top is set
There are electric pushrod, electric pushrod bottom end to be equipped with briquetting, bottom is equipped with servo motor, first bearing successively from left to right in treatment box
Seat and second bearing seat are equipped with the first lead screw in first bearing seat, and the first lead screw left end is connect with servo motor, the first lead screw
It is equipped with the first nut and the first small belt pulley, the first nut is located at the first small belt pulley right, the first nut and the first lead screw
Cooperation, the first small belt pulley are located at first bearing seat left, the second lead screw, the second lead screw and first are equipped in second bearing seat
On the contrary, be connected with link block between the second lead screw and the first lead screw, the second lead screw is equipped with the second nut for the screw thread of lead screw, second
Nut and the second lead screw coordinate, and the second nut and the first nut top are respectively connected with the first wire brush, and treatment box left wall is equipped with the
Three bearing blocks, 3rd bearing seat are located above through-hole, and first rotating shaft is equipped on 3rd bearing seat, and first rotating shaft is equipped with first
Big belt pulley and first bevel gear, the first big belt pulley are located at first bevel gear left, the first big belt pulley and the first belt lace
It is wound with the first flat belt between wheel, treatment box inner top is equipped with fourth bearing seat and 5th bearing seat, and fourth bearing seat is located at the
Five bearing block lefts, are equipped with the second shaft on fourth bearing seat, and the second shaft is equipped with second bevel gear, the successively from top to bottom
Two small belt pulleys and the second wire brush, second bevel gear are engaged with first bevel gear, and third shaft is equipped on 5th bearing seat,
Third shaft is equipped with the second big belt pulley and third wire brush, and the second big belt pulley is located above third wire brush, second largest
The second flat belt is wound between belt pulley and the second small belt pulley.
Preferably, further include having suction unit, treatment box inner top is equipped with suction unit, and suction unit is located at 5th bearing
Seat right, suction unit are to be fixedly connected with treatment box inner top with right wall, and suction unit is horizontal positioned, the table of suction unit
Face is smooth surface.
Preferably, further include having silencing cotton, treatment box inner top is equipped with silencing cotton, and silencing cotton is horizontally disposed, silencing cotton
It is to be fixedly connected with treatment box, the thickness of silencing cotton is 3cm, and the surface of silencing cotton is non-smooth surface, the left view shape of silencing cotton
Shape is rectangle.
Preferably, further include having placing frame, placing frame is equipped on the left for the treatment of box, placing frame is located at the lower section of through-hole, places
Frame is to be fixedly connected with treatment box, and placing frame is horizontally disposed, and the main view shape of placing frame is L-shaped, and the height of placing frame is
30cm。
Preferably, further include having collecting tank, collecting tank is equipped on the right side for the treatment of box, collecting tank is located at the lower section of through-hole, collects
Slot is to be fixedly connected with treatment box, and collecting tank is horizontally disposed, and the height of collecting tank is 30cm, and the length of collecting tank is 30cm,
The width of collecting tank is 25cm.
Preferably, further include having headlamp, top is equipped with headlamp at left and right sides for the treatment of box, and headlamp sets for level
It sets, headlamp is LED light, and the rated voltage of headlamp is 220V, and the rated power of headlamp is 30W, headlamp and treatment box
To be fixedly connected.
Preferably, further include having direction board, top is equipped with direction board on the right side for the treatment of box, and direction board is fixed connect with treatment box
It connects, direction board is located above through-hole, and direction board is located at below headlamp, and the enclosure material of direction board is stainless steel, direction board
Main view shape is rectangle.
Preferably, the material for the treatment of box is Q235 steel, and the left wall cross-sectional shape for the treatment of box is rectangle, treatment box left wall
The length of cross section is 75cm, and the width for the treatment of box left wall cross section is 6cm, and the height for the treatment of box is 125cm, the table for the treatment of box
Face is smooth surface.
Preferably, the material of first rotating shaft, the second shaft and third shaft is KTZ550-04 malleable cast iron, first turn
The surface of axis, the second shaft and third shaft is smooth surface, first rotating shaft, the second shaft and third shaft three-dimensional shape
It is cylinder.
Operation principle:When needing to carry out the processing of rust removing of reinforcing rod, pending reinforcing rod is placed on across through-hole
In treatment box, start electric pushrod elongation, so that briquetting is moved down to fixed pending reinforcing rod, electric pushrod stops work
Make, start servo motor and replace positive and negative rotation, drives the first lead screw and the second lead screw to replace positive and negative rotation, due to the first lead screw and second
On the contrary, so when the first lead screw and the second lead screw rotate forward, the first nut moves right for the screw thread of lead screw, and the second nut is to moving to left
Dynamic, when the first lead screw and the second lead screw invert, the first nut is moved to the left, and the second nut moves right, so the left side first
The direction of motion of the first wire brush of wire brush and the right is always reversed, so the first brush cleaning treatment effect is more preferable, is removed
Processing work of becoming rusty is more efficient, when the first lead screw replaces positive and negative rotation, the first flat belt is made to rotate, the first big belt pulley is driven to turn
It is dynamic, to make first rotating shaft rotate, first bevel gear rotation is driven, second bevel gear is made to rotate, the second shaft is made to rotate, is driven
Second wire brush rotates, and simultaneously rotates the second small belt pulley, drives the second largest pulley rotation, and third shaft is made to rotate,
Final that third wire brush is made to rotate, the second wire brush and third wire brush are constantly rotated, are derusted to pending reinforcing rod
Processing, it is possible to which the rust cleaning efficiency for further increasing reinforcing rod, when the processing of rust removing end of operation of reinforcing rod, servo motor stops
It only works, starts electric pushrod and shrink, briquetting is made to move up reset, electric pushrod is stopped, and operating personnel take out derusting
The reinforcing rod finished can work when also needing to carry out the processing of reinforcing bar high-efficient rust-removing next time again according to above-mentioned principle.
Because further including having suction unit, treatment box inner top is equipped with suction unit, and suction unit is located at 5th bearing seat
Right, suction unit are to be fixedly connected with treatment box inner top with right wall, and suction unit is horizontal positioned, the surface of suction unit
For smooth surface the clean degree for the treatment of box is ensure that so suction unit can clear up the iron filings and impurity of descaling process generation.
Because further including having silencing cotton, treatment box inner top is equipped with silencing cotton, and silencing cotton is horizontally disposed, silencing cotton and place
Reason case is to be fixedly connected, and the thickness of silencing cotton is 3cm, and the surface of silencing cotton is non-smooth surface, and the left view shape of silencing cotton is
Rectangle improves the quality of working environment so silencing cotton can reduce the noise pollution of descaling process generation.
Because further including having placing frame, be equipped with placing frame on the left for the treatment of box, placing frame is located at the lower section of through-hole, placing frame and
Treatment box is to be fixedly connected, and placing frame is horizontally disposed, and the main view shape of placing frame is L-shaped, and the height of placing frame is 30cm, is put
The reinforcing rod for waiting for processing of rust removing can be placed by setting frame, so placing frame can make, derusting work is more convenient, more rhythmically carries out.
(3) advantageous effect
The operation letter of the simple, low manufacture cost of device that invention achieves the structures of rust cleaning efficiency height, device and device
Single effect, and when servo motor works, the first wire brush, the second wire brush and the work of third wire brush can be made simultaneously,
So rust cleaning efficiency higher, and it is more energy saving, comprehensive benefit is high.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the left view structural representation of fixing device of the present invention.
Fig. 3 is the left view structural representation of the first wire brush of the invention.
Fig. 4 is second of main structure diagram of the present invention.
Fig. 5 is the third main structure diagram of the present invention.
Fig. 6 is the 4th kind of main structure diagram of the present invention.
Fig. 7 is the 5th kind of main structure diagram of the present invention.
Label in attached drawing be:1- treatment boxes, 2- servo motors, the first flat belts of 3-, the first small belt pulleys of 4-, 5-
One bearing block, the first nuts of 6-, the first lead screws of 7-, 8- link blocks, the second nuts of 9-, the second lead screws of 10-, 11- second bearing seats,
The first wire brushes of 12-, the second big belt pulleys of 13-, the second flat belts of 14-, the second small belt pulleys of 15-, 16- fixing devices, 17-
Second wire brush, 18- 3rd bearing seats, the first big belt pulleys of 19-, 20- first rotating shafts, 21- first bevel gears, the 4th axis of 22-
Bearing, 23- 5th bearing seats, the second shafts of 24-, 25- second bevel gears, 26- third shafts, 27- third wire brushes, 28- are logical
Hole, 29- electric pushrods, 30- briquettings, 31- suction units, 32- silencing cottons, 33- placing frames, 34- collecting tanks, 35- headlamps,
36- direction boards.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of building bar high efficiency derusting device includes as shown in figs. 1-7 treatment box 1, servo motor 2,
One flat belt 3, the first small belt pulley 4, first bearing seat 5, the first nut 6, the first lead screw 7, link block 8, the second nut 9,
Two lead screws 10, second bearing seat 11, the first wire brush 12, the second big belt pulley 13, the second flat belt 14, the second small belt pulley
15, fixing device 16, the second wire brush 17,3rd bearing seat 18, the first big belt pulley 19, first rotating shaft 20, first bevel gear
21, fourth bearing seat 22,5th bearing seat 23, the second shaft 24, second bevel gear 25, third shaft 26 and third wire brush
27;1 left wall for the treatment of box is equipped with fixing device 16 with right wall, and fixing device 16 includes electric pushrod 29 and briquetting 30, processing
Through-hole 28 is provided in 1 left wall of case and right wall, 28 inner top of through-hole is equipped with electric pushrod 29, and 29 bottom end of electric pushrod is equipped with briquetting
30, bottom is equipped with servo motor 2, first bearing seat 5 and second bearing seat 11, first bearing successively from left to right in treatment box 1
First lead screw 7 is installed on seat 5,7 left end of the first lead screw is connect with servo motor 2, and the first lead screw 7 is equipped with 6 He of the first nut
First small belt pulley 4, the first nut 6 are located at 4 right of the first small belt pulley, and the first nut 6 and the first lead screw 7 coordinate, and first is small
Belt pulley 4 is located at 5 left of first bearing seat, is equipped with the second lead screw 10 in second bearing seat 11, the second lead screw 10 and first
For the screw thread of bar 7 on the contrary, being connected with link block 8 between the second lead screw 10 and the first lead screw 7, the second lead screw 10 is equipped with the second nut
9, the second nut 9 and the second lead screw 10 coordinate, and the second nut 9 and 6 top of the first nut are respectively connected with the first wire brush 12, handle
1 left wall of case is equipped with 3rd bearing seat 18, and 3rd bearing seat 18 is located at 28 top of through-hole, first turn is equipped on 3rd bearing seat 18
Axis 20, first rotating shaft 20 are equipped with the first big belt pulley 19 and first bevel gear 21, and the first big belt pulley 19 is located at the first cone tooth
21 lefts are taken turns, the first flat belt 3 is wound between the first big belt pulley 19 and the first small belt pulley 4,1 inner top for the treatment of box is equipped with
Fourth bearing seat 22 and 5th bearing seat 23, fourth bearing seat 22 are located at 23 left of 5th bearing seat, pacify on fourth bearing seat 22
Equipped with the second shaft 24, the second shaft 24 is equipped with second bevel gear 25, the second small belt pulley 15 and the second steel successively from top to bottom
Wire brush 17, second bevel gear 25 are engaged with first bevel gear 21, and third shaft 26 is equipped on 5th bearing seat 23, and third turns
Axis 26 is equipped with the second big belt pulley 13 and third wire brush 27, and the second big belt pulley 13 is located at 27 top of third wire brush, the
The second flat belt 14 is wound between two big belt pulleys 13 and the second small belt pulley 15.
Further include having suction unit 31,1 inner top for the treatment of box is equipped with suction unit 31, and suction unit 31 is located at 5th bearing
23 rights of seat, suction unit 31 are to be fixedly connected with 1 inner top for the treatment of box with right wall, and suction unit 31 is horizontal positioned, suction
The surface of device 31 is smooth surface.
Further include having silencing cotton 32,1 inner top for the treatment of box is equipped with silencing cotton 32, and silencing cotton 32 is horizontally disposed, silencing cotton
32 with treatment box 1 be to be fixedly connected, and the thickness of silencing cotton 32 is 3cm, and the surface of silencing cotton 32 is non-smooth surface, silencing cotton
32 left view shape is rectangle.
Further include having placing frame 33,1 left side for the treatment of box is equipped with placing frame 33, and placing frame 33 is located at the lower section of through-hole 28, puts
It is to be fixedly connected that frame 33, which is set, with treatment box 1, and placing frame 33 is horizontally disposed, and the main view shape of placing frame 33 is L-shaped, placing frame 33
Height be 30cm.
Further include having collecting tank 34,1 right side for the treatment of box is equipped with collecting tank 34, and collecting tank 34 is located at the lower section of through-hole 28, receives
Collection slot 34 is to be fixedly connected with treatment box 1, and collecting tank 34 is horizontally disposed, and the height of collecting tank 34 is 30cm, collecting tank 34
Length is 30cm, and the width of collecting tank 34 is 25cm.
Further include having headlamp 35,1 left and right sides top for the treatment of box is equipped with headlamp 35, and headlamp 35 sets for level
It sets, headlamp 35 is LED light, and the rated voltage of headlamp 35 is 220V, and the rated power of headlamp 35 is 30W, headlamp 35
It is to be fixedly connected with treatment box 1.
Further include having direction board 36,1 right side top for the treatment of box is equipped with direction board 36, and direction board 36 is to fix with treatment box 1
Connection, direction board 36 are located at 28 top of through-hole, and direction board 36 is located at 35 lower section of headlamp, and the enclosure material of direction board 36 is not
Become rusty steel, and the main view shape of direction board 36 is rectangle.
The material for the treatment of box 1 is Q235 steel, and the left wall cross-sectional shape for the treatment of box 1 is rectangle, and 1 left wall for the treatment of box is transversal
The length in face is 75cm, and the width of 1 left wall cross section for the treatment of box is 6cm, and the height for the treatment of box 1 is 125cm, the table for the treatment of box 1
Face is smooth surface.
The material of first rotating shaft 20, the second shaft 24 and third shaft 26 is KTZ550-04 malleable cast iron, first turn
The surface of axis 20, the second shaft 24 and third shaft 26 is smooth surface, first rotating shaft 20, the second shaft 24 and third shaft
26 three-dimensional shape is cylinder.
Operation principle:When needing to carry out the processing of rust removing of reinforcing rod, pending reinforcing rod is placed across through-hole 28
In treatment box 1, start electric pushrod 29 and extend, so that briquetting 30 is moved down so that fixed pending reinforcing rod, electronic to push away
Bar 29 is stopped, and starts servo motor 2 and replaces positive and negative rotation, and the first lead screw 7 and the second lead screw 10 is driven to replace positive and negative rotation, due to
The screw thread of first lead screw 7 and the second lead screw 10 on the contrary, so when the first lead screw 7 and the second lead screw 10 rotate forward, the first nut 6 to
It moving right, the second nut 9 is moved to the left, and when the first lead screw 7 and the second lead screw 10 invert, the first nut 6 is moved to the left, and second
Nut 9 moves right, so the direction of motion of the first wire brush of the left side 12 and the first wire brush of the right 12 is always reversed, institute
More preferable, the processing of rust removing working efficiency higher with 12 processing of rust removing effect of the first wire brush, when the first lead screw 7 replaces positive and negative rotation,
So that the first flat belt 3 is rotated, drive the rotation of the first big belt pulley 19, to make first rotating shaft 20 rotate, drives first bevel gear
21 rotations, make second bevel gear 25 rotate, and the second shaft 24 is made to rotate, and drive the rotation of the second wire brush 17, and make second simultaneously
Small belt pulley 15 rotates, and drives the rotation of the second big belt pulley 13, so that third shaft 26 is rotated, finally make 27 turns of third wire brush
Dynamic, the second wire brush 17 and third wire brush 27 constantly rotate, and processing of rust removing is carried out to pending reinforcing rod, it is possible into
One step improves the rust cleaning efficiency of reinforcing rod, and when the processing of rust removing end of operation of reinforcing rod, servo motor 2 is stopped, and starts electricity
Dynamic push rod 29 is shunk, and briquetting 30 is made to move up reset, and electric pushrod 29 is stopped, and operating personnel take out the steel that derusting finishes
Rib can work when also needing to carry out the processing of reinforcing bar high-efficient rust-removing next time again according to above-mentioned principle.
Because further including having suction unit 31,1 inner top for the treatment of box is equipped with suction unit 31, and suction unit 31 is located at the 5th
23 right of bearing block, suction unit 31 and 1 inner top for the treatment of box are to be fixedly connected with right wall, suction unit 31 be it is horizontal positioned,
The surface of suction unit 31 is smooth surface, so suction unit 31 can clear up the iron filings and impurity of descaling process generation, is protected
The clean degree for the treatment of box 1 is demonstrate,proved.
Because further including having silencing cotton 32,1 inner top for the treatment of box is equipped with silencing cotton 32, and silencing cotton 32 is horizontally disposed, is disappeared
Sound cotton 32 is to be fixedly connected with treatment box 1, and the thickness of silencing cotton 32 is 3cm, and the surface of silencing cotton 32 is non-smooth surface, noise reduction
The left view shape of cotton 32 is rectangle, so silencing cotton 32 can reduce the noise pollution of descaling process generation, improves building ring
The quality in border.
Because further including having placing frame 33,1 left side for the treatment of box is equipped with placing frame 33, and placing frame 33 is located under through-hole 28
Side, placing frame 33 are to be fixedly connected with treatment box 1, and placing frame 33 is horizontally disposed, and the main view shape of placing frame 33 is L-shaped, is put
The height for setting frame 33 is 30cm, and placing frame 33 can place the reinforcing rod for waiting for processing of rust removing, so placing frame 33 can make derusting
Work it is more convenient, more rhythmically carry out.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (9)
1. a kind of working method of building bar high efficiency derusting device, which is characterized in that building bar high efficiency derusts
Device includes treatment box(1), servo motor(2), the first flat belt(3), the first small belt pulley(4), first bearing seat(5)、
First nut(6), the first lead screw(7), link block(8), the second nut(9), the second lead screw(10), second bearing seat(11),
One wire brush(12), the second big belt pulley(13), the second flat belt(14), the second small belt pulley(15), fixing device(16),
Two wire brushes(17), 3rd bearing seat(18), the first big belt pulley(19), first rotating shaft(20), first bevel gear(21), the 4th
Bearing block(22), 5th bearing seat(23), the second shaft(24), second bevel gear(25), third shaft(26)With third steel wire
Brush(27);Treatment box(1)Left wall is equipped with fixing device with right wall(16), fixing device(16)It include electric pushrod(29)With
Briquetting(30), treatment box(1)It is provided with through-hole in left wall and right wall(28), through-hole(28)Inner top is equipped with electric pushrod(29), electricity
Dynamic push rod(29)Bottom end is equipped with briquetting(30), treatment box(1)Interior bottom is equipped with servo motor successively from left to right(2), first axle
Bearing(5)And second bearing seat(11), first bearing seat(5)On the first lead screw is installed(7), the first lead screw(7)Left end with watch
Take motor(2)Connection, the first lead screw(7)It is equipped with the first nut(6)With the first small belt pulley(4), the first nut(6)Positioned at
One small belt pulley(4)Right, the first nut(6)With the first lead screw(7)Cooperation, the first small belt pulley(4)Positioned at first bearing seat
(5)Left, second bearing seat(11)On the second lead screw is installed(10), the second lead screw(10)With the first lead screw(7)Screw thread phase
Instead, the second lead screw(10)With the first lead screw(7)Between be connected with link block(8), the second lead screw(10)It is equipped with the second nut
(9), the second nut(9)With the second lead screw(10)Cooperation, the second nut(9)With the first nut(6)Top is respectively connected with the first steel
Wire brush(12), treatment box(1)Left wall is equipped with 3rd bearing seat(18), 3rd bearing seat(18)Positioned at through-hole(28)Top, third
Bearing block(18)On first rotating shaft is installed(20), first rotating shaft(20)It is equipped with the first big belt pulley(19)And first bevel gear
(21), the first big belt pulley(19)Positioned at first bevel gear(21)Left, the first big belt pulley(19)With the first small belt pulley(4)
Between be wound with the first flat belt(3), treatment box(1)Inner top is equipped with fourth bearing seat(22)With 5th bearing seat(23), the 4th
Bearing block(22)Positioned at 5th bearing seat(23)Left, fourth bearing seat(22)On the second shaft is installed(24), the second shaft
(24)It is equipped with second bevel gear successively from top to bottom(25), the second small belt pulley(15)With the second wire brush(17), the second cone tooth
Wheel(25)With first bevel gear(21)Engagement, 5th bearing seat(23)On third shaft is installed(26), third shaft(26)On
Equipped with the second big belt pulley(13)With third wire brush(27), the second big belt pulley(13)Positioned at third wire brush(27)Top,
Second big belt pulley(13)With the second small belt pulley(15)Between be wound with the second flat belt(14);It removes when needing to carry out reinforcing rod
When rust processing, pending reinforcing rod is passed through into through-hole(28)It is placed on treatment box(1)It is interior, start electric pushrod(29)Elongation,
Make briquetting(30)It moves down to fixed pending reinforcing rod, electric pushrod(29)It is stopped, starts servo motor(2)
Alternately positive and negative rotation drives the first leading screw(7)With the second lead screw(10)Alternately positive and negative rotation, due to the first leading screw(7)With the second lead screw
(10)Screw thread on the contrary, so in the first leading screw(7)With the second lead screw(10)When rotating forward, the first nut(6)It moves right, second
Nut 9 is moved to the left, in the first leading screw(7)With the second lead screw(10)When reversion, the first nut(6)It is moved to the left, the second nut 9
It moves right, so the first wire brush of the left side(12)With the first wire brush of the right(12)The direction of motion be always reversed, so
First wire brush(12)Processing of rust removing effect is more preferable, processing of rust removing working efficiency higher, in the first leading screw(7)Alternately positive and negative rotation
When, so that the first flat belt 3 is rotated, drives the first big belt pulley(19)Rotation, to make first rotating shaft(20)Rotation drives first
Bevel gear(21)Rotation, makes second bevel gear(25)Rotation, makes the second shaft(24)Rotation drives the second wire brush(17)Turn
It is dynamic, and make the second small belt pulley simultaneously(15)Rotation drives the second big belt pulley(13)Rotation, makes third shaft(26)Rotation,
Finally make third wire brush(27)Rotation, the second wire brush(17)With third wire brush(27)Constantly rotation, to pending steel
Rib carries out processing of rust removing, it is possible to the rust cleaning efficiency for further increasing reinforcing rod, when the processing of rust removing of reinforcing rod has operated
Finish, servo motor(2)It is stopped, starts electric pushrod(29)It shrinks, makes briquetting(30)Move up reset, electric pushrod
(29)It is stopped, operating personnel take out the reinforcing rod that derusting finishes.
2. a kind of working method of building bar high efficiency derusting device according to claim 1, which is characterized in that also
It include suction unit(31), treatment box(1)Inner top is equipped with suction unit(31), suction unit(31)Positioned at 5th bearing seat
(23)Right, suction unit(31)With treatment box(1)Inner top is to be fixedly connected with right wall, suction unit(31)It is put for level
It sets, suction unit(31)Surface be smooth surface.
3. a kind of working method of building bar high efficiency derusting device according to claim 2, which is characterized in that also
It include silencing cotton(32), treatment box(1)Inner top is equipped with silencing cotton(32), silencing cotton(32)It is horizontally disposed, silencing cotton
(32)With treatment box(1)To be fixedly connected, silencing cotton(32)Thickness be 3cm, silencing cotton(32)Surface be non-smooth surface,
Silencing cotton(32)Left view shape be rectangle.
4. a kind of working method of building bar high efficiency derusting device according to claim 3, which is characterized in that also
It include placing frame(33), treatment box(1)Left side is equipped with placing frame(33), placing frame(33)Positioned at through-hole(28)Lower section, put
Set frame(33)With treatment box(1)To be fixedly connected, placing frame(33)It is horizontally disposed, placing frame(33)Main view shape be L-shaped,
Placing frame(33)Height be 30cm.
5. a kind of working method of building bar high efficiency derusting device according to claim 4, which is characterized in that also
It include collecting tank(34), treatment box(1)Right side is equipped with collecting tank(34), collecting tank(34)Positioned at through-hole(28)Lower section, receive
Collect slot(34)With treatment box(1)To be fixedly connected, collecting tank(34)It is horizontally disposed, collecting tank(34)Height be 30cm, receive
Collect slot(34)Length be 30cm, collecting tank(34)Width be 25cm.
6. a kind of working method of building bar high efficiency derusting device according to claim 5, which is characterized in that also
It include headlamp(35), treatment box(1)It is equipped with headlamp above the left and right sides(35), headlamp(35)Be it is horizontally disposed,
Headlamp(35)For LED light, headlamp(35)Rated voltage be 220V, headlamp(35)Rated power be 30W, headlamp
(35)With treatment box(1)To be fixedly connected.
7. a kind of working method of building bar high efficiency derusting device according to claim 6, which is characterized in that also
It include direction board(36), treatment box(1)Direction board is equipped with above right side(36), direction board(36)With treatment box(1)For fixation
Connection, direction board(36)Positioned at through-hole(28)Top, direction board(36)Positioned at headlamp(35)Lower section, direction board(36)Shell
Material is stainless steel, direction board(36)Main view shape be rectangle.
8. a kind of working method of building bar high efficiency derusting device according to claim 7, which is characterized in that place
Manage case(1)Material be Q235 steel, treatment box(1)Left wall cross-sectional shape be rectangle, treatment box(1)Left wall cross section
Length is 75cm, treatment box(1)The width of left wall cross section is 6cm, treatment box(1)Height be 125cm, treatment box(1)'s
Surface is smooth surface.
9. a kind of working method of building bar high efficiency derusting device according to claim 8, which is characterized in that the
One shaft(20), the second shaft(24)With third shaft(26)Material be KTZ550-04 malleable cast iron, first rotating shaft
(20), the second shaft(24)With third shaft(26)Surface be smooth surface, first rotating shaft(20), the second shaft(24)With
Third shaft(26)Three-dimensional shape be cylinder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611029195.8A CN106625169B (en) | 2016-11-22 | 2016-11-22 | A kind of working method of building bar high efficiency derusting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611029195.8A CN106625169B (en) | 2016-11-22 | 2016-11-22 | A kind of working method of building bar high efficiency derusting device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106625169A CN106625169A (en) | 2017-05-10 |
CN106625169B true CN106625169B (en) | 2018-09-25 |
Family
ID=58808799
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611029195.8A Active CN106625169B (en) | 2016-11-22 | 2016-11-22 | A kind of working method of building bar high efficiency derusting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106625169B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107336117A (en) * | 2017-08-15 | 2017-11-10 | 长沙科悦企业管理咨询有限公司 | A kind of construction steel plate derusting device |
CN108356672A (en) * | 2018-02-26 | 2018-08-03 | 张炳强 | A kind of building sheet derusting device |
CN108581781B (en) * | 2018-05-04 | 2023-10-20 | 师海巍 | Steel bar scar removing machine |
CN108312596B (en) * | 2018-05-15 | 2019-09-06 | 江苏菲欧德特种装备有限公司 | A kind of solid-liquid separating garbage disposal pressurizing unit |
CN108789096A (en) * | 2018-06-19 | 2018-11-13 | 苏州睿烁环境科技有限公司 | A kind of adjustable height stainless steel tube grinding device |
CN109176249A (en) * | 2018-09-29 | 2019-01-11 | 柳州市千山木业有限公司 | A kind of timber processing plate surface processing unit (plant) |
CN109730475A (en) * | 2019-03-04 | 2019-05-10 | 付桂芹 | A kind of multi-functional park seat |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101572028B1 (en) * | 2013-12-10 | 2015-11-25 | (주)화이버옵틱코리아 | Tokamak plasma measure for fiber bundle fore-end grinding machine |
CN205630189U (en) * | 2016-05-16 | 2016-10-12 | 江西同心铜业有限公司 | Copper strips is with high -efficient burring device |
CN106078425A (en) * | 2016-08-02 | 2016-11-09 | 鄂星峄 | A kind of mosaic tiles makes uses efficient sanding apparatus |
CN106078384B (en) * | 2016-08-16 | 2018-10-12 | 阜南县德盛隆工艺家具有限公司 | A kind of hardware plate surface movable type grinding device |
CN106181719B (en) * | 2016-08-18 | 2018-06-15 | 山东安智电力设备有限公司 | A kind of hardware is made of ironwork high-efficient rust-removing device |
CN106112771A (en) * | 2016-08-21 | 2016-11-16 | 周栋 | A kind of iron staff Rapid rust cleaning device |
-
2016
- 2016-11-22 CN CN201611029195.8A patent/CN106625169B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106625169A (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106625169B (en) | A kind of working method of building bar high efficiency derusting device | |
CN208427217U (en) | Circulation inhales iron device and construction waste crushing recycling and reusing system | |
CN106584625B (en) | A kind of construction timber high reliable peeling device | |
CN109551350A (en) | A kind of steel rolling station-service wire rod steel muscle automatic rust removing device | |
CN211678372U (en) | Powder spraying device for hardware processing | |
CN205496176U (en) | Hardware component belt cleaning device | |
CN205925993U (en) | Five metals electric part sorting device | |
CN208906448U (en) | A kind of steel rolling station-service wire rod steel muscle automatic rust removing device | |
CN201485557U (en) | Villus fallen litter reclaimer | |
CN214351556U (en) | Steel bar rust removal device | |
CN109939972A (en) | A kind of new energy battery production silicon single crystal rod cleaning equipment | |
CN212329022U (en) | Cleaning device convenient to clearance magnetic core surface magnetism residue | |
CN213466897U (en) | Sewage treatment box convenient to clean for water treatment | |
CN205650590U (en) | Old and useless panel face clearance production line | |
CN211027891U (en) | Reinforcing bar cutting equipment for construction | |
CN210729851U (en) | Integrated waste gas purification equipment based on high-voltage static electricity | |
CN209259626U (en) | A kind of elevator convenient for the cleaning of pedestal material | |
CN210998046U (en) | Rust remover | |
CN109909498B (en) | Brushing thorn mechanism of robot feeding and discharging machine | |
CN110449887A (en) | A kind of highly integrated ion purifier stack of laminations installation | |
CN110480297A (en) | A kind of screw rod feeding device for the installation of highly integrated ion purifier stack of laminations | |
CN205765515U (en) | A kind of handware buffing machine through improvement | |
CN109175281A (en) | A kind of high-alloy steel casting and rolling installation and method | |
CN214812903U (en) | Cleaning device for building scaffold | |
CN218284979U (en) | Mould belt cleaning device is used in production of cement wire pole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180813 Address after: 443003 189-1 along Yanjiang Road, Yichang, Hubei Applicant after: HUBEI HUBEI GUANGSHENG CONSTRUCTION GROUP CO., LTD. Address before: 312379 Zhu Village, south of the Five Ridges Town, Shangyu District, Shaoxing, Zhejiang Applicant before: Yan Youxian |
|
GR01 | Patent grant | ||
GR01 | Patent grant |