CN106624833B - Engine production line linear guide mounting process - Google Patents

Engine production line linear guide mounting process Download PDF

Info

Publication number
CN106624833B
CN106624833B CN201611245807.7A CN201611245807A CN106624833B CN 106624833 B CN106624833 B CN 106624833B CN 201611245807 A CN201611245807 A CN 201611245807A CN 106624833 B CN106624833 B CN 106624833B
Authority
CN
China
Prior art keywords
guide rail
straight line
amesdial
linear guide
sliding block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201611245807.7A
Other languages
Chinese (zh)
Other versions
CN106624833A (en
Inventor
田洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshu Dongbang Technology Venture Capital Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611245807.7A priority Critical patent/CN106624833B/en
Publication of CN106624833A publication Critical patent/CN106624833A/en
Application granted granted Critical
Publication of CN106624833B publication Critical patent/CN106624833B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q1/00Members which are comprised in the general build-up of a form of machine, particularly relatively large fixed members
    • B23Q1/01Frames, beds, pillars or like members; Arrangement of ways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q1/00Members which are comprised in the general build-up of a form of machine, particularly relatively large fixed members
    • B23Q1/01Frames, beds, pillars or like members; Arrangement of ways
    • B23Q1/017Arrangements of ways

Abstract

The present invention provides a kind of engine production line linear guide mounting process, by the way that standardized concise installation steps are arranged, successively install and detect the walking depth of parallelism and apparent height of first straight line guide rail, second straight line guide rail and the two, without special tool and without on mounting plane Design Orientation portion the precision assembly of engine production line linear guide can be completed, there is extreme efficiency and high assembly precision.

Description

Engine production line linear guide mounting process
Technical field
The invention belongs to engine production technical fields, are a kind of engine production line linear guide peaces specifically Dress technique.
Background technique
With the development of automobile and motorcycle industry, the demand of engine is sharply increased.In order to increase the confession of engine Ying Liang, it is necessary to the automatization level for improving engine production, using more automatic production lines.Currently, engine production line Linear motion is mainly realized by the combination of ball-screw and linear guide.
Linear guide is also known as line rail, sliding rail, linear guides, linear slide rail, is used for straight reciprocating motion occasion, and can hold Certain torque is carried on a shoulder pole, can realize high-precision linear motion in high-load situations, this.
However existing assembly method, it is mostly very complicated and mixed and disorderly.Excessively complicated assembly technology makes assembly precision excessively The quality for relying on worker, causes linear guide installation accuracy very different, and assembly efficiency is extremely low, and then it is raw to influence engine The machining accuracy and efficiency of producing line.
Summary of the invention
For overcome the deficiencies in the prior art, the present invention provides a kind of engine production line linear guide mounting process, Effectively improve assembly efficiency and installation accuracy.
The purpose of the present invention is achieved through the following technical solutions:
A kind of engine production line linear guide mounting process, comprising the following steps:
S10: the mounting plane for being used to install linear guide is thoroughly cleaned, and is removed the burr on the mounting plane, is hurt Trace and dirt;
S20: being tightly attached to the mounting plane for the installation base surface of first straight line guide rail, makes the peace of the first straight line guide rail Dress hole is successively directed at the guide rail fixation hole of the mounting plane, and passes sequentially through the first threaded fastener and lock completely;
S30: being tightly attached to the mounting plane for the installation base surface of second straight line guide rail, makes the peace of the second straight line guide rail Dress hole is successively directed at the guide rail fixation hole of the mounting plane, and successively locks the second threaded fastener, and second screw thread is tight Firmware keeps non-locking state;
S40: the first detection dress with orthogonal first datum level and the second datum level and with amesdial is utilized Set the walking depth of parallelism for adjusting the second straight line guide rail relative to the first straight line guide rail;
S50: the first sliding block is installed on the first straight line guide rail, will be with a benchmark bottom surface and the amesdial Second detection device is fixed on the upper level face of first sliding block, the benchmark bottom surface of the second detection device with The upper level face of first sliding block keeps fitting, and keeps the amesdial gauge head of the second detection device and the installation flat Face contact;
It moves first sliding block on the first straight line guide rail, observes described in the reading of the amesdial and adjusting First threaded fastener locks degree, until the reading of the amesdial is within the scope of the first sliding block Height Standard, it is then complete First threaded fastener is locked, and entirely with the reinforcing of screw thread glue;
S60: the height-precision of the second straight line guide rail is adjusted using the second detection device.
As an improvement of the above technical solution, specific step is as follows by the S40:
First detection device is placed in the mounting plane, first datum level and the mounting plane are kept Fitting, second datum level are adjacent to the vertical precision face of the first straight line guide rail;
Make the outermost of the amesdial gauge head of first detection device and the vertical precision face of the second straight line guide rail Contact, and first detection device is made to be adjacent to the vertical precision face of the first straight line guide rail on the mounting plane and slide It is dynamic;
The reading of the amesdial is observed, and finely tunes the position of the second straight line guide rail, until the reading of the amesdial Number is in walking depth of parallelism critical field;
It locks two second threaded fasteners at second straight line guide rail both ends completely respectively, and successively locks institute State remaining described second threaded fastener on second straight line guide rail.
As a further improvement of the above technical scheme, specific step is as follows by the S60:
Second sliding block is installed on the second straight line guide rail, the second detection device is fixed on first sliding block Upper level face center, the benchmark bottom surface of the second detection device and the upper level face keep being bonded, and makes described the The upper level face central contact of the amesdial gauge head of two detection devices and second sliding block;
It moves first sliding block on the first straight line guide rail, observes described in the reading of the amesdial and adjusting The locking degree of second threaded fastener, until the reading of the amesdial is within the scope of the second sliding block Height Standard;
Second threaded fastener is locked, and completely with the reinforcing of screw thread glue.
As a further improvement of the above technical scheme, first detection device includes marble gauge stand and is set to described The amesdial on marble gauge stand.
As a further improvement of the above technical scheme, the marble gauge stand is equipped with first datum level and described the Two datum levels.
As a further improvement of the above technical scheme, the second detection device include Magnetic gauge stand and be set to the magnetic The amesdial on property gauge stand.
As a further improvement of the above technical scheme, the Magnetic gauge stand has a benchmark bottom surface.
As a further improvement of the above technical scheme, the vertical precision face of the first straight line guide rail and described second straight The vertical precision face of line guide rail keeps opposite.
As a further improvement of the above technical scheme, when the mounting plane needs to install third to N linear guide When, execute S030, S040, S060 successively to install remaining linear guide, when execution is straight by second in S030, S040, S060 The N linear guide and sliding block thereon that line guide rail and the second sliding block are installed needed for replacing with respectively, until all linear guides It installs.
As a further improvement of the above technical scheme, the debugging benchmark of the third to N linear guide is described the One linear guide.
The beneficial effects of the present invention are: successively installing by the way that standardized concise installation steps are arranged and detecting first directly The walking depth of parallelism and apparent height of line guide rail, second straight line guide rail and the two, without special tool and without in lathe The precision assembly of linear guide can be completed in Design Orientation portion on pedestal, and providing one kind has extreme efficiency and high assembly precision Engine production line linear guide assembly technology.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment is cited below particularly, and cooperate Appended attached drawing, is described in detail below.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the step flow chart for the engine production line linear guide mounting process that the embodiment of the present invention 1 provides;
Fig. 2 is the first schematic diagram of the engine production line linear guide mounting process that the embodiment of the present invention 1 provides;
Fig. 3 is the second schematic diagram of the engine production line linear guide mounting process that the embodiment of the present invention 1 provides;
Fig. 4 is the third schematic diagram for the engine production line linear guide mounting process that the embodiment of the present invention 1 provides;
Fig. 5 is the first detection device of the engine production line linear guide mounting process that the embodiment of the present invention 1 provides Perspective view;
Fig. 6 is the 4th schematic diagram of the engine production line linear guide mounting process that the embodiment of the present invention 1 provides;
Fig. 7 is the 5th schematic diagram of the engine production line linear guide mounting process that the embodiment of the present invention 1 provides;
Fig. 8 is the second detection device for the engine production line linear guide mounting process that the embodiment of the present invention 1 provides Perspective view.
Main element symbol description:
0100- mounting plane, 0200- first straight line guide rail, the vertical precision face of 0210- first straight line guide rail, 0220- first Sliding block, 0300- second straight line guide rail, the vertical precision face of 0310- second straight line guide rail, the second sliding block of 0320-, 0400- first are examined Survey device, 0410- marble gauge stand, the first datum level of 0411-, the second datum level of 0412-, 0420- amesdial, 0500- second Detection device, 0510- Magnetic gauge stand, 0511- benchmark bottom surface.
Specific embodiment
To facilitate the understanding of the present invention, below with reference to relevant drawings to engine production line linear guide mounting process into Row a more complete description.The preferred embodiment of engine production line linear guide mounting process is given in attached drawing.But start Machine production line linear guide mounting process can be realized by many different forms, however it is not limited to implementation described herein Example.On the contrary, purpose of providing these embodiments is makes to the disclosure of engine production line linear guide mounting process more Add thorough and comprehensive.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to To another element or it may be simultaneously present centering elements.On the contrary, when element is referred to as " directly existing " another element "upper", There is no intermediary elements.Term as used herein "vertical", "horizontal", "left" and "right" and similar statement are For illustrative purposes.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Made in the specification of engine production line linear guide mounting process herein Term, which is only for the purpose of describing specific embodiments, is not intended to limit the present invention.Term as used herein " and/or " it include any and all combinations of one or more related listed items.
Embodiment 1
Referring to Fig. 1, engine production line linear guide mounting process the following steps are included:
S10: the mounting plane 0100 for being used to install linear guide is thoroughly cleaned, the hair on mounting plane 0100 is removed Thorn, scar and dirt.
S20: referring to Fig. 2, the installation base surface of first straight line guide rail 0200 is tightly attached to mounting plane 0100, make first straight The mounting hole of line guide rail 0200 is successively directed at the guide rail fixation hole of mounting plane 0100, and it is complete to pass sequentially through the first threaded fastener Full locking.
S30: referring to Fig. 3, the installation base surface of second straight line guide rail 0300 is tightly attached to mounting plane 0100, make second straight The mounting hole of line guide rail 0300 is successively directed at the guide rail fixation hole of mounting plane 0100, and successively locks the second threaded fastener, Second threaded fastener keeps non-locking state.
At this point, second straight line guide rail 0300 obtains basic precision under the limitation of the second threaded fastener.Due to the second spiral shell Line fastener is not locked completely, in other words, the acting surface position of the second threaded fastener and the fixation of second straight line guide rail 0300 Counter sink countersunk head face contact, makes second straight line guide rail 0300 obtain certain adjustment space.
S40: please referring to Fig. 3, Fig. 4 and Fig. 5, using with orthogonal first datum level 0411 and the second benchmark Face 0412 simultaneously there is the first detection device 0400 adjusting second straight line guide rail 0300 of amesdial 0420 to lead relative to first straight line The walking depth of parallelism of rail 0200.
Preferably, specific step is as follows by S40:
First detection device 0400 is placed in mounting plane 0100, protects the first datum level 0411 with mounting plane 0100 Fitting is held, and the second datum level 0412 is made to be adjacent to the vertical precision face 0210 of first straight line guide rail;
Flank the amesdial gauge head of the first detection device 0400 with vertical the outermost of precision face 0310 of second straight line guide rail Touching, and the first detection device 0400 is made to be adjacent to the vertical precision face 0210 of first straight line guide rail on mounting plane 0100 and slide;
The reading of amesdial 0420 is observed, and finely tunes the position of second straight line guide rail 0300, until the reading of amesdial 0420 Number is in walking depth of parallelism critical field;
Lock two second threaded fasteners at 0300 both ends of second straight line guide rail completely respectively, and successively locking second is straight Remaining second threaded fastener on line guide rail 0300.
At this point, second straight line guide rail 0300 has reached the walking parallelism precision requirement of design object, by from both ends to The second threaded fastener is successively locked in centre, keeps second straight line guide rail 0300 parallel relative to the walking of first straight line guide rail 0200 The optimum state that degree keeps debugging to reach.
Preferably, the vertical precision face 0210 of first straight line guide rail keeps phase with the vertical precision face 0310 of second straight line guide rail It is right.Under such configuration, the detection spacing that can further shorten amesdial 0420, mentions the detection accuracy of amesdial 0420 further It is high.
Preferably, the first detection device 0400 includes marble gauge stand 0410 and thousand points on marble gauge stand 0410 Table 0420.
Specifically, marble gauge stand 0410 is equipped with the first datum level 0411 and the second datum level 0412, the first datum level 0411 keeps vertical with the second datum level 0412, and the first datum level 0411 and the second datum level 0412 are polished surface, has Very high precision can be used as debugging datum level.
Amesdial 0420 is transported the rotation that general straight-line displacement (linear motion) is converted into pointer by gear or lever It is dynamic, the length measuring instrument then read on dial.
S50: referring to Fig. 6, the first sliding block 0220 is installed on first straight line guide rail 0200, there will be a benchmark bottom surface 0511 and the second detection device 0500 of amesdial 0420 be fixed on the upper level face of the first sliding block 0220, make the second detection The benchmark bottom surface 0511 of device 0500 keeps being bonded with the upper level face of the first sliding block 0220, and makes second detection device 0500 Amesdial gauge head contacted with mounting plane 0100.
It moves the first sliding block 0220 on first straight line guide rail 0200, observe the reading of amesdial 0420 and adjusts first Threaded fastener locks degree, until the reading of amesdial 0420 is within the scope of the Height Standard of the first sliding block 0220.
The first threaded fastener is locked, and completely then with the reinforcing of screw thread glue.Screw thread glue abbreviation anaerobic adhesive is to utilize oxygen pair Free radical inhibits one-component made of principle and seals bonding agent, and can be not only used for bonding can be used for sealing again.When coated face and air Completely cut off and in the case where catalysis, screw thread glue just can solidify in room temperature rapid polymerization.It, can be further by adding screw thread glue Bonding and sealing, enhance the active force of threaded connection.
At this point, the height-precision in the upper level face of the first sliding block 0220 reaches the required precision of design object.Due to The upper level face of one sliding block 0220 is used for connecting working table, also ensures that the height-precision of the working face of workbench.
Preferably, second detection device 0500 includes Magnetic gauge stand 0510 and the amesdial on Magnetic gauge stand 0510 0420。
Preferably, Magnetic gauge stand 0510 has a benchmark bottom surface 0511.Benchmark bottom surface 0511 is smooth flat, is had very high Precision, can be used as debug benchmark.
Preferably, the first threaded fastener includes plain washer, spring washer and bolt.Wherein, plain washer rubs for reducing It wipes, spring washer loosens for locking, and bolt is for realizing threaded connection.The first threaded fastener can securely lock as a result, One guide rail 0200 prevents it from loosening and slides.
S60: please referring to Fig. 7 and Fig. 8, and the height of second straight line guide rail 0300 is adjusted using second detection device 0500 Precision.
Preferably, specific step is as follows by S60:
Second sliding block 0320 is installed on second straight line guide rail 0300, second detection device 0500 is fixed on the first sliding block 0220 upper level face center, the upper level face of the benchmark bottom surface 0511 of second detection device 0500 and the first sliding block 0220 Fitting is kept, the amesdial gauge head of second detection device 0500 and the upper level face central contact of the second sliding block 0320 are made.
It moves the first sliding block 0220 on first straight line guide rail 0200, observe the reading of amesdial 0420 and adjusts second The locking degree of threaded fastener, until the reading of amesdial 0420 is within the scope of the Height Standard of the second sliding block 0320.
The second threaded fastener is locked, and completely then with the reinforcing of screw thread glue.Screw thread glue to be further bonded and seal, Enhance the active force being threadedly coupled.
Since S50 and S60 are on the basis of the upper level face of the first sliding block 0220, without dismounting second detection device 0500 can be completed the debugging step of S50 and S60, effectively improve the installation effectiveness of linear guide.Further, since benchmark one It causes, the height-precision of the first sliding block 0220 and the second sliding block 0320 is based on same benchmark, greatlys improve the installation of linear guide Precision.
Preferably, the second threaded fastener includes plain washer, spring washer and bolt.Wherein, plain washer rubs for reducing It wipes, spring washer loosens for locking, and bolt is for realizing threaded connection.The second threaded fastener can securely lock as a result, Two guide rails 0300 prevent it from loosening and slide.
When mounting plane 0100 needs to install third to N linear guide, S20, S30, S50 are executed successively to install it Remaining linear guide, until all linear guides install.
Specifically, the debugging benchmark of third to N linear guide is still first straight line guide rail 0200.In other words, exist When executing step S30, S40, S60 to install third to N linear guide, by the sliding block of third to N linear guide and thereon It is operated according to the installation steps of second straight line guide rail 0300 and the second sliding block 0320, the peace of all linear guides can be completed Dress.
In all examples being illustrated and described herein, any occurrence should be construed as merely illustratively, without It is as limitation, therefore, other examples of exemplary embodiment can have different values.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously Limitation of the scope of the invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art, Without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection model of the invention It encloses.Therefore, protection scope of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of engine production line linear guide mounting process, which comprises the following steps:
S10: the mounting plane for being used to install linear guide is thoroughly cleaned, remove burr on the mounting plane, scar and Dirt;
S20: being tightly attached to the mounting plane for the installation base surface of first straight line guide rail, makes the mounting hole of the first straight line guide rail It is successively directed at the guide rail fixation hole of the mounting plane, and passes sequentially through the first threaded fastener and locks completely;
S30: being tightly attached to the mounting plane for the installation base surface of second straight line guide rail, makes the mounting hole of the second straight line guide rail It is successively directed at the guide rail fixation hole of the mounting plane, and successively locks the second threaded fastener, second threaded fastener Keep non-locking state;
S40: using with orthogonal first datum level and the second datum level and with the first detection device tune of amesdial Save the walking depth of parallelism of the second straight line guide rail relative to the first straight line guide rail;
S50: the first sliding block is installed on the first straight line guide rail, by second with a benchmark bottom surface and the amesdial Detection device is fixed on the upper level face of first sliding block, the benchmark bottom surface of the second detection device with it is described The upper level face of first sliding block keeps fitting, and connects the amesdial gauge head of the second detection device with the mounting plane Touching;
It moves first sliding block on the first straight line guide rail, observe the reading of the amesdial and adjusts described first Threaded fastener locks degree, until the reading of the amesdial is within the scope of the first sliding block Height Standard, then locks completely Tight first threaded fastener, and with the reinforcing of screw thread glue;
S60: the height-precision of the second straight line guide rail is adjusted using the second detection device.
2. engine production line linear guide mounting process according to claim 1, which is characterized in that the S40 is specific Steps are as follows:
First detection device is placed in the mounting plane, first datum level and the mounting plane keep pasting It closes, second datum level is adjacent to the vertical precision face of the first straight line guide rail;
Make the outermost side contacts of the amesdial gauge head of first detection device and the vertical precision face of the second straight line guide rail, And first detection device is made to be adjacent to the vertical precision face of the first straight line guide rail on the mounting plane and slide;
The reading of the amesdial is observed, and finely tunes the position of the second straight line guide rail, until at the reading of the amesdial In in walking depth of parallelism critical field, two second screw threads at second straight line guide rail both ends are then locked completely respectively Fastener, and successively lock remaining described second threaded fastener on the second straight line guide rail.
3. engine production line linear guide mounting process according to claim 1, which is characterized in that the S60 is specific Steps are as follows:
Second sliding block is installed on the second straight line guide rail, the second detection device is fixed on the upper of first sliding block Portion's reference surface center, the benchmark bottom surface of the second detection device keep being bonded with the upper level face, make second inspection Survey the amesdial gauge head of device and the upper level face central contact of second sliding block;
It moves first sliding block on the first straight line guide rail, observe the reading of the amesdial and adjusts described second The locking degree of threaded fastener, until the reading of the amesdial is within the scope of the second sliding block Height Standard, then completely Second threaded fastener is locked, and with the reinforcing of screw thread glue.
4. engine production line linear guide mounting process according to claim 1, which is characterized in that first detection Device includes marble gauge stand and the amesdial on the marble gauge stand.
5. engine production line linear guide mounting process according to claim 4, which is characterized in that the marble table Seat is equipped with first datum level and second datum level.
6. engine production line linear guide mounting process according to claim 1, which is characterized in that second detection Device includes Magnetic gauge stand and the amesdial on the Magnetic gauge stand.
7. engine production line linear guide mounting process according to claim 6, which is characterized in that the Magnetic gauge stand With a benchmark bottom surface.
8. engine production line linear guide mounting process according to claim 1, which is characterized in that the first straight line The vertical precision face of guide rail and the vertical precision face of the second straight line guide rail keep opposite.
9. engine production line linear guide mounting process according to claim 1, which is characterized in that when the installation is flat When face needs to install third to N linear guide, S030, S040, S060 are executed successively to install remaining linear guide, when execution By in S030, S040, S060 second straight line guide rail and the second sliding block replace with respectively needed for install N linear guide and its On sliding block, until all linear guides install.
10. engine production line linear guide mounting process according to claim 9, which is characterized in that the third is extremely The debugging benchmark of N linear guide is the first straight line guide rail.
CN201611245807.7A 2016-12-29 2016-12-29 Engine production line linear guide mounting process Expired - Fee Related CN106624833B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611245807.7A CN106624833B (en) 2016-12-29 2016-12-29 Engine production line linear guide mounting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611245807.7A CN106624833B (en) 2016-12-29 2016-12-29 Engine production line linear guide mounting process

Publications (2)

Publication Number Publication Date
CN106624833A CN106624833A (en) 2017-05-10
CN106624833B true CN106624833B (en) 2019-03-22

Family

ID=58836132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611245807.7A Expired - Fee Related CN106624833B (en) 2016-12-29 2016-12-29 Engine production line linear guide mounting process

Country Status (1)

Country Link
CN (1) CN106624833B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108772749B (en) * 2018-08-01 2023-10-03 成都飞机工业(集团)有限责任公司 Large-stroke gantry machine tool translational shaft sectional rack assembling and adjusting precision detection device
CN110514102B (en) * 2019-08-21 2022-04-29 巨柯自动化设备(东莞)有限公司 High-precision adjusting method for parallelism of guide rail

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6253453B1 (en) * 1993-06-30 2001-07-03 Nsk Ltd Methods of manufacturing a linear guide device and a ball screw device
CN101648342B (en) * 2009-08-21 2011-04-27 纽威数控装备(苏州)有限公司 Method for installing machine tool guideway
CN102179699A (en) * 2011-03-29 2011-09-14 朝阳博文机床有限公司 Installing and positioning method of linear guide rail
CN104416361B (en) * 2013-08-29 2016-11-16 维嘉数控科技(苏州)有限公司 Guide assembly and the fixing means of guide assembly
JP6266404B2 (en) * 2014-03-28 2018-01-24 株式会社ディスコ Guide rail fixture
CN105479159A (en) * 2015-12-01 2016-04-13 江苏帝业仪器科技有限公司 Mounting method for linear guide rail pair

Also Published As

Publication number Publication date
CN106624833A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106624833B (en) Engine production line linear guide mounting process
CN106736365B (en) Rolling guide mounting process
CN110207565B (en) Tool and method for measuring crankshaft assembling position degree of high-speed warp knitting machine
CN202452928U (en) Thickness detecting jig
CN203672284U (en) Special gauge for measuring length bar distance of annular gear
CN109352034A (en) A kind of high-precision is evenly distributed with boring device and its boring method
CN207832118U (en) A kind of external screw thread detection device based on measurement of coordinates
CN105157639A (en) Combined positioning device and positioning method
CN205664757U (en) Measure instrument of work piece internal diameter
CN106584060B (en) Linear movement part mounting process
CN213021306U (en) Precise limiting and fixing test fixture for adjusting plate of medical instrument
CN202974220U (en) Height adjusting universal fixture applied to digital camera exterior part determination
CN209379967U (en) A kind of high-precision is evenly distributed with boring device
CN106475794B (en) Engine production line linear mechanism mounting process
CN112902848A (en) Z-direction linear displacement and error measurement method and system of three-axis numerical control machine tool
CN203125212U (en) Tooling fixture body for quickly positioning three holes of rocker arm
CN202013173U (en) Flatness detector
CN201589706U (en) Device for measuring axial position of belt pulley for automobile alternating-current generator
CN208847081U (en) Coating thickness measuring device
CN206105675U (en) Detection clamp
CN206772707U (en) A kind of hardness measurement positioner
CN205066723U (en) Combination positioner
CN206192203U (en) It examines utensil to lead to no -go gage
CN203550864U (en) Flange caliper gage
CN205449124U (en) A magnetic support for preventing sensor is not hard up

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180724

Address after: 343100 Ji'an County, Jiangxi province Ji'an County North source village official village Tangshan natural village 21

Applicant after: Luo Jun

Address before: 401520 Chongqing Hechuan Industrial Park

Applicant before: CHONGQING TIANJI IND Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210315

Address after: 215534 Dongxu Avenue, DONGBANG Town, Changshu City, Suzhou City, Jiangsu Province

Patentee after: Changshu DONGBANG Technology Venture Capital Development Co.,Ltd.

Address before: 343100 Ji'an County, Jiangxi province Ji'an County North source village official village Tangshan natural village 21

Patentee before: Luo Jun

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190322

Termination date: 20211229

CF01 Termination of patent right due to non-payment of annual fee