CN106623941B - A kind of powder metallurgy superalloy element stages heating squeezes control shape method - Google Patents

A kind of powder metallurgy superalloy element stages heating squeezes control shape method Download PDF

Info

Publication number
CN106623941B
CN106623941B CN201611022071.7A CN201611022071A CN106623941B CN 106623941 B CN106623941 B CN 106623941B CN 201611022071 A CN201611022071 A CN 201611022071A CN 106623941 B CN106623941 B CN 106623941B
Authority
CN
China
Prior art keywords
powder
circular die
press ring
seaming chuck
upper press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611022071.7A
Other languages
Chinese (zh)
Other versions
CN106623941A (en
Inventor
方爽
王淑云
姜涛
兰博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING INSTITUTE OF AERONAUTICAL MATERIALS CHINA AVIATION INDUSTRY GROUP Corp
Original Assignee
BEIJING INSTITUTE OF AERONAUTICAL MATERIALS CHINA AVIATION INDUSTRY GROUP Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING INSTITUTE OF AERONAUTICAL MATERIALS CHINA AVIATION INDUSTRY GROUP Corp filed Critical BEIJING INSTITUTE OF AERONAUTICAL MATERIALS CHINA AVIATION INDUSTRY GROUP Corp
Priority to CN201611022071.7A priority Critical patent/CN106623941B/en
Publication of CN106623941A publication Critical patent/CN106623941A/en
Application granted granted Critical
Publication of CN106623941B publication Critical patent/CN106623941B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F3/00Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces
    • B22F3/20Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces by extruding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F3/00Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces
    • B22F3/20Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces by extruding
    • B22F2003/208Warm or hot extruding

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Powder Metallurgy (AREA)

Abstract

The present invention is that a kind of powder metallurgy superalloy element stages heating squeezes control shape method, this method is that the good mobility of dusty material is utilized, by the deformation temperature and pressure of phase change, dusty material is made to reach initial densification under lower temperature and smaller pressure, and retain powder particle with a degree of surface-active and mobility, then deformation temperature and pressure are improved, parameter is plastically deformed with reference to mold movement direction and deformation velocity etc., it flows superalloy powder and reaches certain shape, in this course, hole between powder particle completely disappears, reach full densification.At the same time, the cycle alternation squeezed using forward extrusion and the back of the body is acted on, and applies certain strained condition to powder particle, big particle changes to small grains crystal grain, and component forming is completed, prepares fully dense powder component, realizes powder component curing texture forming integration.It can obtain dense structure, the powder metallurgy superalloy forging stock that crystal grain is uniform, tiny.

Description

A kind of powder metallurgy superalloy element stages heating squeezes control shape method
Technical field
The present invention is that a kind of stepwise heating for powder metallurgy superalloy component squeezes control shape method, belongs to hot-working process Field is related to the improvement of powder metallurgy superalloy component preparation process.
Background technology
Powder metallurgy superalloy is that solidifying segregation and deformation are tired caused by order to solve casting wrought alloy high temperature alloy high-alloying The difficult and diskware material that grows up.High-alloying powder metallurgy superalloy has high temperature resistant, high-strength tenacity and low crack propagation speed The advantages of excellent combination properties such as rate is that manufacture high-performance, high reliability, the long-life advanced aero engine turbine disk etc. are resistance to The preferred material of high-temperature component.But high-alloying powder metallurgy superalloy, generally to temperature and its sensitivity, process window is narrow, belongs to In less-deformable alloy, cause to perform in technique and organizational controls during there are certain difficulties.
External powder metallurgy superalloy is mainly used to prepare the hot-end components such as the high-performance enginer turbine disk, mainly using powder Prepared by the process of hot isostatic pressing+extruding+isothermal forging, process characteristic is complex process, and long preparation period is of high cost, Moreover, it needs repeatedly to be machined component blank between different processes, to meet process to component blank shape With the requirement of surface state, it is low to cause stock utilization.
Invention content
The present invention is exactly to design for above-mentioned existing domestic the deficiencies in the prior art and provide one kind for powder The stepwise heatings of last superalloy components squeezes control shape method, the purpose is to improve the production efficiency of powder metallurgy superalloy component and Stock utilization.
The purpose of the present invention is achieved through the following technical solutions:
This kind squeezes control shape method for the stepwise heating of powder metallurgy superalloy component, it is characterised in that:The step of this method Suddenly it is:
Step 1: powder prepares
It is calculated according to scantling and weighs atomization superalloy powder, the weight of weighing calculates as follows:
mIt loads=mIt calculates/ 0.8 formula 1
In formula:mIt loadsFor the atomization superalloy powder weight being loaded into mold, mIt calculatesTo be calculated according to the volume of component Obtained atomization superalloy powder weight;
Step 2: prepared by extrusion die
Extrusion die is prepared using Steel material of the fracture strength more than 2000MPa, the mold is by upper circular die 1 and lower annular Mould 2 forms extrusion die profile, wherein, lower circular die 2 is fixed on the lower table of press, and upper circular die 1 is mounted in lower annular It on mould 2, and is fitted close with lower circular die 2, the internal diameter of upper circular die 1 is bigger than the internal diameter of lower circular die 2, and upper circular die 1 is under Circular die 2 can be split in an axial direction;
There is upper press ring 3 in the inner cavity of upper circular die 1, matching between upper press ring 3 and upper circular die 1 is combined into excessive cooperation, Seaming chuck 4 is installed, matching between seaming chuck 4 and upper press ring 3 is combined into excessive cooperation, in lower circular die 2 in the centre bore of upper press ring 3 Centre bore in push-down head 5 is installed, between push-down head 5 and lower circular die 2 with being combined into excessive cooperation, so as to fulfill upper press ring 3, Seaming chuck 4 and push-down head 5 vertically can freely move up and down and the center line of three and upper circular die 1 and lower circular die 2 center line is coaxial;
Step 3: hydraulic system and heating system are in place
Extrusion die inner wall with alcohol and acetone is cleaned out, is placed in vacuum chamber, three sets of liquid of setting in vacuum chamber Pressure system and heating system, three sets of hydraulic systems dock upper press ring 3, seaming chuck 4 and push-down head 5 respectively, in atomization high temperature alloy Before powder loads, the upper end of push-down head 5 is concordant with the upper end of lower circular die 2, and upper press ring 3 is concordant with the lower end of seaming chuck 4, and 1 top of circular die is higher by, heating system is located at the surrounding of extrusion die;
Step 4: powder loads
Preprepared powder metallurgy superalloy atomized powder is passed through under upper press ring 3 and seaming chuck 4 in vacuum chamber Gap between end and upper circular die 1 is poured into mold;
Step 5: powder and mold preheating
Mold and powder are heated to 500-700 DEG C, kept the temperature, soaking time calculates as follows:
TSoaking time=(LUpper circular die intracavity diameter+LUpper circular die wall thickness× 2) × 1.7min/mm formula 2
Step 6: powder curing
After treating soaking time, push-down head 5 remains stationary as, and upper press ring 3 and seaming chuck 4 move downward simultaneously, and speed is protected It holds between 17mm/s~20mm/s, until pressure reaches 300-700MPa, at this point, 4 stop motion of upper press ring 3 and seaming chuck;
It then proceedes to be warming up to 1050-1150 DEG C, be kept the temperature, soaking time is calculated according to formula 2;
Step 7: the component forming after powder curing is using one of following four mode:
The first:After waiting until soaking time again, push-down head 5 still remains stationary as, upper press ring 3 and seaming chuck 4 after Continuous to move downward simultaneously, speed is maintained between 17mm/s~20mm/s, until pressure reaches 1000-1400MPa, seaming chuck 4 With 3 stop motion of upper press ring, cylindrical powder high temperature alloy ingot can be obtained at this time;
Second:After waiting until soaking time again, push-down head 5 still remains stationary as, seaming chuck 4 and upper press ring 3 after Continuous to move downward simultaneously, speed is maintained between 17mm/s~20mm/s, until pressure reaches 1000-1400MPa, later, on Pressure head 4 continues to move downward, while upper press ring 3 starts to move upwards at the same speed, and the lower face of seaming chuck 4 does not contact push-down head 5 During upper surface, 3 stop motion of seaming chuck 4 and upper press ring, you can obtain cupuliform powder metallurgy superalloy ingot;
The third:After waiting until soaking time again, push-down head 5 still remains stationary as, seaming chuck 4 and upper press ring 3 after Continuous to move downward simultaneously, speed is maintained between 17mm/s~20mm/s, until pressure reaches 1000-1400MPa, later, on Pressure head 4 continues to move downward, while upper press ring 3 starts to move upwards at the same speed, treats the lower face contact push-down head 5 of seaming chuck 4 During upper surface, 3 stop motion of seaming chuck 4 and upper press ring, you can obtain tubular powder metallurgy superalloy ingot;
4th kind:After waiting until soaking time again, push-down head 5 still remains stationary as, seaming chuck 4 and upper press ring 3 after Continuous to move downward simultaneously, speed is maintained between 17mm/s~20mm/s, until pressure reaches 1000-1400MPa, later, under Pressure head 5 starts to move downward at the same speed, treats the upper surface of the inner cavity of the lower circular die 2 of lower face contact of seaming chuck 4 and upper press ring 3 When, you can obtain stick powder metallurgy superalloy ingot;
Step 8: the post processing of powder metallurgy superalloy ingot
The position of upper press ring 3 and seaming chuck 4 is adjusted to the state before atomization superalloy powder loads, by upper ring Shape mould 1 and lower circular die 2 are opened in an axial direction, take out powder metallurgy superalloy ingot, blast are carried out after being cooled to room temperature, and using machinery The method removal surface smut of processing is to get to powder metallurgy superalloy component.
Technical solution of the present invention has the special feature that is with advantageous effect:
Present invention is generally directed to prepare powder metallurgy superalloy component using hot isostatic pressing+extruding+isothermal forging process to exist Forging long preparation period, the manufacture state of the art of high cost, the method that extruding control shape is heated with powder stage are original to substitute The mode of Powder hot isostatic pressure+extruding+isothermal forging, solves long preparation period, and manufacture is of high cost low with stock utilization Problem.
The present invention is a kind of plastic forming technology research being directed in powder metallurgy high-temperature alloy component, and basic principle is The good mobility of dusty material is utilized, by the deformation temperature and pressure of phase change, makes dusty material in lower temperature Reach initial densification under smaller pressure, and retain powder particle with a degree of surface-active and mobility, connect down Come, improve deformation temperature and pressure, be plastically deformed parameter with reference to mold movement direction and deformation velocity etc., make superalloy powder It flows and reaches certain shape (cylindrical, cupuliform, stick and tubular etc.), in this course, the hole between powder particle Gap completely disappears, and reaches full densification.At the same time, the cycle alternation squeezed using forward extrusion and the back of the body is acted on, to powder particle Apply certain strained condition, big particle changes to small grains crystal grain, and completes component forming, so as to prepare full cause Close powder component realizes that powder component curing-tissue-is forming integrated.Compared to hot isostatic pressing (generally 10%), deformation Amount is increased substantially to 50~70%, promotes recrystallization, the primary granule boundary of powder is crushed, so as to prepare group Knit powder metallurgy superalloy component fine and close and with tiny recrystal grain.
Technical solution of the present invention is the same as compared with the technology of preparing of domestic and international powder metallurgy superalloy annular construction member, advantage is main It is embodied in:
(1) using the good mobility of powder, during powder forming, the shape of powder component is changing always, realizes The integration of component curing-tissue-forming, reduces blank allowance, improves forging stock utilization;
(2) block forming of the dusty material from powder to the end, whole process is not to be realized at same temperature, Deformation temperature is phase change, so as to meet powder particle from interface cohesion to Recrystallization nucleation and grow up whole process for The different demands of Plastic Forming condition;
(3) powder particle shapes under certain Plastic Deformation Conditions, since the cycle alternation of forward extrusion and back of the body extruding is made With being conveniently adjusted the stress and strain states of component different zones;
(4) technological process is simplified, shortens the lead time, improves stock utilization, reduces component manufacture cost.
Description of the drawings
Fig. 1 is the structure diagram of extrusion die in technical solution of the present invention
Fig. 2 is that the high temperature of technical solution of the present invention embodiment 1 adds up to the microstructure morphology of component
Fig. 3 is that the high temperature of technical solution of the present invention embodiment 2 adds up to the microstructure morphology of component
Specific embodiment
Technical solution of the present invention is further described below with reference to embodiment:
Embodiment 1
This kind squeezes control shape method for the stepwise heating of powder metallurgy superalloy component, it is characterised in that:The step of this method Suddenly it is:
Step 1: powder prepares
It is calculated according to scantling and weighs atomization superalloy powder 7kg, the weight of weighing calculates as follows:
mIt loads=mIt calculates/ 0.8 formula 1
In formula:mIt loadsFor the atomization superalloy powder weight being loaded into mold, mIt calculatesTo be calculated according to the volume of component Obtained atomization superalloy powder weight;
Step 2: prepared by extrusion die
Extrusion die is prepared using Steel material of the fracture strength more than 2000MPa, the mold is by upper circular die 1 and lower annular Mould 2 forms extrusion die profile, wherein, lower circular die 2 is fixed on the lower table of press, and upper circular die 1 is mounted in lower annular It on mould 2, and is fitted close with lower circular die 2, the internal diameter of upper circular die 1 is bigger than the internal diameter of lower circular die 2, and upper circular die 1 is under Circular die 2 can be split in an axial direction;
There is upper press ring 3 in the inner cavity of upper circular die 1, matching between upper press ring 3 and upper circular die 1 is combined into excessive cooperation, Seaming chuck 4 is installed, matching between seaming chuck 4 and upper press ring 3 is combined into excessive cooperation, in lower circular die 2 in the centre bore of upper press ring 3 Centre bore in push-down head 5 is installed, between push-down head 5 and lower circular die 2 with being combined into excessive cooperation, so as to fulfill upper press ring 3, Seaming chuck 4 and push-down head 5 vertically can freely move up and down and the center line of three and upper circular die 1 and lower circular die 2 center line is coaxial;
Step 3: hydraulic system and heating system are in place
Extrusion die inner wall with alcohol and acetone is cleaned out, is placed in vacuum chamber, three sets of liquid of setting in vacuum chamber Pressure system and heating system, three sets of hydraulic systems dock upper press ring 3, seaming chuck 4 and push-down head 5 respectively, in atomization high temperature alloy Before powder loads, the upper end of push-down head 5 is concordant with the upper end of lower circular die 2, and upper press ring 3 is concordant with the lower end of seaming chuck 4, and 1 top of circular die is higher by, heating system is located at the surrounding of extrusion die;
Step 4: powder loads
In vacuum chamber by preprepared high temperature alloy atomized powder 6 by the lower end of upper press ring 3 and seaming chuck 4 with Gap between upper circular die 1 is poured into mold;
Step 5: powder and mold preheating
Mold and high temperature alloy atomized powder 6 are heated to 700 DEG C, kept the temperature, soaking time calculates as follows:
TSoaking time=(LUpper circular die intracavity diameter+LUpper circular die wall thickness× 2) × 1.7min/mm formula 2
Step 6: powder curing
After treating soaking time, push-down head 5 remains stationary as, and upper press ring 3 and seaming chuck 4 move downward simultaneously, and speed is protected It holds between 17mm/s, until pressure reaches 500MPa, at this point, 4 stop motion of upper press ring 3 and seaming chuck;
It then proceedes to be warming up to 1070 DEG C, be kept the temperature, soaking time is calculated according to formula 2;
Step 7: cylindrical powder component forming
After waiting until soaking time again, push-down head 5 still remains stationary as, upper press ring 3 and seaming chuck 4 continue simultaneously to Lower movement, speed are maintained between 17mm/s, until pressure reaches 1400MPa, 3 stop motion of seaming chuck 4 and upper press ring, and at this time Cylindrical powder high temperature alloy ingot can be obtained;
Step 8: the post processing of powder metallurgy superalloy ingot
The position of upper press ring 3 and seaming chuck 4 is adjusted to the state before atomization superalloy powder loads, by upper ring Shape mould 1 and lower circular die 2 are opened in an axial direction, take out powder metallurgy superalloy ingot, blast are carried out after being cooled to room temperature, and using machinery The method removal surface smut of processing is to get to powder metallurgy superalloy component.
Referring to shown in attached drawing 2, the microstructure of powder metallurgy superalloy component is uniform, can't see apparent primary granule side Boundary.
Embodiment 2
This kind squeezes control shape method for the stepwise heating of powder metallurgy superalloy component, it is characterised in that:The step of this method Suddenly it is:
Step 1: powder prepares
It is calculated according to scantling and weighs atomization superalloy powder 5kg, the weight of weighing calculates as follows:
mIt loads=mIt calculates/ 0.8 formula 1
In formula:mIt loadsFor the atomization superalloy powder weight being loaded into mold, mIt calculatesTo be calculated according to the volume of component Obtained atomization superalloy powder weight;
Step 2: prepared by extrusion die
Extrusion die is prepared using Steel material of the fracture strength more than 2000MPa, the mold is by upper circular die 1 and lower annular Mould 2 forms extrusion die profile, wherein, lower circular die 2 is fixed on the lower table of press, and upper circular die 1 is mounted in lower annular It on mould 2, and is fitted close with lower circular die 2, the internal diameter of upper circular die 1 is bigger than the internal diameter of lower circular die 2, and upper circular die 1 is under Circular die 2 can be split in an axial direction;
There is upper press ring 3 in the inner cavity of upper circular die 1, matching between upper press ring 3 and upper circular die 1 is combined into excessive cooperation, Seaming chuck 4 is installed, matching between seaming chuck 4 and upper press ring 3 is combined into excessive cooperation, in lower circular die 2 in the centre bore of upper press ring 3 Centre bore in push-down head 5 is installed, between push-down head 5 and lower circular die 2 with being combined into excessive cooperation, so as to fulfill upper press ring 3, Seaming chuck 4 and push-down head 5 vertically can freely move up and down and the center line of three and upper circular die 1 and lower circular die 2 center line is coaxial;
Step 3: hydraulic system and heating system are in place
Extrusion die inner wall with alcohol and acetone is cleaned out, is placed in vacuum chamber, three sets of liquid of setting in vacuum chamber Pressure system and heating system, three sets of hydraulic systems dock upper press ring 3, seaming chuck 4 and push-down head 5 respectively, in atomization high temperature alloy Before powder loads, the upper end of push-down head 5 is concordant with the upper end of lower circular die 2, and upper press ring 3 is concordant with the lower end of seaming chuck 4, and 1 top of circular die is higher by, heating system is located at the surrounding of extrusion die;
Step 4: powder loads
In vacuum chamber by preprepared high temperature alloy atomized powder 6 by the lower end of upper press ring 3 and seaming chuck 4 with Gap between upper circular die 1 is poured into mold;
Step 5: powder and mold preheating
Mold and high temperature alloy atomized powder 6 are heated to 500-700 DEG C, kept the temperature, soaking time is as follows It calculates:
TSoaking time=(LUpper circular die intracavity diameter+LUpper circular die wall thickness× 2) × 1.7min/mm formula 2
Step 6: powder curing
After treating soaking time, push-down head 5 remains stationary as, and upper press ring 3 and seaming chuck 4 move downward simultaneously, and speed is protected It holds between 20mm/s, until pressure reaches 700MPa, at this point, 4 stop motion of upper press ring 3 and seaming chuck;
It then proceedes to be warming up to 1100 DEG C, be kept the temperature, soaking time is calculated according to formula 2;
Step 7: cupuliform powder component shapes
After waiting until soaking time again, push-down head 5 still remains stationary as, seaming chuck 4 and upper press ring 3 continue simultaneously to Lower movement, speed are maintained between 20mm/s, until pressure reaches 1100MPa, later, seaming chuck 4 continues to move downward, simultaneously Upper press ring 3 starts to move upwards at the same speed, when the lower face of seaming chuck 4 does not contact the upper surface of push-down head 5, seaming chuck 4 and upper pressure 3 stop motion of ring, you can obtain cupuliform powder metallurgy superalloy ingot;
Step 8: the post processing of powder metallurgy superalloy ingot
The position of upper press ring 3 and seaming chuck 4 is adjusted to the state before atomization superalloy powder loads, by upper ring Shape mould 1 and lower circular die 2 are opened in an axial direction, take out powder metallurgy superalloy ingot, blast are carried out after being cooled to room temperature, and using machinery The method removal surface smut of processing is to get to powder metallurgy superalloy component.
Referring to shown in attached drawing 3, the microstructure of powder metallurgy superalloy component is uniform, can't see apparent primary granule side Boundary.

Claims (1)

1. a kind of powder metallurgy superalloy element stages heating squeezes control shape method, it is characterised in that:The step of this method is:
Step 1: powder prepares
It is calculated according to scantling and weighs atomization superalloy powder, the weight of weighing calculates as follows:
mIt loads=mIt calculates/ 0.8 formula 1
In formula:mIt loadsFor the atomization superalloy powder weight being loaded into mold, mIt calculatesIt is calculated for the volume according to component Atomization superalloy powder weight;
Step 2: prepared by extrusion die
Extrusion die is prepared using Steel material of the fracture strength more than 2000MPa, the mold is by upper circular die (1) and lower circular die (2) extrusion die profile is formed, wherein, lower circular die (2) is fixed on the lower table of press, and upper circular die (1) is mounted in down In circular die (2), and it is fitted close with lower circular die (2), the internal diameter of upper circular die (1) is bigger than the internal diameter of lower circular die (2), on Circular die (1) and lower circular die (2) can be split in an axial direction;
There is upper press ring (3) in the inner cavity of upper circular die (1), excessively matching with being combined between upper press ring (3) and upper circular die (1) It closes, installation seaming chuck (4) in the centre bore of upper press ring (3), matching between seaming chuck (4) and upper press ring (3) is combined into excessive cooperation, Push-down head (5) is installed in the centre bore of lower circular die (2), matching between push-down head (5) and lower circular die (2) is combined into and excessively matches It closes, vertically can freely be moved up and down and in three so as to fulfill upper press ring (3), seaming chuck (4) and push-down head (5) Heart line and the center line of upper circular die (1) and lower circular die (2) are coaxial;
Step 3: hydraulic system and heating system are in place
Extrusion die inner wall with alcohol and acetone is cleaned out, is placed in vacuum chamber, three sets of hydraulic pressure systems of setting in vacuum chamber System and heating system, three sets of hydraulic systems dock upper press ring (3), seaming chuck (4) and push-down head (5) respectively, are closed in atomization high temperature Before bronze end loads, the upper end of push-down head (5) is concordant with the upper end of lower circular die (2), upper press ring (3) and seaming chuck (4) Lower end is concordant, and is higher by circular die (1) top, and heating system is located at the surrounding of extrusion die;
Step 4: powder loads
Preprepared powder metallurgy superalloy atomized powder is passed through under upper press ring (3) and seaming chuck (4) in vacuum chamber Gap between end and upper circular die (1) is poured into mold;
Step 5: powder and mold preheating
Mold and powder are heated to 500-700 DEG C, kept the temperature, soaking time calculates as follows:
TSoaking time=(LUpper circular die intracavity diameter+LUpper circular die wall thickness× 2) × 1.7min/mm formula 2
Step 6: powder curing
After treating soaking time, push-down head (5) remains stationary as, and upper press ring (3) and seaming chuck (4) move downward simultaneously, speed It is maintained between 17mm/s~20mm/s, until pressure reaches 300-700MPa, at this point, upper press ring (3) and seaming chuck (4) stop Movement;
It then proceedes to be warming up to 1050-1150 DEG C, be kept the temperature, soaking time is calculated according to formula 2;
Step 7: the component forming after powder curing is using one of following four mode:
The first:After waiting until soaking time again, push-down head (5) still remains stationary as, upper press ring (3) and seaming chuck (4) Continuation moves downward simultaneously, and speed is maintained between 17mm/s~20mm/s, until pressure reaches 1000-1400MPa, seaming chuck (4) and upper press ring (3) stop motion, cylindrical powder high temperature alloy ingot can be obtained at this time;
Second:After waiting until soaking time again, push-down head (5) still remains stationary as, seaming chuck (4) and upper press ring (3) Continuation moves downward simultaneously, and speed is maintained between 17mm/s~20mm/s, until pressure reaches 1000-1400MPa, later, Seaming chuck (4) continues to move downward, while upper press ring (3) beginning moves upwards at the same speed, and the lower face of seaming chuck (4) does not contact down During the upper surface of pressure head (5), seaming chuck (4) and upper press ring (3) stop motion, you can obtain cupuliform powder metallurgy superalloy ingot;
The third:After waiting until soaking time again, push-down head (5) still remains stationary as, seaming chuck (4) and upper press ring (3) Continuation moves downward simultaneously, and speed is maintained between 17mm/s~20mm/s, until pressure reaches 1000-1400MPa, later, Seaming chuck (4) continues to move downward, while upper press ring (3) beginning moves upwards at the same speed, under the lower face contact for treating seaming chuck (4) During the upper surface of pressure head (5), seaming chuck (4) and upper press ring (3) stop motion, you can obtain tubular powder metallurgy superalloy ingot;
4th kind:After waiting until soaking time again, push-down head (5) still remains stationary as, seaming chuck (4) and upper press ring (3) Continuation moves downward simultaneously, and speed is maintained between 17mm/s~20mm/s, until pressure reaches 1000-1400MPa, later, Push-down head (5) beginning moves downward at the same speed, treats the inner cavity of the lower circular die (2) of lower face contact of seaming chuck (4) and upper press ring (3) Upper surface when, you can obtain stick powder metallurgy superalloy ingot;
Step 8: the post processing of powder metallurgy superalloy ingot
The position of upper press ring (3) and seaming chuck (4) is adjusted to the state before atomization superalloy powder loads, by upper ring Shape mould (1) and lower circular die (2) are opened in an axial direction, take out powder metallurgy superalloy ingot, blast is carried out, and use after being cooled to room temperature The method removal surface smut of mechanical processing is to get to powder metallurgy superalloy component.
CN201611022071.7A 2016-11-16 2016-11-16 A kind of powder metallurgy superalloy element stages heating squeezes control shape method Active CN106623941B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611022071.7A CN106623941B (en) 2016-11-16 2016-11-16 A kind of powder metallurgy superalloy element stages heating squeezes control shape method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611022071.7A CN106623941B (en) 2016-11-16 2016-11-16 A kind of powder metallurgy superalloy element stages heating squeezes control shape method

Publications (2)

Publication Number Publication Date
CN106623941A CN106623941A (en) 2017-05-10
CN106623941B true CN106623941B (en) 2018-06-29

Family

ID=58808263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611022071.7A Active CN106623941B (en) 2016-11-16 2016-11-16 A kind of powder metallurgy superalloy element stages heating squeezes control shape method

Country Status (1)

Country Link
CN (1) CN106623941B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107052344A (en) * 2017-05-26 2017-08-18 龙岩紫荆创新研究院 A kind of neodymium iron boron ring composite die
CN107511483A (en) * 2017-10-11 2017-12-26 南通聚星铸锻有限公司 A kind of powder metallurgy superalloy rod pressing method
CN108555302B (en) * 2018-01-22 2019-08-30 华中科技大学 A kind of cold increasing material/warm and hot forging combined shaping method of amorphous alloy part
CN108994299B (en) * 2018-07-13 2020-04-03 中国航发北京航空材料研究院 Device for controlling heating extrusion performance of powder superalloy component in stage and using method
CN109396424B (en) * 2018-11-23 2019-10-29 南京宁阪特殊合金有限公司 The preparation method of nodulizer briquetting
CN110293227B (en) * 2019-07-11 2021-12-03 中国航发北京航空材料研究院 Reverse extrusion preparation method and mold for powder high-temperature alloy ingot blank with sheath
CN110280767B (en) * 2019-07-11 2021-05-28 中国航发北京航空材料研究院 Preparation method and die of titanium-aluminum composite pipe
CN111283201B (en) * 2020-03-31 2023-06-27 四川科匠轻金属材料科技有限公司 Production method for semi-continuous ingot production of alloy powder
CN111647764A (en) * 2020-04-20 2020-09-11 中南大学 Nickel-based powder superalloy and forming method thereof
CN114789250B (en) * 2022-04-07 2024-04-09 中国航发北京航空材料研究院 Preparation method of powder superalloy cylindrical spur gear component
CN115319092B (en) * 2022-07-20 2024-06-18 中国航发北京航空材料研究院 In-situ powder metallurgy forming method for face gear with spiral angle

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0086417A2 (en) * 1982-02-13 1983-08-24 Mtu Motoren- Und Turbinen-Union MàœNchen Gmbh Case for the hot isostatic pressing of intricately shaped high-duty service parts of turbo machines
CN102672174A (en) * 2012-05-15 2012-09-19 华中科技大学 Method for manufacturing integral annular case part by using hot isostatic pressing process
CN103008659A (en) * 2011-09-28 2013-04-03 宝山钢铁股份有限公司 Manufacturing method of ultra-fine grain high-temperature alloy plate blanks
CN103551573A (en) * 2013-10-22 2014-02-05 中国科学院金属研究所 Previous particle boundary precipitation preventable high-temperature alloy powder hot isostatic pressing process
CN103691952A (en) * 2014-01-06 2014-04-02 钢铁研究总院 Preparation method of functional gradient performance coil
CN104493167A (en) * 2014-11-20 2015-04-08 中国航空工业集团公司北京航空材料研究院 Method for forming powder high-temperature alloy annular member

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5839707A (en) * 1981-09-01 1983-03-08 Kobe Steel Ltd High density sintering method for powder molding

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0086417A2 (en) * 1982-02-13 1983-08-24 Mtu Motoren- Und Turbinen-Union MàœNchen Gmbh Case for the hot isostatic pressing of intricately shaped high-duty service parts of turbo machines
CN103008659A (en) * 2011-09-28 2013-04-03 宝山钢铁股份有限公司 Manufacturing method of ultra-fine grain high-temperature alloy plate blanks
CN102672174A (en) * 2012-05-15 2012-09-19 华中科技大学 Method for manufacturing integral annular case part by using hot isostatic pressing process
CN103551573A (en) * 2013-10-22 2014-02-05 中国科学院金属研究所 Previous particle boundary precipitation preventable high-temperature alloy powder hot isostatic pressing process
CN103691952A (en) * 2014-01-06 2014-04-02 钢铁研究总院 Preparation method of functional gradient performance coil
CN104493167A (en) * 2014-11-20 2015-04-08 中国航空工业集团公司北京航空材料研究院 Method for forming powder high-temperature alloy annular member

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Effect of hot extrusion and heat treatment on microstructure of nickel-base superalloy;Chen ze LIU等;《Trans. Nonferrous Met. Soc. China》;20141231;第2544-2553页 *
变形温度及变形量对挤压态FGH96合金晶粒异常长大的影响;王超渊等;《航空材料学报》;20161103;第36卷(第5期);第14-20页 *
粉末高温合金超塑性等温锻造技术研究;王淑云等;《航空材料学报》;20071031;第27卷(第5期);第30-33页 *

Also Published As

Publication number Publication date
CN106623941A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106623941B (en) A kind of powder metallurgy superalloy element stages heating squeezes control shape method
CN106378456B (en) A kind of method for rapidly densifying for powder metallurgy superalloy component
CN101972830A (en) Hot upsetting process for cast ingot with large height to diameter ratio for ultra large ring forging
WO2015035894A1 (en) Method for producing profile for aircraft wing stringer
CN104148430B (en) A kind of amorphous alloy pipe extrusion molding apparatus and technique
CN109226750B (en) Rapid forming method for powder titanium alloy blade prefabricated blank with damping boss
CN1253269C (en) Casting extruding compound shaping method of magnesium alloy automobile hub
CN104493167A (en) Method for forming powder high-temperature alloy annular member
CN104561852A (en) Process for preparing semi-solid state aluminum alloy scroll plate by radial forging strain induction method
CN103264137A (en) Flange ball valve body forging technology
CN204108005U (en) A kind of amorphous alloy pipe extrusion molding apparatus
CN103173597A (en) Method for improving optional performances of large H13 steel hot-extrusion mould
CN103934397B (en) Based on engine turbine disk manufacturing process and the device of heat-resisting alloy
CN113198960A (en) Large-scale fracturing valve body totally-enclosed type multidirectional die forging equipment and die forging process
CN104368790B (en) A kind of metal liquid fluctuates high die casting forging one-step moulding method
CN108994299A (en) A kind of heating of powder metallurgy superalloy element stages squeezes control property device and application method
CN104368621B (en) A kind of manufacture method of sheet metal
CN109092957A (en) A kind of shaft sleeve parts part thixoextruding method
CN104550838B (en) The technique that a kind of radial forging strain-induced method prepares semisolid iron and steel camshaft
CN110293227A (en) A kind of the backward extrusion preparation method and mold of the powder metallurgy superalloy ingot blank with jacket
CN208528052U (en) A kind of shaping dies of shaft sleeve parts part thixoextruding
CN101722204A (en) Extrusion process for titanium alloy profile material
CN107282670A (en) A kind of extrusion blooming method of turbine disk high temperature alloy ingot casting
CN106623580A (en) Method for manufacturing bathroom water faucet branch pipe by compounding hot extrusion with superplastic bulging
CN105436373A (en) Nickel-based powder high-temperature alloy ingot superplastic isothermal closed upset cake blank making method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant