CN106606126A - Sliding rail assembly and sliding rail set thereof - Google Patents
Sliding rail assembly and sliding rail set thereof Download PDFInfo
- Publication number
- CN106606126A CN106606126A CN201510690419.9A CN201510690419A CN106606126A CN 106606126 A CN106606126 A CN 106606126A CN 201510690419 A CN201510690419 A CN 201510690419A CN 106606126 A CN106606126 A CN 106606126A
- Authority
- CN
- China
- Prior art keywords
- rail
- clamping piece
- operating parts
- sliding rail
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Drawers Of Furniture (AREA)
Abstract
The invention relates to a sliding rail assembly and a sliding rail set thereof. The sliding rail assembly comprises a first rail, a second rail, a first clamping piece and an operating piece. The first rail has a stopping feature. The second rail can move in a direction relative to the first rail. The first clamping piece is arranged on the second rail and comprises a first clamping part. The operating piece drives the first clamping piece to move in an operable mode. When the second rail moves to a preset position relative to the first rail, the first clamping part of the first clamping piece is located at the stopping feature side of the first rail, and accordingly the second rail cannot continuously move in the direction relative to the first rail. The first clamping part of the first clamping piece responds to displacement of the operating piece and thus is driven to be not located at the stopping feature side of the first rail any more.
Description
Technical field
The present invention relates to a kind of sliding rail assembly and external member, particularly relate to a kind of slide rail for including an at least clamping piece
Assembly and its slide rail external member.
Background technology
In general, sliding rail assembly can relative first rail displacement with the second rail comprising the first rail.Wherein, when second
Rail with respect to the first rail toward a direction be moved to a precalculated position when, generally can be by between the second rail and the first rail
A barrier structure and the second rail cannot be continued to be only capable of resting on this toward direction displacement with respect to the first rail and make a reservation for
Position.With the progress of technology, a kind of Related product, such as the second rail by one except stopping mechanism relative the
One rail can also release the stop mechanism outside a precalculated position by an operating parts, second rail is continued
With respect to the first rail toward a direction displacement.In the patented technology of correlation type, such as U.S. Patent Bulletin US
6,412,891B1 has disclosed a kind of sliding rail assembly comprising rail (30), a block piece (50) and in an outer rail (20), one
Latching member (70).Wherein, latching member (70) is articulated in interior rail (30), when the relative outer rail (20) of interior rail (30) is in one
When putting, can allow the interior rail (30) cannot relative outer rail with the mutual stop between latching member (70) and block piece (50)
(20) arbitrarily displacement.
The content of the invention
It is an object of the invention to provide a kind of sliding rail assembly, to realize that one second rail of sliding rail assembly can be by extremely
A few clamping piece rests on a precalculated position with respect to one first rail, additionally, can be used to convenient operation through an operating parts
An at least clamping piece, and the intensity of clip is more preferably.
An a kind of viewpoint of the invention, sliding rail assembly includes one first rail, one second rail, one first clip
Part and an operating parts, are characterized in:First rail has one to stop feature.Second rail can be with respect to the first rail edge
One direction displacement.First clamping piece is configured in second rail, and first clamping piece includes one first blocking part.Should
Operating parts operationally drives the first clamping piece displacement.When relative first rail of second rail is moved to a pre-determined bit
When putting, the first blocking part of first clamping piece is located at the side of the stop feature of first rail, makes the second rail phase
First rail cannot be continued toward direction displacement;Wherein, the first blocking part of first clamping piece responds the operation
The displacement of part, be no longer at the first blocking part for driving first clamping piece first rail stop feature should
Side.
Wherein, also it is arranged between second rail and first clamping piece comprising one second clamping piece, second card
Valve part includes one second blocking part, when second rail is moved to the precalculated position, the first card of first clamping piece
Tug portion is located at respectively the both sides of the stop feature with the second blocking part of second clamping piece.
Wherein, first clamping piece also includes one first elastic part, and second clamping piece also includes one second bullet
Power portion, the first elastic part of adjacent first clamping piece of the second elastic part of second clamping piece.
Wherein, the second elastic part of second clamping piece has two ribs, the first bullet of first clamping piece
Receive to be located between two ribs during outer force deformation in power portion.
Wherein, the operating parts is linearly movably connected with second rail.
Wherein, one of second rail and the operating parts have an at least guidance part, and the sliding rail assembly is also
An at least guidance part is passed through comprising at least a connection piece.
Wherein, an at least guidance part be an elongated hole, this at least a connection piece through the elongated hole a part.
Wherein, also it is arranged between second rail and the operating parts comprising an elastic component.
Wherein, second rail has first end first end relative with a second end position, the behaviour
Workpiece is arranged in this second with one first, one second and a solution tug feature, and this first is proximate in this
The first end of the second rail, this second is proximate in the second end of second rail, and the solution pulls feature by the behaviour
Workpiece operationally displacement and the first blocking part of first clamping piece can be pushed against from the stop feature of first rail
Side departs from.
Wherein, the first blocking part of first clamping piece includes one first clip section, one second clip section and
First inclined guide section is connected between the first clip section and the second clip section, the solution tug feature bag of the operating parts
Containing one first solution tug section, one second solution tug section and one second inclined guide section be connected to this first solution tug section and this second
Between solution tug section, when the first blocking part of first clamping piece is butted on the stop feature, the second clip section direction
The second inclined guide section, the second solution tug section is towards the first inclined guide section.
A kind of another viewpoint of the invention, slide rail external member includes a slide rail, an operating parts, one first clip
Part and one second clamping piece, are characterized in:The operating parts is linearly movably connected with the slide rail.First clamping piece
The slide rail is configured in, first clamping piece includes one first elastic part and one first blocking part.Second clamping piece is matched somebody with somebody
Put in the slide rail, second clamping piece includes one second elastic part and one second blocking part.Wherein, first clip
First elastic part of part is the second elastic part of adjacent second clamping piece, and the first blocking part of first clamping piece is borrowed
First elastic part is helped to be maintained at a position;Wherein, the first blocking part of first clamping piece responds the operating parts
Operate and the position can be left, to interlock the second elastic part of second clamping piece, make the second blocking part displacement.
Description of the drawings
To further illustrate the above-mentioned purpose for confirming the present invention, construction featuress and effect, below with reference to accompanying drawing pair
The present invention is described in detail, wherein:
Fig. 1 shows the schematic perspective view of the sliding rail assembly of one embodiment of the invention.
Fig. 2 shows the decomposing schematic representation of the sliding rail assembly of one embodiment of the invention.
Fig. 3 shows the schematic perspective view of the slide rail external member of one embodiment of the invention.
Fig. 4 show the second rail of the sliding rail assembly of one embodiment of the invention with respect to the first rail showing toward a direction displacement
It is intended to.
Fig. 5 is moved to the schematic diagram in a precalculated position for the second rail of the sliding rail assembly of Fig. 4 with respect to the first rail.
Fig. 6 shows that the first clamping piece of the sliding rail assembly of one embodiment of the invention and the second clamping piece respond operating parts
Operation and depart from stop feature schematic diagram.
Fig. 7 shows that the first clamping piece of the sliding rail assembly of one embodiment of the invention and the second clamping piece depart from and stops special
After levying, the second rail continues the schematic diagram toward a direction displacement with respect to the first rail.
Specific embodiment
Fig. 1 shows that the sliding rail assembly 10 of one embodiment of the invention can comprising one first rail 12 and one second rail 14
It is moved in an extension state from a collapse state with respect to first rail 12.It is preferred that pacifying on first rail 12
Row has one first bracket 16 and one second bracket 18 can respectively to be attached to an object, e.g. pillar, wall
Or frame etc..
As shown in Fig. 2 first bracket 16 and second bracket 18 are be respectively arranged in first rail 12 two
Individual position, such as anterior and rear portion.First rail 12 has at least one to stop feature 20.Specifically, this
One rail 12 is connected to first wall 22a comprising one first wall 22a, one second wall 22b and a first longitudinal direction wall 24
Between second wall 22b, first wall 22a, the second wall 22b and the first longitudinal direction wall 24 define one and lead to
Road 26.In this, at least one stop feature 20 is located at the first longitudinal direction wall 24, in the enforcement of stop feature 20
By taking protuberance as an example.At least a portion of second rail 14 is arranged in the passage 26 of first rail 12.This
Two rails 14 have an a first end 28a and the second end 28b, the position of the second end 28b with respect to this
One end 28a.Second rail 14 connects comprising one first wall 30a, one second wall 30b and a second longitudinal direction wall 32
It is connected between the first wall 30a and second wall 30b.The sliding rail assembly 10 also comprising one first clamping piece 34,
One operating parts 36, preferably also comprising one second clamping piece 38 and an elastic component 40.
As shown in Figure 2 and Figure 3, second rail 14, first clamping piece 34, second clamping piece 38 with should
Operating parts 36 may make up a slide rail external member 41.First clamping piece 34 is all configured in this with second clamping piece 38
Second rail 14, it is preferred that second clamping piece 38 be arranged in the second longitudinal direction wall 32 of second rail 14 with this
Between one clamping piece 34.Wherein, first clamping piece 34 includes one first base portion 42, second clamping piece 38
Comprising one second base portion 44, first base portion 42 and second base portion 44 can be by being for example spirally connected, rivet, weld
Connect or the mode such as gluing is connected to the second longitudinal direction wall 32 of second rail 14.
Specifically, first clamping piece 34 also connects comprising one first blocking part 46 and one first elastic part 48
Between first base portion 42 and first blocking part 46, first elastic part 48 extremely should to provide an elastic force
First blocking part 46.On the other hand, second clamping piece 38 includes one second blocking part 50 and one second elastic force
Portion 52 is connected between second base portion 44 and second blocking part 50, and second elastic part 52 is to provide one
Elastic force is to second blocking part 50.Second elastic part 52 of second clamping piece 38 is adjacent to first clip
First elastic part 48 of part 34.It is preferred that the second elastic part 52 of second clamping piece 38 has two ribs
54a, 54b, the first elastic part 48 of first clamping piece 34 can be resisted against two ribs when being deformed by external force
Between bar 54a, 54b.In this embodiment, the first elastic part 48 of first clamping piece 34 and second card
The second longitudinal direction wall 32 of relative second rail 14 of the second elastic part 52 of valve part 38 obliquely tilts an angle.
The operating parts 36 is linearly movably connected with second rail 14, it is preferred that second rail 14 and the operating parts
One of 36 have an at least guidance part 56, in this by taking two guidance parts 56 as an example, and each guidance part
56 is an elongated hole.Wherein, also two guidance parts 56 are passed partially through comprising two connectors 58.For example, often
A connection piece 58 passes partially through a part for each elongated hole and operating parts 36 is connected to into second rail 14, makes
Relative second rail 14 of the operating parts 36 can be by operatively displacement in limited scope.The operating parts 36 has
Have one first 60, one second 62 and an extension 64 be connected to this first 60 with this second 62 it
Between.Wherein, between this first 60 and this second 62 have a distance, and this first 60 be proximate in
The first end 28a of second rail 14, this second 62 is proximate to the second end 28b in second rail 14.
It is preferred that the operating parts 36 has a performance characteristic 66, an e.g. projection is arranged in this first 60, and one
Solution tug feature 68 is arranged in this second 62.
The elastic component 40 is arranged between second rail 14 and the operating parts 36.For example, second rail 14 with
There is respectively the operating parts 36 one first mounting characteristic 70a and the second mounting characteristic 70b to be available for the elastic component 40
Install.
As shown in figure 4, working as relative first rail 12 of second rail 14 toward a direction D, such as an opening direction
During displacement, first elastic part 48 and the second elastic force of second clamping piece 38 of first clamping piece 34
Portion 52 can pass through the stop feature 20, wherein, a part for second elastic part 52 can be with first rail 12
Stop that feature 20 offsets, make second elastic part 52 respond second rail 14 with respect to the displacement of first rail 12
Accumulate an elastic force.
As shown in figs. 4 and 5, when relative first rail 12 of second rail 14, to be displaced to one toward direction D pre-
Positioning is when putting P, the second elastic part 52 of second clamping piece 38 no longer with the stop feature 20 of first rail 12
Offset, the second elastic part 52 of second clamping piece 38 discharges immediately the elastic force, makes second clamping piece 38
Second blocking part 50 is located at the side of the stop feature 20, such as the second side 72b, through second clamping piece 38
The second elastic part 52 two ribs 54a, 54b, can increase and be contacted with the stop between the stop feature 20
Area.Now, the first blocking part 46 of first clamping piece 34 is located at the opposite side of the stop feature 20, example
Such as the first side 72a.Specifically, the first blocking part 46 of first clamping piece 34 is by first elastic part 48
And a first position L1 can be maintained at.That is, when second rail 14 is in precalculated position P, this first
First blocking part 46 of clamping piece 34 is located at the first side 72a of the stop feature 20 of first rail 12, make this
Relative first rail 12 of two rail 14 cannot continue toward the displacement of direction D.On the other hand, by second clip
Second blocking part 50 of part 38 is located at the second side 72b of the stop feature 20, make second rail 14 it is relative this
One rail 12 is also restrained toward the displacement that contrary direction D such as folds direction.Therefore, under this state,
Relative first rail 12 of second rail 14 can not arbitrarily leave from precalculated position P, and have good clip
Intensity.Wherein, the second elastic part 52 by second clamping piece 38 can further provide for supporting role in this
First elastic part 48 of one clamping piece 34.
As shown in figs. 5 and 6, first clamping piece 34 respond the operating parts 36 operationally displacement and can quilt
The operating parts 36 drives to depart from from the stop feature 20 of first rail 12.Specifically, operator can apply
Plus the performance characteristic 66 of the strength to the operating parts 36 toward direction D, the operating parts 36 is made toward direction D position
Move, making the solution tug feature 68 of the operating parts 36 can push against the first blocking part 46 of first clamping piece 34, make this
First blocking part 46 is responded the elastic force of first elastic part 48 and is departed from from the first side 72a of the stop feature 20,
And first elastic part 48 of first clamping piece 34 interlocks the second elastic part 52 of second clamping piece 38, makes this
Second blocking part 50 of the second clamping piece 38 also leaves the second side 72b of the stop feature 20.That is,
First blocking part 46 of first clamping piece 34 respond the operation of the operating parts 36 and can be from first position L1
Second position L2 is moved to, to interlock the second elastic part 52 of second clamping piece 38, second clip is made
Also the stop feature 20 is left in portion 50.It is noted that operated toward direction D when the operating parts 36 and
During displacement, the elastic component 40 is to become an extended state from an original state.
It is preferred that the first blocking part 46 of first clamping piece 34 blocks comprising one first clip section 74, one second
The tug inclined guide section 78 of section 76 and 1 first is connected between the first clip section 74 and the second clip section 76.
On the other hand, the operating parts 36 solution tug feature 68 comprising one first solution tug section 80, one second solution tug section 82 and
One second 84 sections of inclined guide is connected between the first solution tug section 80 and the second solution tug section 82.When this first
When first clip section 74 of the first blocking part 46 of clamping piece 34 is butted on the first side 72a of the stop feature 20,
The second clip section 76 towards the second inclined guide section 84, towards first inclination lead by the second solution tug section 82
Draw section 78.Therefore, when the operating parts 36 is toward the displacement of direction D, the solution tug feature 68 of the operating parts 36
Second solution tug section 82 can be guided by the first inclined guide section 78 with push against first clamping piece 34 first card
Tug portion 46, on the other hand, the second clip section 76 of the first blocking part 46 of first clamping piece 34 can by this
Two inclined guide sections 84 are guided, and make the first blocking part 46 of first clamping piece 34 from the of the stop feature 20
Side 72a departs from.
As shown in Figures 6 and 7, when first blocking part 46 and second clamping piece 38 of first clamping piece 34
The second blocking part 50 depart from from the first side 72a and the second side 72b of the stop feature 20 respectively, and operator
The strength for stopping applying toward direction D makes the elastic component 40 revert back to after original state in the operating parts 36, grasps
Operable second rail 14 of author continues toward direction D with respect to the displacement of the first rail 12, enables second rail 14
Unload from first rail 12, for the replacing or associated maintenance operation of slide rail.Or, in the state of Fig. 6,
Operable second rail 14 of operator is toward the relative displacement of first rail 12 of contrary direction D.
According to more than explanation, it is known that the present invention enhancement effect be with advantage:
A. a precalculated position can be rested on by relative one first rail of an at least clamping piece.
B. can be used to conveniently operate an at least clamping piece through an operating parts, and the intensity of clip is more preferably.
Although the present invention is described with reference to current specific embodiment, ordinary skill in the art
Personnel it should be appreciated that the embodiment of the above be intended merely to explanation the present invention, in the feelings without departing from spirit of the present invention
Can also make under condition it is various equivalent change and modifications, therefore, as long as the present invention spirit in on
Stating change, the modification of embodiment all will fall in the range of the application claims.
Claims (11)
1. a kind of sliding rail assembly, comprising one first rail, one second rail, one first clamping piece and an operating parts, it is special
Levy and be:
First rail has one to stop feature;
Second rail can be with respect to first rail along a direction displacement;
First clamping piece is configured in second rail, and first clamping piece includes one first blocking part;And
The operating parts operationally drives the first clamping piece displacement;
Wherein, when relative first rail of second rail is moved to a precalculated position, the first of first clamping piece
Blocking part is located at the side of the stop feature of first rail, second rail is continued toward the party with respect to first rail
To displacement;
Wherein, the first blocking part of first clamping piece responds the displacement of the operating parts, to drive first clip
First blocking part of part is no longer at the side of the stop feature of first rail.
2. sliding rail assembly according to claim 1, it is characterised in that be also arranged in comprising one second clamping piece
Between second rail and first clamping piece, second clamping piece includes one second blocking part, when the second rail displacement
During to the precalculated position, the first blocking part of first clamping piece distinguishes position with the second blocking part of second clamping piece
In the both sides of the stop feature.
3. sliding rail assembly according to claim 2, it is characterised in that first clamping piece is also comprising one the
One elastic part, second clamping piece also includes one second elastic part, and the second elastic part of second clamping piece is adjacent should
First elastic part of the first clamping piece.
4. sliding rail assembly according to claim 3, it is characterised in that the second elastic force of second clamping piece
Portion has two ribs, and the first elastic part of first clamping piece is received to be located between two ribs during outer force deformation.
5. sliding rail assembly according to claim 1, it is characterised in that the operating parts is linearly movably connected with
Second rail.
6. sliding rail assembly according to claim 5, it is characterised in that second rail and the operating parts its
One of there is an at least guidance part, the sliding rail assembly also passes through an at least guidance part comprising at least a connection piece.
7. sliding rail assembly according to claim 6, it is characterised in that an at least guidance part is an elongated hole,
This at least a connection piece through the elongated hole a part.
8. sliding rail assembly according to claim 6, it is characterised in that also comprising an elastic component be arranged in this
Between two rails and the operating parts.
9. sliding rail assembly according to claim 1, it is characterised in that second rail has a first end
With a second end, the position of the second end with respect to the first end, the operating parts have one first, one the
Two and a solution tug feature, solution tug feature is arranged in this second, this first the be proximate in second rail
One end, this second is proximate in the second end of second rail, and the solution tug feature is operable by the operating parts
Ground displacement and the side disengaging of the first blocking part of first clamping piece from the stops feature of first rail can be pushed against.
10. sliding rail assembly according to claim 9, it is characterised in that the first card of first clamping piece
Tug portion includes one first clip section, one second clip section and one first inclined guide section, first inclined guide Duan Lian
Be connected between the first clip section and the second clip section, the solution of operating parts tug feature comprising one first solution tug section,
One second solution tug section and one second inclined guide section, the second inclined guide section be connected to the first solution tug section with this
Between two solution tug sections, when the first blocking part of first clamping piece is butted on the stop feature, the second clip section court
To the second inclined guide section, the second solution tug section is towards the first inclined guide section.
A kind of 11. slide rail external members, comprising a slide rail, an operating parts, one first clamping piece and one second clamping piece,
It is characterized in that:
The operating parts is linearly movably connected with the slide rail;
First clamping piece is configured in the slide rail, and first clamping piece includes one first elastic part and one first card
Tug portion;And
Second clamping piece is configured in the slide rail, and second clamping piece includes one second elastic part and one second card
Tug portion;
Wherein, the first elastic part of first clamping piece is the second elastic part of adjacent second clamping piece, and this
First blocking part of one clamping piece is maintained at a position by first elastic part;
Wherein, the first blocking part of first clamping piece responds the operation of the operating parts and can leave the position, with
The second elastic part of second clamping piece is interlocked, the second blocking part displacement is made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510690419.9A CN106606126B (en) | 2015-10-22 | 2015-10-22 | Sliding rail assembly and its sliding rail external member |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510690419.9A CN106606126B (en) | 2015-10-22 | 2015-10-22 | Sliding rail assembly and its sliding rail external member |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106606126A true CN106606126A (en) | 2017-05-03 |
CN106606126B CN106606126B (en) | 2018-09-25 |
Family
ID=58611683
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510690419.9A Active CN106606126B (en) | 2015-10-22 | 2015-10-22 | Sliding rail assembly and its sliding rail external member |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106606126B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109984494A (en) * | 2018-01-03 | 2019-07-09 | 川湖科技股份有限公司 | Sliding rail assembly and its sliding rail external member |
CN111263559A (en) * | 2018-12-03 | 2020-06-09 | 川湖科技股份有限公司 | Sliding rail assembly |
CN112188786A (en) * | 2019-07-02 | 2021-01-05 | 川湖科技股份有限公司 | Wire management assembly |
CN114680489A (en) * | 2020-12-28 | 2022-07-01 | 川湖科技股份有限公司 | Slide rail assembly and slide rail external member thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5405195A (en) * | 1994-03-01 | 1995-04-11 | General Devices Co., Inc. | Automatic release mechanism for telescoping slide assembly |
US5961193A (en) * | 1997-11-07 | 1999-10-05 | General Devices Co., Inc. | Release-control mechanism for telescoping slide assembly |
CN2498913Y (en) * | 2001-01-22 | 2002-07-10 | 川湖工厂股份有限公司 | Front pulling bolt locking mechanism for slide rail |
US20020089274A1 (en) * | 2001-01-05 | 2002-07-11 | Hsiu-Chiang Liang | Release mechanism for telescoping slide assembly |
CN2621500Y (en) * | 2003-02-25 | 2004-06-30 | 川湖工厂股份有限公司 | Limit structure of drawer slideway |
CN102548333A (en) * | 2010-12-30 | 2012-07-04 | 鸿富锦精密工业(深圳)有限公司 | Sliding rail device |
CN103462387A (en) * | 2012-06-08 | 2013-12-25 | 川湖科技股份有限公司 | Slide rail assembly |
-
2015
- 2015-10-22 CN CN201510690419.9A patent/CN106606126B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5405195A (en) * | 1994-03-01 | 1995-04-11 | General Devices Co., Inc. | Automatic release mechanism for telescoping slide assembly |
US5961193A (en) * | 1997-11-07 | 1999-10-05 | General Devices Co., Inc. | Release-control mechanism for telescoping slide assembly |
US20020089274A1 (en) * | 2001-01-05 | 2002-07-11 | Hsiu-Chiang Liang | Release mechanism for telescoping slide assembly |
CN2498913Y (en) * | 2001-01-22 | 2002-07-10 | 川湖工厂股份有限公司 | Front pulling bolt locking mechanism for slide rail |
CN2621500Y (en) * | 2003-02-25 | 2004-06-30 | 川湖工厂股份有限公司 | Limit structure of drawer slideway |
CN102548333A (en) * | 2010-12-30 | 2012-07-04 | 鸿富锦精密工业(深圳)有限公司 | Sliding rail device |
CN103462387A (en) * | 2012-06-08 | 2013-12-25 | 川湖科技股份有限公司 | Slide rail assembly |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109984494A (en) * | 2018-01-03 | 2019-07-09 | 川湖科技股份有限公司 | Sliding rail assembly and its sliding rail external member |
CN111263559A (en) * | 2018-12-03 | 2020-06-09 | 川湖科技股份有限公司 | Sliding rail assembly |
CN111263559B (en) * | 2018-12-03 | 2021-04-13 | 川湖科技股份有限公司 | Sliding rail assembly |
CN112188786A (en) * | 2019-07-02 | 2021-01-05 | 川湖科技股份有限公司 | Wire management assembly |
CN113543571A (en) * | 2019-07-02 | 2021-10-22 | 川湖科技股份有限公司 | Wire management assembly |
CN114680489A (en) * | 2020-12-28 | 2022-07-01 | 川湖科技股份有限公司 | Slide rail assembly and slide rail external member thereof |
CN114680489B (en) * | 2020-12-28 | 2023-09-26 | 川湖科技股份有限公司 | Slide rail assembly and slide rail external member thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106606126B (en) | 2018-09-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106606126A (en) | Sliding rail assembly and sliding rail set thereof | |
TWI584761B (en) | Slide rail assembly | |
EP3175736B1 (en) | Slide rail assembly | |
EP3505010A1 (en) | Slide rail assembly and rail kit thereof | |
US9629459B2 (en) | Slide rail assembly | |
TW201726032A (en) | Slide rail assembly and operation method thereof | |
US9723746B2 (en) | Slide rail assembly | |
TWI572303B (en) | Slide rail assembly and rail kit thereof | |
EP3461244B1 (en) | Slide rail assembly and driving mechanism thereof | |
US10743660B2 (en) | Slide rail assembly and rail kit thereof | |
US20160227666A1 (en) | Slide rail assembly | |
TW202116224A (en) | Slide rail assembly | |
EP3679833B1 (en) | Slide rail assembly | |
TW201813553A (en) | Slide rail assembly | |
EP3073811B1 (en) | Slide rail assembly | |
EP2233754B1 (en) | Attachment elements cartridge strip | |
DE10327313B4 (en) | Blackout device for the glass roof of a motor vehicle | |
EP2921076B1 (en) | Slide rail assembly | |
TW201628483A (en) | Slide rail assembly | |
EP1188693B1 (en) | Chain support element for a transferring system | |
TWI706748B (en) | Slide rail assembly | |
DE102008021217B3 (en) | Deceleration device for deceleration of rail vehicle, has braking device that is arranged at coupling element, where braking device comprises two brake shoes which are arranged on opposite sides of rail brake | |
EP4023108A1 (en) | Slide rail assembly | |
CN106604599A (en) | Sliding rail assembly and bracket for rail element | |
KR20170040663A (en) | A slat for shutter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |