CN106602463B - Fault detector installation tool and fault detector - Google Patents

Fault detector installation tool and fault detector Download PDF

Info

Publication number
CN106602463B
CN106602463B CN201611130638.2A CN201611130638A CN106602463B CN 106602463 B CN106602463 B CN 106602463B CN 201611130638 A CN201611130638 A CN 201611130638A CN 106602463 B CN106602463 B CN 106602463B
Authority
CN
China
Prior art keywords
installation
pallet
rotation axis
fixed part
insulating bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201611130638.2A
Other languages
Chinese (zh)
Other versions
CN106602463A (en
Inventor
刘林康
杨文卿
赵莉
赵龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Weishan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Weishan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Weishan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611130638.2A priority Critical patent/CN106602463B/en
Publication of CN106602463A publication Critical patent/CN106602463A/en
Application granted granted Critical
Publication of CN106602463B publication Critical patent/CN106602463B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Abstract

Fault detector installation tool provided in an embodiment of the present invention and fault detector include mounting portion, insulating bar and hollow cylinder.The mounting portion is fixedly connected with the insulating bar, and the diameter of the insulating bar is less than the diameter of the hollow cylinder, and the hollow cylinder is sheathed on the outer surface of the insulating bar.Mounting portion includes that the first installation pallet, the second installation pallet and third install pallet, first installation pallet is connect by first connecting rod with interconnecting piece, second installation pallet is connect by the second connecting rod with interconnecting piece, and third installation pallet is connect by third connecting rod with interconnecting piece.It can be installed in pallet, the second installation pallet and third installation pallet first respectively and place fault detector, then hollow cylinder is lifted, so that fault detector installation tool disposably installs multiple fault detectors close to overhead power line, so as to realize, it is easy to operate, it improves efficiency.

Description

Fault detector installation tool and fault detector
Technical field
The present invention relates to electric system detection fields, in particular to a kind of fault detector installation tool and failure Indicator.
Background technique
In electric system detection field, fault detector is mounted on power circuit, is on-line checking and instruction open circuit event The intelligent apparatus of barrier and ground fault.Current overhead transmission line is often the parallel structure of a plurality of cabling, and existing failure refers to Show that device installation tool often can only install respectively fault detector in every cabling of a plurality of cabling, installs repetitive operation too More, installation process is relatively complicated.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of fault detector installation tool, to improve existing phase sequence inspection It surveys device installation tool to need that fault detector is installed in every cabling of a plurality of cabling respectively, operating process is relatively complicated to ask Topic.
To achieve the above object, the embodiment of the invention provides a kind of fault detector installation tool, the installation tools It include: mounting portion, insulating bar and hollow cylinder.The mounting portion is fixedly connected with the insulating bar, the insulating bar it is straight Diameter is less than the diameter of the hollow cylinder, and the hollow cylinder is sheathed on the outer surface of the insulating bar.The mounting portion packet Include the first installation pallet, second installation pallet, third installation pallet, first connecting rod, the second connecting rod, third connecting rod and Interconnecting piece.The first installation pallet is connect by the first connecting rod with the interconnecting piece, and the second installation pallet is logical It crosses second connecting rod to connect with the interconnecting piece, the third installation pallet passes through the third connecting rod and the connection Portion's connection.Side and institute of the connecting rod far from the first installation pallet, the second installation pallet and third installation pallet State insulating bar connection.There are two corresponding semi-annular shape knob, two semi-annular shape knobs are all provided with for the hollow cylinder setting It is placed in the outer surface of the hollow cylinder, and along the radial internal stretch to the hollow cylinder of the hollow cylinder, if institute It states two semi-annular shape knobs to be pressed, then described two semi-annular shape knobs form annular structure, and the circular knot Structure is in contact with the insulating bar, and the annular structure is flexibly connected with the insulating bar, and the insulating bar is with the circle The rotation of cyclic structure rises or falls.
Preferably, in above-mentioned installation tool, the first connecting rod includes the first fixed part and the first rotation axis, institute It states the first fixed part to be fixedly connected with the interconnecting piece, one end of first rotation axis and first fixed part rotation connect It connects, the other end of first rotation axis is fixedly connected with the first installation pallet.
First connecting rod can specifically include the first fixed part and the first rotation axis, the first fixed part and the first rotation axis Rotation connection, to realize the relative movement with the position of the first installation pallet of the first rotation axis connection.
Preferably, in above-mentioned installation tool, first rotation axis and first fixed part are hinged.
First rotation axis can be connect with the first fixed part by hinged mode.
Preferably, in above-mentioned installation tool, second connecting rod includes the second fixed part and the second rotation axis, institute It states the second fixed part to be fixedly connected with the interconnecting piece, one end of second rotation axis and second fixed part rotation connect It connects, the other end of second rotation axis is fixedly connected with the second installation pallet.
Second fixed part and the second rotation axis are rotatablely connected, to realize and the second installation pallet of the second rotation axis connection The relative movement of position.
Preferably, in above-mentioned installation tool, second rotation axis and second fixed part are hinged.
It is hingedly a kind of more common connection type, the second rotation axis and the second fixed part pass through hinged connection type Reliability is higher.
Preferably, in above-mentioned installation tool, the third connecting rod includes third fixed part and third rotation axis, institute It states third fixed part to be fixedly connected with the interconnecting piece, one end of the third rotation axis and third fixed part rotation connect It connects, the other end of the third rotation axis is fixedly connected with third installation pallet.
Third fixed part and third rotation axis are rotatablely connected, to realize and the third installation pallet of third rotation axis connection The relative movement of position.
Preferably, in above-mentioned installation tool, the third rotation axis and the third fixed part are hinged.
It is hingedly a kind of more common connection type, third rotation axis and third fixed part pass through hinged connection type Reliability is higher.
Preferably, in above-mentioned installation tool, the installation tool further includes the 4th spring, block and stabilizer sleeve, 4th spring pocket is set to the insulating bar, and the stabilizer sleeve includes the first stabilizer sleeve and the second stabilizer sleeve, institute It states the first stabilizer sleeve to be fixedly connected with second stabilizer sleeve, second stabilizer sleeve is sheathed on the 4th spring Close to one end of the interconnecting piece, the other end of the 4th spring is fixedly connected with the block, the block fixed setting In the inside of the hollow cylinder, the hollow cylinder is sheathed on the 4th spring and the second stabilizer sleeve, described hollow The barrel diameter of one end close to the interconnecting piece of cylinder is less than the diameter of second stabilizer sleeve and is greater than described first The diameter of stabilizer sleeve.
The setting of 4th spring enables to mounting portion and insulating bar to have movable space, allows mounting portion with frame The shaking on ceases to be busy road and move, be more advantageous to the progress of installation.
Preferably, in above-mentioned installation tool, the annular structure is with the insulating bar in such a way that screw thread engages Connection.
Due to the effect of screw thread engagement, the rotation of annular structure can influence rising or falling for insulating bar.
The embodiment of the invention also provides a kind of fault detector, fault detector and above-mentioned fault detector erector Tool matches.
Fault detector installation tool provided in an embodiment of the present invention and fault detector have the beneficial effect that
Fault detector installation tool provided in an embodiment of the present invention and fault detector include mounting portion, insulating bar and Hollow cylinder.The mounting portion is fixedly connected with the insulating bar, and the diameter of the insulating bar is less than the straight of the hollow cylinder Diameter, and the hollow cylinder is sheathed on the outer surface of the insulating bar.Mounting portion includes the first installation pallet, the second installation pallet And third installs pallet, the first installation pallet is connect by first connecting rod with interconnecting piece, and the second installation pallet passes through second Connecting rod is connect with interconnecting piece, and third installation pallet is connect by third connecting rod with interconnecting piece.It can be respectively in the first installation Fault detector is placed in pallet, the second installation pallet and third installation pallet, hollow cylinder is then lifted, so that failure refers to Show that device installation tool close to overhead power line, disposably installs multiple fault detectors so as to realize, it is easy to operate, it mentions High efficiency.
Detailed description of the invention
Illustrate the embodiment of the present invention or technical solution in the prior art in order to clearer, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram for the fault detector installation tool that present pre-ferred embodiments provide;
Fig. 2 is a kind of structural representation of the use state for the fault detector installation tool that present pre-ferred embodiments provide Figure;
Fig. 3 is the semi-annular shape knob open state for the fault detector installation tool that present pre-ferred embodiments provide Structural schematic diagram;
Fig. 4 is the semi-annular shape knob closed state for the fault detector installation tool that present pre-ferred embodiments provide Structural schematic diagram.
Icon: 10- installation tool;110- mounting portion;111- first installs pallet;112- second installs pallet;113- Three installation pallets;114- first connecting rod;The first fixed part of 1142-;The first rotation axis of 1141-;The second connecting rod of 115-; The second fixed part of 1152-;The second rotation axis of 1151-;116- third connecting rod;1162- third fixed part;The rotation of 1161- third Axis;117- interconnecting piece;120- insulating bar;130- hollow cylinder;131- semi-annular shape knob;132- annular structure;140- Four springs;150- block;160- stabilizer sleeve;The first stabilizer sleeve of 161-;The second stabilizer sleeve of 162-.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete Ground description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is right below The detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit the range of claimed invention, but It is merely representative of selected embodiment of the invention.Based on the embodiment of the present invention, those skilled in the art are not making creativeness Every other embodiment obtained, shall fall within the protection scope of the present invention under the premise of labour.
Referring to Figure 1, installation tool 10 includes mounting portion 110, insulating bar 120 and hollow cylinder 130 to details.Mounting portion 110 are fixedly connected with insulating bar 120, and the diameter of insulating bar 120 is less than the diameter of hollow cylinder 130, and hollow cylinder 130 is arranged In the outer surface of insulating bar 120.
Mounting portion 110 includes that the first installation pallet 111, second installs pallet 112, third installation pallet 113, first connects Bar 114, the second connecting rod 115, third connecting rod 116 and interconnecting piece 117.First installation pallet 111 passes through first connecting rod 114 connect with interconnecting piece 117, and the second installation pallet 112 is connect by the second connecting rod 115 with interconnecting piece 117, third mounting bracket Disk 113 is connect by third connecting rod 116 with interconnecting piece 117.First connecting rod 114, the second connecting rod 115 and third connection Bar 116 is all set in the side of interconnecting piece 117, and the other side of interconnecting piece 117 is connect with insulating bar 120.
First connecting rod 114 includes the first fixed part 1142 and the first rotation axis 1141, the first fixed part 1142 and company Socket part 117 is fixedly connected, and one end of the first rotation axis 1141 and the first fixed part 1142 are rotatablely connected, the first rotation axis 1141 The other end can be fixedly connected with the first installation pallet 111.Specifically, the first rotation axis 1141 and the first fixed part 1142 are cut with scissors It connects.
Second connecting rod 115 includes the second fixed part 1152 and the second rotation axis 1151, the second fixed part 1152 and company Socket part 117 is fixedly connected, and one end of the second rotation axis 1151 and the second fixed part 1152 are rotatablely connected, the second rotation axis 1151 The other end can be fixedly connected with the second installation pallet 112.Specifically, the second rotation axis 1151 and the second fixed part 1152 are cut with scissors It connects.
Third connecting rod 116 includes third fixed part 1162 and third rotation axis 1161, third fixed part 1162 and company Socket part 117 is fixedly connected, and one end of third rotation axis 1161 and third fixed part 1162 are rotatablely connected, third rotation axis 1161 The other end can install pallet 113 with third and be fixedly connected.Specifically, third rotation axis 1161 and third fixed part 1162 are cut with scissors It connects.
The setting of hollow cylinder 130 there are two corresponding semi-annular shape knob 131, details referring to Figure 1 and Fig. 3, two Semi-annular shape knob 131 is arranged at the outer surface of hollow cylinder 130, and two semi-annular shape knobs 131 are along hollow cylinder 130 The radial internal stretch to hollow cylinder 130.If two semi-annular shape knobs 131 are pressed, two semi-annular shape knobs 131 composition annular structures 132, as shown in Figure 4.The annular structure 132 can be in contact with insulating bar 120, annular shape knot Structure 132 is flexibly connected with insulating bar 120.Annular structure 132 is connect in such a way that screw thread engages with insulating bar 120.
The installation tool 10 can also include the 4th spring 140, block 150 and stabilizer sleeve 160, the 4th spring 140 It is sheathed on insulating bar 120.
Stabilizer sleeve 160 includes the first stabilizer sleeve 161 and the second stabilizer sleeve 162, the first stabilizer sleeve 161 and the Two stabilizer sleeves 162 are fixedly connected, and the second stabilizer sleeve 162 is set in one end of the close interconnecting piece 117 of the 4th spring 140 (upper end i.e. as shown in Figure 1), the other end of the 4th spring 140 is fixedly connected with block 150.During block 150 is fixedly installed on The inside of empty cylinder 130, and block 150 is specifically as follows annular structure 132 so that insulating bar 120 is logical from the inner ring of annulus It crosses.Hollow cylinder 130 is sheathed on the 4th spring 140 and the second stabilizer sleeve 162, and the close interconnecting piece of hollow cylinder 130 Diameter of the barrel diameter of 117 one end less than the second stabilizer sleeve 162 and the diameter greater than the first stabilizer sleeve 161.
The working principle of fault detector installation tool 10 provided in an embodiment of the present invention are as follows:
Due to the first rotation axis 1141 and the first fixed part 1142, the second rotation axis 1151 and the second fixed part 1152, It is hinged between three rotation axis 1161 and third fixed part 1162, thus can to the first rotation axis 1141, the second rotation axis 1151 with And third rotation axis 1161 is adjusted, so that the first installation pallet 111, second installs pallet 112 and third installs pallet 113 is corresponding with a plurality of cabling of overhead transmission line.
Three fault detectors are individually positioned in the first installation pallet 111, second installation pallet 112 and third installation In pallet 113, hollow cylinder 130 then can be held, the first installation pallet 111, second is installed into pallet 112 and third Fault detector in installation pallet 113 is pushed into a plurality of cabling of overhead transmission line, to realize that can once carry out multiple failures refers to Show the installation of device.
If two semi-annular shape knobs 131 state in the open state, i.e., as shown in figures 1 and 3, then the installation tool 10 mounting portion 110 and insulating bar 120 is since the effect of the 4th spring 140 can be compressed or extend.For example, installing Cheng Zhong, when a plurality of cabling of overhead transmission line is shaken because of situations such as strong wind, the first installation pallet 111, the second mounting bracket Disk 112, third installation pallet 113, first connecting rod 114, the second connecting rod 115, third connecting rod 116 and interconnecting piece 117 It can be moved due to the elastic reaction of the 4th spring 140 with the shaking of cabling.Can to avoid because overhead transmission line it is a plurality of walk Line and first installation pallet 111, second install pallet 112, third installation pallet 113 in fault detector relative motion and Fault detector is caused to be easy to appear the problem of falling during the installation process.
If forming annular structure 132 in closed state after two semi-annular shape knobs 131 are pressed, such as Fig. 2 and Shown in Fig. 4, then the annular structure 132 is in contact with insulating bar 120, and insulating bar 120 can turn with annular structure 132 It is dynamic to rise or fall.
Specifically, annular structure 132 is flexibly connected by way of being engaged with insulating bar 120 screw thread, works as annulus When shape structure 132 rotates, due to the effect of screw thread engagement, insulating bar 120 can be made to rise or fall, make staff in face When to for higher overhead transmission line, fault detector can be preferably installed.
Fault detector installation tool 10 provided in an embodiment of the present invention and fault detector include mounting portion 110, insulation Bar 120 and hollow cylinder 130.The mounting portion 110 is fixedly connected with the insulating bar 120, the diameter of the insulating bar 120 Less than the diameter of the hollow cylinder 130, and the hollow cylinder 130 is sheathed on the outer surface of the insulating bar 120.Mounting portion 110 include that the first installation pallet 111, second installs pallet 112 and third installation pallet 113, and the first installation pallet 111 passes through First connecting rod 114 is connect with interconnecting piece 117, and the second installation pallet 112 is connect by the second connecting rod 115 with interconnecting piece 117, Third installation pallet 113 is connect by third connecting rod 116 with interconnecting piece 117.Pallet 111, the can be installed first respectively Fault detector is placed in two installation pallets 112 and third installation pallet 113, hollow cylinder 130 is then lifted, so that failure Indicator installation tool 10 disposably installs multiple fault detectors, operation side close to overhead power line, so as to realize Just, it improves efficiency.
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, above in conjunction in the embodiment of the present invention Attached drawing, technical solution in the embodiment of the present invention clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the above detailed description to the embodiment of the present invention provided in the accompanying drawings is not intended to limit claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, or be somebody's turn to do Invention product using when the orientation or positional relationship usually put, be merely for convenience of description of the present invention and simplification of the description, without It is that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore not It can be interpreted as limitation of the present invention.In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, and cannot manage Solution is indication or suggestion relative importance.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary It is connected, can be the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.

Claims (9)

1. a kind of fault detector installation tool, which is characterized in that the installation tool includes: mounting portion, insulating bar and in Empty cylinder, the mounting portion are fixedly connected with the insulating bar, and the diameter of the insulating bar is less than the diameter of the hollow cylinder, And the hollow cylinder is sheathed on the outer surface of the insulating bar,
The mounting portion includes the first installation pallet, the second installation pallet, third installation pallet, first connecting rod, the second connection Bar, third connecting rod and interconnecting piece, the first installation pallet are connect by the first connecting rod with the interconnecting piece, institute It states the second installation pallet and is connect by second connecting rod with the interconnecting piece, the third installation pallet passes through the third Connecting rod is connect with the interconnecting piece, and the interconnecting piece is far from the first installation pallet, the second installation pallet and third peace The side of dress pallet is connect with the insulating bar,
There are two corresponding semi-annular shape knob, two semi-annular shape knobs are all set in described for the hollow cylinder setting The outer surface of empty cylinder, and along the radial internal stretch to the hollow cylinder of the hollow cylinder, if described two semicircles Ring-like knob is pressed, then described two semi-annular shape knobs form annular structures, and the annular structure and it is described absolutely Edge bar is in contact, and the annular structure is flexibly connected with the insulating bar, and the insulating bar is with the annular structure Rotation rises or falls, and the installation tool further includes the 4th spring, block and stabilizer sleeve, and the 4th spring pocket is set to The insulating bar, the stabilizer sleeve include the first stabilizer sleeve and the second stabilizer sleeve, first stabilizer sleeve and institute It states the second stabilizer sleeve to be fixedly connected, second stabilizer sleeve is sheathed on the one of the close interconnecting piece of the 4th spring End, the other end of the 4th spring are fixedly connected with the block, and the block is fixedly installed on the interior of the hollow cylinder Side, the hollow cylinder are sheathed on the 4th spring and the second stabilizer sleeve, the close connection of the hollow cylinder The barrel diameter of the one end in portion is less than the diameter of second stabilizer sleeve and is greater than the diameter of first stabilizer sleeve.
2. installation tool according to claim 1, which is characterized in that the first connecting rod include the first fixed part and First rotation axis, first fixed part are fixedly connected with the interconnecting piece, one end of first rotation axis and described first Fixed part rotation connection, the other end of first rotation axis are fixedly connected with the first installation pallet.
3. installation tool according to claim 2, which is characterized in that first rotation axis and first fixed part are cut with scissors It connects.
4. installation tool according to claim 1, which is characterized in that second connecting rod include the second fixed part and Second rotation axis, second fixed part are fixedly connected with the interconnecting piece, one end of second rotation axis and described second Fixed part rotation connection, the other end of second rotation axis are fixedly connected with the second installation pallet.
5. installation tool according to claim 4, which is characterized in that second rotation axis and second fixed part are cut with scissors It connects.
6. installation tool according to claim 1, which is characterized in that the third connecting rod include third fixed part and Third rotation axis, the third fixed part are fixedly connected with the interconnecting piece, one end of the third rotation axis and the third The other end of fixed part rotation connection, the third rotation axis is fixedly connected with third installation pallet.
7. installation tool according to claim 6, which is characterized in that the third rotation axis and the third fixed part are cut with scissors It connects.
8. installation tool according to claim 1, which is characterized in that the annular structure and the insulating bar pass through spiral shell The mode of line engagement connects.
9. a kind of fault detector, which is characterized in that the fault detector refers to the described in any item failures of claim 1-8 Show that device installation tool matches.
CN201611130638.2A 2016-12-09 2016-12-09 Fault detector installation tool and fault detector Expired - Fee Related CN106602463B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611130638.2A CN106602463B (en) 2016-12-09 2016-12-09 Fault detector installation tool and fault detector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611130638.2A CN106602463B (en) 2016-12-09 2016-12-09 Fault detector installation tool and fault detector

Publications (2)

Publication Number Publication Date
CN106602463A CN106602463A (en) 2017-04-26
CN106602463B true CN106602463B (en) 2019-07-26

Family

ID=58598345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611130638.2A Expired - Fee Related CN106602463B (en) 2016-12-09 2016-12-09 Fault detector installation tool and fault detector

Country Status (1)

Country Link
CN (1) CN106602463B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203385757U (en) * 2013-08-02 2014-01-08 北京泽源惠通科技发展有限公司 Angular adjustment mechanism cooperating with overhead line fault indicator installation tool for use
CN203894276U (en) * 2014-06-13 2014-10-22 国家电网公司 Apparatus for live-line mounting and dismounting of overhead fault indicator
CN204706828U (en) * 2015-06-05 2015-10-14 李风秀 The combination tool of 10kV charged installation circuit faulty indication instrument

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120146661A1 (en) * 2010-02-02 2012-06-14 Kirk Thomas Fault indicator capactive power source

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203385757U (en) * 2013-08-02 2014-01-08 北京泽源惠通科技发展有限公司 Angular adjustment mechanism cooperating with overhead line fault indicator installation tool for use
CN203894276U (en) * 2014-06-13 2014-10-22 国家电网公司 Apparatus for live-line mounting and dismounting of overhead fault indicator
CN204706828U (en) * 2015-06-05 2015-10-14 李风秀 The combination tool of 10kV charged installation circuit faulty indication instrument

Also Published As

Publication number Publication date
CN106602463A (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN205691724U (en) A kind of multistation test device of semiconductor components and devices
CN205617869U (en) Lifting and horizontal moving formula stereo garage safety hook
CN106602463B (en) Fault detector installation tool and fault detector
CN202994948U (en) Locking structure of suspension insulator detection robot
CN201829401U (en) Cross-the-center closing isolation switch
CN107554757B (en) A kind of undercarriage emergency extension mechanism
CN209981092U (en) Two-station operating mechanism of GIS gas switch cabinet
CN203205761U (en) Device for loading and unloading cable fault indicator
CN213278856U (en) Intelligent humidity relay protector for transformer box
CN209710002U (en) A kind of skyscraper solar energy is to day bracket
CN203011673U (en) LED performance test box
CN103616278B (en) A kind of wire rod waves proving installation
CN205487894U (en) A dead point indicating device that closed a floodgate that is used for perpendicular telescopic isolator of single -column both arms
CN215955663U (en) Use short circuit grounding wire intelligence dismouting system on overhead transmission line
CN205680610U (en) Intelligent vacuum circuit breaker on a kind of post
CN103926428A (en) Special sensor support for VS1 type breaker characteristic test
CN205028832U (en) A spring mechanism in crossing for wind energy combined electrical apparatus
CN208985485U (en) Electrician practical training apparatus
CN209488392U (en) A kind of motor with built-in speed device
CN210161057U (en) Plum blossom contact dismantles frock
CN204289225U (en) The heterogeneous linkage disconnector of a kind of linear pattern
CN103727396B (en) Gas controlling device and maintaining method thereof in lock well
CN213998408U (en) Automatic frame welding positioning fixture
CN114700909B (en) Device for installing R pin
CN212750652U (en) Self-checking type isolating switch

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190726

Termination date: 20191209