CN106599229A - Method and device for constructing business system based on Flex - Google Patents

Method and device for constructing business system based on Flex Download PDF

Info

Publication number
CN106599229A
CN106599229A CN201611178728.9A CN201611178728A CN106599229A CN 106599229 A CN106599229 A CN 106599229A CN 201611178728 A CN201611178728 A CN 201611178728A CN 106599229 A CN106599229 A CN 106599229A
Authority
CN
China
Prior art keywords
component
component exhibiting
operation system
exhibiting
user interface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611178728.9A
Other languages
Chinese (zh)
Inventor
杨志鹏
陈显龙
罗新伟
江春华
李鑫
贾立鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Forever Technology Co Ltd
Original Assignee
Beijing Forever Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Forever Technology Co Ltd filed Critical Beijing Forever Technology Co Ltd
Priority to CN201611178728.9A priority Critical patent/CN106599229A/en
Publication of CN106599229A publication Critical patent/CN106599229A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/248Presentation of query results
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2455Query execution
    • G06F16/24568Data stream processing; Continuous queries

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computational Linguistics (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Stored Programmes (AREA)

Abstract

The invention discloses a method and device for constructing a business system based on Flex. The method comprises the following steps: when the business system is constructed, adopting the Flex technology, selecting necessary display components in a user interface from a preset component library according to the business demands of the business system, configuring the layout of the display components and the mutual linkage, creating a data flow in a data flow management interface, configuring the created data flow to the corresponding display components, and configuring a trigger behavior sum event to construct the business system. Compared with the traditional scheme, in the method and device disclosed by the invention, necessary display components are selected, the layout, the linkage and the data sources of the display components are configured, and the data in the display components require no code compiling, thereby simplifying the configuration process of the display components and improving the construction efficiency of the business system.

Description

A kind of construction method and device of operation system based on Flex
Technical field
The present invention relates to graphical data display technology field, in particular, is related to a kind of business system based on Flex The construction method and device of system.
Background technology
With the development of information technology, all kinds of data messages are defined in enterprise.Intuitively analyze to meet business data Needs, make enterprise operator rapidly find out required information by data analysis, it will usually to be processed to corresponding data Process, then the information of working process is intuitively shown.Wherein, can be with to data working process and the process of displaying It is considered the building process of operation system.
Operation system generally includes different component exhibitings, when building to operation system, not only needs in front end Each component exhibiting is carried out to write code, and also needs to rear end and be merged together each component exhibiting by writing code.By Data very complicated in component exhibiting, so as to cause front-end and back-end to write coding process complexity to component exhibiting, enters And cause the structure efficiency of operation system low.
The content of the invention
In view of this, the present invention discloses a kind of construction method and device of operation system based on Flex, to solve because of exhibition Show the data very complicated in component, so as to cause front-end and back-end to write coding process complexity to component exhibiting, and then lead The problem for causing the structure efficiency of operation system low.
A kind of construction method of the operation system based on Flex, including:
An operation system is created, the title of the operation system at least includes:Project name and address name;
Using Flex technology, according to the service needed of the operation system, from the Component Gallery for pre-seting, user circle is chosen Component exhibiting needed for face;
Configure the layout of each component exhibiting and linkage each other;
At data stream management interface, data flow corresponding with each component exhibiting is created;
Each data flow is configured on the component exhibiting that corresponding layout and linkage configuration are completed;
Triggering behavior and the event between each component exhibiting and corresponding data stream is configured, the structure to the operation system is completed Build.
Preferably, the triggering behavior between each component exhibiting of the configuration and corresponding data stream and event, complete to described The structure of operation system includes:
Configure triggering behavior and the event between each component exhibiting and corresponding data stream;
Preview is currently configured interface, judges whether each component exhibiting is correct with corresponding data stream;
When judging that each component exhibiting is correct with corresponding data stream, it is determined that completing the structure to the operation system.
Preferably, after the structure completed to the operation system, also include:
The configuration information of the operation system is preserved to database.
Preferably, when the component exhibiting without user interface needs in the Component Gallery, the employing Flex skills Art, according to the service needed of the operation system, from the Component Gallery for pre-seting, choose user interface needed for component exhibiting it Afterwards, also include:
Create the component exhibiting that the user interface needs;
The component exhibiting of new establishment is shown in the user interface.
Preferably, after the component exhibiting for creating the user interface needs, also include:
The new component exhibiting for creating is saved in the Component Gallery.
A kind of construction device of the operation system based on Flex, including:
First creating unit, for creating an operation system, the title of the operation system at least includes:Project name And address name;
Unit is chosen, for adopting Flex technology, according to the service needed of the operation system, from the Component Gallery for pre-seting In, choose the component exhibiting needed for user interface;
First dispensing unit, for configuring the layout of each component exhibiting and linkage each other;
Second creating unit, at data stream management interface, creating data flow corresponding with each component exhibiting;
Second dispensing unit, for each data flow to be configured to into the presentation group that corresponding layout and linkage configuration are completed On part;
3rd dispensing unit, for configuring triggering behavior and event between each component exhibiting and corresponding data stream, completes Structure to the operation system.
Preferably, the 3rd dispensing unit includes:
Configuration subelement, for configuring triggering behavior and event between each component exhibiting and corresponding data stream;
Judgment sub-unit, for preview interface is currently configured, and judges whether each component exhibiting is correct with corresponding data stream;
Determining unit, in the case of being judged as YES in the judgment sub-unit, it is determined that completing to the operation system Structure.
Preferably, also include:
First storage unit, after completing the structure to the operation system in the 3rd dispensing unit, by institute The configuration information for stating operation system is preserved to database.
Preferably, also include:
3rd creating unit, for when in the Component Gallery without the user interface need component exhibiting when, in institute State selection unit and adopt Flex technology, according to the service needed of the operation system, from the Component Gallery for pre-seting, choose user After component exhibiting needed for interface, the component exhibiting that the user interface needs is created;
Display unit, for showing the component exhibiting of new establishment in the user interface.
Preferably, also include:
Second storage unit, for the 3rd creating unit create component exhibiting that the user interface needs it Afterwards, the new component exhibiting for creating is saved in the Component Gallery.
Knowable to above-mentioned technical scheme, the invention discloses the construction method and dress of a kind of operation system based on Flex Put, when operation system is created, using Flex technology, according to the service needed of operation system, from the Component Gallery for pre-seting, choosing The component exhibiting needed for user interface is taken, the layout of each component exhibiting and linkage each other is configured, by data flow Administration interface creates data flow, and the data flow of establishment is configured to into correspondence component exhibiting, and completes triggering behavior and event Configuration, realizes the structure to operation system.For comparing traditional scheme, the present invention only needs to choose component exhibiting, configures each displaying The layout of component, linkage and data source, without the need for carrying out writing code to the data in component exhibiting, so as to simplify The configuration process of component exhibiting, improves the structure efficiency of operation system.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, can be with basis Disclosed accompanying drawing obtains other accompanying drawings.
Fig. 1 is a kind of construction method flow chart of the operation system based on Flex disclosed in the embodiment of the present invention;
Fig. 2 is the connection diagram of a kind of Custom component disclosed in the embodiment of the present invention and interface;
Fig. 3 is a kind of structural representation of the construction device of the operation system based on Flex disclosed in the embodiment of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
The embodiment of the invention discloses the construction method and device of a kind of operation system based on Flex, to solve because showing Data very complicated in component, so as to cause front-end and back-end to write coding process complexity to component exhibiting, and then causes The low problem of the structure efficiency of operation system.
Referring to Fig. 1, a kind of construction method flow chart of the operation system based on Flex disclosed in the embodiment of the present invention, the party Method includes step:
Step S101, one operation system of establishment, the title of the operation system at least includes:Project name and user's surname Name;
It is understood that different operation systems has different functions, and it is to distinguish different operation systems, creating During operation system, the function of the operation system can be directed to, different project names be marked in the title of operation system, such as (result of appraisal display systems), address name can be the name for creating operation system personnel:Such as Zhang San.
Step S102, Flex technology is adopted, according to the service needed of the operation system, from the Component Gallery for pre-seting, Choose the component exhibiting needed for user interface;
Specifically, Flex is an efficient, free Open Framework, can be used to build the expressive Web applications journey of tool Sequence, these application programs utilize Adobe Flash Player and Adobe AIR, it is possible to achieve browser-cross, desktop and operation System.
The present invention specifically adopts Flex technology in front end, and with directly perceived, gorgeous operation system is represented.Flex adopts component Formula, configurable mode exploitation, to realize according to service needed, dynamic configuration bandwagon effect are realized to operation system, and provide thing Part interface, to realize the extension to component exhibiting in Component Gallery.
In the Component Gallery of the present invention, it is stored with and disclosure satisfy that the component exhibiting of most of operation systems, including chart, table Lattice, number, multimedia, map etc..Select for the convenience of the user, these component exhibitings are displayed in the left side of user interface, work as user When choosing certain component exhibiting, it is only necessary to which selected component exhibiting is dragged to into operation interface.
Step S103, the layout for configuring each component exhibiting and linkage each other;
Wherein, the layout of each component exhibiting includes position and the hierarchical relationship of each display member.
The layout of each component exhibiting is configured for the convenience of the user, and layout component can be illustrated in the left side of user interface.Cloth Office's component includes:Absolute layout container, tab, longitudinal layout container, landscape layout container etc..When need configure component exhibiting Layout when, it is only necessary to the layout component of selection is dragged to into operation interface, such as when needing component exhibiting whole longitudinal arrangement When, by the way that longitudinal layout container is dragged to into the operation interface comprising component exhibiting, you can realize component exhibiting all longitudinal direction rows Row.
Linkage between component exhibiting includes:Button click, tab switching, form selected line, chart click on element, Figure clicks on element etc..
By designing the linkage between each component exhibiting in the Activity design area at current user operation interface, each exhibition can be made Show that component performs corresponding behavior based on event driven manner.
Step S104, at data stream management interface, create data flow corresponding with each component exhibiting;
Specifically, the data source of each component exhibiting that the corresponding data flow of each component exhibiting refers to, data flow at least includes: Service logic and SQL (Structured Query Language, SQL).
It should be noted that in the corresponding data flow of each component exhibiting of establishment, the data processing of each data flow need to be added Node, each data flow includes some data processing nodes, including SQL nodes, Groovy data processing nodes etc., component exhibiting In data processed by each data processing node after return to front end and use.
Groovy is a kind of quick dynamic language for Java Virtual Machine, and with java perfect adaptation has been carried out;Online Parser, analysis model rule are realized by writing Groovy scripts;Groovy scripts are stored in database, can be to script The operations such as newly-built, modification, deletion are carried out online, can be run with Online release.
Step S105, each data flow is configured in corresponding layout and the linkage component exhibiting that completes of configuration;
Triggering behavior and event between step S106, each component exhibiting of configuration and corresponding data stream, completes to the industry The structure of business system.
In summary, it is of the invention when operation system is created, using Flex technology, according to the service needed of operation system, From the Component Gallery for pre-seting, choose the component exhibiting needed for user interface, configure each component exhibiting layout and mutually it Between linkage, by data stream management interface creating data flow, and the data flow of establishment is configured to into correspondence component exhibiting, and Triggering behavior and the configuration of event are completed, the structure to operation system is realized.For comparing traditional scheme, the present invention only needs to choose Component exhibiting, configures the layout of each component exhibiting, linkage and data source, without the need for carrying out to the data in component exhibiting Code is write, so as to simplify the configuration process of component exhibiting, the structure efficiency of operation system is improve.
In addition, it is necessary to explanation, knowable to above-mentioned discussion, the present invention can create a configuration circle in reality is used Face design tool, the instrument may be considered a kind of omnibearing graphic user interface constructor of What You See Is What You Get, and design is opened The personnel of sending out carry out the design and configuration of user interface by the instrument to operation system, i.e., by visualizing drag and drop various assemblies structure Graphical interface of user is made, user's preview, and the linkage of back-end data stream and front end assemblies is supported, and the industry that complete can be configured Business system is construed to the application program that developer uses, so that it is lighter to design and develop process.
Wherein, configuration interface design tool can have message push function, and it is for Web application and developments field that message is pushed Technology, refer to service end with active mode by information delivery client.It is mainly used in lifting Consumer's Experience, it is to avoid user's refresh page Face is from service end pulling data.For example occurs the mail item for just having received in Web mail automatically, automatically prompting is new for Web instant messagings To application scenarios such as message.Message pushes mode to be included:Repeating query and in real time.
To ensure the correct of created operation system, the triggering row between each component exhibiting and corresponding data stream is being configured The correctness for being and after event, also needing to judge each component exhibiting and corresponding data stream.
Therefore, it is further to optimize above-described embodiment, step S106 is specifically included:
Configure triggering behavior and the event between each component exhibiting and corresponding data stream;
Preview is currently configured interface, judges whether each component exhibiting is correct with corresponding data stream;
When judging that each component exhibiting is correct with corresponding data stream, it is determined that completing the structure to the operation system.
Wherein, when judging that each component exhibiting has mistake with corresponding data stream, need to be modified the part of mistake, And continue to judge the correctness of each component exhibiting after change and corresponding data stream, until each component exhibiting is with corresponding data stream just Really, the structure to operation system is completed.
Sometimes there is identical content between different operation systems, therefore to improve the establishment efficiency to operation system, The operation system that establishment is completed can be saved as template, subsequently when processing other operation systems, will to store Template as loading basic system, current business system is configured on the basis of the template, so as to improve business The establishment efficiency of system.
It should be noted that the function that the component pool in the Component Gallery in the present invention has includes:(1) support that the page is nested (i.e. template application);(2) page and modular construction acquisition of information are provided:Structure+component array+configuration information;(3) component level Relation decomposing moves into engine, and by engine load component exhibiting is created;(4) page info object only preserves page info, not internally Deposit example to be managed;(5) component pool is responsible for the management of instance object;(6) lazy loading, whether instantiate and belong to component pool and connect Mouthful;(7) behavior controller running status control:Behavior controller running status is controlled by switch.
Wherein, each component exhibiting in Component Gallery has corresponding ID, and according to the ID corresponding presentation group is may determine that Whether part has loaded or has created.
The function of analytics engine includes:
First, parse according to configuration file number, including:Single configuration file parsing and the parsing of multiple configuration files;
2nd, parse according to function, including:Attribute parsing, pattern parsing, special efficacy parsing and renderer parsing.
When the component exhibiting in Component Gallery does not meet the displaying demand of operation system, it is necessary to which Component Gallery is expanded Exhibition.
Therefore, it is further to optimize above-described embodiment, after step s 102, also includes:
Create the component exhibiting that user interface needs;
The component exhibiting of new establishment is shown in the user interface.
To ensure that the new component for creating can create the exhibition that user interface needs used in configuration interface design tool After showing component, can also include:
The new component exhibiting for creating is saved in the Component Gallery.
It should be noted that when the component in Component Gallery is extended, to make Custom component (the i.e. new exhibition for creating Show component) can be used in configuration interface design tool, in addition it is also necessary to the configuration of Custom component and the corresponding interface is realized, is such as schemed Shown in 2, Custom component 1~3 is set up into configuration with interface and is connected, interface includes:Physical layer interface and interface can be pulled.
Wherein, after the component in Component Gallery is extended, in addition it is also necessary to carry out behavior extension to Custom component, specifically Including:
(1) definition of behavior expansion interface and specification:The secondary development of behavior can be provided, analytics engine can be parsed;
(2) definition of behavior panel interface and specification:The secondary development of behavior configured board, configuration interface design can be provided Instrument can be configured;
(3) self-defined behavior and self-defined behavior panel are added dynamically to configuration interface design tool can use.
(4) management (deactivation of behavior, the state control such as debug, use) of behavior.
It is corresponding with said method embodiment, the invention also discloses a kind of structure dress of operation system based on Flex Put.
Referring to Fig. 3, a kind of structural representation of the construction device of the operation system based on Flex disclosed in the embodiment of the present invention Figure, the device includes:
First creating unit 301, for creating an operation system, the title of the operation system at least includes:Project Title and address name;
It is understood that different operation systems has different functions, and it is to distinguish different operation systems, creating During operation system, the function of the operation system can be directed to, different project names be marked in the title of operation system, such as (result of appraisal display systems), address name can be the name for creating operation system personnel:Such as Zhang San.
Unit 302 is chosen, for adopting Flex technology, according to the service needed of the operation system, from the group for pre-seting In part storehouse, the component exhibiting needed for user interface is chosen;
Specifically, Flex is an efficient, free Open Framework, can be used to build the expressive Web applications journey of tool Sequence, these application programs utilize Adobe Flash Player and Adobe AIR, it is possible to achieve browser-cross, desktop and operation System.
The present invention specifically adopts Flex technology in front end, and with directly perceived, gorgeous operation system is represented.Flex adopts component Formula, configurable mode exploitation, to realize according to service needed, dynamic configuration bandwagon effect are realized to operation system, and provide thing Part interface, to realize the extension to component exhibiting in Component Gallery.
In the Component Gallery of the present invention, it is stored with and disclosure satisfy that the component exhibiting of most of operation systems, including chart, table Lattice, number, multimedia, map etc..Select for the convenience of the user, these component exhibitings are displayed in the left side of user interface, work as user When choosing certain component exhibiting, it is only necessary to which selected component exhibiting is dragged to into operation interface.
First dispensing unit 303, for configuring the layout of each component exhibiting and linkage each other;
Wherein, the layout of each component exhibiting includes position and the hierarchical relationship of each display member.
The layout of each component exhibiting is configured for the convenience of the user, and layout component can be illustrated in the left side of user interface.Cloth Office's component includes:Absolute layout container, tab, longitudinal layout container, landscape layout container etc..When need configure component exhibiting Layout when, it is only necessary to the layout component of selection is dragged to into operation interface, such as when needing component exhibiting whole longitudinal arrangement When, by the way that longitudinal layout container is dragged to into the operation interface comprising component exhibiting, you can realize component exhibiting all longitudinal direction rows Row.
Linkage between component exhibiting includes:Button click, tab switching, form selected line, chart click on element, Figure clicks on element etc..
By designing the linkage between each component exhibiting in the Activity design area at current user operation interface, each exhibition can be made Show that component performs corresponding behavior based on event driven manner.
Second creating unit 304, at data stream management interface, creating data corresponding with each component exhibiting Stream;
Specifically, the data source of each component exhibiting that the corresponding data flow of each component exhibiting refers to, data flow at least includes: Service logic and SQL (Structured Query Language, SQL).
It should be noted that in the corresponding data flow of each component exhibiting of establishment, the data processing of each data flow need to be added Node, each data flow includes some data processing nodes, including SQL nodes, Groovy data processing nodes etc., component exhibiting In data processed by each data processing node after return to front end and use.
Groovy is a kind of quick dynamic language for Java Virtual Machine, and with java perfect adaptation has been carried out;Online Parser, analysis model rule are realized by writing Groovy scripts;Groovy scripts are stored in database, can be to script The operations such as newly-built, modification, deletion are carried out online, can be run with Online release.
Second dispensing unit 305, for each data flow to be configured to into the exhibition that corresponding layout and linkage configuration are completed Show on component;
3rd dispensing unit 306, it is complete for configuring triggering behavior and event between each component exhibiting and corresponding data stream The structure of the paired operation system.
In summary, it is of the invention when operation system is created, using Flex technology, according to the service needed of operation system, From the Component Gallery for pre-seting, choose the component exhibiting needed for user interface, configure each component exhibiting layout and mutually it Between linkage, by data stream management interface creating data flow, and the data flow of establishment is configured to into correspondence component exhibiting, and Triggering behavior and the configuration of event are completed, the structure to operation system is realized.For comparing traditional scheme, the present invention only needs to choose Component exhibiting, configures the layout of each component exhibiting, linkage and data source, without the need for carrying out to the data in component exhibiting Code is write, so as to simplify the configuration process of component exhibiting, the structure efficiency of operation system is improve.
In addition, it is necessary to explanation, knowable to above-mentioned discussion, the present invention can create a configuration circle in reality is used Face design tool, the instrument may be considered a kind of omnibearing graphic user interface constructor of What You See Is What You Get, and design is opened The personnel of sending out carry out the design and configuration of user interface by the instrument to operation system, i.e., by visualizing drag and drop various assemblies structure Graphical interface of user is made, user's preview, and the linkage of back-end data stream and front end assemblies is supported, and the industry that complete can be configured Business system is construed to the application program that developer uses, so that it is lighter to design and develop process.
Wherein, configuration interface design tool can have message push function, and it is for Web application and developments field that message is pushed Technology, refer to service end with active mode by information delivery client.It is mainly used in lifting Consumer's Experience, it is to avoid user's refresh page Face is from service end pulling data.For example occurs the mail item for just having received in Web mail automatically, automatically prompting is new for Web instant messagings To application scenarios such as message.Message pushes mode to be included:Repeating query and in real time.
To ensure the correct of created operation system, the triggering row between each component exhibiting and corresponding data stream is being configured The correctness for being and after event, also needing to judge each component exhibiting and corresponding data stream.
Therefore, it is further to optimize above-described embodiment, the 3rd dispensing unit 306 includes:
Configuration subelement, for configuring triggering behavior and event between each component exhibiting and corresponding data stream;
Judgment sub-unit, for preview interface is currently configured, and judges whether each component exhibiting is correct with corresponding data stream;
Determining unit, in the case of being judged as YES in the judgment sub-unit, it is determined that completing to the operation system Structure.
Wherein, when judging that each component exhibiting has mistake with corresponding data stream, need to be modified the part of mistake, And continue to judge the correctness of each component exhibiting after change and corresponding data stream, until each component exhibiting is with corresponding data stream just Really, the structure to operation system is completed.
Sometimes there is identical content between different operation systems, therefore to improve the establishment efficiency to operation system, The operation system that establishment is completed can be saved as template, subsequently when processing other operation systems, will to store Template as loading basic system, current business system is configured on the basis of the template, so as to improve business The establishment efficiency of system.
It should be noted that the function that the component pool in the Component Gallery in the present invention has includes:(1) support that the page is nested (i.e. template application);(2) page and modular construction acquisition of information are provided:Structure+component array+configuration information;(3) component level Relation decomposing moves into engine, and by engine load component exhibiting is created;(4) page info object only preserves page info, not internally Deposit example to be managed;(5) component pool is responsible for the management of instance object;(6) lazy loading, whether instantiate and belong to component pool and connect Mouthful;(7) behavior controller running status control:Behavior controller running status is controlled by switch.
Wherein, each component exhibiting in Component Gallery has corresponding ID, and according to the ID corresponding presentation group is may determine that Whether part has loaded or has created.
The function of analytics engine includes:
First, parse according to configuration file number, including:Single configuration file parsing and the parsing of multiple configuration files;
2nd, parse according to function, including:Attribute parsing, pattern parsing, special efficacy parsing and renderer parsing.
When the component exhibiting in Component Gallery does not meet the displaying demand of operation system, it is necessary to which Component Gallery is expanded Exhibition.
Therefore, it is further to optimize above-described embodiment, construction device also includes:
First storage unit, after completing the structure to the operation system in the 3rd dispensing unit 306, will be described The configuration information of operation system is preserved to database.
Therefore, it is further to optimize above-described embodiment, construction device also includes:
3rd creating unit, for when in the Component Gallery without the user interface need component exhibiting when, in institute State selection unit and adopt Flex technology, according to the service needed of the operation system, from the Component Gallery for pre-seting, choose user After component exhibiting needed for interface, the component exhibiting that the user interface needs is created;
Display unit, for showing the component exhibiting of new establishment in the user interface.
To ensure that the new component for creating can create the exhibition that user interface needs used in configuration interface design tool After showing component, can also include:
Second storage unit, for the 3rd creating unit create component exhibiting that the user interface needs it Afterwards, the new component exhibiting for creating is saved in the Component Gallery.
It should be noted that when the component in Component Gallery is extended, to make Custom component (the i.e. new exhibition for creating Show component) can be used in configuration interface design tool, in addition it is also necessary to the configuration of Custom component and the corresponding interface is realized, is such as schemed Shown in 2, Custom component 1~3 is set up into configuration with interface and is connected, interface includes:Physical layer interface and interface can be pulled.
Wherein, after the component in Component Gallery is extended, in addition it is also necessary to carry out behavior extension to Custom component, specifically Including:
(1) definition of behavior expansion interface and specification:The secondary development of behavior can be provided, analytics engine can be parsed;
(2) definition of behavior panel interface and specification:The secondary development of behavior configured board, configuration interface design can be provided Instrument can be configured;
(3) self-defined behavior and self-defined behavior panel are added dynamically to configuration interface design tool can use.
(4) management (deactivation of behavior, the state control such as debug, use) of behavior.
Finally, in addition it is also necessary to explanation, herein, such as first and second or the like relational terms be used merely to by One entity or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or operation Between there is any this actual relation or order.And, term " including ", "comprising" or its any other variant meaning Covering including for nonexcludability, so that a series of process, method, article or equipment including key elements not only includes that A little key elements, but also including other key elements being not expressly set out, or also include for this process, method, article or The intrinsic key element of equipment.In the absence of more restrictions, the key element for being limited by sentence "including a ...", does not arrange Except also there is other identical element in including the process of the key element, method, article or equipment.
Each embodiment is described by the way of progressive in this specification, and what each embodiment was stressed is and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention. Various modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, the present invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope for causing.

Claims (10)

1. a kind of construction method of the operation system based on Flex, it is characterised in that include:
An operation system is created, the title of the operation system at least includes:Project name and address name;
Using Flex technology, according to the service needed of the operation system, from the Component Gallery for pre-seting, user interface institute is chosen The component exhibiting for needing;
Configure the layout of each component exhibiting and linkage each other;
At data stream management interface, data flow corresponding with each component exhibiting is created;
Each data flow is configured on the component exhibiting that corresponding layout and linkage configuration are completed;
Triggering behavior and the event between each component exhibiting and corresponding data stream is configured, the structure to the operation system is completed.
2. construction method according to claim 1, it is characterised in that each component exhibiting of the configuration and corresponding data stream it Between triggering behavior and event, complete to include the structure of the operation system:
Configure triggering behavior and the event between each component exhibiting and corresponding data stream;
Preview is currently configured interface, judges whether each component exhibiting is correct with corresponding data stream;
When judging that each component exhibiting is correct with corresponding data stream, it is determined that completing the structure to the operation system.
3. construction method according to claim 1, it is characterised in that it is described complete the structure to the operation system it Afterwards, also include:
The configuration information of the operation system is preserved to database.
4. construction method according to claim 1, it is characterised in that when needing without the user interface in the Component Gallery During the component exhibiting wanted, the employing Flex technology, according to the service needed of the operation system, from the Component Gallery for pre-seting In, after choosing the component exhibiting needed for user interface, also include:
Create the component exhibiting that the user interface needs;
The component exhibiting of new establishment is shown in the user interface.
5. construction method according to claim 4, it is characterised in that create the displaying that the user interface needs described After component, also include:
The new component exhibiting for creating is saved in the Component Gallery.
6. a kind of construction device of the operation system based on Flex, it is characterised in that include:
First creating unit, for creating an operation system, the title of the operation system at least includes:Project name and use Family name;
Unit is chosen, for adopting Flex technology, according to the service needed of the operation system, from the Component Gallery for pre-seting, Choose the component exhibiting needed for user interface;
First dispensing unit, for configuring the layout of each component exhibiting and linkage each other;
Second creating unit, at data stream management interface, creating data flow corresponding with each component exhibiting;
Second dispensing unit, for each data flow to be configured to into the component exhibiting that corresponding layout and linkage configuration are completed On;
3rd dispensing unit, for configuring triggering behavior and event between each component exhibiting and corresponding data stream, completes to institute State the structure of operation system.
7. construction device according to claim 6, it is characterised in that the 3rd dispensing unit includes:
Configuration subelement, for configuring triggering behavior and event between each component exhibiting and corresponding data stream;
Judgment sub-unit, for preview interface is currently configured, and judges whether each component exhibiting is correct with corresponding data stream;
Determining unit, in the case of being judged as YES in the judgment sub-unit, it is determined that completing the structure to the operation system Build.
8. construction device according to claim 6, it is characterised in that also include:
First storage unit, after completing the structure to the operation system in the 3rd dispensing unit, by the industry The configuration information of business system is preserved to database.
9. construction device according to claim 6, it is characterised in that also include:
3rd creating unit, for when in the Component Gallery without the user interface need component exhibiting when, in the choosing Take unit and adopt Flex technology, according to the service needed of the operation system, from the Component Gallery for pre-seting, choose user interface After required component exhibiting, the component exhibiting that the user interface needs is created;
Display unit, for showing the component exhibiting of new establishment in the user interface.
10. construction device according to claim 9, it is characterised in that also include:
Second storage unit, after creating the component exhibiting that the user interface needs in the 3rd creating unit, will The new component exhibiting for creating is saved in the Component Gallery.
CN201611178728.9A 2016-12-19 2016-12-19 Method and device for constructing business system based on Flex Pending CN106599229A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611178728.9A CN106599229A (en) 2016-12-19 2016-12-19 Method and device for constructing business system based on Flex

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611178728.9A CN106599229A (en) 2016-12-19 2016-12-19 Method and device for constructing business system based on Flex

Publications (1)

Publication Number Publication Date
CN106599229A true CN106599229A (en) 2017-04-26

Family

ID=58599889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611178728.9A Pending CN106599229A (en) 2016-12-19 2016-12-19 Method and device for constructing business system based on Flex

Country Status (1)

Country Link
CN (1) CN106599229A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107291462A (en) * 2017-06-13 2017-10-24 成都四方伟业软件股份有限公司 The self-defined method of combination of interactive data system, system and compiling, operation method
CN107608667A (en) * 2017-08-18 2018-01-19 深圳怡化电脑股份有限公司 The update method and device of a kind of operation flow
CN108037834A (en) * 2017-12-31 2018-05-15 武汉烽火云创软件技术有限公司 Virtual interactive interface management system based on motion sensing control
CN108121449A (en) * 2017-12-31 2018-06-05 武汉烽火云创软件技术有限公司 The newer virtual interactive interface management system based on motion sensing control of editable
CN108228253A (en) * 2017-12-29 2018-06-29 武汉璞华大数据技术有限公司 A kind of APP construction methods and system
CN109240706A (en) * 2017-05-09 2019-01-18 北京京东尚科信息技术有限公司 For configuring the method, apparatus and electronic equipment of system business
WO2019033405A1 (en) * 2017-08-18 2019-02-21 深圳怡化电脑股份有限公司 Service flow updating method and device
CN109375916A (en) * 2018-10-30 2019-02-22 成都四方伟业软件股份有限公司 Interactive Web Page method of combination and device
CN110727869A (en) * 2019-10-18 2020-01-24 北京字节跳动网络技术有限公司 Page construction method and device
CN111124375A (en) * 2019-12-27 2020-05-08 杭州东方通信软件技术有限公司 Autonomous front-end design and display system
CN111221523A (en) * 2019-12-24 2020-06-02 方正株式(武汉)科技开发有限公司 Optimized manufacturing method and system of Web page linkage control, server and medium
CN113568683A (en) * 2021-08-05 2021-10-29 京东科技控股股份有限公司 Method and device for dynamically expanding asset data stream processing service assembly
CN117573090A (en) * 2023-11-17 2024-02-20 易方达基金管理有限公司 Construction method, system and storage medium of application system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101692736A (en) * 2009-09-16 2010-04-07 南京联创科技集团股份有限公司 Method for monitoring telecom mobile service exchange based on flex technology
US20110078607A1 (en) * 2009-09-30 2011-03-31 Teradata Us, Inc. Workflow integration with adobe™flex™user interface
CN102184107A (en) * 2011-05-19 2011-09-14 北京邮电大学 Method and system for combining user interface services
CN103019693A (en) * 2012-11-21 2013-04-03 用友软件股份有限公司 System and method for generating user interface

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101692736A (en) * 2009-09-16 2010-04-07 南京联创科技集团股份有限公司 Method for monitoring telecom mobile service exchange based on flex technology
US20110078607A1 (en) * 2009-09-30 2011-03-31 Teradata Us, Inc. Workflow integration with adobe™flex™user interface
CN102184107A (en) * 2011-05-19 2011-09-14 北京邮电大学 Method and system for combining user interface services
CN103019693A (en) * 2012-11-21 2013-04-03 用友软件股份有限公司 System and method for generating user interface

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡洁 等: "《Flex完全自学手册》", 31 January 2009, 机械工业出版社 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109240706A (en) * 2017-05-09 2019-01-18 北京京东尚科信息技术有限公司 For configuring the method, apparatus and electronic equipment of system business
CN107291462A (en) * 2017-06-13 2017-10-24 成都四方伟业软件股份有限公司 The self-defined method of combination of interactive data system, system and compiling, operation method
CN107608667A (en) * 2017-08-18 2018-01-19 深圳怡化电脑股份有限公司 The update method and device of a kind of operation flow
WO2019033405A1 (en) * 2017-08-18 2019-02-21 深圳怡化电脑股份有限公司 Service flow updating method and device
CN108228253A (en) * 2017-12-29 2018-06-29 武汉璞华大数据技术有限公司 A kind of APP construction methods and system
CN108121449A (en) * 2017-12-31 2018-06-05 武汉烽火云创软件技术有限公司 The newer virtual interactive interface management system based on motion sensing control of editable
CN108037834A (en) * 2017-12-31 2018-05-15 武汉烽火云创软件技术有限公司 Virtual interactive interface management system based on motion sensing control
CN109375916A (en) * 2018-10-30 2019-02-22 成都四方伟业软件股份有限公司 Interactive Web Page method of combination and device
CN110727869A (en) * 2019-10-18 2020-01-24 北京字节跳动网络技术有限公司 Page construction method and device
CN111221523A (en) * 2019-12-24 2020-06-02 方正株式(武汉)科技开发有限公司 Optimized manufacturing method and system of Web page linkage control, server and medium
CN111124375A (en) * 2019-12-27 2020-05-08 杭州东方通信软件技术有限公司 Autonomous front-end design and display system
CN113568683A (en) * 2021-08-05 2021-10-29 京东科技控股股份有限公司 Method and device for dynamically expanding asset data stream processing service assembly
CN117573090A (en) * 2023-11-17 2024-02-20 易方达基金管理有限公司 Construction method, system and storage medium of application system

Similar Documents

Publication Publication Date Title
CN106599229A (en) Method and device for constructing business system based on Flex
US10222951B2 (en) Modeling system for graphic user interface
US7581189B2 (en) Dynamically generating a database report during a report building process
EP2388692A1 (en) In-place user interface and dataflow modeling
US20080028328A1 (en) System and method to dynamically change object data patterns
CN103885943B (en) The implementation method of drop-down list box control in webpage
US20070168932A1 (en) Support of a platform-independent model including descriptions of modeling language entities
CN103714492A (en) Automatic report generating method capable of meeting power distribution network management specific data standards
CN101887370B (en) Method and device for creating system user interface
CN104239073A (en) Data maintenance system rapid prototyping development system and method
CN102779037A (en) Visual programming method for automatically generating and uniformly maintaining java items
CN102298740A (en) Business process management supporting method
CN111240659A (en) Page design method based on Vue
CN103902256A (en) Interface generating system and method
JP2009527830A (en) Method and system for creating a tree file in a computer
CN107766519B (en) Method for visually configuring data structure
CN103593188A (en) System and method for managing what-you-see-is-what-you-get menus of instrument
CN109408322A (en) A kind of automatic business process implementation method of cloud platform
CN104731804A (en) General query framework establishing method and device
Di Battista et al. Diagram server
CN102868746A (en) Method for realizing mobile informationization
KR20200119108A (en) Method for constructing database in WYSIWYG based website builder
Limbourg et al. The Task-Dialog and Task-Presentation Mapping Problem: Some Preliminary Results
US20140164429A1 (en) Persisting instance-level report customizations
CN112162731B (en) Data expansion method, device, storage medium and electronic device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426