CN106598525A - Pre-loading method and apparatus for spliced wall resources - Google Patents

Pre-loading method and apparatus for spliced wall resources Download PDF

Info

Publication number
CN106598525A
CN106598525A CN201611179721.9A CN201611179721A CN106598525A CN 106598525 A CN106598525 A CN 106598525A CN 201611179721 A CN201611179721 A CN 201611179721A CN 106598525 A CN106598525 A CN 106598525A
Authority
CN
China
Prior art keywords
combination
resource
combination resource
loaded
loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611179721.9A
Other languages
Chinese (zh)
Other versions
CN106598525B (en
Inventor
李申展
朱小华
余雪晨
陈先志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vtron Technologies Ltd
Original Assignee
Vtron Technologies Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vtron Technologies Ltd filed Critical Vtron Technologies Ltd
Priority to CN201611179721.9A priority Critical patent/CN106598525B/en
Publication of CN106598525A publication Critical patent/CN106598525A/en
Application granted granted Critical
Publication of CN106598525B publication Critical patent/CN106598525B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/14Digital output to display device ; Cooperation and interconnection of the display device with other functional units
    • G06F3/1423Digital output to display device ; Cooperation and interconnection of the display device with other functional units controlling a plurality of local displays, e.g. CRT and flat panel display
    • G06F3/1446Digital output to display device ; Cooperation and interconnection of the display device with other functional units controlling a plurality of local displays, e.g. CRT and flat panel display display composed of modules, e.g. video walls

Abstract

The invention discloses a pre-loading method and apparatus for spliced wall resources. The pre-loading method comprises the steps of loading spliced wall resources with a first loading quantity to cache, and then loading to-be-loaded spliced wall resources in sequence; according to a loading sequence, putting the loaded spliced wall resources into a movable container control; and after the quantity of the spliced wall resources in the movable container control achieves a set first release count value, releasing the spliced wall resources in the movable container control. According to the pre-loading method and apparatus for the spliced wall resources disclosed by the invention, the spliced wall resources are loaded to the cache in sequence according to the quantity of the spliced wall resources, so that the sequential spliced wall resource display can be facilitated; when the quantity of the spliced wall resources in the movable container control achieves a certain value, the spliced wall resources in the movable control are released; and the released spliced wall resources are loaded spliced wall resources, so that cache pressure is relieved, smooth display of the spliced wall data resources can be facilitated, and unsmooth and temporary stopping states are avoided.

Description

A kind of preloading method and device of combination resource
Technical field
The present invention relates to combination field, more particularly to a kind of preloading method and device of combination resource.
Background technology
In recent years, with the fast development of domestic economy, the rapid growth of various information so that each enterprise, institute of group The information content for watch, monitoring is more and more, and urgent requirement terminal display system is towards maximization, high-definition development.Spell Wall is connect as a kind of large screen display system, the characteristics of with big picture, high-resolution, the information content that can be provided the user compared with Greatly, thus be widely applied.
The method for showing resource on combination at present is first to obtain whole combination data resources, disposably loads institute There is combination data resource, then shown, because combination data resource data amount is very huge, so hold when showing Easily cause interface long-time and be in an interim card state, be unfavorable for the smooth display of combination data resource.
The content of the invention
Based on this, the present invention proposes a kind of preloading method and device of combination resource, being capable of smooth display splicing wall Data resource.
A kind of pre-add support method of combination resource, comprises the following steps:
Loading first loads the combination resource of quantity to caching, and combination resource to be loaded is loaded successively;
The combination resource for having loaded is sequentially placed into into mobile container control according to the order of loading, when mobile container control In combination resource quantity reach setting first release count value after, by the combination resource in the mobile container control Release;Wherein, the first release count value is less than the first loading quantity.
A kind of pre-load means of combination resource, including:
Load-on module, the combination resource of quantity is loaded to caching for loading first, and splicing to be loaded is loaded successively Wall resource;
Release module, for the combination for having loaded resource to be sequentially placed into into mobile container control according to the order of loading, After the combination resource quantity in mobile container control reaches the first release count value of setting, by the mobile container control In combination resource release;Wherein, the first release count value is less than the first loading quantity.
The preloading method and device of above-mentioned combination resource, loading first loads the combination resource of quantity to caching Afterwards, combination resource to be loaded is loaded successively, according to loading sequence, successively the combination resource for having loaded is put into into mobile appearance Device control, after the combination resource quantity in mobile container control reaches the first release count value of setting, by the movement Combination resource release in container control.The preloading method and device of combination resource of the present invention is according to combination resource Several times successively loading combination resource, to caching, is conducive to orderly display splicing wall resource to quantity, when in mobile control Combination resource quantity is reached after certain value, the combination resource in the mobile control of release, and the combination resource being released is for The combination resource that Jing was loaded, alleviates caching pressure, is conducive to the smooth display of combination data resource, does not result in card State.
Description of the drawings
Fig. 1 is the preloading method flow schematic diagram of the combination resource in one embodiment;
Fig. 2 is the preloading method flow schematic diagram of the combination resource in another embodiment;
Fig. 3 is the pre-add support method application schematic diagram of the combination resource in one embodiment;
Fig. 4 is the pre-add support method application schematic diagram of the combination resource in another embodiment;
Fig. 5 is the preloading method flow schematic diagram of the combination resource in another embodiment;
Fig. 6 is the pre-add support method application schematic diagram of the combination resource in further embodiment;
Fig. 7 is the pre-add support method application schematic diagram of the combination resource in another embodiment;
Fig. 8 is the pre-load means application schematic diagram of the combination resource in another embodiment;
Fig. 9 is the pre-load means structural representation of the combination resource in one embodiment.
Specific embodiment
In order that the objects, technical solutions and advantages of the present invention become more apparent, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, and It is not used in the restriction present invention.
In one embodiment, Fig. 1 is referred to, a kind of pre-add support method of combination resource is comprised the following steps:
S11:Loading first loads the combination resource of quantity to caching, and combination resource to be loaded is loaded successively;
S12:The combination resource for having loaded is sequentially placed into into mobile container control according to the order of loading, when mobile container Combination resource quantity in control is reached after the first release count value of setting, by the combination in the mobile container control Resource discharges;Wherein, the first release count value is less than the first loading quantity.
Combination is large screen display system, and combination resource is the data moneys such as the picture or the video that show in combination Source, combination resource can be online from curstomer's site or be obtained offline.The pre-add support method of the combination resource can pass through Cocos2dx increases income development of games software platform to realize.
It is described to cache for preserving the combination resource for preloading, in order to show, concretely ListView controls.Institute Mobile container control is stated for after the combination resource quantity of mobile container control reaches certain value, in mobile container control A number of combination resource discharged.Load the step of combination resource is extremely cached and combination resource is put into into shifting The step of dynamic container control, can be carried out simultaneously, also can load the combination resource of quantity to after caching loading first is completed, then Combination resource is put into into mobile container control.First release count value is less than the first loading quantity, it is ensured that the splicing being released Combination resource of the wall resource less than loading.
In a kind of optional embodiment, Fig. 2 is referred to, pre-add can be carried out to combination resource according to following steps Carry:
S111:With first combination resource to load starting point, the combination resource of the first quantity is loaded to caching, from treating First combination resource of loading starts, and combination resource to be loaded is loaded successively;
S121:From the beginning of first combination resource in the combination resource for having loaded, successively by the splicing for having loaded Wall resource is put into mobile container control, when the first release that the combination resource quantity in mobile container control reaches setting is counted After value, the combination resource in the mobile container control is discharged;Wherein, the first release count value is less than the first loading number Amount.
Illustrate below by an instantiation.
For example, Fig. 3 is referred to, if there are 100 combination resources to need loading, the first loading quantity is 12, the of setting One release count value is 10, and the combination resource of 12 is loaded onto into caching when being loaded for the first time, afterwards, is loaded from Combination resource in first combination resource start, successively combination resource is put into mobile container control, mobile container After combination resource quantity in control reaches 10, the 1st to the 10th combination resource is discharged, while to be loaded first Combination resource starts, i.e., from the beginning of the 13rd combination resource, continue to load the 13rd to 22 combination resources to caching. Fig. 4 is referred to, Fig. 4 is illustrated the step of loading combination resource is extremely cached and combination resource is put into into mobile container control The situation that step is carried out simultaneously, caching is loaded onto when being loaded for the first time by the combination resource of 12, while will load Combination resource be put into mobile container control, the combination resource quantity in mobile container control reaches 10, release the 1st to 10th combination resource, while continuing to load combination resource to be loaded.
The pre-add support method of above-mentioned combination resource, loading first loads the combination resource of quantity to after caching, from treating First combination resource of loading starts, and combination resource to be loaded is loaded successively, from the combination resource for having loaded First combination resource start, successively the combination resource for having loaded is put into into mobile container control, when mobile container control Combination resource quantity in part is reached after the first release count value of setting, and the combination in the mobile container control is provided Source discharges.According to the quantity of combination resource, several times successively loading combination resource, to caching, is conducive to orderly display to spell Wall resource is connect, after the combination resource quantity in mobile control reaches certain value, the combination resource in the mobile control of release, The combination resource being released is the combination resource for having loaded, and alleviates caching pressure, is conducive to combination data to provide The smooth display in source, does not result in interim card state.
In a kind of optional embodiment, Fig. 5 is referred to, pre-add can be carried out to combination resource according to following steps Carry:
S112:With last combination resource to load starting point, loading first loads the combination resource of quantity to slow Deposit, from the beginning of last combination resource to be loaded, combination resource to be loaded is loaded successively;
S122:From the beginning of last the combination resource in the combination resource for having loaded, successively by the spelling for having loaded Connect wall resource and be put into mobile container control, when the combination resource quantity in mobile container control reaches the first release meter of setting After numerical value, the combination resource in the mobile container control is discharged;Wherein, the first release count value is less than the first loading number Amount.
Illustrate below by an instantiation.
For example, Fig. 6 is referred to, if there are 100 combination resources to need loading, the first loading quantity is 12, the of setting One release count value be 10, when being loaded for the first time, with the 100th combination resource as load starting point by the 100th extremely The combination resource of the 89th is loaded onto caching, afterwards, last the combination resource from the combination resource for having loaded Start, successively combination resource is put into mobile container control, after the combination resource quantity in mobile container control reaches 10, The the 100th to the 91st combination resource is discharged, while last combination resource to be loaded starts, i.e., from the 88th splicing Wall resource starts, and continues to load the 88th to 79 combination resources to caching.Fig. 7 is referred to, Fig. 7 illustrates loading combination Resource to cache the step of with combination resource is put into into mobile container control the step of while situation about carrying out, is carried out for the first time The combination resource of 12 is loaded onto into caching during loading, while the combination resource for having loaded is put into into mobile container control, Combination resource quantity in mobile container control reaches 10, discharges the 100th to the 89th combination resource, while continuing Loading combination resource to be loaded.
The pre-add support method of above-mentioned combination resource, adds with last combination resource to load starting point, loading first The combination resource of quantity is carried to after caching, from the beginning of last combination resource to be loaded, is loaded successively to be loaded Combination resource, from the beginning of last the combination resource in the combination resource for having loaded, successively by the splicing for having loaded Wall resource is put into mobile container control, when the first release that the combination resource quantity in mobile container control reaches setting is counted After value, the combination resource in the mobile container control is discharged.Successively loaded several times according to the quantity of combination resource Combination resource is conducive to orderly display splicing wall resource to caching, when the combination resource quantity in mobile control reaches After certain value, the combination resource in the mobile control of release, the combination resource being released is the combination money for having loaded Source, alleviates caching pressure, is conducive to the smooth display of combination data resource, does not result in interim card state.
The loading of combination resource to be loaded can be several times completed, every time the combination quantity of loading can be identical, also may be used Difference, the combination resource quantity for having loaded that mobile container control is put into each time may be the same or different, and one preferred real In applying example, include the step of combination resource to be loaded is loaded successively:
Several continuous combination resources to be loaded are loaded every time, wherein, every time loading is continuous to be loaded The quantity of combination resource is equal to the first release count value.
The preferred embodiment is illustrated below by a specific embodiment.
For example, refer to Fig. 6, the quantity of the combination resource that need to be loaded totally 100, set first release count value as 10, for combination resource to be loaded, every time the quantity of the combination resource continuous to be loaded of loading is 10, etc. Count value is discharged in first, 1 to 12 combination resource is loaded onto into caching when being loaded for the first time, be put into mobile container control The combination resource quantity of part reaches 10, then discharges the 1st to the 10th combination resource, illustrates the 10th to 12 combination 13rd to 22 combination resource (totally 10) also in the buffer, caching is loaded onto when being loaded for the second time by resource, by 11 to the 20th combination resources (totally 10) are put into mobile container control, then discharge 11 to 20 combination resources, in the same manner Loading afterwards and release steps ibid, until having loaded remaining combination resource, are repeated no more.
The preferred embodiment is illustrated below by another specific embodiment.
For example, the quantity of the combination resource that need to be loaded totally 100, first for setting discharges count value as 10, for Combination resource to be loaded, every time the quantity of the combination resource continuous to be loaded of loading is 10, is released equal to first Count value is put, 100 to 89 combination resources are loaded onto into caching when being loaded for the first time, be put into the spelling of mobile container control Connect wall resource quantity and reach 10, then discharge the 100th to the 91st combination resource, illustrate the 90th to 89 combination resource Also in the buffer, the 88th to 79 combination resource (totally 10) is loaded onto into caching when being loaded for the second time, by the 90th to 81st combination resource (totally 10) is put into mobile container control, then discharge 90 to 81 combination resources, in the same manner after Loading and release steps ibid, until having loaded remaining combination resource, repeat no more.
In one embodiment, the combination resource of the first loading quantity is loaded onto before caching, including step:
The combination resource of quantity is loaded to local cache application first, the node of the first loading quantity is plotted to;
Show the node of the first loading quantity drawn.
The node is displayable node, for obtaining the load progress of combination resource.To local cache application After the combination resource of one loading quantity, illustrating the combination resource of the first loading quantity will be loaded onto caching, by drawing To the node of the first loading quantity, the node of the first loading quantity of drafting is then shown, can intuitively obtain combination resource Load progress.
In one embodiment, after the combination resource in the mobile container control is discharged, comprise the following steps:
If the quantity of combination resource to be applied is more than or equal to the first release count value, by application order to local Caching applies for successively combination resource to be applied, wherein, every time the combination resource quantity to be applied of application is released equal to first Put count value.
After the combination resource that quantity is the first release count value is discharged from mobile container control, judge to treat The quantity of the combination resource of application with first release count value relation, if the quantity of combination resource to be applied be more than or Equal to the first release count value, then continue to the combination that local cache application quantity is the first release count value by application order Resource, the quantity for reloading application is equal to the combination resource of the first release count value.
In one embodiment, if the quantity of combination resource to be applied discharges count value more than or equal to first, from First combination resource to be applied starts, and to local cache combination resource to be applied is applied for successively, wherein, each Shen Combination resource quantity to be applied please is equal to the first release count value.
After the combination resource that quantity is the first release count value is discharged from mobile container control, judge to treat The quantity of the combination resource of application with first release count value relation, if the quantity of combination resource to be applied be more than or Equal to the first release count value, then can continue to local cache application quantity from the beginning of first combination resource to be applied For the combination resource of the first release count value, the combination resource of the quantity equal to the first release count value of application is reloaded.
Illustrate below by a specific embodiment.
For example, the quantity of combination resource totally 25, for the first time 12 to local cache application, have illustrated 12 quantity Combination resource need to be loaded, first release count value be 10, illustrate to be put into the 1st to the 10th combination resource extremely Move after container control it is necessary to be discharged.After the step of first application, local cache also has 13 combination resources Wait to apply and load, more than the first release count value for 10, then to the 13rd to 22 combination money of local cache application Source is simultaneously loaded onto caching.
In one embodiment, after the combination resource in the mobile container control is discharged, comprise the following steps:
If the quantity of combination resource to be applied is more than or equal to the first release count value, to be applied last Individual combination resource starts, and to local cache combination resource to be applied is applied for successively, wherein, that what is applied every time treats that application is spelled Wall resource quantity is connect equal to the first release count value.
After the combination resource that quantity is the first release count value is discharged from mobile container control, judge to treat The quantity of the combination resource of application with first release count value relation, if the quantity of combination resource to be applied be more than or Equal to the first release count value, then from the beginning of last combination resource to be applied, continue to local cache application quantity For the combination resource of the first release count value, the combination resource of the quantity equal to the first release count value of application is reloaded.
Illustrate below by a specific embodiment.
For example, the quantity of combination resource totally 25, for the first time 12 to local cache application, illustrate the 25th to the 14th The combination resource of individual quantity need to be loaded, and the first release count value is 10, illustrates to be put into the 25th to the 16th splicing Wall resource is to mobile container control it is necessary to being discharged.After the step of first application, local cache also has 13 spellings Connect wall resource to wait to apply and load, more than the first release count value for 10, then to the 13rd to 4 spelling of local cache application Connect wall resource and be loaded onto caching.
In one embodiment, after the combination resource in the mobile container control is discharged, comprise the following steps:
If the quantity of combination resource to be applied is less than the first release count value, from first combination to be applied Resource starts, then to combination resource to be applied described in local cache application.
After the combination resource that quantity is the first release count value is discharged from mobile container control, judge to treat The relation of the quantity of the combination resource of application and the first release count value, if the quantity of combination resource to be applied is less than the One release count value, then it is to combination resource to be applied described in local cache application, remaining combination resource is disposable Load.
The embodiment is illustrated below by a specific embodiment.
For example, the quantity totally 25 of combination resource for being loaded is needed in local cache, if having applied and having loaded to complete 20 combination resources, the first release count value is 10, illustrate that be put into the 1st to the 10th combination resource holds to mobile It is necessary to being discharged after device control.The now remaining combination quantity do not applied and load is 5, less than first for 10 Release count value, then next time to remaining 21st to the 25th combination resource of local cache application, be loaded onto successively slow In depositing.
Also can be from the beginning of last combination resource to be applied, to combination to be applied described in local cache application Resource.
The embodiment is illustrated below by a specific embodiment.
For example, the quantity totally 25 of combination resource for being loaded is needed in local cache, if having applied and having loaded to complete 20 combination resources, illustrate that the 25th to the 6th combination resource is applied and loads, and the first release count value is 10. Now residue is not applied and the combination quantity that load is 5, and less than first for 10 count value is discharged, then next time to Remaining 5th to the 1st combination resource of local cache application, during caching is loaded onto successively.
The pre-add support method of above-mentioned combination resource, loading first loads the combination resource of quantity to after caching, successively Loading combination resource to be loaded, according to loading sequence, is put into mobile container control by the combination resource for having loaded successively, After the combination resource quantity in mobile container control reaches the first release count value of setting, by the mobile container control In combination resource release.The pre-add support method of combination resource of the present invention according to the quantity of combination resource successively several times Loading combination resource is conducive to orderly display splicing wall resource to caching, the combination resource quantity in mobile control After reaching certain value, the combination resource in the mobile control of release, the combination resource being released is the splicing for having loaded Wall resource, alleviates caching pressure, is conducive to the smooth display of combination data resource, does not result in interim card state.
Above for the present invention a kind of combination resource pre-add support method specific embodiment, the present invention set forth below A kind of combination resource pre-load means.
In one embodiment, Fig. 9 is referred to, a kind of pre-load means of combination resource, including:
Load-on module 10, loads the combination resource of quantity to caching, from first spelling to be loaded for loading first Connect wall resource to start, combination resource to be loaded is loaded successively;
Release module 20, for from the beginning of first combination resource in the combination resource for having loaded, successively by The combination resource of loading is put into mobile container control, when the combination resource quantity in mobile container control reaches the of setting After one release count value, the combination resource in the mobile container control is discharged;Wherein, the first release count value is less than the One loading quantity.
The pre-load means of the combination resource of the present invention are right one by one with the pre-add support method of the combination resource of the present invention Should, it is applied to splicing in the technical characteristic and its advantage of the embodiment elaboration of the pre-add support method of above-mentioned combination resource In the embodiment of the pre-load means of wall resource, hereby give notice that.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply each technical characteristic in example be possible to combination be all described, as long as but there is no lance in the combination of these technical characteristics Shield, all should be the scope of this specification record.
Embodiment described above only expresses several embodiments of the present invention, and its description is more concrete and detailed, but not Therefore the restriction to the scope of the claims of the present invention can be interpreted as.It should be pointed out that for one of ordinary skill in the art comes Say, without departing from the inventive concept of the premise, some deformations and improvement can also be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (10)

1. a kind of pre-add support method of combination resource, it is characterised in that comprise the following steps:
Loading first loads the combination resource of quantity to caching, and combination resource to be loaded is loaded successively;
The combination resource for having loaded is sequentially placed into into mobile container control according to the order of loading, when in mobile container control Combination resource quantity is reached after the first release count value of setting, and the combination resource in the mobile container control is released Put;Wherein, the first release count value is less than the first loading quantity.
2. the pre-add support method of combination resource according to claim 1, it is characterised in that comprise the following steps:
With first combination resource to load starting point, loading first loads the combination resource of quantity to caching, to be loaded First combination resource start, combination resource to be loaded is loaded successively;
From the beginning of first combination resource in the combination resource for having loaded, the combination resource for having loaded is put into successively Mobile container control, after the combination resource quantity in mobile container control reaches the first release count value of setting, by institute State the combination resource release in mobile container control;Wherein, the first release count value is less than the first loading quantity.
3. the pre-add support method of combination resource according to claim 1, it is characterised in that comprise the following steps:
With last combination resource to load starting point, loading first loads the combination resource of quantity to caching, to be added Last the combination resource for carrying starts, and combination resource to be loaded is loaded successively;
From the beginning of last the combination resource in the combination resource for having loaded, the combination resource for having loaded is put successively Enter mobile container control, after the combination resource quantity in mobile container control reaches the first release count value of setting, will Combination resource release in the mobile container control;Wherein, the first release count value is less than the first loading quantity.
4. the pre-add support method of the combination resource according to any one of claim 1-3, it is characterised in that loading successively is treated The step of combination resource of loading, includes:
Several continuous combination resources to be loaded are loaded every time, wherein, the splicing continuous to be loaded of loading every time The quantity of wall resource is equal to the first release count value.
5. the pre-add support method of combination resource according to claim 4, it is characterised in that by the spelling of the first loading quantity Connect wall resource to be loaded onto before caching, comprise the following steps:
The combination resource of quantity is loaded to local cache application first, the node of the first loading quantity is plotted to;
Show the node of the first loading quantity drawn.
6. the pre-add support method of combination resource according to claim 5, it is characterised in that by the mobile container control In combination resource release after, comprise the following steps:
If the quantity of combination resource to be applied is more than or equal to the first release count value, by application order to local cache Apply for combination resource to be applied successively, wherein, every time the combination resource quantity to be applied of application is equal to the first release meter Numerical value.
7. the pre-add support method of combination resource according to claim 6, it is characterised in that
If the quantity of combination resource to be applied is more than or equal to the first release count value, from first splicing to be applied Wall resource starts, and to local cache combination resource to be applied is applied for successively, wherein, combination the to be applied money of application every time Source quantity is equal to the first release count value.
8. the pre-add support method of combination resource according to claim 6, it is characterised in that
If the quantity of combination resource to be applied is more than or equal to the first release count value, from last spelling to be applied Connect wall resource to start, to local cache combination resource to be applied is applied for successively, wherein, the combination to be applied applied every time Resource quantity is equal to the first release count value.
9. the pre-add support method of combination resource according to claim 5, it is characterised in that by the mobile container control In combination resource release after, comprise the following steps:
If the quantity of combination resource to be applied is less than the first release count value, by application order to local cache successively Shen Please the combination resource be applied.
10. a kind of pre-load means of combination resource, it is characterised in that include:
Load-on module, the combination resource of quantity is loaded to caching for loading first, and combination money to be loaded is loaded successively Source;
Release module, for the combination for having loaded resource to be sequentially placed into into mobile container control according to the order of loading, works as shifting Combination resource quantity in dynamic container control is reached after the first release count value of setting, by the mobile container control Combination resource discharges;Wherein, the first release count value is less than the first loading quantity.
CN201611179721.9A 2016-12-19 2016-12-19 A kind of preloading method and device of combination resource Expired - Fee Related CN106598525B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611179721.9A CN106598525B (en) 2016-12-19 2016-12-19 A kind of preloading method and device of combination resource

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611179721.9A CN106598525B (en) 2016-12-19 2016-12-19 A kind of preloading method and device of combination resource

Publications (2)

Publication Number Publication Date
CN106598525A true CN106598525A (en) 2017-04-26
CN106598525B CN106598525B (en) 2019-09-17

Family

ID=58600643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611179721.9A Expired - Fee Related CN106598525B (en) 2016-12-19 2016-12-19 A kind of preloading method and device of combination resource

Country Status (1)

Country Link
CN (1) CN106598525B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108345505A (en) * 2018-02-02 2018-07-31 珠海金山网络游戏科技有限公司 A kind of multithreading method for managing resource and system
CN110471751A (en) * 2019-07-18 2019-11-19 深圳梧童科技有限公司 A kind of terminal device exchange method, device, readable storage medium storing program for executing and terminal device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104484142A (en) * 2014-12-01 2015-04-01 广东威创视讯科技股份有限公司 Jointing wall web page display method and system
CN105786429A (en) * 2016-02-22 2016-07-20 广东威创视讯科技股份有限公司 Method and system for displaying data on spliced wall
CN105898507A (en) * 2016-05-30 2016-08-24 广东威创视讯科技股份有限公司 Video signal synchronization method and device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104484142A (en) * 2014-12-01 2015-04-01 广东威创视讯科技股份有限公司 Jointing wall web page display method and system
CN105786429A (en) * 2016-02-22 2016-07-20 广东威创视讯科技股份有限公司 Method and system for displaying data on spliced wall
CN105898507A (en) * 2016-05-30 2016-08-24 广东威创视讯科技股份有限公司 Video signal synchronization method and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108345505A (en) * 2018-02-02 2018-07-31 珠海金山网络游戏科技有限公司 A kind of multithreading method for managing resource and system
CN110471751A (en) * 2019-07-18 2019-11-19 深圳梧童科技有限公司 A kind of terminal device exchange method, device, readable storage medium storing program for executing and terminal device

Also Published As

Publication number Publication date
CN106598525B (en) 2019-09-17

Similar Documents

Publication Publication Date Title
CN108628652A (en) User interface rendering intent, device and terminal
CN105988809B (en) A kind of on-line loaded method of game resource and micro- end engine
CN107050850A (en) The recording and back method of virtual scene, device and playback system
CN113031842B (en) Video-based interaction method and device, storage medium and electronic equipment
CN105740010B (en) A kind of starting-up method and terminal device
CN106598525A (en) Pre-loading method and apparatus for spliced wall resources
CN103823690B (en) A kind of online picture loading method and system
CN112698769A (en) Information interaction method, device, equipment, storage medium and program product
CN109936749A (en) Special efficacy implementation method, device and readable storage medium storing program for executing
CN103581987B (en) The test method and device of the page download speed of mobile terminal device
CN109473121B (en) Voice synthesis quality testing method and device
CN113395572B (en) Video processing method and device, storage medium and electronic equipment
CN102364905A (en) Data representation method and apparatus, and mobile terminal
CN107329792A (en) A kind of Docker containers start method and device
US20240118794A1 (en) Control display method, apparatus, and device, and medium
CN110958402B (en) Spliced matrix display method and system
US8904373B2 (en) Method for persisting specific variables of a software application
CN106598600A (en) Startup guide information display method and terminal device
EP4057634A1 (en) Multimedia information processing method, apparatus, electronic device, and medium
CN110648032A (en) Information updating method and device
CN113395549B (en) Play resource downloading method, device, equipment and storage medium
CN115567746A (en) Playing method and device and electronic equipment
CN106855808A (en) It is a kind of to accelerate the system and method that application starts response
CN104853256B (en) A kind of video broadcasts single menu displaying method and device
CN107291483A (en) Intelligence deletes the method and electronic equipment of application program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant