CN106598525B - A kind of preloading method and device of combination resource - Google Patents
A kind of preloading method and device of combination resource Download PDFInfo
- Publication number
- CN106598525B CN106598525B CN201611179721.9A CN201611179721A CN106598525B CN 106598525 B CN106598525 B CN 106598525B CN 201611179721 A CN201611179721 A CN 201611179721A CN 106598525 B CN106598525 B CN 106598525B
- Authority
- CN
- China
- Prior art keywords
- resource
- combination
- combination resource
- load
- loaded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 36
- 230000036316 preload Effects 0.000 claims description 8
- 238000010586 diagram Methods 0.000 description 9
- 238000000151 deposition Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/14—Digital output to display device ; Cooperation and interconnection of the display device with other functional units
- G06F3/1423—Digital output to display device ; Cooperation and interconnection of the display device with other functional units controlling a plurality of local displays, e.g. CRT and flat panel display
- G06F3/1446—Digital output to display device ; Cooperation and interconnection of the display device with other functional units controlling a plurality of local displays, e.g. CRT and flat panel display display composed of modules, e.g. video walls
Abstract
The present invention proposes a kind of preloading method and device of combination resource, the combination resource of load the first load quantity is to after caching, successively load combination resource to be loaded, according to loading sequence, the combination resource loaded is successively put into mobile container control, after the combination resource quantity in mobile container control reaches the first release count value of setting, the combination resource in the mobile container control is discharged.According to the quantity of combination resource, successively load combination resource extremely caches the preloading method and device of combination resource of the present invention several times, be conducive to orderly display splicing wall resource, after the combination resource quantity in mobile control reaches certain value, discharge the combination resource in mobile control, the combination resource being released is the combination resource loaded, caching pressure is alleviated, is conducive to the smooth display of combination data resource, not will cause Caton state.
Description
Technical field
The present invention relates to combination field more particularly to a kind of preloading method and devices of combination resource.
Background technique
In recent years, with the rapid development of domestic economy, the rapid growth of various information, so that each enterprise, institute, group
The information content watch, monitored is more and more, and urgent requirement terminal display system develops towards enlargement, high-definition.It spells
Wall is connect as a kind of large screen display system, there is the characteristics of big picture, high-resolution, can for information content that user provides compared with
Greatly, it thus is widely applied.
The method for showing resource on combination at present is first to obtain whole combination data resources, disposably loads institute
There is combination data resource, then shown, since combination data resource data amount is very huge, is held in this way in display
It easily causes interface to be in a Caton state for a long time, is unfavorable for the smooth display of combination data resource.
Summary of the invention
Based on this, the present invention proposes a kind of preloading method and device of combination resource, being capable of smooth display splicing wall
Data resource.
A kind of pre-add support method of combination resource, comprising the following steps:
The combination resource of load the first load quantity successively loads combination resource to be loaded to caching;
The combination resource loaded is sequentially placed into mobile container control according to the sequence of load, when mobile container control
In combination resource quantity reach setting first release count value after, by the combination resource in the mobile container control
Release;Wherein, the first release count value is less than the first load quantity.
A kind of pre-load means of combination resource, comprising:
Loading module, the combination resource for loading the first load quantity successively load splicing to be loaded to caching
Wall resource;
Release module, the combination resource for will load are sequentially placed into mobile container control according to the sequence of load,
After the combination resource quantity in mobile container control reaches the first release count value of setting, by the mobile container control
In combination resource release;Wherein, the first release count value is less than the first load quantity.
The combination resource of the preloading method and device of above-mentioned combination resource, load the first load quantity extremely caches
Afterwards, combination resource to be loaded is successively loaded, according to loading sequence, the combination resource loaded is successively put into mobile appearance
Device control, after the combination resource quantity in mobile container control reaches the first release count value of setting, by the movement
Combination resource release in container control.The preloading method and device of combination resource of the present invention is according to combination resource
Successively load combination resource is conducive to orderly display splicing wall resource to caching to quantity several times, when in mobile control
After combination resource quantity reaches certain value, the combination resource in mobile control is discharged, the combination resource being released is
Combination resource through loading, alleviates caching pressure, is conducive to the smooth display of combination data resource, not will cause card
State.
Detailed description of the invention
Fig. 1 is the preloading method flow schematic diagram of the combination resource in one embodiment;
Fig. 2 is the preloading method flow schematic diagram of the combination resource in another embodiment;
Fig. 3 is the pre-add support method application schematic diagram of the combination resource in one embodiment;
Fig. 4 is the pre-add support method application schematic diagram of the combination resource in another embodiment;
Fig. 5 is the preloading method flow schematic diagram of the combination resource in another embodiment;
Fig. 6 is the pre-add support method application schematic diagram of the combination resource in further embodiment;
Fig. 7 is the pre-add support method application schematic diagram of the combination resource in another embodiment;
Fig. 8 is the pre-load means application schematic diagram of the combination resource in another embodiment;
Fig. 9 is the pre-load means structural schematic diagram of the combination resource in one embodiment.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
In one embodiment, referring to Fig. 1, a kind of pre-add support method of combination resource, comprising the following steps:
S11: the combination resource of load the first load quantity successively loads combination resource to be loaded to caching;
S12: being sequentially placed into mobile container control according to the sequence of load for the combination resource loaded, when mobile container
After combination resource quantity in control reaches the first release count value of setting, by the combination in the mobile container control
Resource release;Wherein, the first release count value is less than the first load quantity.
Combination is large screen display system, and combination resource is the data such as the picture shown in combination or video money
Source, combination resource can the online or offline acquisitions from curstomer's site.The pre-add support method of the combination resource can pass through
Cocos2dx increases income development of games software platform to realize.
The caching is for saving the combination resource of preloading, in order to show, concretely ListView control.Institute
Mobile container control is stated to be used for after the combination resource quantity of mobile container control reaches certain value, in mobile container control
A certain number of combination resources discharged.Load combination resource is put into shifting to the step of caching and by combination resource
The step of dynamic container control, can carry out simultaneously, can also in the combination resource for completing load the first load quantity to after caching, then
Combination resource is put into mobile container control.First release count value guarantees the splicing being released less than the first load quantity
Wall resource is less than the combination resource of load.
In a kind of optional embodiment, referring to Fig. 2, pre-add can be carried out to combination resource according to the following steps
It carries:
S111: with first combination resource be load starting point, load the first quantity combination resource to cache, to
First combination resource of load starts, and successively loads combination resource to be loaded;
S121: since first combination resource in the combination resource loaded, the splicing that will successively load
Wall resource is put into mobile container control, when the first release that the combination resource quantity in mobile container control reaches setting counts
After value, the combination resource in the mobile container control is discharged;Wherein, the first release count value is less than the first load number
Amount.
Illustrate below by a specific example.
For example, the first load quantity is 12 referring to Fig. 3, if there is 100 combination resources to need to load, the of setting
One release count value is 10,12 combination resources is loaded onto caching when being loaded for the first time, later, from having loaded
Combination resource in first combination resource start, successively combination resource is put into mobile container control, mobile container
After combination resource quantity in control reaches 10, the 1st to the 10th combination resource, while to be loaded first are discharged
Combination resource starts, i.e., since the 13rd combination resource, continues the 13rd to 22 combination resources of load to caching.
Referring to Fig. 4, Fig. 4, which illustrates load combination resource, is put into mobile container control to the step of caching and by combination resource
The case where step carries out simultaneously, is loaded onto caching for 12 combination resources when being loaded for the first time, while will load
Combination resource be put into mobile container control, the combination resource quantity in mobile container control reaches 10, release the 1st to
10th combination resource, while continuing to load combination resource to be loaded.
The pre-add support method of above-mentioned combination resource, load first load quantity combination resource to cache after, to
First combination resource of load starts, and combination resource to be loaded is successively loaded, from the combination resource loaded
First combination resource start, the combination resource loaded is successively put into mobile container control, when mobile container control
After combination resource quantity in part reaches the first release count value of setting, the combination in the mobile container control is provided
Source release.According to the quantity of combination resource, successively load combination resource is conducive to orderly display and spells to caching several times
Wall resource is connect, after the combination resource quantity in mobile control reaches certain value, discharges the combination resource in mobile control,
The combination resource being released is the combination resource loaded, alleviates caching pressure, is conducive to combination data money
The smooth display in source, not will cause Caton state.
In a kind of optional embodiment, referring to Fig. 5, pre-add can be carried out to combination resource according to the following steps
It carries:
S112: being load starting point with the last one combination resource, and the combination resource of load the first load quantity is to slow
It deposits, since the last one combination resource to be loaded, successively loads combination resource to be loaded;
S122: since the last one combination resource in the combination resource loaded, the spelling that will successively load
It connects wall resource and is put into mobile container control, when the combination resource quantity in mobile container control reaches the first release meter of setting
After numerical value, the combination resource in the mobile container control is discharged;Wherein, the first release count value is less than the first load number
Amount.
Illustrate below by a specific example.
For example, the first load quantity is 12 referring to Fig. 6, if there is 100 combination resources to need to load, the of setting
One release count value be 10, when being loaded for the first time, with the 100th combination resource be load starting point by the 100th extremely
89th combination resource is loaded onto caching, later, from the last one combination resource in the combination resource loaded
Start, successively combination resource is put into mobile container control, after the combination resource quantity in mobile container control reaches 10,
The the 100th to the 91st combination resource is discharged, while the last one combination resource to be loaded starts, i.e., spliced from the 88th
Wall resource starts, and continues the 88th to 79 combination resources of load to caching.Referring to Fig. 7, Fig. 7 illustrates load combination
The case where resource is to the step of caching with carrying out simultaneously the step of combination resource is put into mobile container control, carries out for the first time
12 combination resources are loaded onto caching when load, while the combination resource loaded is put into mobile container control,
Combination resource quantity in mobile container control reaches 10, discharges the 100th to the 89th combination resource, continues simultaneously
Load combination resource to be loaded.
The pre-add support method of above-mentioned combination resource, is load starting point with the last one combination resource, and load first adds
The combination resource of quantity is carried to after caching, since the last one combination resource to be loaded, is successively loaded to be loaded
Combination resource, since the last one combination resource in the combination resource loaded, the splicing that will successively load
Wall resource is put into mobile container control, when the first release that the combination resource quantity in mobile container control reaches setting counts
After value, the combination resource in the mobile container control is discharged.It is successively loaded several times according to the quantity of combination resource
Combination resource is conducive to orderly display splicing wall resource to caching, when the combination resource quantity in mobile control reaches
After certain value, the combination resource in mobile control is discharged, the combination resource being released is the combination money loaded
Source alleviates caching pressure, is conducive to the smooth display of combination data resource, not will cause Caton state.
The load that can complete combination resource to be loaded several times, the combination quantity loaded every time can be identical, can also
Difference, the combination resource quantity loaded that mobile container control is put into each time may be the same or different, and one preferred real
The step of applying in example, successively loading combination resource to be loaded include:
Several continuous combination resources to be loaded are loaded every time, wherein what is loaded every time is continuous to be loaded
The quantity of combination resource is equal to the first release count value.
Illustrate the preferred embodiment below by a specific embodiment.
For example, referring to Fig. 6, the quantity for the combination resource that need to be loaded totally 100, the first release count value for setting as
10, for combination resource to be loaded, the quantity of the continuous combination resource to be loaded loaded every time is 10, etc.
Count value is discharged in first, 1 to 12 combination resource is loaded onto caching when being loaded for the first time, is put into mobile container control
The combination resource quantity of part reaches 10, then discharges the 1st to the 10th combination resource, illustrates the 10th to 12 combination
13rd to 22 combination resource (totally 10) also in the buffer, is loaded onto caching when being loaded for the second time by resource, by
11 to the 20th combination resources (totally 10) are put into mobile container control, then discharge 11 to 20 combination resources, similarly
Load and release steps later is same as above, until having loaded remaining combination resource, is repeated no more.
Illustrate the preferred embodiment below by another specific embodiment.
For example, the quantity for the combination resource that need to be loaded totally 100, the first release count value set as 10, for
Combination resource to be loaded, the quantity of the continuous combination resource to be loaded loaded every time are 10, are released equal to first
Count value is put, 100 to 89 combination resources are loaded onto caching when being loaded for the first time, is put into the spelling of mobile container control
It connects wall resource quantity and reaches 10, then discharge the 100th to the 91st combination resource, illustrate the 90th to 89 combination resource
Also in the buffer, the 88th to 79 combination resource (totally 10) is loaded onto caching when being loaded for the second time, by the 90th to
81st combination resource (totally 10) is put into mobile container control, then discharge 90 to 81 combination resources, similarly after
Load and release steps be same as above, until loaded remaining combination resource, repeat no more.
In one embodiment, before the combination resource of the first load quantity is loaded onto caching, comprising steps of
The combination resource that quantity is loaded to local cache application first, is plotted to the node of the first load quantity;
The node for the first load quantity that display is drawn.
The node is displayable node, for obtaining the load progress of combination resource.To local cache application
After the combination resource of one load quantity, illustrates that the combination resource for having the first load quantity will be loaded onto caching, pass through drafting
To the node of the first load quantity, then shows the node of the first load quantity of drafting, can intuitively obtain combination resource
Load progress.
In one embodiment, after the combination resource release in the mobile container control, comprising the following steps:
If the quantity of combination resource to be applied is greater than or equal to the first release count value, by application sequence to local
Caching successively applies for combination resource to be applied, wherein the combination resource quantity to be applied applied every time is equal to first and releases
Put count value.
By combination resource that quantity is the first release count value after being discharged in mobile container control, judge to
The quantity of the combination resource of application with first release count value relationship, if the quantity of combination resource to be applied be greater than or
Equal to the first release count value, then continue to be the first combination for discharging count value to local cache application quantity by application sequence
Resource, the quantity for reloading application are equal to the combination resource of the first release count value.
In one embodiment, if the quantity of combination resource to be applied is greater than or equal to the first release count value, from
First combination resource to be applied starts, and successively applies for combination resource to be applied to local cache, wherein each Shen
Combination resource quantity to be applied please is equal to the first release count value.
By combination resource that quantity is the first release count value after being discharged in mobile container control, judge to
The quantity of the combination resource of application with first release count value relationship, if the quantity of combination resource to be applied be greater than or
Equal to the first release count value, then can continue since first combination resource to be applied to local cache application quantity
For the combination resource of the first release count value, the quantity for reloading application is equal to the combination resource of the first release count value.
Illustrate below by a specific embodiment.
For example, the quantity of combination resource totally 25, for the first time to local cache application 12, illustrate there are 12 quantity
Combination resource need to be loaded, first release count value be 10, illustrate to be put into the 1st to the 10th combination resource extremely
It is necessary to being discharged after mobile container control.After by the first application the step of, there are also 13 combination resources for local cache
Wait apply and load, count value is discharged greater than first for 10, then to the 13rd to 22 combination money of local cache application
Source is simultaneously loaded onto caching.
In one embodiment, after the combination resource release in the mobile container control, comprising the following steps:
If the quantity of combination resource to be applied is greater than or equal to the first release count value, from last to be applied
A combination resource starts, and successively applies for combination resource to be applied to local cache, wherein apply every time wait apply spelling
Wall resource quantity is connect equal to the first release count value.
By combination resource that quantity is the first release count value after being discharged in mobile container control, judge to
The quantity of the combination resource of application with first release count value relationship, if the quantity of combination resource to be applied be greater than or
Continue then since the last one combination resource to be applied to local cache application quantity equal to the first release count value
For the combination resource of the first release count value, the quantity for reloading application is equal to the combination resource of the first release count value.
Illustrate below by a specific embodiment.
For example, the quantity of combination resource totally 25, for the first time to local cache application 12, illustrate the 25th to the 14th
The combination resource of a quantity need to be loaded, and the first release count value is 10, illustrate to be put into the 25th to the 16th splicing
It is necessary to being discharged after wall resource to mobile container control.After by the first application the step of, there are also 13 spellings for local cache
It connects wall resource to wait applying and loading, discharges count value greater than first for 10, then spelled to local cache application the 13rd to 4
It connects wall resource and is loaded onto caching.
In one embodiment, after the combination resource release in the mobile container control, comprising the following steps:
If the quantity of combination resource to be applied is less than the first release count value, from first combination to be applied
Resource starts, then to combination resource to be applied described in local cache application.
By combination resource that quantity is the first release count value after being discharged in mobile container control, judge to
The relationship of the quantity of the combination resource of application and the first release count value, if the quantity of combination resource to be applied is less than the
One release count value, then it is to combination resource to be applied described in local cache application, remaining combination resource is disposable
It has loaded.
Illustrate the embodiment below by a specific embodiment.
For example, quantity totally 25 of the combination resource loaded are needed in local cache, if having applied and having loaded completion
20 combination resources, the first release count value is 10, illustrate to be put into the 1st to the 10th combination resource to mobile appearance
It is necessary to being discharged after device control.The remaining combination quantity do not applied and loaded is 5 at this time, less than first for 10
Count value is discharged, then be successively loaded onto slow to the remaining 21st to the 25th combination resource of local cache application next time
In depositing.
It can also be since the last one combination resource to be applied, to combination to be applied described in local cache application
Resource.
Illustrate the embodiment below by a specific embodiment.
For example, quantity totally 25 of the combination resource loaded are needed in local cache, if having applied and having loaded completion
20 combination resources, illustrate that the 25th to the 6th combination resource is applied and loads, and the first release count value is 10.
The combination quantity do not applied and load remaining at this time is 5, less than the first release count value for 10, then next time to
The the remaining 5th to the 1st combination resource of local cache application, is successively loaded onto caching.
The pre-add support method of above-mentioned combination resource, the combination resource of load the first load quantity is to after caching, successively
Combination resource to be loaded is loaded, according to loading sequence, the combination resource loaded is successively put into mobile container control,
After the combination resource quantity in mobile container control reaches the first release count value of setting, by the mobile container control
In combination resource release.The pre-add support method of combination resource of the present invention is successive several times according to the quantity of combination resource
Combination resource is loaded to caching, is conducive to orderly display splicing wall resource, the combination resource quantity in mobile control
After reaching certain value, the combination resource in mobile control is discharged, the combination resource being released is the splicing loaded
Wall resource alleviates caching pressure, is conducive to the smooth display of combination data resource, not will cause Caton state.
The above are a kind of specific embodiment of the pre-add support method of combination resource of the invention, the present invention set forth below
A kind of combination resource pre-load means.
In one embodiment, referring to Fig. 9, a kind of pre-load means of combination resource, comprising:
Loading module 10, the combination resource for loading the first load quantity are spelled to caching to be loaded first
It connects wall resource to start, successively loads combination resource to be loaded;
Release module 20 successively will for since first combination resource in the combination resource loaded
The combination resource of load is put into mobile container control, when the combination resource quantity in mobile container control reaches the of setting
After one release count value, the combination resource in the mobile container control is discharged;Wherein, the first release count value is less than the
One load quantity.
The pre-load means of combination resource of the invention and the pre-add support method of combination resource of the invention are right one by one
It answers, is suitable for splicing in the technical characteristic and its advantages of the embodiment elaboration of the pre-add support method of above-mentioned combination resource
In the embodiment of the pre-load means of wall resource, hereby give notice that.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality
The each technical characteristic all possible combinations applied in example are all described, as long as however lance is not present in the combination of these technical characteristics
Shield all should be the range that this specification is recorded.
Several embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but not
Limitations on the scope of the patent of the present invention therefore can be interpreted as.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention
Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (10)
1. a kind of pre-add support method of combination resource, which comprises the following steps:
The combination resource of load the first load quantity successively loads combination resource to be loaded to caching;
The combination resource loaded is sequentially placed into mobile container control according to the sequence of load, when in mobile container control
After combination resource quantity reaches the first release count value of setting, the combination resource in the mobile container control is released
It puts;The combination resource being released is the combination resource loaded;Wherein, the first release count value is less than the first load
Quantity.
2. the pre-add support method of combination resource according to claim 1, which comprises the following steps:
It is load starting point with first combination resource, the combination resource of load the first load quantity is to caching, to be loaded
First combination resource start, successively load combination resource to be loaded;
Since first combination resource in the combination resource loaded, successively the combination resource loaded is put into
Mobile container control, after the combination resource quantity in mobile container control reaches the first release count value of setting, by institute
State the combination resource release in mobile container control;Wherein, the first release count value is less than the first load quantity.
3. the pre-add support method of combination resource according to claim 1, which comprises the following steps:
It is load starting point with the last one combination resource, the combination resource of load the first load quantity is to caching, to be added
The last one the combination resource carried starts, and successively loads combination resource to be loaded;
Since the last one combination resource in the combination resource loaded, successively the combination resource loaded is put
Enter mobile container control, it, will after the combination resource quantity in mobile container control reaches the first release count value of setting
Combination resource release in the mobile container control;Wherein, the first release count value is less than the first load quantity.
4. the pre-add support method of combination resource according to claim 1-3, which is characterized in that successively load to
The step of combination resource of load includes:
Several continuous combination resources to be loaded are loaded every time, wherein the continuous splicing to be loaded loaded every time
The quantity of wall resource is equal to the first release count value.
5. the pre-add support method of combination resource according to claim 4, which is characterized in that by the spelling of the first load quantity
It connects before wall resource is loaded onto caching, comprising the following steps:
The combination resource that quantity is loaded to local cache application first, is plotted to the node of the first load quantity;
The node for the first load quantity that display is drawn.
6. the pre-add support method of combination resource according to claim 5, which is characterized in that by the mobile container control
In combination resource release after, comprising the following steps:
If the quantity of combination resource to be applied is greater than or equal to the first release count value, by application sequence to local cache
Successively apply for combination resource to be applied, wherein the combination resource quantity to be applied applied every time is equal to the first release meter
Numerical value.
7. the pre-add support method of combination resource according to claim 6, which is characterized in that
If the quantity of combination resource to be applied is greater than or equal to the first release count value, from first splicing to be applied
Wall resource starts, and successively applies for combination resource to be applied to local cache, wherein combination the to be applied money applied every time
Source quantity is equal to the first release count value.
8. the pre-add support method of combination resource according to claim 6, which is characterized in that
If the quantity of combination resource to be applied is greater than or equal to the first release count value, from the last one spelling to be applied
It connects wall resource to start, successively applies for combination resource to be applied to local cache, wherein the combination to be applied applied every time
Resource quantity is equal to the first release count value.
9. the pre-add support method of combination resource according to claim 5, which is characterized in that by the mobile container control
In combination resource release after, comprising the following steps:
If the quantity of combination resource to be applied less than the first release count value, by application sequence to local cache successively Shen
It please the combination resource be applied.
10. a kind of pre-load means of combination resource characterized by comprising
Loading module, the combination resource for loading the first load quantity successively load combination money to be loaded to caching
Source;
Release module, the combination resource for will load are sequentially placed into mobile container control according to the sequence of load, work as shifting
It, will be in the mobile container control after combination resource quantity in dynamic container control reaches the first release count value of setting
The release of combination resource;The combination resource being released is the combination resource loaded;Wherein, the first release count value
Less than the first load quantity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611179721.9A CN106598525B (en) | 2016-12-19 | 2016-12-19 | A kind of preloading method and device of combination resource |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611179721.9A CN106598525B (en) | 2016-12-19 | 2016-12-19 | A kind of preloading method and device of combination resource |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106598525A CN106598525A (en) | 2017-04-26 |
CN106598525B true CN106598525B (en) | 2019-09-17 |
Family
ID=58600643
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611179721.9A Expired - Fee Related CN106598525B (en) | 2016-12-19 | 2016-12-19 | A kind of preloading method and device of combination resource |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106598525B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108345505B (en) * | 2018-02-02 | 2022-08-30 | 珠海金山网络游戏科技有限公司 | Multithreading resource management method and system |
CN110471751B (en) * | 2019-07-18 | 2022-06-14 | 深圳梧童科技有限公司 | Terminal equipment interaction method and device, readable storage medium and terminal equipment |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104484142A (en) * | 2014-12-01 | 2015-04-01 | 广东威创视讯科技股份有限公司 | Jointing wall web page display method and system |
CN105786429A (en) * | 2016-02-22 | 2016-07-20 | 广东威创视讯科技股份有限公司 | Method and system for displaying data on spliced wall |
CN105898507A (en) * | 2016-05-30 | 2016-08-24 | 广东威创视讯科技股份有限公司 | Video signal synchronization method and device |
-
2016
- 2016-12-19 CN CN201611179721.9A patent/CN106598525B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104484142A (en) * | 2014-12-01 | 2015-04-01 | 广东威创视讯科技股份有限公司 | Jointing wall web page display method and system |
CN105786429A (en) * | 2016-02-22 | 2016-07-20 | 广东威创视讯科技股份有限公司 | Method and system for displaying data on spliced wall |
CN105898507A (en) * | 2016-05-30 | 2016-08-24 | 广东威创视讯科技股份有限公司 | Video signal synchronization method and device |
Also Published As
Publication number | Publication date |
---|---|
CN106598525A (en) | 2017-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108628652A (en) | User interface rendering intent, device and terminal | |
CN110825456B (en) | Loading time calculation method, loading time calculation device, computer equipment and storage medium | |
CN107050850A (en) | The recording and back method of virtual scene, device and playback system | |
CN107018191B (en) | Method and device for controlling game | |
CN107451193B (en) | A kind of acquisition methods and device of customer terminal webpage load time, electronic equipment | |
CN105740010B (en) | A kind of starting-up method and terminal device | |
CN105095157B (en) | character string display method and device | |
CN106598525B (en) | A kind of preloading method and device of combination resource | |
CN104899049B (en) | File deletion method and device | |
CN107203303A (en) | A kind of interface display method and device | |
CN112698769A (en) | Information interaction method, device, equipment, storage medium and program product | |
CN109361947A (en) | Internet resources batch loading method, smart television, storage medium and device | |
CN109473121B (en) | Voice synthesis quality testing method and device | |
CN107329792A (en) | A kind of Docker containers start method and device | |
CN103491171A (en) | Network resource asynchronous loading method and device | |
CN113342230A (en) | Control display method, device, equipment and medium | |
CN105354090B (en) | The management method and device of virtual unit | |
CN111309416B (en) | Information display method, device and equipment of application interface and readable medium | |
CN110618848A (en) | Page display method, device, equipment and storage medium | |
CN106598600A (en) | Startup guide information display method and terminal device | |
CN111782996A (en) | Asynchronous request processing method and device | |
CN103702168A (en) | Method of displaying video list and video client | |
CN108668160B (en) | Rhythm barrage display method and device and electronic equipment | |
CN111338729A (en) | Method, device, medium and electronic equipment for playing view | |
CN107479960B (en) | Method and device for displaying unit view |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190917 |