- CN106597041A CN106597041A CN201611015234.9A CN201611015234A CN106597041A CN 106597041 A CN106597041 A CN 106597041A CN 201611015234 A CN201611015234 A CN 201611015234A CN 106597041 A CN106597041 A CN 106597041A
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- meter
- standard scale
- current loop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R11/00—Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention provides a standard meter access-based uninterrupted-power replacement method for replacing electric energy meters. A standard meter is accessed to the circuit of an electric energy meter. During the process from the removal of an old electric energy meter to the installation of a new electric energy meter, an electric energy metering circuit is established through switching the short-circuit plates of an electric energy metering device. In this way, the electric energy metering function is realized during the replacement of electric energy meters by means of the standard meter. According to the technical scheme of the invention, the electric energy metering function is realized during the replacement of electric energy meters. In this way, the economic loss caused by the missed metering phenomenon of the electric energy during the current power-outage replacement process of electric energy meters in the prior art can be avoided. According to the method, a three-phase 0.02-level portable multifunctional standard electric energy meter is adopted, so that the metering accuracy can be ensured. At the same time, based on the design of upper blocks, lower blocks and short-circuit plates in the junction box of the electric energy metering device, the electric energy is completely cut off during the mounting and dismounting process of to-be-dismounted electric energy meters and newly mounted electric energy meters. Therefore, electric energy meters are isolated from the charged electric energy metering loop of the standard electric energy meter. As a result, the secure operation is realized.
Description
Technical field
The replacing options the present invention relates to electric energy meter that a kind of standard scale is accessed does not have a power failure.
Background technology
Electric energy meter is the important component part of electric power meter, is usually used in the trade settlement of electricity.Electric energy meter it is long-term
The problems such as using inner body can be caused aging, the degree of accuracy of electric energy metrical is affected, and there is larger potential safety hazard, therefore needed
More to renew electric energy meter and take over metering.On the one hand, according to DL/T 448-2000《Electric power meter technical management code》, electricity
Energy measurement technology mechanism runs archives, the rotational cycle that the code specifies and workload situation etc. according to electric energy meter, can carry out
The work of rotating at regular intervals of electric energy meter.On the other hand, Electric Energy Metering Technology mechanism also can be held according to the abnormal operating condition of electric energy meter
The interim replacing of exhibition electric energy meter.These measures may insure the safety of electric energy metrical and accuracy, so as to ensure power grid security
With the economic interests of electricity trade both sides.
The replacing of electric energy meter at present takes power failure to change, that is, start to remove the mistake that old electric energy meter is finished to the new electric energy meter of installation
Cheng Zhong, electric energy meter are in off-position, exist without electric energy metrical loop.
Power failure is changed table and is mainly comprised the following steps:
(1)Work ticket is handled, outward appearance, equipment and ruuning situation of electric power meter etc., ready work before work, is checked;
(2)Electrical verification is carried out to metering device cabinet, electric energy meter bottom to be torn open degree is confirmed;
(3)By the short-circuit piece for mutually opening voltage circuit in connection box of power measuring device, that is, cut off the work electricity of electric energy meter to be torn open
Pressure;
(4)By the upside short-circuit piece for mutually closing current loop in rosette, the i.e. current loop of short circuit electric energy meter to be torn open, and use instrument
Whether table checks electric energy meter to be torn open fully powered-off;
(5)Remove whole wiring such as the current loop of electric energy meter, voltage flow back, RS485 communicates and carry out labelling;
(6)Whole wiring such as the current loop of new clothes electric energy meter, voltage flow back, RS485 communicates are carried out according to labelling and is checked
Whether wiring is firmly correct;
(7)By the short-circuit piece for mutually closing voltage circuit in rosette, that is, recover the running voltage of new clothes electric energy meter;
(8)By the upside short-circuit piece for mutually opening current loop in rosette, that is, recover the current loop of new clothes electric energy meter, confirm new
Dress electric energy meter bottom degree.
During table is changed in existing power failure, electric energy meter is in off-position, exists without electric energy metrical loop.And now, electricity
Can transmission still suffer from consumption, therefore cannot just be measured the electric energy that consumes in the table period is changed.The annual electric energy meter of China
Replacing workload is huge, and the electric energy that metering is omitted within the replacing period is huge, and this is for power plant and power grid enterprises
No small economic loss.
The content of the invention
The replacing options it is an object of the invention to provide electric energy meter that a kind of standard scale is accessed does not have a power failure.
For achieving the above object, the present invention employs the following technical solutions realization:The electric energy meter that a kind of standard scale is accessed is not
Power failure replacing options, it is characterised in that comprise the following steps:Step S1:Work ticket is handled, electric power meter before work, is checked
Outward appearance, equipment and ruuning situation, ready work;Step S2:Electrical verification is carried out to metering device cabinet, electric energy to be torn open is confirmed
Table bottom degree;Step S3:Carry out the insulation inspection of standard scale, standard scale measurement parameter be set, by the voltage tester line of standard scale and
Testing current line accesses the rosette of electric power meter;Step S4:By the downside short circuit for mutually opening current loop in rosette
Piece, that is, connect the current loop of standard scale, confirms whether the running voltage and electric current of now standard scale be normal;Step S5:By phase
In closure rosette, the upside short-circuit piece of current loop, the current loop of short circuit electric energy meter to be torn open, then start the meter of standard scale
Measure function of having good luck;Step S6:By the short-circuit piece for mutually opening voltage circuit in rosette, the running voltage of electric energy meter to be torn open is cut off,
And it is whether fully powered-off with instrument verification electric energy meter to be torn open;Step S7:Remove electric energy meter current loop, voltage backflow,
RS485 communicates and other wiring carries out labelling;Step S8:The current loop of new clothes electric energy meter, voltage are carried out according to labelling to return
Whether firmly correctly stream, RS485 communications and other wiring simultaneously check wiring;Step S9:By voltage circuit in mutually closure rosette
Short-circuit piece, recover new clothes electric energy meter running voltage;Step S10:By the upside short circuit for mutually opening current loop in rosette
Piece, recovers the current loop of new clothes electric energy meter, and then stopping criterion meter amount is had good luck;Step S11:Validation criteria table is when table is changed
Metering electricity in section, while confirming new electric energy meter bottom degree.
The above standard scale is 0.02 grade of portable multi-function power electric energy standard scale of three-phase.
Compared with prior art, the present invention has advantages below:Electric energy meter replacing is built by the method for concatenating standard scale
During electric energy metrical loop, so as to realize in the electric energy meter Renewal process period consume electric energy metering, lifted power plant and
The economic benefit of power grid enterprises.
Description of the drawings
Fig. 1 is the schematic flow sheet of the present invention.
Specific embodiment
Explanation is further explained to the present invention with specific embodiment below in conjunction with the accompanying drawings.
Referring to Fig. 1, the present invention provides the electric energy meter that a kind of standard scale accesses and does not have a power failure replacing options, and which includes following step
Suddenly:Step S1:Work ticket is handled, outward appearance, equipment and the ruuning situation of electric power meter, ready work before work, is checked
Make;Step S2:Electrical verification is carried out to metering device cabinet, electric energy meter bottom to be torn open degree is confirmed;Step S3:Carry out the insulation inspection of standard scale
Look into, standard scale measurement parameter is set, the voltage tester line of standard scale and testing current line are accessed into the wiring of electric power meter
Box;Step S4:By the downside short-circuit piece for mutually opening current loop in rosette, that is, the current loop of standard scale is connected, this is confirmed
When standard scale running voltage and electric current it is whether normal;Step S5:By the upside short-circuit piece for mutually closing current loop in rosette,
The current loop of short circuit electric energy meter to be torn open, the metering for then starting standard scale are had good luck function;Step S6:By in mutually opening rosette
Whether the short-circuit piece of voltage circuit, cut off the running voltage of electric energy meter to be torn open, and broken completely with instrument verification electric energy meter to be torn open
Electricity;Step S7:Remove current loop, voltage backflow, RS485 communications and other wiring of electric energy meter and carry out labelling;Step S8:
Current loop, voltage backflow, RS485 communications and other wiring of new clothes electric energy meter are carried out according to labelling and whether check wiring firm
Gu it is correct;Step S9:By the short-circuit piece for mutually closing voltage circuit in rosette, recover the running voltage of new clothes electric energy meter;Step
S10:By the upside short-circuit piece for mutually opening current loop in rosette, recover the current loop of new clothes electric energy meter, then stop mark
Quasi- meter amount is had good luck;Step S11:Validation criteria table is in the metering electricity changed in the table period, while confirming new electric energy meter bottom degree.
Table is changed compared to power failure, the present invention has accessed standard scale in the loop, start to remove new electric energy in old electric energy meter
During table completes to install, electric energy metrical loop is built by switching the short-circuit piece in electric power meter, using standard scale
Realize the electric energy metrical changed during table.
The present invention can realize changing the electric energy metrical during table, it is to avoid when table is changed in existing power failure, electric energy omits meter
The economic loss that amount is produced.This method adopts 0.02 grade of portable multi-function power electric energy standard scale of three-phase, and the accuracy of measuring can
To be protected.Meanwhile, the design of the upper and lower block of connection box of power measuring device and short-circuit piece can ensure electric energy meter to be torn open and
New clothes electric energy meter is fully powered-off in disassembly process, isolates with powered standard scale electric energy metrical loop, realizes safety operation.
It is more than presently preferred embodiments of the present invention, all changes made according to technical solution of the present invention, produced function are made
During with scope without departing from technical solution of the present invention, protection scope of the present invention is belonged to.
Claims (2)
1. the electric energy meter that a kind of standard scale is accessed does not have a power failure replacing options, it is characterised in that comprise the following steps:
Step S1:Work ticket is handled, outward appearance, equipment and the ruuning situation of electric power meter, ready work before work, is checked
Make;
Step S2:Electrical verification is carried out to metering device cabinet, electric energy meter bottom to be torn open degree is confirmed;
Step S3:The insulation inspection of standard scale is carried out, standard scale measurement parameter is set, by the voltage tester line and electric current of standard scale
P-wire accesses the rosette of electric power meter;
Step S4:By the downside short-circuit piece for mutually opening current loop in rosette, that is, the current loop of standard scale is connected, this is confirmed
When standard scale running voltage and electric current it is whether normal;
Step S5:By mutually close rosette in current loop upside short-circuit piece, the current loop of short circuit electric energy meter to be torn open, then
The metering for starting standard scale is had good luck function;
Step S6:By the short-circuit piece for mutually opening voltage circuit in rosette, the running voltage of electric energy meter to be torn open is cut off, and uses instrument
Check electric energy meter to be torn open whether fully powered-off;
Step S7:Remove current loop, voltage backflow, RS485 communications and other wiring of electric energy meter and carry out labelling;
Step S8:Current loop, voltage backflow, RS485 communications and other wiring the core of new clothes electric energy meter are carried out according to labelling
Whether butted line is firmly correct;
Step S9:By the short-circuit piece for mutually closing voltage circuit in rosette, recover the running voltage of new clothes electric energy meter;
Step S10:By the upside short-circuit piece for mutually opening current loop in rosette, that is, recover the current loop of new clothes electric energy meter,
Then stopping criterion meter amount is had good luck;
Step S11:Validation criteria table is in the metering electricity changed in the table period, while confirming new electric energy meter bottom degree.
2. the electric energy meter that standard scale according to claim 1 is accessed does not have a power failure replacing options, it is characterised in that:The mark
Quasi- table is 0.02 grade of portable multi-function power electric energy standard scale of three-phase.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611015234.9A CN106597041A (en) | 2016-11-18 | 2016-11-18 | Standard meter access-based uninterrupted-power replacement method for replacing electric energy meters |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611015234.9A CN106597041A (en) | 2016-11-18 | 2016-11-18 | Standard meter access-based uninterrupted-power replacement method for replacing electric energy meters |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106597041A true CN106597041A (en) | 2017-04-26 |
Family
ID=58592170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611015234.9A Pending CN106597041A (en) | 2016-11-18 | 2016-11-18 | Standard meter access-based uninterrupted-power replacement method for replacing electric energy meters |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106597041A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107390159A (en) * | 2017-07-31 | 2017-11-24 | 国网山东省电力公司青州市供电公司 | Tester for electric energy meter and its application method |
CN110542772A (en) * | 2019-09-06 | 2019-12-06 | 国网黑龙江省电力有限公司鹤岗供电公司 | Nondestructive replacement device and method for electric energy meter |
CN110726859A (en) * | 2019-10-31 | 2020-01-24 | 国网山东省电力公司济宁供电公司 | Switching device for continuously metering during live replacement of electric energy meter and electric energy meter replacement method |
CN111474396A (en) * | 2020-04-23 | 2020-07-31 | 国网天津市电力公司 | Electric energy meter with electric meter changing function |
CN112133029A (en) * | 2020-09-15 | 2020-12-25 | 赵敏 | Real-time electric quantity charging settlement method for electric energy meter replacement |
CN112858745A (en) * | 2020-12-31 | 2021-05-28 | 国网浙江省电力有限公司嘉兴供电公司 | Low-voltage uninterrupted meter replacing device |
CN113702677A (en) * | 2021-08-04 | 2021-11-26 | 国网浙江杭州市富阳区供电有限公司 | Uninterrupted meter changing method and device with meter reading number updating function |
CN113791273A (en) * | 2021-07-26 | 2021-12-14 | 广东电网有限责任公司广州供电局 | Electric quantity compensation method, device, system and storage medium |
CN114113723A (en) * | 2021-11-19 | 2022-03-01 | 云南电网有限责任公司电力科学研究院 | Electric energy meter live-line replacement method and device without electric quantity loss |
CN114137267A (en) * | 2021-11-17 | 2022-03-04 | 杭州惠嘉信息科技有限公司 | Non-power-outage lossless replacement method and lossless replacement device for electric energy meter |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102393480A (en) * | 2011-11-11 | 2012-03-28 | 天津市电力公司 | Electric quantity compensation method during live replacement of electric energy meter |
CN103245809A (en) * | 2013-06-03 | 2013-08-14 | 国家电网公司 | Portable electric quantity remedying device and electric energy meter replacing method for accurate metering |
CN203405489U (en) * | 2013-07-30 | 2014-01-22 | 广东电网公司汕尾供电局 | A secondary combined wiring module of an electric energy metering device |
KR101434600B1 (en) * | 2013-05-20 | 2014-08-26 | 주식회사 한국나이스기술단 | Multi-terminal block for uninterruptible tasks of watt-hour meter |
KR101457625B1 (en) * | 2013-05-20 | 2014-11-07 | 주식회사 한국나이스기술단 | One body type watt-hour meter with multi-terminal block |
CN204044202U (en) * | 2014-07-25 | 2014-12-24 | 国家电网公司 | A kind of power failure changes the Apparatus and system of electric energy meter |
-
2016
- 2016-11-18 CN CN201611015234.9A patent/CN106597041A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102393480A (en) * | 2011-11-11 | 2012-03-28 | 天津市电力公司 | Electric quantity compensation method during live replacement of electric energy meter |
KR101434600B1 (en) * | 2013-05-20 | 2014-08-26 | 주식회사 한국나이스기술단 | Multi-terminal block for uninterruptible tasks of watt-hour meter |
KR101457625B1 (en) * | 2013-05-20 | 2014-11-07 | 주식회사 한국나이스기술단 | One body type watt-hour meter with multi-terminal block |
CN103245809A (en) * | 2013-06-03 | 2013-08-14 | 国家电网公司 | Portable electric quantity remedying device and electric energy meter replacing method for accurate metering |
CN203405489U (en) * | 2013-07-30 | 2014-01-22 | 广东电网公司汕尾供电局 | A secondary combined wiring module of an electric energy metering device |
CN204044202U (en) * | 2014-07-25 | 2014-12-24 | 国家电网公司 | A kind of power failure changes the Apparatus and system of electric energy meter |
Non-Patent Citations (1)
Title |
---|
刘峰: "电能表现场更换", 《电能计量实训》 * |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107390159B (en) * | 2017-07-31 | 2022-08-23 | 国网山东省电力公司青州市供电公司 | Electric energy meter calibration device and use method thereof |
CN107390159A (en) * | 2017-07-31 | 2017-11-24 | 国网山东省电力公司青州市供电公司 | Tester for electric energy meter and its application method |
CN110542772A (en) * | 2019-09-06 | 2019-12-06 | 国网黑龙江省电力有限公司鹤岗供电公司 | Nondestructive replacement device and method for electric energy meter |
CN110726859A (en) * | 2019-10-31 | 2020-01-24 | 国网山东省电力公司济宁供电公司 | Switching device for continuously metering during live replacement of electric energy meter and electric energy meter replacement method |
CN110726859B (en) * | 2019-10-31 | 2022-01-21 | 国网山东省电力公司济宁供电公司 | Switching device for continuously metering during live replacement of electric energy meter and electric energy meter replacement method |
CN111474396A (en) * | 2020-04-23 | 2020-07-31 | 国网天津市电力公司 | Electric energy meter with electric meter changing function |
CN112133029A (en) * | 2020-09-15 | 2020-12-25 | 赵敏 | Real-time electric quantity charging settlement method for electric energy meter replacement |
CN112858745A (en) * | 2020-12-31 | 2021-05-28 | 国网浙江省电力有限公司嘉兴供电公司 | Low-voltage uninterrupted meter replacing device |
CN113791273A (en) * | 2021-07-26 | 2021-12-14 | 广东电网有限责任公司广州供电局 | Electric quantity compensation method, device, system and storage medium |
CN113702677A (en) * | 2021-08-04 | 2021-11-26 | 国网浙江杭州市富阳区供电有限公司 | Uninterrupted meter changing method and device with meter reading number updating function |
CN113702677B (en) * | 2021-08-04 | 2024-05-24 | 国网浙江杭州市富阳区供电有限公司 | Uninterrupted meter changing method and device with meter number updating and reading functions |
CN114137267A (en) * | 2021-11-17 | 2022-03-04 | 杭州惠嘉信息科技有限公司 | Non-power-outage lossless replacement method and lossless replacement device for electric energy meter |
CN114137267B (en) * | 2021-11-17 | 2024-05-07 | 杭州惠嘉信息科技有限公司 | Uninterrupted power supply nondestructive replacement method and device for electric energy meter |
CN114113723A (en) * | 2021-11-19 | 2022-03-01 | 云南电网有限责任公司电力科学研究院 | Electric energy meter live-line replacement method and device without electric quantity loss |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106597041A (en) | Standard meter access-based uninterrupted-power replacement method for replacing electric energy meters | |
CN202837423U (en) | Wireless GPRS wind power power grid electric energy quality detection device based on DSP and ARM | |
CN108802458A (en) | A kind of detection method for voltage chopping stealing event | |
CN203376434U (en) | A current transformer polarity verification apparatus | |
CN107238750B (en) | A kind of network wave method for detecting based on operational amplifier circuit | |
CN103219941A (en) | Switching circuit and switching method of star-shaped / triangular general savor for motor | |
CN202748425U (en) | Residual current protection uninterrupted testing device | |
CN202093088U (en) | Electrical parameter measuring device | |
CN209432939U (en) | A kind of high-power transformer second protection polarity test device | |
CN203326948U (en) | Switching circuit of star-shaped / triangular general savor for motor | |
CN202167821U (en) | Monitoring and control device of cable branch box | |
CN103592507A (en) | Voltage loop alarm for metering devices of transformer station | |
CN203069698U (en) | An integrated information acquiring device of electric energy in a transformer station | |
CN107677863A (en) | A kind of control system for the low voltage power measuring case for being easy to repair | |
CN102323563A (en) | Secondary current loop checking method of sealing type switching cabinet in power substation | |
CN207148310U (en) | Three-phase electric energy meter measuring and testing device | |
CN207502984U (en) | A kind of portable intelligent actuating of relay power measuring | |
CN205643683U (en) | Ampere meter with measurement interface | |
CN206638707U (en) | A kind of workbench for the verification of electric energy meter registration | |
CN204414371U (en) | The electric control gear of dry-mixing mortar storage tank | |
CN104092205A (en) | Switchgear microcomputer harmonic elimination apparatus | |
CN105137225A (en) | Electric leakage protector monitoring system based on voltage-stabilizing circuit | |
CN215525910U (en) | Intelligent electric energy meter with leakage protection function | |
CN204597248U (en) | Power distribution cabinet | |
CN203745633U (en) | Testing instrument used for three phases of lightning counters |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170426 |
|
RJ01 | Rejection of invention patent application after publication |