CN106593480A - Comprehensive tunnel maintenance trolley - Google Patents

Comprehensive tunnel maintenance trolley Download PDF

Info

Publication number
CN106593480A
CN106593480A CN201710025796.XA CN201710025796A CN106593480A CN 106593480 A CN106593480 A CN 106593480A CN 201710025796 A CN201710025796 A CN 201710025796A CN 106593480 A CN106593480 A CN 106593480A
Authority
CN
China
Prior art keywords
vertical frame
frame
maintenance chassis
comprehensive maintenance
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710025796.XA
Other languages
Chinese (zh)
Inventor
赵松森
刘占辉
李飞
朱志秀
王士友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Friendship One 6th Engineering Co Ltd Of Public Office
Original Assignee
Middle Friendship One 6th Engineering Co Ltd Of Public Office
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Friendship One 6th Engineering Co Ltd Of Public Office filed Critical Middle Friendship One 6th Engineering Co Ltd Of Public Office
Priority to CN201710025796.XA priority Critical patent/CN106593480A/en
Publication of CN106593480A publication Critical patent/CN106593480A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a comprehensive tunnel maintenance trolley which comprises a main rack, at least two sets of rollers and at least three work platforms. The rollers are parallelly arranged at the bottom of the main rack. Each work platform comprises two supporting tables which are separately erected on the two opposite sides of the main rack. Stairs are connected between every two adjacent layers of supporting tables. According to the comprehensive tunnel maintenance trolley, a trolley body is provided with the multiple work platforms of different heights, different devices are mounted on the different work platforms to conduct operation of different types, and therefore the multiple operation of construction, use, maintenance and the like on a tunnel can be achieved through one device.

Description

Tunnel comprehensive maintenance chassis
Technical field
The present invention relates to build maintenance technology, and in particular to a kind of tunnel comprehensive maintenance chassis.
Background technology
The tunnel structures such as subway tunnel, underpass need to carry out the equipment such as light, air draft from building, using to maintenance Installation, secondary lining detection and watering dedusting etc. operation.In prior art, equipment is installed carries out operation by equipment installation car, Secondary lining detection detected by corresponding testing equipment, and maintenance of sprinkling water then has watering to care the car to carry out operation.
The deficiencies in the prior art part is that the different work in tunnel needs different implements, causes implement Excessively so that it purchases, use and maintenance process is more inconvenient.
The content of the invention
It is an object of the invention to provide a kind of tunnel comprehensive maintenance chassis, to solve above-mentioned deficiency of the prior art Place.
To achieve these goals, the present invention provides following technical scheme:
A kind of tunnel comprehensive maintenance chassis, including body frame, also include:
At least two groups rollers, it is juxtaposed on the bottom of the body frame;
At least three layers work platforms, per layer of work platforms include two supporting tables, and supporting table described in two separates from institute State the opposite sides of body frame;
Multiple stair, are respectively connected with the stair between supporting table described in arbitrary neighborhood two-layer.
Above-mentioned tunnel comprehensive maintenance chassis, the body frame includes two row vertical frames and the crossbearer being oppositely arranged, the horizontal stroke The two ends of frame are connected to the top of the two row vertical frame, and two groups of rollers are respectively arranged at the bottom of the two row vertical frame.
Above-mentioned tunnel comprehensive maintenance chassis, per group of roller includes two row rollers, and two row rollers separate from described perpendicular The opposite sides of frame.
Above-mentioned tunnel comprehensive maintenance chassis, for roller described in arbitrary group, each roller interlaced arrangement in the vertical.
Above-mentioned tunnel comprehensive maintenance chassis, the supporting table includes flat board stage body and inclined support bar, the flat board stage body One end be connected in the vertical frame, one end of the inclined support bar is connected in the vertical frame, and the other end is connected to described flat On pallet body.
Above-mentioned tunnel comprehensive maintenance chassis, also including vertical frame, the crossbearer and vertical frame are provided with the vertical multigroup, institute Vertical frame is stated with each crossbearer or vertical frame while being connected.
Above-mentioned tunnel comprehensive maintenance chassis, also including bracing piece, the two ends of the bracing piece respectively with the vertical frame and Crossbearer is connected.
Above-mentioned tunnel comprehensive maintenance chassis, also includes:
Top layer platform, it is arranged at the top of the body frame.
Above-mentioned tunnel comprehensive maintenance chassis, also including gag lever post, the gag lever post is connected to the end of each supporting table Portion, the gag lever post covers in the outside of the body frame and supporting table.
Above-mentioned tunnel comprehensive maintenance chassis, each support edge of table is provided with guard rail.
In above-mentioned technical proposal, the above-mentioned tunnel comprehensive maintenance chassis that the present invention is provided arranges multiple on car body Highly different work platformses, install different equipment to carry out different types of operation on different work platformses, so make Tunnel from building, using to safeguard etc. many operations can realize on one device.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present application or technical scheme of the prior art, below will be to institute in embodiment The accompanying drawing that needs are used is briefly described, it should be apparent that, drawings in the following description are only described in the present invention A little embodiments, for those of ordinary skill in the art, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1 is the structural representation of comprehensive maintenance chassis in tunnel provided in an embodiment of the present invention;
Fig. 2 is the front view of comprehensive maintenance chassis in tunnel provided in an embodiment of the present invention;
Fig. 3 is the top view of comprehensive maintenance chassis in tunnel provided in an embodiment of the present invention.
Description of reference numerals:
1st, body frame;1.1st, vertical frame;1.2nd, crossbearer;1.3rd, frame is indulged;2nd, roller;3rd, supporting table;4th, stair;5th, inclined support bar; 6th, bracing piece;7th, top layer platform;8th, gag lever post;9th, guard rail;10th, tunnel.
Specific embodiment
In order that those skilled in the art more fully understands technical scheme, below in conjunction with accompanying drawing to this It is bright to be further detailed.
In the present embodiment, up, down, top, bottom, left, right, laterally, vertical, longitudinal direction etc. on the basis of tunnel with respect to and Speech, such as ground be under, the bottom of for, away from ground for it is upper, for top, longitudinal direction for tunnel bearing of trend, be vertically vertical direction, its It is general perpendicular to the ground, it is laterally the width in tunnel.It is apparent that the above-mentioned noun of locality is defined used in the present embodiment When be only on the basis of tunnel under the conditions of relative restriction, rather than the absolute restriction to claim.
As Figure 1-3, a kind of tunnel comprehensive maintenance chassis provided in an embodiment of the present invention, including body frame 1, also include to Few two groups of rollers 2, it is juxtaposed on the bottom of body frame 1;At least three layers work platforms, every layer of work platforms are supported including two Platform 3, two supporting tables 3 separate from the opposite sides of body frame 1;Stair 4 are respectively connected between arbitrary neighborhood two-layer supporting table 3.
Specifically, body frame 1 is the main body framework of tunnel comprehensive maintenance chassis, and other each components are mounted on body frame 1, its It is welded to form by hard material such as metal tube, shaped steel etc., or is assembled with rigid plastics part by metal tube and form, body frame 1 can by crossbearer 1.2, vertical frame 1.1 fix the groined type frame structure that constitute, or by crossbearer 1.2, vertical frame 1.1 with And the frame structure that tiltedly frame is constituted, can also be the multiple field frame structure being made up of rod member, pipe fitting and plate.Roller 2 sets The bottom of body frame 1 is placed in, tunnel comprehensive maintenance chassis is moved by roller 2 in tunnel 10, in the present embodiment, body frame 1 can be with Passively move, such as promote body frame 1 to move in tunnel 10 by trailer, or other vehicles such as loader promotes body frame 1 Move in tunnel 10;Can also be actively mobile, dynamic power machine such as internal combustion engine, motor are set such as on body frame 1, dynamic power machine leads to Drive mechanism driving rolls 2 is crossed, to realize automatically moving for tunnel comprehensive maintenance chassis.Differing heights are provided with body frame 1 Multiple work platformses, work platformses are fixed on body frame 1, and it can be network structure, platy structure or be welded by rod member, pipe fitting The truss structure of composition is connect, every layer of work platforms include two parts (two supporting tables 3), and supporting table 3 separates from the phase of body frame 1 To both sides, such as left and right (horizontal) both sides of body frame 1 or in front and back (longitudinal direction) both sides, the supporting table 3 of diverse location is used to complete not Same job task, the such as work platformses of bottom are used to complete dedusting of sprinkling water, and the work platformses in middle level are used to complete light units With the installation of ventilation installation, the work platformses of top layer are used to carry out secondary lining detection etc. operation, accordingly, on correspondence work platformses Corresponding work equipment can be installed.It is that it can be carried out accordingly in diverse location that work platformses are divided into the effect of two parts The work of job task.Adjacent each supporting table 3 is connected with stair 4, and stair 4 are moved for personnel in each floor gap.
In the present embodiment, the monnolithic case Ying Yuqi of the tunnel comprehensive maintenance chassis of body frame 1 and three layers of work platformses composition The profile of the lateral cross section in the tunnel 10 of work is more consistent, and such as the lateral cross section in tunnel 10 is rectangle, then tunnel is comprehensively supported The monnolithic case of shield chassis is also rectangle or approximate rectangle, and and for example the lateral cross section in tunnel 10 is dome-shaped, then overall Profile is also dome-shaped.
Comprehensive maintenance chassis in tunnel provided in an embodiment of the present invention, multiple highly different work is arranged on car body and is put down Platform, installs different equipment to carry out different types of operation on different work platformses, so that tunnel 10 is from building, make Using many operations such as maintenance can realize on one device.
In the present embodiment, it is preferred that body frame 1 includes two row vertical frames 1.1 and the crossbearer 1.2 being oppositely arranged, crossbearer 1.2 Two ends be connected to the top of two row vertical frames 1.1, each work platformses are both secured in vertical frame 1.1, and two groups of rollers 2 set respectively The bottom of two row vertical frames 1.1 is placed in, is arranged so as to that profile is more succinct and more material-saving.It is furthermore preferred that also including vertical frame 1.3, crossbearer 1.2 and vertical frame 1.1 are provided with the vertical multigroup, and vertical frame 1.3 be connected simultaneously with each crossbearer 1.2 or vertical frame 1.1, vertical Frame 1.3 can also have multiple, be sequentially arranged from top to bottom, and multigroup crossbearer 1.2, vertical frame 1.1, vertical frame 1.3 ensure the entirety of body frame 1 Intensity.Further preferably, also including bracing piece 6, the two ends of bracing piece 6 are connected respectively with vertical frame 1.1 and crossbearer 1.2, so make The connection for obtaining vertical frame 1.1 is more consolidated.
In the present embodiment, further, every group of roller 2 includes two row rollers 2, and two row rollers 2 separate from the phase of vertical frame 1.1 To both sides, so that the pressure equilibrium of the transmission of each vertical frame 1.1 is distributed to both sides, further, for arbitrary group of roller 2, In the vertical interlaced arrangement, i.e. some roller 2 are located at vertical frame 1.1 to each roller 2, and the roller 2 on its both sides is respectively positioned on vertical frame 1.1 Opposite side, such as every group roller 2 has two, two rollers, 2 one left sides for being located at the leading portion of vertical frame 1.1, and another is located at vertical frame 1.1 The right side of rear end, if three, on middle one left side for being located at vertical frame 1.1, two right sides for being located at vertical frame 1.1 on both sides Side, is arranged so as to, and the equilibrium that pressure is realized on the premise of using less amount of roller 2 is born.
In the present embodiment, further, supporting table 3 includes flat board stage body and inclined support bar 5, one end connection of flat board stage body In vertical frame 1.1, one end of inclined support bar 5 is connected in vertical frame 1.1, and the other end is connected on flat board stage body.Flat board stage body is The job platform of staff, inclined support bar 5 is used to make flat board stage body more consolidate with the connection of body frame 1.
In the present embodiment, it is preferred that the edge of each supporting table 3 is provided with guard rail 9, guard rail 9 shields, and uses Fall from the edge of supporting table 3 in staff or equipment is prevented.
In the present embodiment, further, also including top layer platform 7, it is arranged at the top of body frame 1, and top layer platform 7 is used for The top in tunnel 10 is built, equipment is installed or safeguarded etc. operation, and installs corresponding equipment.
In the present embodiment, further, also including gag lever post 8, gag lever post 8 is connected to the end of each supporting table 3, gag lever post 8 outsides for covering in body frame 1 and supporting table 3, the profile of gag lever post 8 is consistent with the profile in tunnel 10, as coordinate dome-shaped Tunnel 10, then gag lever post 8 is arc, if rectangular tunnel 10, then gag lever post 8 is rectangle, and it is located at the outside of main body, On the one hand the peripheral edge portion of main body and work platformses is connected so that tunnel comprehensive maintenance chassis is without more prominent outer umbo Structure, so as to ensure the safety of corresponding personnel, on the other hand for providing manufacture benchmark, gag lever post 8 is arranged to and tunnel 10 The size of outer wall is fixed, and the such as distance controlling of the wall in gag lever post 8 and tunnel 10 is between 20-50cm, and so whole tunnel is comprehensive The overall manufacture benchmark for closing maintenance trolley is easy to control.
Some one exemplary embodiments of the present invention are only described by way of explanation above, undoubtedly, for ability The those of ordinary skill in domain, in the case of without departing from the spirit and scope of the present invention, can with a variety of modes to institute The embodiment of description is modified.Therefore, above-mentioned accompanying drawing and description are inherently illustrative, should not be construed as to the present invention The restriction of claims.

Claims (10)

1. a kind of tunnel comprehensive maintenance chassis, including body frame, it is characterised in that also include:
At least two groups rollers, it is juxtaposed on the bottom of the body frame;
At least three layers work platforms, per layer of work platforms include two supporting tables, and supporting table described in two separates from the master The opposite sides of frame;
Multiple stair, are respectively connected with the stair between supporting table described in arbitrary neighborhood two-layer.
2. comprehensive maintenance chassis in tunnel according to claim 1, it is characterised in that the body frame includes two for being oppositely arranged Row vertical frame and crossbearer, the two ends of the crossbearer are connected to the top of the two row vertical frame, and two groups of rollers are respectively arranged at The bottom of the two row vertical frame.
3. comprehensive maintenance chassis in tunnel according to claim 2, it is characterised in that per group of roller includes two row rollings Wheel, two row rollers separate from the opposite sides of the vertical frame.
4. comprehensive maintenance chassis in tunnel according to claim 3, it is characterised in that for roller described in arbitrary group, each institute State roller interlaced arrangement in the vertical.
5. comprehensive maintenance chassis in tunnel according to claim 2, it is characterised in that the supporting table include flat board stage body and Inclined support bar, one end of the flat board stage body is connected in the vertical frame, and one end of the inclined support bar is connected to the vertical frame On, the other end is connected on the flat board stage body.
6. comprehensive maintenance chassis in tunnel according to claim 2, it is characterised in that also including vertical frame, the crossbearer and perpendicular Frame is provided with the vertical multigroup, and the vertical frame and each crossbearer or vertical frame are connected simultaneously.
7. comprehensive maintenance chassis in tunnel according to claim 2, it is characterised in that also including bracing piece, the bracing piece Two ends be connected with the vertical frame and crossbearer respectively.
8. comprehensive maintenance chassis in tunnel according to claim 1, it is characterised in that also include:
Top layer platform, it is arranged at the top of the body frame.
9. comprehensive maintenance chassis in tunnel according to claim 1, it is characterised in that also including gag lever post, the gag lever post The end of each supporting table is connected to, the gag lever post covers in the outside of the body frame and supporting table.
10. comprehensive maintenance chassis in tunnel according to claim 1, it is characterised in that each support edge of table is all provided with It is equipped with guard rail.
CN201710025796.XA 2017-01-13 2017-01-13 Comprehensive tunnel maintenance trolley Pending CN106593480A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710025796.XA CN106593480A (en) 2017-01-13 2017-01-13 Comprehensive tunnel maintenance trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710025796.XA CN106593480A (en) 2017-01-13 2017-01-13 Comprehensive tunnel maintenance trolley

Publications (1)

Publication Number Publication Date
CN106593480A true CN106593480A (en) 2017-04-26

Family

ID=58585507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710025796.XA Pending CN106593480A (en) 2017-01-13 2017-01-13 Comprehensive tunnel maintenance trolley

Country Status (1)

Country Link
CN (1) CN106593480A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152289A (en) * 2017-07-25 2017-09-12 重庆交通大学 The vcehicular tunnel maintenance and reinforcement platform and device of low influence traffic
CN107191195A (en) * 2017-07-25 2017-09-22 重庆交通大学 The vcehicular tunnel maintenance and reinforcement platform and device of uninterrupted traffic
CN110805454A (en) * 2019-10-24 2020-02-18 中铁十八局集团有限公司 Simple and easy rack of double-line tunnel multipurpose
CN113389568A (en) * 2021-07-02 2021-09-14 长治市山隧工程机械有限公司 Tunneling trolley

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201407063Y (en) * 2009-05-19 2010-02-17 云南路桥股份有限公司 Multifunctional tunnel operating platform frame
CN202441387U (en) * 2012-02-06 2012-09-19 中铁十六局集团有限公司 Multifunctional tunnel working rack
KR101463859B1 (en) * 2013-12-12 2014-12-04 주식회사 이제이텍 Tunnel construction method using the tunnel monitoring
CN205823303U (en) * 2016-07-25 2016-12-21 中车建设工程有限公司 The Multifunctional bench that a kind of tunnel special lining cutting reinforcement installation and splash guard are laid

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201407063Y (en) * 2009-05-19 2010-02-17 云南路桥股份有限公司 Multifunctional tunnel operating platform frame
CN202441387U (en) * 2012-02-06 2012-09-19 中铁十六局集团有限公司 Multifunctional tunnel working rack
KR101463859B1 (en) * 2013-12-12 2014-12-04 주식회사 이제이텍 Tunnel construction method using the tunnel monitoring
CN205823303U (en) * 2016-07-25 2016-12-21 中车建设工程有限公司 The Multifunctional bench that a kind of tunnel special lining cutting reinforcement installation and splash guard are laid

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152289A (en) * 2017-07-25 2017-09-12 重庆交通大学 The vcehicular tunnel maintenance and reinforcement platform and device of low influence traffic
CN107191195A (en) * 2017-07-25 2017-09-22 重庆交通大学 The vcehicular tunnel maintenance and reinforcement platform and device of uninterrupted traffic
CN110805454A (en) * 2019-10-24 2020-02-18 中铁十八局集团有限公司 Simple and easy rack of double-line tunnel multipurpose
CN113389568A (en) * 2021-07-02 2021-09-14 长治市山隧工程机械有限公司 Tunneling trolley

Similar Documents

Publication Publication Date Title
CN106593480A (en) Comprehensive tunnel maintenance trolley
CN102828609A (en) Overhanging-type mobile blanking platform for building construction
CN202767491U (en) Building operation overhanging type movable blanking platform
KR102109969B1 (en) A work bogie for tunnel work
KR101969621B1 (en) Overhead conveying device having a self-supporting supporting framework
CN205777634U (en) Telescopic moving formula protection canopy
CN101440660B (en) Guiding-rail attached lifting scaffold
CN202805171U (en) Railway vehicle assembly examining and repairing workshop elevated platform tool
CN204356829U (en) Excavator cab heightening bracket and device of boarding
CN108252218A (en) A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device
CN207063484U (en) Movable operation platform for corridor construction
CN207177246U (en) A kind of elevated truss Mobile operating platform
KR102599944B1 (en) Overhead moving type gondola apparatus
CN205636517U (en) Steel longeron construction and installation operation platform
CN105332345A (en) Lifting type construction system for bridge superstructure construction and construction method thereof
CN201933423U (en) Movable type protecting canopy frame
CN206969947U (en) Stagnant empty formula construction elevator
CN206694033U (en) Mobile platform between a kind of shield machine segment assembling machine and chassis
CN106121252B (en) A kind of hydraulic stepping is from climbing material transfering device and method
CN201141203Y (en) Guiding-rail attached lifting scaffold
CN203769283U (en) Adaptive angle self-climbing construction platform
CN103603486B (en) A kind of self adaptation angle is from climbing operation platform
CN207434909U (en) Lifting/lowering type dedusting tower crane
CN207405845U (en) It is a kind of to be used to carry out large-scale component transport, the device having bad luck on light roof
CN206668304U (en) A kind of anti-collapse operation platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426

RJ01 Rejection of invention patent application after publication