CN106592570A - Foundation treatment process using pre-fabricated compact type iron tailing reinforced bodies - Google Patents

Foundation treatment process using pre-fabricated compact type iron tailing reinforced bodies Download PDF

Info

Publication number
CN106592570A
CN106592570A CN201611095904.2A CN201611095904A CN106592570A CN 106592570 A CN106592570 A CN 106592570A CN 201611095904 A CN201611095904 A CN 201611095904A CN 106592570 A CN106592570 A CN 106592570A
Authority
CN
China
Prior art keywords
reinforcing body
grouting
pile
tailings
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611095904.2A
Other languages
Chinese (zh)
Other versions
CN106592570B (en
Inventor
徐立军
宋志强
朱光宇
李建军
何经纬
刘绍文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd filed Critical ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201611095904.2A priority Critical patent/CN106592570B/en
Publication of CN106592570A publication Critical patent/CN106592570A/en
Application granted granted Critical
Publication of CN106592570B publication Critical patent/CN106592570B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention relates to a foundation treatment process using pre-fabricated compact type iron tailing reinforced bodies. The process comprises the following steps: (1) determining the quantity and dimension of the iron tailing reinforced bodies according to a design requirement, wherein each of the iron tailing reinforced bodies is composed of a cylindrical structure and a reversed circular truncated cone structure which are integrated; a steel wire gauze or a bar-mat reinforcement is arranged in each of the iron tailing reinforced bodies, pile side grouting pipes are uniformly distributed along the wall of the steel wire gauze or the bar-mat reinforcement, a slurry discharging duct is arranged at the center of the steel wire gauze or the bar-mat reinforcement, and pile end grouting pipes are located at the center of the slurry discharging duct; (2) forming pre-drilled holes in pile positions by using a drilling machine, protecting the wall by using slurry, wherein the depth of the pre-drilled holes reaches a designed pile end supporting layer; (3) pressing the iron tailing reinforced bodies into the pre-drilled holes till the depth of the pre-drilled holes reaches a designed pile end supporting layer by virtue of a static pressure method, and discharging the wall-protecting slurry through the slurry discharging duct; and (4) grouting the pile side slurry pipes and setting the same 4-8 hours, then grouting the pile end grouting pipes, and stopping grouting if a grouting control index is reached to form an integral foundation.

Description

A kind of basement process technique using prefabricated compacted sections tailings reinforcing body
Technical field
The present invention relates to industrial residue utilization and building foundation treatment technical field, more particularly to a kind of to be squeezed using prefabricated The basement process technique of close sections tailings reinforcing body.
Background technology
Iron milltailings are the Ore waste residues formed with iron mine digging and ore dressing.Typically adopt one ton of iron mine and can form about 3-5m3 Mine tailing, the annual mining activity of China defines substantial amounts of iron tailings.The discharge of mine tailing, accumulation occupy substantial amounts of soil money Source, while the dust for being formed is also to environment.The comprehensive utilization of mine tailing is all subject to national policy emphasis to rouse all the time Encourage and support.Technology more ripe in terms of building at present has such as the blockwork of ground laying, for partly replacing Concrete fine aggregate etc..
The content of the invention
The present invention newly utilizes channel in order to further develop iron milltailings, improves on the basis of existing method of comprehensive utilization A kind of utilization rate of iron milltailings, there is provided basement process technique using prefabricated compacted sections tailings reinforcing body.The technology of the present invention Scheme is:
A kind of basement process technique using prefabricated compacted sections tailings reinforcing body, comprises the following steps:
(1)The quantity and size of iron milltailings reinforcing body are determined according to design requirement;The iron milltailings reinforcing body is justified by all-in-one-piece Rod structure and inverted round stage structure composition, the diameter ratio of the inverted round stage structure upper and lower surface is 1.15 ~ 1.35, the iron milltailings Reinforcing sets steel wire or bar-mat reinforcement in vivo, is evenly distributed with slip casting around pile pipe, steel wire or steel along steel wire wall or bar-mat reinforcement wall The central authorities of muscle net are provided with plasma discharge duct, and pile end grouting pipe is located at plasma discharge duct center;
Slip casting around pile bottom of the tube connection diverter one and non-return valve one, top are provided with for connecting the connecting pipe of grouting pump One;The pile end grouting pipe is provided with grouting stop-valve, pile end grouting bottom of the tube connection diverter two and non-return valve two, top be provided with for The connecting pipe two of connection grouting pump;The diverter one, diverter two, non-return valve one, non-return valve two, connecting pipe one and connecting pipe Two are respectively positioned on outside the reinforcing body;
(2)Prebored hole is formed in stake position using rig, and adopt mud off, the depth of the prebored hole reaches design stake end Supporting course, preboring bore dia are identical with the lower surface diameter of the iron milltailings reinforcing body inverted round stage;
(3)Iron milltailings reinforcing body is pressed into by the bearing course at pile end that prebored hole to depth reaches design requirement using static pressure method, and will Discharge in slurry coat method Jing plasma discharges duct;
(4)To the slip casting around pile pipe slip casting, and 4 ~ 8h is solidified, then to the pile end grouting pipe slip casting, reach grout injection control and refer to Stop slip casting after mark, form complete ground.
In above-mentioned technique, the pile end grouting pipe, grouting stop-valve, diverter two, non-return valve two and connecting pipe two are in the step Suddenly(4)To being attached in the iron milltailings reinforcing body before the pile end grouting pipe slip casting.
In above-mentioned technique, the manufacture method of the iron milltailings reinforcing body is:All-in-one-piece cylinder is made according to design requirement The mould of structure and inverted round stage structure;According to iron milltailings:Cement:The quality proportioning of water is (5 ~ 5.5):(1~1.4):(1.2~ 1.4) compound is prepared, adds adulterating agent, inject after stirring in the mould, vibrated successively, the demoulding, obtain institute after health preserving Iron milltailings reinforcing body is stated, comprcssive strength is 6 ~ 10MPa.
In above-mentioned technique, the iron milltailings adopt basis《Iron tailings sand concrete application technology specification》In GB51032 The qualified tail medium coarse sand of specification inspection radiation and/or tail Extra-fine sand iron milltailings.
In above-mentioned technique, the column structure is highly 0.3 ~ 0.5m.
In above-mentioned technique, the inverted round stage structure height is more than 3m.
In above-mentioned technique, plasma discharge duct bottom is provided with only stock tank, installs grouting stop-valve, the plasma discharge in the only stock tank A diameter of 100 ~ 300mm in duct.
In above-mentioned technique, the material of the slip casting around pile pipe and the pile end grouting pipe includes PVC, steel.
In above-mentioned technique, the non-return valve one and the non-return valve two are located at the diverter one and the diverter respectively Two top.
In above-mentioned technique, the adulterating agent includes flyash, water reducer.
In above-mentioned technique, the bearing capacity of the complete ground reaches 200 ~ 400KPa.
Beneficial effects of the present invention are:
1st, the present invention is using industrial residue --- and, used as the raw material for making reinforcing body, the prefabricated compacted type reinforcing body of formation is strong for iron milltailings Degree fully meets the requirement to basement process up to 6 ~ 10MPa, the Bearing Capacity of Composite Foundation after process up to 200 ~ 300KPa, And technique waste residue is using the polluter and potential geological disaster source that original accumulation place had both been eliminated after finishing, again can be with Vacate the soil of original occupancy.
2nd, the prefabricated compacted type reinforcing body of present invention design employs single-unit inverted round table shape, by round platform side wall soil compaction Effect, makes reinforcing body preferably be combined with soil layer, is that reinforcing body side wall grouting is reinforced to form good stop grouting plug, to give full play to Reinforcing body side friction power creates condition.And the present invention adopts side wall grouting and the Multiple-step mode of end slip casting to send out for abundant Wave bearing capacity of pile tip and create advantage.
3rd, the present invention is easy to industrialized production, can pile up place in industrial residue and found the factory production, substantially reduce and produce into This, improves production efficiency, it is adaptable to the reinforcing of various soil body grounds, applied range.
Description of the drawings
Fig. 1 is the reinforcing body structural representation of the present invention, wherein 1- connecting pipes two, 2- connecting pipes one, the circle of 3- reinforcing bodies Rod structure, the inverted round stage structure of 4- reinforcing bodies, 5- steel wires(Muscle)Net, 6- slip casting around pile pipes, 7- pile end grouting pipes, 8- stop stock tank, 9- grouting stop-valves, 10- diverters one, 11- diverters two.
Fig. 2 is the profile in A-A faces in Fig. 1, wherein 14- plasma discharges duct.
Specific embodiment
The present invention is described in further details with specific embodiment below in conjunction with the accompanying drawings, described is the solution to the present invention Release rather than limit.
Embodiment 1
A kind of basement process technique using prefabricated compacted sections tailings reinforcing body, in Liaoning, metallurgical works land used is implemented, bag Include following steps:
(1)The quantity and size of iron milltailings reinforcing body are determined according to design requirement;The iron milltailings reinforcing body is high by all-in-one-piece It is that the column structure 3 of 0.5m and the inverted round stage structure 4 highly for 3.5m are constituted to spend, and Fig. 1 and Fig. 2 provides the knot of the reinforcing body Structure schematic diagram, the diameter ratio of 4 upper and lower surface of inverted round stage structure are 1.2, a diameter of 600mm of the lower surface, the ferrum Tailings is reinforced and sets steel wire 5 in vivo, and the central authorities for being evenly distributed with slip casting around pile pipe 6, steel wire or bar-mat reinforcement along steel wire wall set There is plasma discharge duct 14, plasma discharge duct bottom is provided with only stock tank 8, and pile end grouting pipe 7 is located at plasma discharge duct center, described A diameter of 300mm in plasma discharge duct;
Slip casting around pile bottom of the tube connection diverter 1 and non-return valve one, top are provided with for connecting the connecting pipe of grouting pump One 2;The pile end grouting pipe is provided with grouting stop-valve 9, and the grouting stop-valve 9 is installed in the only stock tank 8,7 bottom of pile end grouting pipe Connection diverter 2 11 and non-return valve two, top are provided with for connecting the connecting pipe 21 of grouting pump;The diverter 1, point Stream device 2 11, non-return valve one, non-return valve two, connecting pipe 1 and connecting pipe 21 are respectively positioned on outside the reinforcing body, the check Valve one and the non-return valve two are located at the top of the diverter 1 and the diverter 2 11 respectively;
(2)Prebored hole is formed in stake position using rig, and adopt mud off, the depth of the prebored hole reaches design stake end Supporting course, preboring bore dia are identical with the lower surface diameter of the iron milltailings reinforcing body inverted round stage;
(3)Iron milltailings reinforcing body is pressed into by the bearing course at pile end that prebored hole to depth reaches design requirement using static pressure method, and will Discharge in slurry coat method Jing plasma discharges duct;
(4)To the slip casting around pile pipe slip casting, and 4h is solidified, then to the pile end grouting pipe slip casting, reach grout injection control index After stop slip casting, form complete ground, bearing capacity reaches 300KPa.
In above-mentioned technique, the pile end grouting pipe, grouting stop-valve, diverter two, non-return valve two and connecting pipe two are in the step Suddenly(4)To before the pile end grouting pipe slip casting install.
In above-mentioned technique, the manufacture method of the iron milltailings reinforcing body is:Reversed round bench shaped mould is made according to design requirement Tool;According to iron milltailings:Cement:The quality proportioning of water is 5.0:1.4:1.2 prepare compound, add flyash, and consumption is cement The 15% of consumption, injects after stirring in the mould, vibrates successively, the demoulding, obtains the iron milltailings reinforcing body after health preserving, Comprcssive strength is 8.5MPa.
In above-mentioned technique, the iron milltailings adopt basis《Iron tailings sand concrete application technology specification》In GB51032 The qualified tail medium coarse sand iron milltailings of specification inspection radiation.
In above-mentioned technique, the material selection steel of the slip casting around pile pipe and the pile end grouting pipe.
Embodiment 2
A kind of basement process technique using prefabricated compacted sections tailings reinforcing body, implements in Liaoning food processing factory land used, Comprise the following steps:
(1)The quantity and size of iron milltailings reinforcing body are determined according to design requirement;The iron milltailings reinforcing body is high by all-in-one-piece It is that the column structure 3 of 0.5m and the inverted round stage structure 4 highly for 5m are constituted to spend, and Fig. 1 and Fig. 2 provides the structure of the reinforcing body Schematic diagram, the diameter ratio of 4 upper and lower surface of inverted round stage structure are 1.25, a diameter of 400mm of the lower surface, the ferrum tail Sand is reinforced and sets steel wire 5 in vivo, the central authorities that are evenly distributed with slip casting around pile pipe 6, steel wire or bar-mat reinforcement along steel wire wall are provided with Plasma discharge duct 14, plasma discharge duct bottom are provided with only stock tank 8, and pile end grouting pipe 7 is located at plasma discharge duct center, the row A diameter of 250mm in slurry duct;
Slip casting around pile bottom of the tube connection diverter 1 and non-return valve one, top are provided with for connecting the connecting pipe of grouting pump One 2;The pile end grouting pipe is provided with grouting stop-valve 9, and the grouting stop-valve 9 is installed in the only stock tank 8,7 bottom of pile end grouting pipe Connection diverter 2 11 and non-return valve two, top are provided with for connecting the connecting pipe 21 of grouting pump;The diverter 1, point Stream device 2 11, non-return valve one, non-return valve two, connecting pipe 1 and connecting pipe 21 are respectively positioned on outside the reinforcing body, the check Valve one and the non-return valve two are located at the top of the diverter 1 and the diverter 2 11 respectively;
(2)Prebored hole is formed in stake position using rig, and adopt mud off, the depth of the prebored hole reaches design stake end Supporting course, preboring bore dia are identical with the lower surface diameter of the iron milltailings reinforcing body inverted round stage;
(3)Iron milltailings reinforcing body is pressed into by the bearing course at pile end that prebored hole to depth reaches design requirement using static pressure method, and will Discharge in slurry coat method Jing plasma discharges duct;
(4)To the slip casting around pile pipe slip casting, and 6h is solidified, then to the pile end grouting pipe slip casting, reach grout injection control index After stop slip casting, form complete ground, bearing capacity reaches 250KPa.
In above-mentioned technique, the pile end grouting pipe, grouting stop-valve, diverter two, non-return valve two and connecting pipe two are in the step Suddenly(4)To before the pile end grouting pipe slip casting install.
In above-mentioned technique, the manufacture method of the iron milltailings reinforcing body is:Reversed round bench shaped mould is made according to design requirement Tool;According to iron milltailings:Cement:The quality proportioning of water is 5.2:1.1:1.3 prepare compound, add flyash, and consumption is cement The 12% of consumption, injects after stirring in the mould, vibrates successively, the demoulding, obtains the iron milltailings reinforcing body after health preserving, Comprcssive strength is 6.5MPa.
In above-mentioned technique, the iron milltailings adopt basis《Iron tailings sand concrete application technology specification》In GB51032 The qualified tail Extra-fine sand iron milltailings of specification inspection radiation.
In above-mentioned technique, the material selection steel of the slip casting around pile pipe and the pile end grouting pipe.
Embodiment 3
A kind of basement process technique using prefabricated compacted sections tailings reinforcing body, in Liaoning highway land implement, including with Lower step:
(1)The quantity and size of iron milltailings reinforcing body are determined according to design requirement;The iron milltailings reinforcing body is high by all-in-one-piece It is that the column structure 3 of 0.5m and the inverted round stage structure 4 highly for 8m are constituted to spend, and Fig. 1 and Fig. 2 provides the structure of the reinforcing body Schematic diagram, the diameter ratio of 4 upper and lower surface of inverted round stage structure are 1.2, a diameter of 600mm of the lower surface, the ferrum tail Sand is reinforced and sets steel wire 5 in vivo, and the central authorities for being evenly distributed with slip casting around pile pipe 6, steel wire or bar-mat reinforcement along steel wire wall are provided with Plasma discharge duct 14, plasma discharge duct bottom are provided with only stock tank 8, and pile end grouting pipe 7 is located at plasma discharge duct center, the row A diameter of 300mm in slurry duct;
Slip casting around pile bottom of the tube connection diverter 1 and non-return valve one, top are provided with for connecting the connecting pipe of grouting pump One 2;The pile end grouting pipe is provided with grouting stop-valve 9, and the grouting stop-valve 9 is installed in the only stock tank 8,7 bottom of pile end grouting pipe Connection diverter 2 11 and non-return valve two, top are provided with for connecting the connecting pipe 21 of grouting pump;The diverter 1, point Stream device 2 11, non-return valve one, non-return valve two, connecting pipe 1 and connecting pipe 21 are respectively positioned on outside the reinforcing body, the check Valve one and the non-return valve two are located at the top of the diverter 1 and the diverter 2 11 respectively;
(2)Prebored hole is formed in stake position using rig, and adopt mud off, the depth of the prebored hole reaches design stake end Supporting course, preboring bore dia are identical with the lower surface diameter of the iron milltailings reinforcing body inverted round stage;
(3)Iron milltailings reinforcing body is pressed into by the bearing course at pile end that prebored hole to depth reaches design requirement using static pressure method, and will Discharge in slurry coat method Jing plasma discharges duct;
(4)To the slip casting around pile pipe slip casting, and 8h is solidified, then to the pile end grouting pipe slip casting, reach grout injection control index After stop slip casting, form complete ground, bearing capacity reaches 250KPa.
In above-mentioned technique, the pile end grouting pipe, grouting stop-valve, diverter two, non-return valve two and connecting pipe two are in the step Suddenly(4)To before the pile end grouting pipe slip casting install.
In above-mentioned technique, the manufacture method of the iron milltailings reinforcing body is:Reversed round bench shaped mould is made according to design requirement Tool;According to iron milltailings:Cement:The quality proportioning of water is 5.0:1.2:1.3 prepare compound, add flyash, and consumption is cement The 15% of consumption, injects after stirring in the mould, vibrates successively, the demoulding, obtains the iron milltailings reinforcing body after health preserving, Comprcssive strength is 6.5MPa.
In above-mentioned technique, the iron milltailings adopt basis《Iron tailings sand concrete application technology specification》In GB51032 The qualified tail medium coarse sand of specification inspection radiation and tail Extra-fine sand iron milltailings.
In above-mentioned technique, the material selection PVC of the slip casting around pile pipe and the pile end grouting pipe.

Claims (10)

1. a kind of basement process technique using prefabricated compacted sections tailings reinforcing body, it is characterised in that comprise the following steps:
(1)The quantity and size of iron milltailings reinforcing body are determined according to design requirement;The iron milltailings reinforcing body is justified by all-in-one-piece Rod structure and inverted round stage structure composition, the diameter ratio of the inverted round stage structure upper and lower surface is 1.15 ~ 1.35, the iron milltailings Reinforcing sets steel wire or bar-mat reinforcement in vivo, is evenly distributed with slip casting around pile pipe, steel wire or steel along steel wire wall or bar-mat reinforcement wall The central authorities of muscle net are provided with plasma discharge duct, and pile end grouting pipe is located at plasma discharge duct center;
Slip casting around pile bottom of the tube connection diverter one and non-return valve one, top are provided with for connecting the connecting pipe of grouting pump One;The pile end grouting pipe is provided with grouting stop-valve, pile end grouting bottom of the tube connection diverter two and non-return valve two, top be provided with for The connecting pipe two of connection grouting pump;The diverter one, diverter two, non-return valve one, non-return valve two, connecting pipe one and connecting pipe Two are respectively positioned on outside the reinforcing body;
(2)Prebored hole is formed in stake position using rig, and adopt mud off, the depth of the prebored hole reaches design stake end Supporting course, preboring bore dia are identical with the lower surface diameter of the iron milltailings reinforcing body inverted round stage;
(3)Iron milltailings reinforcing body is pressed into by the bearing course at pile end that prebored hole to depth reaches design requirement using static pressure method, and will Discharge in slurry coat method Jing plasma discharges duct;
(4)To the slip casting around pile pipe slip casting, and 4 ~ 8h is solidified, then to the pile end grouting pipe slip casting, reach grout injection control and refer to Stop slip casting after mark, form complete ground.
2. a kind of basement process technique using prefabricated compacted sections tailings reinforcing body according to claim 1, its feature It is the pile end grouting pipe, grouting stop-valve, diverter two, non-return valve two and connecting pipe two in the step(4)To the stake It is attached in the iron milltailings reinforcing body before the Grouting Pipe slip casting of end.
3. a kind of basement process technique using prefabricated compacted sections tailings reinforcing body according to claim 1, its feature It is that the manufacture method of the iron milltailings reinforcing body is:All-in-one-piece column structure and inverted round stage structure are made according to design requirement Mould;According to iron milltailings:Cement:The quality proportioning of water is (5 ~ 5.5):(1~1.4):(1.2 ~ 1.4) compound is prepared, is added Adulterating agent, injects after stirring in the mould, vibrates successively, the demoulding, obtains the iron milltailings reinforcing body, resistance to compression after health preserving Intensity is 6 ~ 10MPa.
4. a kind of basement process technique using prefabricated compacted sections tailings reinforcing body according to claim 3, its feature It is that the iron milltailings adopt basis《Iron tailings sand concrete application technology specification》In GB51032 specifications inspection radiation it is qualified Tail medium coarse sand and/or tail Extra-fine sand iron milltailings.
5. a kind of basement process technique using prefabricated compacted sections tailings reinforcing body according to claim 1, its feature Be the column structure highly for 0.3 ~ 0.5m, the inverted round stage structure height is more than 3m.
6. a kind of basement process technique using prefabricated compacted sections tailings reinforcing body according to claim 1, its feature It is that plasma discharge duct bottom is provided with only stock tank, described stopping install in stock tank grouting stop-valve, a diameter of the 100 of the plasma discharge duct ~300mm。
7. a kind of basement process technique using prefabricated compacted sections tailings reinforcing body according to claim 1, its feature It is that the material of the slip casting around pile pipe and the pile end grouting pipe includes PVC, steel.
8. a kind of basement process technique using prefabricated compacted sections tailings reinforcing body according to claim 1, its feature It is top that the non-return valve one and the non-return valve two are located at the diverter one and the diverter two respectively.
9. a kind of basement process technique using prefabricated compacted sections tailings reinforcing body according to claim 1, its feature It is that the adulterating agent includes flyash, water reducer.
10. a kind of basement process technique using prefabricated compacted sections tailings reinforcing body according to claim 1, its feature It is that the bearing capacity of the complete ground reaches 200 ~ 400KPa.
CN201611095904.2A 2016-12-02 2016-12-02 A kind of basement process technique using prefabricated compacted sections tailings reinforcing body Active CN106592570B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611095904.2A CN106592570B (en) 2016-12-02 2016-12-02 A kind of basement process technique using prefabricated compacted sections tailings reinforcing body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611095904.2A CN106592570B (en) 2016-12-02 2016-12-02 A kind of basement process technique using prefabricated compacted sections tailings reinforcing body

Publications (2)

Publication Number Publication Date
CN106592570A true CN106592570A (en) 2017-04-26
CN106592570B CN106592570B (en) 2019-02-15

Family

ID=58595414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611095904.2A Active CN106592570B (en) 2016-12-02 2016-12-02 A kind of basement process technique using prefabricated compacted sections tailings reinforcing body

Country Status (1)

Country Link
CN (1) CN106592570B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978636A (en) * 2018-08-28 2018-12-11 中冶沈勘工程技术有限公司 A kind of compacted type shaped pile of CHARACTERISTICS OF TAILINGS SAND and its composite foundation treatment process
CN111501743A (en) * 2020-04-23 2020-08-07 中核第四研究设计工程有限公司 Titanium white tailing curing method
CN112649263A (en) * 2020-12-11 2021-04-13 浙江科技学院 Cylindrical sample undisturbed soaking type circumferential grouting sample preparation instrument and sample preparation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0247421A (en) * 1988-08-06 1990-02-16 Shin Gijutsu Koei Kk Bag-shaped ground anchor body and anchoring mechanism therefor
US20060159525A1 (en) * 2005-01-03 2006-07-20 Ramzy Moumneh Grout injecting/structure anchoring system
CN102465524A (en) * 2010-11-11 2012-05-23 上海市政工程设计研究总院 Double radial mesh-cage sand-gravel pile and construction process thereof
CN102505684A (en) * 2011-11-02 2012-06-20 河海大学 Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN103061328A (en) * 2013-01-29 2013-04-24 方泰建设集团有限公司 Post-grouting gravel pile with sand wall wing plates and construction method
CN105804083A (en) * 2016-05-06 2016-07-27 同济大学 Grouting pipeline device, conical special-shaped pile and application method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0247421A (en) * 1988-08-06 1990-02-16 Shin Gijutsu Koei Kk Bag-shaped ground anchor body and anchoring mechanism therefor
US20060159525A1 (en) * 2005-01-03 2006-07-20 Ramzy Moumneh Grout injecting/structure anchoring system
CN102465524A (en) * 2010-11-11 2012-05-23 上海市政工程设计研究总院 Double radial mesh-cage sand-gravel pile and construction process thereof
CN102505684A (en) * 2011-11-02 2012-06-20 河海大学 Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN103061328A (en) * 2013-01-29 2013-04-24 方泰建设集团有限公司 Post-grouting gravel pile with sand wall wing plates and construction method
CN105804083A (en) * 2016-05-06 2016-07-27 同济大学 Grouting pipeline device, conical special-shaped pile and application method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978636A (en) * 2018-08-28 2018-12-11 中冶沈勘工程技术有限公司 A kind of compacted type shaped pile of CHARACTERISTICS OF TAILINGS SAND and its composite foundation treatment process
CN111501743A (en) * 2020-04-23 2020-08-07 中核第四研究设计工程有限公司 Titanium white tailing curing method
CN112649263A (en) * 2020-12-11 2021-04-13 浙江科技学院 Cylindrical sample undisturbed soaking type circumferential grouting sample preparation instrument and sample preparation method

Also Published As

Publication number Publication date
CN106592570B (en) 2019-02-15

Similar Documents

Publication Publication Date Title
JP5270819B2 (en) Ground strengthening method
CN101858077B (en) Construction method of composite foundation with bagged compacting and slurry cementing small-diameter gravel pile
CN105507340B (en) Construction method of bridge pile foundation in mountainous area
CN105240047A (en) Filling reinforcement method for managing underground mined area of open-pit mine
CN102155009A (en) Crushed rock pile used for strengthening extremely soft soil foundation and construction method thereof
CN101899828B (en) Construction method of bagged rammed small-diameter soil-cement pile composite foundation
CN105625294A (en) Composite foundation and construction method thereof
CN103993594B (en) A kind of micro-nano bubble process can liquefied foundation device and working method
CN101581095A (en) Anti-corrosive pre-stressed concrete pipe pile foundation
CN104711976B (en) A kind of construction refuse regenerated aggregate complex carrier stake and preparation method thereof
CN101899838B (en) Bottom-grouting-enlarged small-diameter prestressed tubular pile composite foundation construction method
CN105541214A (en) Pocket type separated strata grouting material for controlling surface subsidence, preparation and grouting method thereof
CN106592570A (en) Foundation treatment process using pre-fabricated compact type iron tailing reinforced bodies
CN106866085A (en) Special grouting material and its grouting method are reinforced in a kind of high-speed railway subgrade repairing
CN104404838A (en) Collapsed loess subgrade base treatment method for railway with speed more than 200km
CN107178077B (en) karst area karst cave overburden grouting reinforcement structure and design method thereof
JP4628378B2 (en) Ground strengthening method
CN106812129A (en) A kind for the treatment of technology of the rigid pile composite foundation with discharging consolidation function
JP4972661B2 (en) Ground injection method
CN105484230A (en) Pile and soil concreted and integrated composite pile and construction method thereof
CN106869153B (en) A kind of method of the quick soft soil foundation treatment of well-points dewatering
CN102839647B (en) Stirring pile-permeable concrete pile compound foundation and treatment method thereof
CN100355991C (en) Method for constructing composite foundation of piles and ground interactive slurry bonded dispersed body material
JP2007040096A (en) Ground reinforcing method, managing method of pressure injection into ground, and managing device used for pressure injection
CN202099795U (en) Crushed stone pile for reinforcing extremely soft soil foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant