CN106592567A - Stripe used for earthwork standard room, production method of stripe and earthwork standard room - Google Patents
Stripe used for earthwork standard room, production method of stripe and earthwork standard room Download PDFInfo
- Publication number
- CN106592567A CN106592567A CN201611093674.6A CN201611093674A CN106592567A CN 106592567 A CN106592567 A CN 106592567A CN 201611093674 A CN201611093674 A CN 201611093674A CN 106592567 A CN106592567 A CN 106592567A
- Authority
- CN
- China
- Prior art keywords
- band
- core material
- geotechnical grid
- reinforcement core
- ready
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/005—Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0006—Plastics
- E02D2300/0009—PE
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0006—Plastics
- E02D2300/001—PP
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
- E02D2300/0034—Steel; Iron in wire form
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0051—Including fibers
- E02D2300/0053—Including fibers made from glass
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0084—Geogrids
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Package Frames And Binding Bands (AREA)
- Ropes Or Cables (AREA)
Abstract
The invention provides a stripe used for an earthwork standard room, a production method of the stripe and the earthwork standard room. The stripe used for the earthwork standard room comprises a stripe body and reinforcing cores coated inside the stripe body. The reinforcing cores are made of a material with good butt fusion and connection performance, and the stripe body is made of a high-strength material. The material with good butt fusion and connection performance and the high-strength material are combined, so that the whole stripe has inherent high-tensile mechanical strength and also has good butt fusion and connection performance externally.
Description
Technical field
The present invention relates to technical field of civil engineering, more particularly to a kind of geo-grid reinforcement structure, and in particular to a kind of geotechnique
Compartment band, the production method of band and geotechnical grid.
Background technology
It is inferior soft for processing usually using polymeric synthetic material as geo-grid reinforcement material in civil engineering construction
Soil, swelled ground, sandy soil, marine clay etc., to meet requirement of the engineering construction to ground.These materials mainly include three types:
Geotextiles, GSZ, geotechnical grid.
Geotextiles are earliest geo-grid reinforcement materials, can have very high intensity and relatively low elongation percentage, have been had the disadvantage
Isolate upper and lower layer material entirely, be easily caused to form slide surface, so as to cause reinforcing engineering to fail;GSZ because its have it is very high
Tensile strength and relatively low elongation percentage, in extensively reacting the geo-grid reinforcement engineering for soil, level can be efficiently controlled
Load and deformation, it also has a limitation, be exactly can only dispersion level load, for vertical load can only " hard anti-", easily make
Into single-point destruction, differential settlement is formed, so as to cause engineering to fail.
Geotechnical grid is the new geo-grid reinforcement material for growing up recent years, and it has certain altitude, can be effective
Ground dispersion vertical load, the destruction line of slide for making ground road bed is transmitted toward deep layer, forms " deep ground " effect, reduces uneven
Even sedimentation.Geotechnical grid as the earth working material for having obvious mechanical property advantage, in many mistakes such as railway, highway, dykes and dams, water conservancy
Application in terms of Cheng Jianshe is more and more extensive, to the mechanical property requirements of compartment also more and more higher itself.But it is universal as industry
Using method of manufacturing technology for, the high material of intensity, fragility is big, and welding and connecting performance are poor;And welding and connecting performance
Prominent material, cannot meet the requirement of terms of mechanics again;So cause at present geotechnical grid, it is impossible to be provided simultaneously with height
The mechanical property requirements of tensile strength and high heat seal strength in terms of the two.
The content of the invention
The present invention is directed to the deficiencies in the prior art, there is provided a kind of geotechnical grid band, the production method of band and geotechnique
Compartment, makes geotechnical grid not only have high tensile but also have high heat seal strength.
The present invention is achieved through the following technical solutions:
The present invention provides a kind of geotechnical grid band, and the band includes bar band body and to be coated on the band intrinsic
Strengthening core.
In the present invention, the reinforcement core material is high-strength material, and described bar band body is that welding and connecting performance are excellent
Good material, bi-material combines, and makes whole band both have inherent high tensile mechanical strength, outside again with good
Welding and connecting performance.
Preferably, the angle between the length direction of the strengthening core and the bar band body is more than or equal to zero degree, and little
In 90 degree.
The purpose for arranging strengthening core is to make band have certain intensity in the longitudinal direction, using grid made by band
In each grid of the geotechnical grid of shape during filling construction material, band is set to be unlikely to support bad by construction material, therefore, strengthening core
As long as can play a role on the length direction of band, when the angle between strengthening core and bar band body is zero degree, i.e.,
When strengthening core extends on the length direction of bar band body, effect is best.
Preferably, the strengthening core is steel band and/or steel wire, and the bar band body is polypropylene or polythene material.
Preferably, the strengthening core is PP tension belts, and the bar band body is polypropylene or polythene material.
Preferably, the strengthening core be polyethylene terephthalate tension belt, the bar band body be polypropylene or
Polythene material.
Preferably, the strengthening core is glass fibre, and the bar band body is polypropylene or polythene material.
The present invention also provides a kind of production method of geotechnical grid band, and methods described comprises the steps:
S101:Identical tension is unreeled:Ready reinforcement core material is unreeled under the conditions of constant tension is 20-30N;Unreel
When make constant tension, it can be ensured that the flatness and pretightning force for strengthening core material each band is basically identical, to greatest extent
Ensure as strengthening core each band in load bearing process, common bearing load
S102:Decontamination drying:The greasy dirt of the reinforcement core material surfaces after unreeling in step S101 is removed, then dries on surface
It is dry, 95-105 DEG C is heated to, to guarantee cleaning and drying effect;
S103:Cladding:Under the conditions of 185-200 DEG C, ready band bulk material even roller briquetting is overlying on into the step
The reinforcement core material surfaces that S102 is obtained, form overall band;
S104:Cooling and shaping:The band that step S103 is obtained is cooled to into 50-70 DEG C of sizing;
S105:Roll-in:The surface of the band that step S104 is obtained carries out roll-in, increases surface roughness.
Preferably, it was wound before step S102 and send band and/or winding wire feed, makes the steel band and/or steel
Silk does not fold and intersects confusion.
The present invention also provides a kind of production method of geotechnical grid band, and methods described comprises the steps:
S101:Unreel:Ready reinforcement core material is unreeled with the speed of 8-12 rice per minute, makes to open during unreeling
Power is constant for 8-10N;
S102:Heating:The surface of the reinforcement core material of step S101 is heated to into 145-150 DEG C, then will strengthen core
The surface of material carries out annular knurl process;
S103:Cladding:Under the conditions of 185-200 DEG C, ready band bulk material even roller is pressed in into step S102
The surface of the reinforcement core material for obtaining, forms overall band;
S104:Cooling and shaping:The band that step S103 is obtained is cooled to into 50-70 DEG C of sizing;
S105:Destressing is stretched:The band that step S104 is obtained is stretched, to the band surface without warpage and
Wave transformation.
Preferably, also include between step S104 and step S105:
The surface of the band obtained in step S104 carries out roll-in, to increase its surface roughness.
The present invention also provides a kind of production method of geotechnical grid band, and methods described comprises the steps:
S101:Unreel:Ready reinforcement core material is unreeled with the speed of 8-12 rice per minute, makes to open during unreeling
Power is constant for 12-15N;
S102:Heating:The surface of the reinforcement core material of step S101 is heated to into 180-200 DEG C, then will strengthen core
The surface of material carries out annular knurl process;
S103:Cladding:Under the conditions of 210-225 DEG C, ready band bulk material even roller is pressed in into step S102
The surface of the reinforcement core material for obtaining, forms overall band;
S104:Cooling and shaping:The band that step S103 is obtained is cooled to into 70-90 DEG C of sizing;
S105:Destressing is stretched:The band that step S104 is obtained is stretched, to the band surface without warpage and
Wave transformation.
Preferably, also include between step S104 and step S105:
The surface of the band obtained in step S104 carries out roll-in, to increase its surface roughness.
The present invention also provides a kind of production method of geotechnical grid band, and methods described comprises the steps:
S101:Unreel:Ready reinforcement core material is unreeled, the tension force that the reinforcement core material is made during unreeling is protected
Hold in 2-3N;
S102:Spraying:The surface spraying wetting agent of the strengthening core obtained in step S101, make it is described reinforcement core material regardless of
Dissipate;Described wetting agent is generally the mixture of film former and lubricant, can also have other materials certainly, to reach strengthening core
For the purpose of material does not disperse;
S103:Coating:The water-soluble modified Colophonium of surface-coated of the reinforcement core material obtained in step S102 and acrylic acid
The mixed diluting solution of glue, improves the compatibility for strengthening core material and bar band body;
Coating herein refers to that the reinforcement core material for obtaining step S102 is infiltrated in water-soluble modified Colophonium and acrylic acid
In the mixed diluting solution of glue, water-soluble modified Colophonium is deep into the mixed diluting solution of acrylate glue and strengthen core material
It is internal;
S104:Drying:The reinforcement core material drying that step S103 is obtained, removes the spray on surface;
S105:Ready band bulk material even roller briquetting is overlayed on into step S104 under the conditions of 185-200 DEG C to obtain
The surface of the reinforcement core material for arriving, forms overall band;
S106:Cooling and shaping:The band that step S105 is obtained is cooled to into 50-70 DEG C of sizing.
Preferably, methods described also includes step:
S107:Roll-in:The surface of the band obtained in step S106 is carried out into roller process, increases its surface roughness.
The present invention also provides a kind of geotechnical grid, including many bands described above, the spaced connection of adjacent two bars
Network structure is formed, junction forms node.
Preferably, the band and the node are global formation.
The band and the node are global formation, make to be formed without the need for Jing secondary operations at node, and people is saved in a large number
Power, material resources, and, the node strength of global formation has and the same intensity of base material, substantially increases node strength.
Technical scheme provided in an embodiment of the present invention can include following beneficial effect:
The present invention provides a kind of geotechnical grid band, the production method of band and geotechnical grid, the geotechnical grid band
Including bar band body and being coated on the intrinsic strengthening core of the band.The reinforcement core material is high-strength material, described
Bar band body is the excellent material of welding and connecting performance, and bi-material combines, and makes whole band that both there is inherent height to resist
Mechanical strength is drawn, it is outside that there is good welding and connecting performance again.
Description of the drawings
For the clearer explanation embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
The accompanying drawing to be used needed for having technology description is briefly described, it is clear that, to those skilled in the art, not
On the premise of paying creative work, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1 is a kind of overlooking the structure diagram of geotechnical grid provided in an embodiment of the present invention.
Fig. 2 is a kind of cross-sectional view of the band of geotechnical grid provided in an embodiment of the present invention.
Shown in figure:Band 1, bar band body 11, strengthening core 12, node 2.
Specific embodiment
In order that those skilled in the art more fully understand the technical scheme in the present invention, below in conjunction with of the invention real
The accompanying drawing in example is applied, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described enforcement
Example is only a part of embodiment of the invention, rather than the embodiment of whole.Based on the embodiment in the present invention, art technology
The every other embodiment that personnel are obtained under the premise of creative work is not made, should all belong to the protection model of the present invention
Enclose.
Referring to Fig. 1, a kind of overlooking the structure diagram of geotechnical grid provided in an embodiment of the present invention is shown.
As shown in Figure 1, the geotechnical grid includes multiple bands 1, and adjacent two bands 1 interval connection forms netted knot
Structure, junction forms node 2, and in the present embodiment, the band 1 and the node 2 are global formation.Without the need for Jing bis- times at node
Processing is formed, and human and material resources are saved in a large number, and, the node strength of global formation has and the same intensity of base material, significantly
Improve node strength.In other embodiments of the invention, after the node 2 that the junction of the band 1 is formed can also be
Phase processing, such as welding etc..In the geotechnical grid that the present invention is provided, described band 1 can be following any one embodiment
The band 1 of middle offer.
Referring to Fig. 2, a kind of cross section structure diagram of geotechnical grid band provided in an embodiment of the present invention is shown, schemed
Structure shown in 2 is that the band 1 shown in Fig. 1 fell, and makes the width of the band 1(Highly)During the horizontal positioned of direction, edge
The width of band 1(Highly)The profile in direction, the band of the offer in following embodiments is with the structure shown in Fig. 2 as base
Plinth.
Embodiment 1
The present embodiment provides a kind of geotechnical grid band, as shown in Fig. 2 band 1 includes bar band body 11 and is coated on described
Angle between the length direction of three strengthening cores 12 in bar band body 11, the strengthening core 12 and the bar band body 11 is
Zero degree.In the present embodiment, the reinforcement core material is cold drawn wire, and the band bulk material is PP(Polypropylene)Material.
The present embodiment also provides a kind of production method of geotechnical grid band, for producing above-mentioned band, the side
Method comprises the steps:
S101:Identical tension is unreeled:Ready cold drawn wire material is unreeled under the conditions of constant tension is 20N;
S102:Decontamination drying:The greasy dirt of the cold drawn wire material surface after unreeling in step S101 is removed, then by surface
Drying, is heated to 100 DEG C;Remove greasy dirt before sub-wire is wound to cold drawn wire, determine cold drawn wire do not occur winding and
Intersect chaotic;
S103:Cladding:Under the conditions of 190 DEG C, ready polypropylene material even roller briquetting is overlying on into step S102 and is obtained
The cold drawn wire material surface for arriving, forms overall band 1;
S104:Cooling and shaping:The band 1 that step S103 is obtained is cooled to 60 DEG C of sizings;
S105:Roll-in:The surface of the band 1 that step S104 is obtained carries out roll-in, increases surface roughness.
In this enforcement, after step S105, size according to actual needs is cut to band 1, can be with after cutting
Band 1 is rolled into storage stand-by, it is constant to make to batch torque when batching, and batches using double:What one station was batched
Meanwhile, another station in last volume or waiting state, after the completion of coiling station, two stations can switching state online, circulate
Use.
Embodiment 2
The present embodiment provides a kind of geotechnical grid band, as shown in Fig. 2 band 1 includes bar band body 11 and is coated on described
Angle between the length direction of three strengthening cores 12 in bar band body 11, the strengthening core 12 and the bar band body 11 is
Zero degree.In the present embodiment, the reinforcement core material is steel band, and the band bulk material is PE(Polyethylene)Material.
The present embodiment also provides a kind of production method of geotechnical grid band, for producing above-mentioned band, the side
Method comprises the steps:
S101:Identical tension is unreeled:Ready steel band is unreeled under the conditions of constant tension is 25N;
S102:Decontamination drying:The greasy dirt of the steel strip surface after unreeling in step S101 is removed, then by skin drying, plus
Heat is to 95 DEG C;Steel band is wound before greasy dirt is removed send band, determine that steel band does not fold and intersect confusion;
S103:Cladding:Under the conditions of 185 DEG C, ready polythene material even roller briquetting is overlying on into step S102 and is obtained
The steel strip surface for arriving, forms overall band 1;
S104:Cooling and shaping:The band 1 that step S103 is obtained is cooled to 50 DEG C of sizings;
S105:Roll-in:The surface of the band 1 that step S104 is obtained carries out roll-in, increases surface roughness.
In this enforcement, after step S105, size according to actual needs is cut to band 1, can be with after cutting
Band 1 is rolled into storage stand-by.
Embodiment 3
The present embodiment provides a kind of geotechnical grid band, as shown in Fig. 2 band 1 includes bar band body 11 and is coated on described
Angle between the length direction of three strengthening cores 12 in bar band body 11, the strengthening core 12 and the bar band body 11 is
Zero degree.In the present embodiment, the reinforcement core material is steel band, and the band bulk material is PP(Polypropylene)Material.
The present embodiment also provides a kind of production method of geotechnical grid band, for producing above-mentioned band, the side
Method comprises the steps:
S101:Identical tension is unreeled:Ready steel band is unreeled under the conditions of constant tension is 30N;
S102:Decontamination drying:The greasy dirt of the steel strip surface after unreeling in step S101 is removed, then by skin drying, plus
Heat is to 105 DEG C;Steel band is wound before greasy dirt is removed send band, determine that steel band does not fold and intersect confusion;
S103:Cladding:Under the conditions of 200 DEG C, ready polypropylene material even roller briquetting is overlying on into step S102 and is obtained
The reinforcement core material surfaces for arriving, form overall band 1;
S104:Cooling and shaping:The band 1 that step S103 is obtained is cooled to 70 DEG C of sizings;
S105:Roll-in:The surface of the band 1 that step S104 is obtained carries out roll-in, increases surface roughness.
In this enforcement, after step S105, size according to actual needs is cut to band 1, can be with after cutting
Band 1 is rolled into storage stand-by, it is constant to make to batch torque when batching, and batches using double:What one station was batched
Meanwhile, another station in last volume or waiting state, after the completion of coiling station, two stations can switching state online, circulate
Use.
Embodiment 4
The present embodiment provides a kind of geotechnical grid band, as shown in Fig. 2 band 1 includes bar band body 11 and is coated on described
Angle between the length direction of three strengthening cores 12 in bar band body 11, the strengthening core 12 and the bar band body 11 is
Zero degree.In the present embodiment, the reinforcement core material is cold drawn wire, and the band bulk material is PE(Polyethylene)Material.
The present embodiment also provides a kind of production method of geotechnical grid band, for producing above-mentioned band, the side
Method comprises the steps:
S101:Identical tension is unreeled:Ready cold drawn wire material is unreeled under the conditions of constant tension is 25N;
S102:Decontamination drying:The greasy dirt of the cold drawn wire material surface after unreeling in step S101 is removed, then by surface
Drying, is heated to 100 DEG C;Remove greasy dirt before sub-wire is wound to cold drawn wire, determine cold drawn wire do not occur winding and
Intersect chaotic;
S103:Cladding:Under the conditions of 190 DEG C, ready polythene material even roller briquetting is overlying on into step S102 and is obtained
The cold drawn wire material surface for arriving, forms overall band 1;
S104:Cooling and shaping:The band 1 that step S103 is obtained is cooled to 60 DEG C of sizings;
S105:Roll-in:The surface of the band 1 that step S104 is obtained carries out roll-in, increases surface roughness.
In this enforcement, after step S105, size according to actual needs is cut to band 1, can be with after cutting
Band 1 is rolled into storage stand-by, it is constant to make to batch torque when batching, and batches using double:What one station was batched
Meanwhile, another station in last volume or waiting state, after the completion of coiling station, two stations can switching state online, circulate
Use.
Embodiment 5
The present embodiment provides a kind of geotechnical grid band, as shown in Fig. 2 band 1 includes bar band body 11 and is coated on described
Angle between the length direction of three strengthening cores 12 in bar band body 11, the strengthening core 12 and the bar band body 11 is
Zero degree.In the present embodiment, the reinforcement core material is PP(Polypropylene)Tension belt, the band bulk material is PP(Polypropylene)
Material.
The present embodiment also provides a kind of production method of geotechnical grid band, for producing above-mentioned band, the side
Method comprises the steps:
S101:Unreel:Ready polypropylene stretching carrying material is unreeled with 8 meters per minute of speed, during unreeling
Constant tension is set to be 8N;
S102:Heating:The surface that the polypropylene of step S101 stretches carrying material is heated to into 145 DEG C, then by polypropylene
The surface of stretching carrying material carries out annular knurl process;
S103:Cladding:Under the conditions of 185 DEG C, ready polypropylene material even roller is pressed in into what step S102 was obtained
Polypropylene stretches the surface of carrying material, forms overall band 1;
S104:Cooling and shaping:The band 1 that step S103 is obtained is cooled to 50 DEG C of sizings;Then roller is carried out to its surface
Pressure, to increase surface roughness;
S105:Destressing is stretched:The band 1 that step S104 is obtained is stretched, and the surface to the band 1 is without warpage
And wave transformation.
In the present embodiment, after step S105, size according to actual needs is cut to band 1, can after cutting
Stand-by so that band 1 rolled into storage, it is constant to make to batch torque when batching, and is batched using double:One station is batched
While, another station in last volume or waiting state, after the completion of coiling station, two stations can switching state online, follow
Ring is used.
Embodiment 6
The present embodiment provides a kind of geotechnical grid band, as shown in Fig. 2 band 1 includes bar band body 11 and is coated on described
Angle between the length direction of three strengthening cores 12 in bar band body 11, the strengthening core 12 and the bar band body 11 is
Zero degree.In the present embodiment, the reinforcement core material is PP(Polypropylene)Tension belt, the band bulk material is PE(Polyethylene)
Material.
The present embodiment also provides a kind of production method of geotechnical grid band, for producing above-mentioned band, the side
Method comprises the steps:
S101:Unreel:Ready PP tension belts are unreeled with 12 meters per minute of speed, makes tension force permanent during unreeling
It is set to 10N;
S102:Heating:Step S101 plus PP tension belts surface is heated to into 150 DEG C, then PP carrying material is stretched into
Surface carry out annular knurl process;
S103:Cladding:Under the conditions of 200 DEG C, ready polythene material even roller is pressed in into what step S102 was obtained
PP stretches the surface of carrying material, forms overall band 1;
S104:Cooling and shaping:The band 1 that step S103 is obtained is cooled to 70 DEG C of sizings;Then roller is carried out to its surface
Pressure, to increase surface roughness;
S105:Destressing is stretched:The band 1 that step S104 is obtained is stretched, and the surface to the band 1 is without warpage
And wave transformation.
In the present embodiment, after step S105, size according to actual needs is cut to band 1, can after cutting
Stand-by so that band 1 rolled into storage, it is constant to make to batch torque when batching, and is batched using double:One station is batched
While, another station in last volume or waiting state, after the completion of coiling station, two stations can switching state online, follow
Ring is used.
Embodiment 7
The present embodiment provides a kind of geotechnical grid band, as shown in Fig. 2 band 1 includes bar band body 11 and is coated on described
Angle between the length direction of three strengthening cores 12 in bar band body 11, the strengthening core 12 and the bar band body 11 is
Zero degree.In the present embodiment, the reinforcement core material is PET(Polyethylene terephthalate)Tension belt, the bar band body
Material is PE(Polyethylene)Material.
The present embodiment also provides a kind of production method of geotechnical grid band, for producing above-mentioned band, the side
Method comprises the steps:
S101:Unreel:Ready polyethylene terephthalate tension belt is unreeled with 8 meters per minute of speed,
Constant tension is set to be 12N during unreeling;
S102:Heating:Step S101 plus polyethylene terephthalate tension belt surface is heated to into 180 DEG C,
Then the surface for strengthening core material is carried out into annular knurl process;
S103:Cladding:Under the conditions of 210 DEG C, ready polythene material even roller is pressed in into what step S102 was obtained
The surface of polyethylene terephthalate tension belt, forms overall band 1;
S104:Cooling and shaping:The band 1 that step S103 is obtained is cooled to 70 DEG C of sizings;Then the surface of band 1 is entered
Row roll-in, to increase its surface roughness;
S105:Destressing is stretched:The band 1 that step S104 is obtained is stretched, and the surface to the band 1 is without warpage
And wave transformation.
In the present embodiment, after step S105, size according to actual needs is cut to band 1, can after cutting
Stand-by so that band 1 rolled into storage, it is constant to make to batch torque when batching, and is batched using double:One station is batched
While, another station in last volume or waiting state, after the completion of coiling station, two stations can switching state online, follow
Ring is used.
Embodiment 8
The present embodiment provides a kind of geotechnical grid band, as shown in Fig. 2 band 1 includes bar band body 11 and is coated on described
Angle between the length direction of three strengthening cores 12 in bar band body 11, the strengthening core 12 and the bar band body 11 is
Zero degree.In the present embodiment, the reinforcement core material is PET(Polyethylene terephthalate)Tension belt, the bar band body
Material is PP(Polypropylene)Material.
The present embodiment also provides a kind of production method of geotechnical grid band, for producing above-mentioned band, the side
Method comprises the steps:
S101:Unreel:Ready polyethylene terephthalate tension belt is unreeled with 12 meters per minute of speed,
Constant tension is set to be 15N during unreeling;
S102:Heating:Step S101 plus polyethylene terephthalate tension belt surface is heated to into 200 DEG C,
Then the surface for strengthening core material is carried out into annular knurl process;
S103:Cladding:Under the conditions of 225 DEG C, ready polypropylene material even roller is pressed in into what step S102 was obtained
The surface of polyethylene terephthalate tension belt, forms overall band 1;
S104:Cooling and shaping:The band 1 that step S103 is obtained is cooled to 90 DEG C of sizings;Then the surface of band 1 is entered
Row roll-in, to increase its surface roughness;
S105:Destressing is stretched:The band 1 that step S104 is obtained is stretched, and the surface to the band 1 is without warpage
And wave transformation.
In the present embodiment, after step S105, size according to actual needs is cut to band 1, can after cutting
Stand-by so that band 1 rolled into storage, it is constant to make to batch torque when batching, and is batched using double:One station is batched
While, another station in last volume or waiting state, after the completion of coiling station, two stations can switching state online, follow
Ring is used.
Embodiment 9
The present embodiment provides a kind of geotechnical grid band, as shown in Fig. 2 band 1 includes bar band body 11 and is coated on described
Angle between the length direction of three strengthening cores 12 in bar band body 11, the strengthening core 12 and the bar band body 11 is
Zero degree.In the present embodiment, the reinforcement core material is glass fibre, and the band bulk material is PP(Polypropylene)Material.
The present embodiment also provides a kind of production method of geotechnical grid band, for producing above-mentioned band, the side
Method comprises the steps:
S101:Unreel:Ready glass fibre is unreeled, the tension force that the glass fibre is made during unreeling is maintained at
2N;
S102:Spraying:The one layer of wetting agent of surface spraying for the strengthening core obtained in step S101, makes the reinforcement core material
Do not disperse;
S103:Coating:Step S102 is obtained reinforcement core material strengthening core material infiltration water-soluble modified Colophonium with
In the mixed diluting solution of acrylate glue, water-soluble modified Colophonium deeply strengthens core material with the mixed diluting solution of acrylate glue
Inside, improves the compatibility for strengthening core material and bar band body 1;
S104:Drying:The glass fibre drying that step S103 is obtained, removes the painting objects on surface;
S105:Ready polypropylene material even roller briquetting is overlayed on into the glass that step S104 is obtained under the conditions of 185 DEG C
The surface of glass fiber, forms overall band 1;
S106:Cooling and shaping:The band 1 that step S105 is obtained is cooled to 50 DEG C of sizings;
S107:Roll-in:The surface of the band 1 obtained in step S106 is carried out into roller process, increases its surface roughness.
In the present embodiment, after step S107, size according to actual needs is cut to band 1, can after cutting
It is stand-by so that band 1 is rolled into storage.
Embodiment 10
The present embodiment provides a kind of geotechnical grid band, as shown in Fig. 2 band 1 includes bar band body 11 and is coated on described
Angle between the length direction of three strengthening cores 12 in bar band body 11, the strengthening core 12 and the bar band body 11 is
Zero degree.In the present embodiment, the reinforcement core material is glass fibre, and the band bulk material is PE(Polyethylene)Material.
The present embodiment also provides a kind of production method of geotechnical grid band, for producing above-mentioned band, the side
Method comprises the steps:
S101:Unreel:Ready glass fibre is unreeled, the tension force that the glass fibre is made during unreeling is maintained at
3N;
S102:Spraying:The surface spraying wetting agent of the strengthening core obtained in step S101, make it is described reinforcement core material regardless of
Dissipate;
S103:Coating:Step S102 is obtained reinforcement core material strengthening core material infiltration water-soluble modified Colophonium with
In the mixed diluting solution of acrylate glue, water-soluble modified Colophonium deeply strengthens core material with the mixed diluting solution of acrylate glue
Inside, improves the compatibility for strengthening core material and bar band body 1;
S104:Drying:The glass fibre drying that step S103 is obtained, removes the painting objects on surface;
S105:Ready polythene material even roller briquetting is overlayed on into the glass that step S104 is obtained under the conditions of 200 DEG C
The surface of glass fiber, forms overall band 1;
S106:Cooling and shaping:The band 1 that step S105 is obtained is cooled to 70 DEG C of sizings;
S107:Roll-in:The surface of the band 1 obtained in step S106 is carried out into roller process, increases its surface roughness.
In the present embodiment, combing point band can be carried out to glass fibre between step S102 and S103, it is ensured that glass fibers
Without friction in dimension transmit process, reduce and damage;After step S107, size according to actual needs is carried out point to band 1
Cut, band 1 can be rolled storage after cutting stand-by.
In other embodiments of the invention, the strengthening core 12 can also adopt the material of other high intensity, the bar
Band body 11 can also adopt the good material of other welding connecting performances, it is not limited to the material be given in above-described embodiment
Material, the reinforcement core material of high intensity is coated in the band bulk material of high welding connecting performance, whole band 1 was both had
Inherent high tensile mechanical strength, and with outside good welding and connecting performance.
In the various embodiments described above, the quantity of the strengthening core 12 is merely illustrative, in the other embodiment of the present invention
In, the quantity of the strengthening core 12 in each band body 11 can be with more or less, and its quantity sets according to use demand, not
It is confined to the quantity be given in above-described embodiment.
Jing is tested, and the outside welding of the band 1 that above-described embodiment 1-10 is provided and connecting performance are basic with existing band
Zero difference, but tensile strength is substantially better than existing band, 2-5 times of the existing ribbon tensile strength of average out to, using above-mentioned reality
The tensile strength for applying the geotechnical grid of the making of band 1 of example offer is substantially better than geotechnical grid of the prior art.
Certainly, described above is also not limited to the example above, the present invention can pass through without the technical characteristic of description or
Realized using prior art, be will not be described here;Above example and accompanying drawing are merely to illustrate technical scheme not
It is limitation of the present invention, reference has preferred embodiment been described in detail to the present invention, the ordinary skill people of this area
Member should be appreciated that change, remodeling, the addition that those skilled in the art are made in the essential scope of the present invention
Or replace without departure from spirit of the invention, should also belong to the claims of the present invention.
Claims (16)
1. a kind of geotechnical grid band, it is characterised in that the band(1)Including bar band body(11)Be coated on the bar
Band body(11)Interior strengthening core(12).
2. geotechnical grid band according to claim 1, it is characterised in that the strengthening core(12)With the band sheet
Body(11)Length direction between angle be more than or equal to zero degree, and less than 90 degree.
3. geotechnical grid band according to claim 1 and 2, it is characterised in that the strengthening core(12)For steel band and/
Or steel wire, the bar band body(11)For polypropylene or polythene material.
4. geotechnical grid band according to claim 1 and 2, it is characterised in that the strengthening core(12)For polypropylene
Tension belt, the bar band body(11)For polypropylene or polythene material.
5. geotechnical grid band according to claim 1 and 2, it is characterised in that the strengthening core(12)For poly- to benzene
Naphthalate tension belt, the bar band body(11)For polypropylene or polythene material.
6. geotechnical grid band according to claim 1 and 2, it is characterised in that the strengthening core(12)For glass fibers
Dimension, the bar band body(11)For polypropylene or polythene material.
7. a kind of production method of geotechnical grid band as claimed in claim 3, it is characterised in that methods described include as
Lower step:
S101:Identical tension is unreeled:Ready reinforcement core material is unreeled under the conditions of constant tension is 20-30N;
S102:Decontamination drying:The greasy dirt of the reinforcement core material surfaces after unreeling in step S101 is removed, then dries on surface
It is dry, it is heated to 95 DEG C -105 DEG C;
S103:Cladding:Under the conditions of 185-200 DEG C, ready band bulk material even roller briquetting is overlying on into the step
The reinforcement core material surfaces that S102 is obtained, form overall band(1);
S104:Cooling and shaping:The band that step S103 is obtained(1)It is cooled to 50-70 DEG C of sizing;
S105:Roll-in:The band that step S104 is obtained(1)Surface carry out roll-in, increase surface roughness.
8. the production method of geotechnical grid band according to claim 7, it is characterised in that step S102 it
Before be wound send band and/or winding wire feed, the steel band and/or steel wire is not folded and intersect confusion.
9. a kind of production method of geotechnical grid band as claimed in claim 4, it is characterised in that methods described include as
Lower step:
S101:Unreel:Ready reinforcement core material is unreeled with the speed of 8-12 rice per minute, makes to open during unreeling
Power is constant for 8-10N;
S102:Heating:The surface of the reinforcement core material of step S101 is heated to into 145-150 DEG C, then will strengthen core
The surface of material carries out annular knurl process;
S103:Cladding:Under the conditions of 185-200 DEG C, ready band bulk material even roller is pressed in into step S102
The surface of the reinforcement core material for obtaining, forms overall band(1);
S104:Cooling and shaping:The band that step S103 is obtained(1)It is cooled to 50-70 DEG C of sizing;
S105:Destressing is stretched:The band that step S104 is obtained(1)Stretched, to the band(1)Surface without
Warpage and wave transformation.
10. the production method of geotechnical grid band according to claim 9, it is characterised in that step S104 and
Also include between step S105:
In the band that step S104 is obtained(1)Surface carry out roll-in, to increase its surface roughness.
11. a kind of production methods of geotechnical grid band as claimed in claim 5, it is characterised in that methods described includes
Following steps:
S101:Unreel:Ready reinforcement core material is unreeled with the speed of 8-12 rice per minute, makes to open during unreeling
Power is constant for 12-15N;
S102:Heating:The surface of the reinforcement core material of step S101 is heated to into 180-200 DEG C, then will strengthen core
The surface of material carries out annular knurl process;
S103:Cladding:Under the conditions of 210-225 DEG C, ready band bulk material even roller is pressed in into step S102
The surface of the reinforcement core material for obtaining, forms overall band(1);
S104:Cooling and shaping:The band that step S103 is obtained(1)It is cooled to 70-90 DEG C of sizing;
S105:Destressing is stretched:The band that step S104 is obtained(1)Stretched, to the band(1)Surface without
Warpage and wave transformation.
The production method of 12. geotechnical grid bands according to claim 11, it is characterised in that step S104 and
Also include between step S105:
In the band that step S104 is obtained(1)Surface carry out roll-in, to increase its surface roughness.
13. a kind of production methods of geotechnical grid band as claimed in claim 6, it is characterised in that methods described includes
Following steps:
S101:Unreel:Ready reinforcement core material is unreeled, the tension force that the reinforcement core material is made during unreeling is protected
Hold in 2-3N;
S102:Spraying:The surface spraying wetting agent of the strengthening core obtained in step S101, make it is described reinforcement core material regardless of
Dissipate;
S103:Coating:The water-soluble modified Colophonium of surface-coated of the reinforcement core material obtained in step S102 and acrylic acid
The mixed diluting solution of glue, improves the reinforcement core material and bar band body(1)The compatibility;
S104:Drying:The reinforcement core material drying that step S103 is obtained, removes the painting objects on surface;
S105:Ready band bulk material even roller briquetting is overlayed on into step S104 under the conditions of 185-200 DEG C to obtain
The surface of the reinforcement core material for arriving, forms overall band(1);
S106:Cooling and shaping:The band that step S105 is obtained(1)It is cooled to 50-70 DEG C of sizing.
The production method of 14. geotechnical grid bands according to claim 13, it is characterised in that methods described also includes
Step:
S107:Roll-in:The band that will be obtained in step S106(1)Surface carry out roller process, increase its rough surface
Degree.
15. a kind of geotechnical grids, it is characterised in that including the band described in many claim 1(1), adjacent two bands(1)
Interval connection forms network structure, and junction forms node(2).
16. geotechnical grids according to claim 15, it is characterised in that the band(1)With the node(2)For entirety
Molding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611093674.6A CN106592567B (en) | 2016-12-02 | 2016-12-02 | Geotechnical grid band, the production method of band and geotechnical grid |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611093674.6A CN106592567B (en) | 2016-12-02 | 2016-12-02 | Geotechnical grid band, the production method of band and geotechnical grid |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106592567A true CN106592567A (en) | 2017-04-26 |
CN106592567B CN106592567B (en) | 2019-01-22 |
Family
ID=58596903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611093674.6A Active CN106592567B (en) | 2016-12-02 | 2016-12-02 | Geotechnical grid band, the production method of band and geotechnical grid |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106592567B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237229A (en) * | 2017-06-22 | 2017-10-10 | 中国建筑土木建设有限公司 | Geotechnical grid and its construction method |
CN110805020A (en) * | 2019-11-14 | 2020-02-18 | 安徽捷思新材料科技有限公司 | I-cell production process of rope-penetrating soil with strip holes |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201411679Y (en) * | 2009-06-19 | 2010-02-24 | 宜兴市华泰土工材料有限公司 | High-strength glass-plastic compound geogrid |
CN201411678Y (en) * | 2009-06-19 | 2010-02-24 | 宜兴市华泰土工材料有限公司 | High-strength compound grid |
CN201447700U (en) * | 2009-06-19 | 2010-05-05 | 宜兴市华泰土工材料有限公司 | High-strength steel-plastic geocell |
CN201588218U (en) * | 2009-11-20 | 2010-09-22 | 宜兴市明辉塑料制品有限公司 | Plastic geocell |
WO2011105916A2 (en) * | 2010-02-26 | 2011-09-01 | Geo Globe Polska | Geocell with reduced creep and high microbiological and hydrolysis resistance |
CN102978830A (en) * | 2011-09-02 | 2013-03-20 | 上海杰事杰新材料(集团)股份有限公司 | Glass fiber/flame-retardance polypropylene fiber light composite board and preparation method thereof |
CN205444204U (en) * | 2015-12-29 | 2016-08-10 | 埃瑞弗(上海)规划设计工程咨询股份有限公司 | Vertical geogrid |
-
2016
- 2016-12-02 CN CN201611093674.6A patent/CN106592567B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201411679Y (en) * | 2009-06-19 | 2010-02-24 | 宜兴市华泰土工材料有限公司 | High-strength glass-plastic compound geogrid |
CN201411678Y (en) * | 2009-06-19 | 2010-02-24 | 宜兴市华泰土工材料有限公司 | High-strength compound grid |
CN201447700U (en) * | 2009-06-19 | 2010-05-05 | 宜兴市华泰土工材料有限公司 | High-strength steel-plastic geocell |
CN201588218U (en) * | 2009-11-20 | 2010-09-22 | 宜兴市明辉塑料制品有限公司 | Plastic geocell |
WO2011105916A2 (en) * | 2010-02-26 | 2011-09-01 | Geo Globe Polska | Geocell with reduced creep and high microbiological and hydrolysis resistance |
CN102978830A (en) * | 2011-09-02 | 2013-03-20 | 上海杰事杰新材料(集团)股份有限公司 | Glass fiber/flame-retardance polypropylene fiber light composite board and preparation method thereof |
CN205444204U (en) * | 2015-12-29 | 2016-08-10 | 埃瑞弗(上海)规划设计工程咨询股份有限公司 | Vertical geogrid |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237229A (en) * | 2017-06-22 | 2017-10-10 | 中国建筑土木建设有限公司 | Geotechnical grid and its construction method |
CN110805020A (en) * | 2019-11-14 | 2020-02-18 | 安徽捷思新材料科技有限公司 | I-cell production process of rope-penetrating soil with strip holes |
Also Published As
Publication number | Publication date |
---|---|
CN106592567B (en) | 2019-01-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106592567A (en) | Stripe used for earthwork standard room, production method of stripe and earthwork standard room | |
CN100393933C (en) | Gum dipping, stentering forming method of earthwork grid cloth | |
CN106125236A (en) | A kind of Full-drying type loose flange optic fibre dual-purpose optical cable of band indoor and outdoor | |
CN2876811Y (en) | Skeleton type optical fiber band optical cable | |
CN207829190U (en) | Composite board for architectural exterior insulation | |
CN104943186B (en) | A kind of compound infiltrating irrigation pipe of plastics and its manufacturing method | |
CN103287997A (en) | Double-layer winding hoisting mechanism | |
CN201694692U (en) | Paper pipe | |
CN106739196B (en) | Composite earthwork cloth and preparation method thereof and manufacturing equipment | |
CN207032198U (en) | Warp-knitting polyester GSZ | |
CN211707300U (en) | Gluing template for splicing wafer rods | |
CN206696501U (en) | A kind of optical cable stranding sheath continuous production device | |
CN210713247U (en) | Building steel structure connecting device | |
CN102636854A (en) | Cable ointment sprayed water-blocking strip-shaped cable | |
CN109138416A (en) | Bolt box hole removable combination bellows and its construction method | |
CN207875048U (en) | A kind of oil absorbent material for kitchen use | |
CN205294460U (en) | Creel | |
CN207037170U (en) | A kind of fluid type wind resistance power swings self-support aerial cable | |
CN103437237A (en) | Fiber net wet forming technology and special device thereof | |
CN211319794U (en) | Power cable with good wear resistance | |
CN203069839U (en) | Novel central bundle tube type ribbon-shaped optical fiber | |
CN204626366U (en) | Laying structure on a kind of standard bamboo net mud | |
CN216845898U (en) | Camouflage net capable of being spliced | |
CN216782915U (en) | Degradable anti-embroidery cloth | |
CN206301627U (en) | A kind of photoelectric composite extra-high-tension cable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20170426 Assignee: Shandong Liantuo New Material Co.,Ltd. Assignor: FEICHENG LIANYI ENGINEERING PLASTICS Co.,Ltd. Contract record no.: X2022980008237 Denomination of invention: Strips for geocell, production method of strips and geocell Granted publication date: 20190122 License type: Common License Record date: 20220620 |