CN106592444A - Novel single-beam bridge erecting machine - Google Patents

Novel single-beam bridge erecting machine Download PDF

Info

Publication number
CN106592444A
CN106592444A CN201710062442.2A CN201710062442A CN106592444A CN 106592444 A CN106592444 A CN 106592444A CN 201710062442 A CN201710062442 A CN 201710062442A CN 106592444 A CN106592444 A CN 106592444A
Authority
CN
China
Prior art keywords
assembly
supporting leg
erecting machine
bridge erector
bridge erecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710062442.2A
Other languages
Chinese (zh)
Other versions
CN106592444B (en
Inventor
童国柱
童巨苍
张苗红
项广力
袁金金
师韵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGJIAN LUQIAO EQUIPMENT Co Ltd
Original Assignee
ZHONGJIAN LUQIAO EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGJIAN LUQIAO EQUIPMENT Co Ltd filed Critical ZHONGJIAN LUQIAO EQUIPMENT Co Ltd
Priority to CN201710062442.2A priority Critical patent/CN106592444B/en
Publication of CN106592444A publication Critical patent/CN106592444A/en
Application granted granted Critical
Publication of CN106592444B publication Critical patent/CN106592444B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a novel single-beam bridge erecting machine which comprises a bridge erecting machine body. The bridge erecting machine body comprises a supporting leg, a guide beam assembly, reverse roller sets, a hoisting trolley, a main beam assembly, a power generator set, an operation and control system, a beam transport vehicle, a transverse moving rail structure, a travelling crane power supply device assembly and saddle tying hawser cables. The supporting leg comprises a front auxiliary supporting leg body, a front supporting leg assembly, a middle supporting leg assembly and a tail supporting leg assembly. The front auxiliary supporting leg body is arranged at one end of the bridge erecting machine body. The top of the front auxiliary supporting leg body is provided with the guide beam assembly. The tail supporting leg assembly is arranged at the end, opposite to the end provided with the front auxiliary supporting leg body, of the bridge erecting machine body. The novel single-beam bridge erecting machine is simple in structure, high in practicality and easy to popularize, and by arranging a saddle and the saddle tying hawser cables, the hawser cables are not needed when the bridge erecting machine is at work and are tied when the bridge erecting machine does not work, the windproof effect can be achieved, the stability of the truss type single-beam bridge erecting machine is improved, the bridge erecting machine is safe to use, and property loss is reduced.

Description

A kind of new single-beam type Bridge Erector
Technical field
The present invention relates to a kind of Bridge Erector, more particularly to a kind of new single-beam type Bridge Erector.
Background technology
Bridge Erector is exactly the equipment that prefabricated beam piece is placed into into prefabricated bridge pier up.Bridge Erector belongs to crane Category, because its major function is to lift beam piece, is then transported to behind position and puts down.But itself and crane in general sense It is very different.The condition that it is required is harsh, and there is traveling on beam piece, or cries vertical shift.It is public that Bridge Erector is divided into erection Road and bridge, conventional railway bridge, railway of passengers' private line bridge etc. are several.
Existing single beam girder erecting machine its less stable when in use, because lacking saddle and saddle system cable wind rope, is there is wind Weather environment under, the windproof poor problem of single beam girder erecting machine.
The content of the invention
The present invention proposes a kind of new single-beam type Bridge Erector, solves in prior art single beam girder erecting machine when in use, Its less stable, because lacking saddle and saddle system cable wind rope, under windy day environment, single beam girder erecting machine it is windproof compared with Poor problem, uses single beam girder erecting machine safer.
In order to solve above-mentioned technical problem, the invention provides following technical scheme:
A kind of new single-beam type Bridge Erector of the present invention, including Bridge Erector body, the Bridge Erector body includes supporting leg, nose girder Assembly, anti-roller group, trolley, girder assembly, generating set, operation and control system, beam car, cross moving track structure, Purlin car electric supply installation assembly and saddle system cable wind rope, supporting leg includes front auxiliary leg, front leg strut assembly, middle supporting leg assembly and tail Lower limb assembly, the front auxiliary leg is arranged on one end of Bridge Erector body, is set to nose girder at the top of the front auxiliary leg total , one end that the Bridge Erector body is relatively set with front auxiliary leg is provided with tail supporting leg assembly, the one of the nose girder assembly End is provided with beam car, and trolley, generating set and operation and control system are provided with the top of described nose girder assembly one end, Saddle system cable wind rope is provided with the nose girder assembly, girder assembly, the operation are provided between saddle system cable wind rope And control system is connected with remote controller signal.
As a preferred technical solution of the present invention, cross moving track structure and purlin car are provided with the front leg strut assembly Electric supply installation assembly, the purlin car electric supply installation assembly is arranged on the top of cross moving track structure.
As a preferred technical solution of the present invention, anti-roller is installed between the front leg strut assembly and nose girder assembly Group.
It is total in nose girder between the front auxiliary leg and tail supporting leg assembly as a preferred technical solution of the present invention Into being above provided with front leg strut assembly and middle supporting leg assembly.
Used as a preferred technical solution of the present invention, the generating set adopts 90KW electrostatic generating units.
The beneficial effect that reached of the present invention is:The simple structure of the present invention, it is practical, it is easy to promote, by being provided with Saddle and saddle system cable wind rope, operationally do not need cable wind rope, and system's cable wind rope when not working can play the effect of Radix Saposhnikoviae, The stability of the Bridge Erector of truss-like single-beam is improved, safer, the loss of reduction property is used.
Description of the drawings
Fig. 1 is the subjective structural representation of the present invention;
Fig. 2 is the B-B structure sectional views of the present invention.
In figure:1st, front auxiliary leg;2nd, nose girder assembly;3rd, front leg strut assembly;4th, anti-roller group;5th, trolley;6th, it is main Beam assembly;7th, middle supporting leg assembly;8th, generating set;9th, operation and control system;10th, beam car;11st, tail supporting leg assembly;12nd, it is horizontal Move track structure;13rd, purlin car electric supply installation assembly;14th, saddle system cable wind rope;15th, Bridge Erector body.
Specific embodiment
Below by embodiment, and accompanying drawing is combined, technical scheme is described in further detail.
Embodiment:A kind of new single-beam type Bridge Erector, as shown in Figure 1-2, including Bridge Erector body 15, Bridge Erector body 15 Including supporting leg, nose girder assembly 2, anti-roller group 4, trolley 5, girder assembly 6, generating set 8, operation and control system 9, fortune Beam car 10, cross moving track structure 12, purlin car electric supply installation assembly 13 and saddle system cable wind rope 14, supporting leg include front auxiliary leg 1, Front leg strut assembly 3, middle supporting leg assembly 7 and tail supporting leg assembly 11, front auxiliary leg 1 is arranged on one end of Bridge Erector body 15, front The top of auxiliary leg 1 is set to nose girder assembly 2, and Bridge Erector body 15 is relatively set with one end of front auxiliary leg 1 and is provided with Tail supporting leg assembly 11, one end of nose girder assembly 2 is provided with beam car 10, and at the top of described one end of nose girder assembly 2 lifting is provided with Dolly 5, generating set 8 and operation and control system 9, are provided with saddle system cable wind rope 14, the saddle on the nose girder assembly 2 It is that girder assembly 6 is provided between cable wind rope 14, the operation and control system 9 are connected with remote controller signal, are easy to building bridge Machine carries out remote operation control.
Preferably, cross moving track structure 12 and purlin car electric supply installation assembly 13 are provided with the front leg strut assembly 3, it is described Purlin car electric supply installation assembly 13 is easy to the movement of purlin car on Bridge Erector installed in the top of cross moving track structure 12.
Preferably, anti-roller group 4 is installed between the front leg strut assembly 3 and nose girder assembly 2, is easy to front leg strut assembly 3 Movement, improve the motility of front leg strut assembly 3.
Preferably, it is provided with front leg strut assembly on the nose girder assembly 2 between the front auxiliary leg 1 and tail supporting leg assembly 11 3 and middle supporting leg assembly 7, increase the structural stability can of Bridge Erector.
Preferably, the generating set 8 adopts 90KW electrostatic generating units, reduces the noise produced when Bridge Erector is used, Improve the environmental quality of staff.
The simple structure of the present invention, it is practical, it is easy to promote, by being provided with saddle and saddle system cable wind rope 14, Cable wind rope is not needed during work, system's cable wind rope when not working can play the effect of Radix Saposhnikoviae, improve the Bridge Erector of truss-like single-beam Stability, uses safer, the loss of reduction property.
Finally it is pointed out that above example is only the more representational example of the present invention.It is clear that the invention is not restricted to Above-described embodiment, can also there is many deformations.Any letter that every technical spirit according to the present invention is made to above example Single modification, equivalent variations and modification, are considered as belonging to protection scope of the present invention.

Claims (5)

1. a kind of new single-beam type Bridge Erector, including Bridge Erector body (15), it is characterised in that Bridge Erector body (15) bag Include supporting leg, nose girder assembly (2), anti-roller group (4), trolley (5), girder assembly (6), generating set (8), operation and control System (9), beam car (10), cross moving track structure (12), purlin car electric supply installation assembly (13) and saddle system cable wind rope (14), Lower limb includes front auxiliary leg (1), front leg strut assembly (3), middle supporting leg assembly (7) and tail supporting leg assembly (11), the front auxiliary Lower limb (1) is arranged on one end of Bridge Erector body (15), and at the top of the front auxiliary leg (1) nose girder assembly (2) is set to, described Bridge Erector body (15) is relatively set with one end of front auxiliary leg (1) and is provided with tail supporting leg assembly (11), the nose girder assembly (2) one end is provided with beam car (10), and at the top of described nose girder assembly (2) one end trolley (5), generating set are provided with (8) and operation and control system (9), saddle system cable wind rope (14), the saddle heaving pile wind are provided with the nose girder assembly (2) Girder assembly (6) is provided between rope (14), the operation and control system (9) are connected with remote controller signal.
2. a kind of new single-beam type Bridge Erector according to claim 1, it is characterised in that on the front leg strut assembly (3) Cross moving track structure (12) and purlin car electric supply installation assembly (13) are provided with, the purlin car electric supply installation assembly (13) is installed in horizontal stroke Move the top of track structure (12).
3. a kind of new single-beam type Bridge Erector according to claim 1, it is characterised in that the front leg strut assembly (3) and Anti- roller group (4) is installed between nose girder assembly (2).
4. a kind of new single-beam type Bridge Erector according to claim 1, it is characterised in that the front auxiliary leg (1) and Between tail supporting leg assembly (11), front leg strut assembly (3) and middle supporting leg assembly (7) are provided with nose girder assembly (2).
5. a kind of new single-beam type Bridge Erector according to claim 1, it is characterised in that the generating set (8) adopts 90KW electrostatic generating units.
CN201710062442.2A 2017-01-24 2017-01-24 A kind of novel single-beam type Bridge Erector Active CN106592444B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710062442.2A CN106592444B (en) 2017-01-24 2017-01-24 A kind of novel single-beam type Bridge Erector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710062442.2A CN106592444B (en) 2017-01-24 2017-01-24 A kind of novel single-beam type Bridge Erector

Publications (2)

Publication Number Publication Date
CN106592444A true CN106592444A (en) 2017-04-26
CN106592444B CN106592444B (en) 2018-11-06

Family

ID=58586744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710062442.2A Active CN106592444B (en) 2017-01-24 2017-01-24 A kind of novel single-beam type Bridge Erector

Country Status (1)

Country Link
CN (1) CN106592444B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700367A (en) * 2017-11-22 2018-02-16 浙江中建路桥设备有限公司 A kind of integrated bridge machine
CN110273370A (en) * 2018-03-17 2019-09-24 中国铁路总公司 Guide girder machine is installed on to the method for station of setting a roof beam in place

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009287360A (en) * 2008-06-02 2009-12-10 Ihi Corp Overhang electing method and bridge girder block
CN202755313U (en) * 2012-07-25 2013-02-27 中铁十一局集团有限公司 Tunnel portal short-distance girder-erecting and tunnel-passing bridge-erecting machine
CN103572699A (en) * 2012-08-03 2014-02-12 浙江中建路桥设备有限公司 Novel road bridge girder erection machine
CN203654188U (en) * 2013-09-29 2014-06-18 浙江中建路桥设备有限公司 Novel multifunctional bridge erecting machine
CN104594198A (en) * 2014-11-28 2015-05-06 中铁二十三局集团有限公司 Method for erecting parallel box girders in tunnel
CN206553958U (en) * 2017-01-24 2017-10-13 浙江中建路桥设备有限公司 A kind of new single-beam type Bridge Erector

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009287360A (en) * 2008-06-02 2009-12-10 Ihi Corp Overhang electing method and bridge girder block
CN202755313U (en) * 2012-07-25 2013-02-27 中铁十一局集团有限公司 Tunnel portal short-distance girder-erecting and tunnel-passing bridge-erecting machine
CN103572699A (en) * 2012-08-03 2014-02-12 浙江中建路桥设备有限公司 Novel road bridge girder erection machine
CN203654188U (en) * 2013-09-29 2014-06-18 浙江中建路桥设备有限公司 Novel multifunctional bridge erecting machine
CN104594198A (en) * 2014-11-28 2015-05-06 中铁二十三局集团有限公司 Method for erecting parallel box girders in tunnel
CN206553958U (en) * 2017-01-24 2017-10-13 浙江中建路桥设备有限公司 A kind of new single-beam type Bridge Erector

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵昕玮: ""电网工程造价信息平台的构建研究"", 《中国优秀硕士学位论文全文数据库经济与管理科学辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700367A (en) * 2017-11-22 2018-02-16 浙江中建路桥设备有限公司 A kind of integrated bridge machine
CN110273370A (en) * 2018-03-17 2019-09-24 中国铁路总公司 Guide girder machine is installed on to the method for station of setting a roof beam in place
CN110273370B (en) * 2018-03-17 2021-06-25 中国铁路总公司 Method for installing beam guide machine on beam erecting station

Also Published As

Publication number Publication date
CN106592444B (en) 2018-11-06

Similar Documents

Publication Publication Date Title
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN203855866U (en) Large-span frame bridge overhead roof with beams convenient to construct
CN203383148U (en) Span internal lifting device for small prefabricated box girders
CN102020206A (en) Ropeway transport system of long-span steep terrain wind power device
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN105002831A (en) Wheel-rail type loading and traveling cable crane
CN101481903B (en) Method for constructing hilly region rope-suspension bridge main beam by span cable supported crane assembling
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN201933415U (en) Highway and railway twin-girder bridge erection machine
CN106592444A (en) Novel single-beam bridge erecting machine
CN111711117A (en) Special equipment is strideed across to reliability
CN103774543A (en) Deck bridge with cable-arch combination structure
CN206986644U (en) A kind of tunnel track simply removes device
CN206553958U (en) A kind of new single-beam type Bridge Erector
CN203716044U (en) Low bearing or middle bearing cable arch combined structural bridge
CN201118145Y (en) Powerline aerial spanning device
CN202730569U (en) Simply-supported beam track skeleton laying car
CN201914860U (en) Cableway transporting system of large-span steep terrain wind power equipment
CN205367521U (en) Novel intelligent hoist and mount system of super high -rise building core section of thick bamboo component
CN202415024U (en) Crane capable of climbing over beam-arch, climbing up slope and climbing down slope
CN207295408U (en) A kind of construction beam
CN201647844U (en) Beam lifting station without abutments
CN107747280A (en) The Bridge Erector of full span erection steel-pipe concrete truss
CN110042760A (en) One kind can be with the mobile deck unit erection gantry of load
CN207934293U (en) A kind of movable roof arch steel truss control thrust exempts from clamp rail device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Novel single-beam bridge erecting machine

Effective date of registration: 20190919

Granted publication date: 20181106

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Shaoxing Shangyu Small and Micro Enterprise Franchised Branch

Pledgor: ZHONGJIAN LUQIAO EQUIPMENT Co.,Ltd.

Registration number: Y2019330000073

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220808

Granted publication date: 20181106

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Shaoxing Shangyu Small and Micro Enterprise Franchised Branch

Pledgor: ZHONGJIAN LUQIAO EQUIPMENT Co.,Ltd.

Registration number: Y2019330000073