CN106586853A - Intelligent equipment for component hoisting and manufacturing method of equipment - Google Patents
Intelligent equipment for component hoisting and manufacturing method of equipment Download PDFInfo
- Publication number
- CN106586853A CN106586853A CN201710044545.6A CN201710044545A CN106586853A CN 106586853 A CN106586853 A CN 106586853A CN 201710044545 A CN201710044545 A CN 201710044545A CN 106586853 A CN106586853 A CN 106586853A
- Authority
- CN
- China
- Prior art keywords
- radar
- arm
- office
- crane
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/88—Safety gear
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/16—Applications of indicating, registering, or weighing devices
Abstract
The invention discloses intelligent equipment for component hoisting and a manufacturing method of the equipment. According to the method, a crane jib is equipped with a movable radar device and a camera; when the jib gets close to a high-voltage line, that is, the jib reaches a radar sensing zone, a crane driver and an office manager can make adjustment timely, and when the driver cannot see a hook and a hoisted material, safety accidents are caused relatively easily. Thus, the high-definition camera which can rotate in all directions is mounted at the top of the jib, field situations can be clearly shot, and the inconvenience caused by the blind zone is eliminated. Blind-zone-free operation by the crane driver and field management are integrated, so that hoisting construction is facilitated, the project progress, quality and safety are guaranteed, and the equipment can be adapted to more complex environment operation, can be operated more smoothly and efficiently and is higher in safety.
Description
Technical field
The present invention relates to the intelligent equipment of construction implement technical field, especially a kind of lifting component and its making side
Method.
Background technology
With the development of society, conventional concrete building is just having the trend that formula building is gradually substituted that is assembled.Assembled is built
Build under the support of national policy and environmental demand, quickly grow, and prefabricated rate is also incrementally increased, the structure such as precast beam, plate, post
Part enters in a large number job site.The characteristics of precast beam, plate, post is that volume or area are big, and weight is big.Precast beam, plate, post hang
An important step for building industrialization is pretended, it is smoothed out, affect the side such as progress, quality, safety of engineering aspect
Face;The importance of lifting can not be ignored.In reality, job site often has much can not resist factor, affects production activity, than
The such as severe factor of working environment, along with the difficulty for lifting these prefabricated components it is relatively large, it is desirable to higher, traditional crane is past
It is past to be difficult to meet smooth construction;In order to meet growing Production requirement, need to existing lifting utensil(Crane or tower
Hang)It is designed improvement and construction innovation.
The content of the invention
The technical problem to be solved is:Intelligent equipment of a kind of lifting component and preparation method thereof is provided, with
Overcome the deficiencies in the prior art.
What the present invention was realized in:
A kind of manufacture method of the intelligent equipment of lifting component, the method crane arm equip moveable radar installations and
One photographic head, in office and crane OPS equipment information receptor;When arm is near high-voltage line, that is, reach radar sense
When answering area, radar will pass to information at hoister operation and office and be expressed in the form of alarm song, lifting
Machine driver and office management personnel just can make adjustment in time, to avoid the generation of accident;When crane loading component etc.
When material is to two layers or more floorings, driver cannot see suspension hook and the material for being hung, now against commanding above with
Speech form passes on the driver of information to underground, and this is also to be easier to cause security incident.So far, install at the top of arm
One high-definition camera that can be rotated in all directions, can clearly take field condition, and be equipped with by scene in real time
Tell broadband transmission to hoister operation and office, hoister is just it will be clear that field condition, solution
That has determined that blind area brings is constant, is also convenient for office management personnel and makes a general survey of the live overall situation, and carries out real-time management.
A kind of intelligent equipment of lifting component, including gantry body, arranging on the arm arm top of heavy-duty machine body can 360 degree
The WiFi photographic head of rotation, is correspondingly arranged radar induction apparatuss, in the operation of heavy-duty machine body at the hoisting arm expansion section of heavy-duty machine body
Indoor setting radar and video receiver, shooting information and radar induction information are by on-site wireless network transmission to operation interior
Receptor, and make corresponding prompting..
As a result of above-mentioned technical proposal, compared with prior art, the present invention realizes that hoister is operated without blind spot
With field management integration, so as to facilitate lifting construction, project progress, quality and safety are ensured, and be enough adapted to more complicated
Environment work, operate it is more smooth efficiently, safety is higher.
Description of the drawings
Accompanying drawing 1 is the structural representation of the present invention;
Accompanying drawing 2 is the plane graph of the operation under a certain environment in the present invention.
Specific embodiment
Embodiments of the invention:A kind of manufacture method of the intelligent equipment of lifting component, the method is filled in crane arm
Standby moveable radar installations and a photographic head, in office and crane OPS equipment information receptor;When arm is leaned on
Nearly high-voltage line 7, that is, when reaching radar induction zone 8, radar will pass to information at hoister operation and office and with police
The form of report sound is expressed, and hoister and office management personnel just can make adjustment in time, to avoid accident
Occur;When the materials such as crane loading component are to two layers or more floorings, driver cannot see suspension hook and the material for being hung, this
When against commanding above with speech form pass on information to underground driver, this be also be easier cause security incident
's;So far, a high-definition camera that can be rotated in all directions is installed at the top of arm, field condition can be clearly taken
Come, and in real time by scene be equipped with tell broadband transmission to hoister operation and office, hoister just may be used
To be clear that field condition, solve that blind area brings is constant, is also convenient for office management personnel and makes a general survey of the live overall situation, and
Real-time management is carried out, other accompanying drawings are:Road in 9- stations, 10- is building building, 11- driver operations blind area.
A kind of intelligent equipment of lifting component according to needed for said method, as shown in drawings, including gantry body 6,
The arm top of arm 3 of heavy-duty machine body 6 arrange can 360 degree WiFi photographic head 1 for rotating, at the telescopic joint of arm 3 of heavy-duty machine body 6 pair
Radar induction apparatuss 2 should be set, radar and video receiver 4, the He of WiFi photographic head 1 are set in the operating room 5 of heavy-duty machine body 6
Radar induction apparatuss 2 are connected by wireless network with radar and video receiver 4.
The description of such scheme is the invention for being understood that for ease of those skilled in the art and using, and is familiar with
The personnel of art technology obviously easily can make various modifications to embodiment, therefore, the invention is not restricted to above-mentioned reality
Scheme, those skilled in the art's the method according to the invention, the improvement made without departing from scope and modification all should
Within protection scope of the present invention.
Claims (2)
1. the manufacture method that a kind of lifting component intellectuality is equipped, it is characterised in that:The method equips removable in crane arm
Dynamic radar installations and a photographic head, in office and crane OPS equipment information receptor;When arm is near high pressure
Line, that is, when reaching radar induction zone, radar will pass to information at hoister operation and office and with the shape of alarm song
Formula is expressed, and hoister and office management personnel just can make adjustment in time, to avoid the generation of accident;When rise
When the materials such as crane loading component are to two layers or more floorings, driver cannot see suspension hook and the material for being hung, now against upper
The commanding in face passes on the driver of information to underground with speech form, and this is also to be easier to cause security incident;So far,
One high-definition camera that can be rotated in all directions is installed at the top of arm, field condition can clearly be taken, and in real time
Tell broadband transmission to hoister operation and office by what scene was equipped with, hoister just can clearly be seen
To field condition, solve that blind area brings is constant, is also convenient for office management personnel and makes a general survey of the live overall situation, and is managed in real time
Reason.
2. a kind of intelligent equipment of lifting component, including gantry body(6), it is characterised in that:In heavy-duty machine body(6)Arm
(3)Arm top is arranged can 360 degree of WiFi photographic head for rotating(1), in heavy-duty machine body(6)Arm(3)It is correspondingly arranged at telescopic joint
Radar induction apparatuss(2), in heavy-duty machine body(6)Operating room(5)Interior setting radar and video receiver(4), the WiFi photographic head
(1)With radar induction apparatuss(2)By wireless network and radar and video receiver(4)Connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710044545.6A CN106586853A (en) | 2017-01-19 | 2017-01-19 | Intelligent equipment for component hoisting and manufacturing method of equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710044545.6A CN106586853A (en) | 2017-01-19 | 2017-01-19 | Intelligent equipment for component hoisting and manufacturing method of equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106586853A true CN106586853A (en) | 2017-04-26 |
Family
ID=58585041
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710044545.6A Pending CN106586853A (en) | 2017-01-19 | 2017-01-19 | Intelligent equipment for component hoisting and manufacturing method of equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106586853A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109191533A (en) * | 2018-08-21 | 2019-01-11 | 江苏德丰建设集团有限公司 | Tower crane high-altitude construction method based on assembled architecture |
CN112216063A (en) * | 2020-10-10 | 2021-01-12 | 深圳电目科技有限公司 | Method for improving construction safety of high-voltage power grid, intelligent controller and construction equipment |
US20210300731A1 (en) * | 2020-03-27 | 2021-09-30 | Sumitomo Heavy Industries Construction Cranes Co., Ltd. | Crane and monitoring device for crane |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200992464Y (en) * | 2006-12-30 | 2007-12-19 | 安徽朗讯科技有限公司 | Lifting mechanical apparatus with position safety monitoring system |
CN202170226U (en) * | 2011-07-18 | 2012-03-21 | 三一汽车起重机械有限公司 | Crane with large-view lower sight glass at boom end |
CN203079601U (en) * | 2012-12-28 | 2013-07-24 | 上海红箭自动化设备有限公司 | Automatic collision avoidance system for dock hoisting devices |
CN104340871A (en) * | 2013-08-09 | 2015-02-11 | 苗军 | Crane combiner |
CN104925676A (en) * | 2015-07-08 | 2015-09-23 | 湖北浩天专用汽车有限公司 | Vehicle-mounted tower-type aerial working system |
CN105480872A (en) * | 2016-01-15 | 2016-04-13 | 天津大学 | Automobile crane based on vision feedback and pole tower hoisting method thereof |
CN205634710U (en) * | 2016-05-31 | 2016-10-12 | 湖北天环建筑工程技术有限公司 | Tower crane remote control unit |
CN106121257A (en) * | 2016-08-16 | 2016-11-16 | 郑州暖树实业有限公司 | Component Intelligent transport method and system for assembled architecture |
-
2017
- 2017-01-19 CN CN201710044545.6A patent/CN106586853A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200992464Y (en) * | 2006-12-30 | 2007-12-19 | 安徽朗讯科技有限公司 | Lifting mechanical apparatus with position safety monitoring system |
CN202170226U (en) * | 2011-07-18 | 2012-03-21 | 三一汽车起重机械有限公司 | Crane with large-view lower sight glass at boom end |
CN203079601U (en) * | 2012-12-28 | 2013-07-24 | 上海红箭自动化设备有限公司 | Automatic collision avoidance system for dock hoisting devices |
CN104340871A (en) * | 2013-08-09 | 2015-02-11 | 苗军 | Crane combiner |
CN104925676A (en) * | 2015-07-08 | 2015-09-23 | 湖北浩天专用汽车有限公司 | Vehicle-mounted tower-type aerial working system |
CN105480872A (en) * | 2016-01-15 | 2016-04-13 | 天津大学 | Automobile crane based on vision feedback and pole tower hoisting method thereof |
CN205634710U (en) * | 2016-05-31 | 2016-10-12 | 湖北天环建筑工程技术有限公司 | Tower crane remote control unit |
CN106121257A (en) * | 2016-08-16 | 2016-11-16 | 郑州暖树实业有限公司 | Component Intelligent transport method and system for assembled architecture |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109191533A (en) * | 2018-08-21 | 2019-01-11 | 江苏德丰建设集团有限公司 | Tower crane high-altitude construction method based on assembled architecture |
CN109191533B (en) * | 2018-08-21 | 2021-06-25 | 江苏德丰建设集团有限公司 | Tower crane high-altitude construction method based on fabricated building |
US20210300731A1 (en) * | 2020-03-27 | 2021-09-30 | Sumitomo Heavy Industries Construction Cranes Co., Ltd. | Crane and monitoring device for crane |
CN112216063A (en) * | 2020-10-10 | 2021-01-12 | 深圳电目科技有限公司 | Method for improving construction safety of high-voltage power grid, intelligent controller and construction equipment |
CN112216063B (en) * | 2020-10-10 | 2022-02-15 | 深圳电目科技有限公司 | Method for improving construction safety of high-voltage power grid, intelligent controller and construction equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106586853A (en) | Intelligent equipment for component hoisting and manufacturing method of equipment | |
CN205302523U (en) | Infrared intelligence is reported to police to warn and is taken fixing device | |
CN207844900U (en) | A kind of tower crane monitoring camera mounting device | |
EP3230195A1 (en) | Tower crane for erecting a wind turbine, and method for erecting said tower crane | |
CN107244620A (en) | Spliced road deck hoisting structure | |
CN212101751U (en) | Pipeline embedding device for hydraulic engineering | |
US9284165B2 (en) | Method of moving large cranes in the setup system and system of carrying out this method | |
CN107539928B (en) | Aerial working platform arranged on crane boom of automobile crane | |
CN209702141U (en) | A kind of tower crane with projective iteration function | |
CN206466922U (en) | A kind of lifting component intellectuality equipment | |
CN213416064U (en) | Hoisting system for unit plate of glass curtain wall | |
CN106812300B (en) | Multidirectional adjusting type operation platform for construction site and construction method thereof | |
CN210029827U (en) | Tower crane | |
CN204802903U (en) | Safe tower crane | |
CN207587187U (en) | A kind of mobile solar energy signal lamp | |
CN211315550U (en) | Wireless monitoring equipment controlled by remote network | |
CN212198252U (en) | Evaporate and press hoist device for aerated concrete slab production | |
CN212176500U (en) | Adjustable reducing type open caisson safety operation platform | |
CN205381880U (en) | Novel high -rise building is with compound column equipment that hangs | |
CN212356462U (en) | Waterproof device for building | |
CN210049301U (en) | Excavating gear for building engineering | |
CN207645650U (en) | Tower crane lifting luffing linkage | |
CN103434948A (en) | Mast type hoisting device | |
CN108862002B (en) | Hoisting device and hoisting method for ultrathin steel plate shear wall in tower crane blind area | |
CN207844905U (en) | A kind of tower crane equipment for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170426 |