CN106586853A - Intelligent equipment for component hoisting and manufacturing method of equipment - Google Patents

Intelligent equipment for component hoisting and manufacturing method of equipment Download PDF

Info

Publication number
CN106586853A
CN106586853A CN201710044545.6A CN201710044545A CN106586853A CN 106586853 A CN106586853 A CN 106586853A CN 201710044545 A CN201710044545 A CN 201710044545A CN 106586853 A CN106586853 A CN 106586853A
Authority
CN
China
Prior art keywords
radar
arm
office
crane
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710044545.6A
Other languages
Chinese (zh)
Inventor
王加鑫
吴开纳
肖帅
张佳盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Third Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority to CN201710044545.6A priority Critical patent/CN106586853A/en
Publication of CN106586853A publication Critical patent/CN106586853A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/88Safety gear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices

Abstract

The invention discloses intelligent equipment for component hoisting and a manufacturing method of the equipment. According to the method, a crane jib is equipped with a movable radar device and a camera; when the jib gets close to a high-voltage line, that is, the jib reaches a radar sensing zone, a crane driver and an office manager can make adjustment timely, and when the driver cannot see a hook and a hoisted material, safety accidents are caused relatively easily. Thus, the high-definition camera which can rotate in all directions is mounted at the top of the jib, field situations can be clearly shot, and the inconvenience caused by the blind zone is eliminated. Blind-zone-free operation by the crane driver and field management are integrated, so that hoisting construction is facilitated, the project progress, quality and safety are guaranteed, and the equipment can be adapted to more complex environment operation, can be operated more smoothly and efficiently and is higher in safety.

Description

Intelligent equipment of a kind of lifting component and preparation method thereof
Technical field
The present invention relates to the intelligent equipment of construction implement technical field, especially a kind of lifting component and its making side Method.
Background technology
With the development of society, conventional concrete building is just having the trend that formula building is gradually substituted that is assembled.Assembled is built Build under the support of national policy and environmental demand, quickly grow, and prefabricated rate is also incrementally increased, the structure such as precast beam, plate, post Part enters in a large number job site.The characteristics of precast beam, plate, post is that volume or area are big, and weight is big.Precast beam, plate, post hang An important step for building industrialization is pretended, it is smoothed out, affect the side such as progress, quality, safety of engineering aspect Face;The importance of lifting can not be ignored.In reality, job site often has much can not resist factor, affects production activity, than The such as severe factor of working environment, along with the difficulty for lifting these prefabricated components it is relatively large, it is desirable to higher, traditional crane is past It is past to be difficult to meet smooth construction;In order to meet growing Production requirement, need to existing lifting utensil(Crane or tower Hang)It is designed improvement and construction innovation.
The content of the invention
The technical problem to be solved is:Intelligent equipment of a kind of lifting component and preparation method thereof is provided, with Overcome the deficiencies in the prior art.
What the present invention was realized in:
A kind of manufacture method of the intelligent equipment of lifting component, the method crane arm equip moveable radar installations and One photographic head, in office and crane OPS equipment information receptor;When arm is near high-voltage line, that is, reach radar sense When answering area, radar will pass to information at hoister operation and office and be expressed in the form of alarm song, lifting Machine driver and office management personnel just can make adjustment in time, to avoid the generation of accident;When crane loading component etc. When material is to two layers or more floorings, driver cannot see suspension hook and the material for being hung, now against commanding above with Speech form passes on the driver of information to underground, and this is also to be easier to cause security incident.So far, install at the top of arm One high-definition camera that can be rotated in all directions, can clearly take field condition, and be equipped with by scene in real time Tell broadband transmission to hoister operation and office, hoister is just it will be clear that field condition, solution That has determined that blind area brings is constant, is also convenient for office management personnel and makes a general survey of the live overall situation, and carries out real-time management.
A kind of intelligent equipment of lifting component, including gantry body, arranging on the arm arm top of heavy-duty machine body can 360 degree The WiFi photographic head of rotation, is correspondingly arranged radar induction apparatuss, in the operation of heavy-duty machine body at the hoisting arm expansion section of heavy-duty machine body Indoor setting radar and video receiver, shooting information and radar induction information are by on-site wireless network transmission to operation interior Receptor, and make corresponding prompting..
As a result of above-mentioned technical proposal, compared with prior art, the present invention realizes that hoister is operated without blind spot With field management integration, so as to facilitate lifting construction, project progress, quality and safety are ensured, and be enough adapted to more complicated Environment work, operate it is more smooth efficiently, safety is higher.
Description of the drawings
Accompanying drawing 1 is the structural representation of the present invention;
Accompanying drawing 2 is the plane graph of the operation under a certain environment in the present invention.
Specific embodiment
Embodiments of the invention:A kind of manufacture method of the intelligent equipment of lifting component, the method is filled in crane arm Standby moveable radar installations and a photographic head, in office and crane OPS equipment information receptor;When arm is leaned on Nearly high-voltage line 7, that is, when reaching radar induction zone 8, radar will pass to information at hoister operation and office and with police The form of report sound is expressed, and hoister and office management personnel just can make adjustment in time, to avoid accident Occur;When the materials such as crane loading component are to two layers or more floorings, driver cannot see suspension hook and the material for being hung, this When against commanding above with speech form pass on information to underground driver, this be also be easier cause security incident 's;So far, a high-definition camera that can be rotated in all directions is installed at the top of arm, field condition can be clearly taken Come, and in real time by scene be equipped with tell broadband transmission to hoister operation and office, hoister just may be used To be clear that field condition, solve that blind area brings is constant, is also convenient for office management personnel and makes a general survey of the live overall situation, and Real-time management is carried out, other accompanying drawings are:Road in 9- stations, 10- is building building, 11- driver operations blind area.
A kind of intelligent equipment of lifting component according to needed for said method, as shown in drawings, including gantry body 6, The arm top of arm 3 of heavy-duty machine body 6 arrange can 360 degree WiFi photographic head 1 for rotating, at the telescopic joint of arm 3 of heavy-duty machine body 6 pair Radar induction apparatuss 2 should be set, radar and video receiver 4, the He of WiFi photographic head 1 are set in the operating room 5 of heavy-duty machine body 6 Radar induction apparatuss 2 are connected by wireless network with radar and video receiver 4.
The description of such scheme is the invention for being understood that for ease of those skilled in the art and using, and is familiar with The personnel of art technology obviously easily can make various modifications to embodiment, therefore, the invention is not restricted to above-mentioned reality Scheme, those skilled in the art's the method according to the invention, the improvement made without departing from scope and modification all should Within protection scope of the present invention.

Claims (2)

1. the manufacture method that a kind of lifting component intellectuality is equipped, it is characterised in that:The method equips removable in crane arm Dynamic radar installations and a photographic head, in office and crane OPS equipment information receptor;When arm is near high pressure Line, that is, when reaching radar induction zone, radar will pass to information at hoister operation and office and with the shape of alarm song Formula is expressed, and hoister and office management personnel just can make adjustment in time, to avoid the generation of accident;When rise When the materials such as crane loading component are to two layers or more floorings, driver cannot see suspension hook and the material for being hung, now against upper The commanding in face passes on the driver of information to underground with speech form, and this is also to be easier to cause security incident;So far, One high-definition camera that can be rotated in all directions is installed at the top of arm, field condition can clearly be taken, and in real time Tell broadband transmission to hoister operation and office by what scene was equipped with, hoister just can clearly be seen To field condition, solve that blind area brings is constant, is also convenient for office management personnel and makes a general survey of the live overall situation, and is managed in real time Reason.
2. a kind of intelligent equipment of lifting component, including gantry body(6), it is characterised in that:In heavy-duty machine body(6)Arm (3)Arm top is arranged can 360 degree of WiFi photographic head for rotating(1), in heavy-duty machine body(6)Arm(3)It is correspondingly arranged at telescopic joint Radar induction apparatuss(2), in heavy-duty machine body(6)Operating room(5)Interior setting radar and video receiver(4), the WiFi photographic head (1)With radar induction apparatuss(2)By wireless network and radar and video receiver(4)Connection.
CN201710044545.6A 2017-01-19 2017-01-19 Intelligent equipment for component hoisting and manufacturing method of equipment Pending CN106586853A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710044545.6A CN106586853A (en) 2017-01-19 2017-01-19 Intelligent equipment for component hoisting and manufacturing method of equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710044545.6A CN106586853A (en) 2017-01-19 2017-01-19 Intelligent equipment for component hoisting and manufacturing method of equipment

Publications (1)

Publication Number Publication Date
CN106586853A true CN106586853A (en) 2017-04-26

Family

ID=58585041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710044545.6A Pending CN106586853A (en) 2017-01-19 2017-01-19 Intelligent equipment for component hoisting and manufacturing method of equipment

Country Status (1)

Country Link
CN (1) CN106586853A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109191533A (en) * 2018-08-21 2019-01-11 江苏德丰建设集团有限公司 Tower crane high-altitude construction method based on assembled architecture
CN112216063A (en) * 2020-10-10 2021-01-12 深圳电目科技有限公司 Method for improving construction safety of high-voltage power grid, intelligent controller and construction equipment
US20210300731A1 (en) * 2020-03-27 2021-09-30 Sumitomo Heavy Industries Construction Cranes Co., Ltd. Crane and monitoring device for crane

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200992464Y (en) * 2006-12-30 2007-12-19 安徽朗讯科技有限公司 Lifting mechanical apparatus with position safety monitoring system
CN202170226U (en) * 2011-07-18 2012-03-21 三一汽车起重机械有限公司 Crane with large-view lower sight glass at boom end
CN203079601U (en) * 2012-12-28 2013-07-24 上海红箭自动化设备有限公司 Automatic collision avoidance system for dock hoisting devices
CN104340871A (en) * 2013-08-09 2015-02-11 苗军 Crane combiner
CN104925676A (en) * 2015-07-08 2015-09-23 湖北浩天专用汽车有限公司 Vehicle-mounted tower-type aerial working system
CN105480872A (en) * 2016-01-15 2016-04-13 天津大学 Automobile crane based on vision feedback and pole tower hoisting method thereof
CN205634710U (en) * 2016-05-31 2016-10-12 湖北天环建筑工程技术有限公司 Tower crane remote control unit
CN106121257A (en) * 2016-08-16 2016-11-16 郑州暖树实业有限公司 Component Intelligent transport method and system for assembled architecture

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200992464Y (en) * 2006-12-30 2007-12-19 安徽朗讯科技有限公司 Lifting mechanical apparatus with position safety monitoring system
CN202170226U (en) * 2011-07-18 2012-03-21 三一汽车起重机械有限公司 Crane with large-view lower sight glass at boom end
CN203079601U (en) * 2012-12-28 2013-07-24 上海红箭自动化设备有限公司 Automatic collision avoidance system for dock hoisting devices
CN104340871A (en) * 2013-08-09 2015-02-11 苗军 Crane combiner
CN104925676A (en) * 2015-07-08 2015-09-23 湖北浩天专用汽车有限公司 Vehicle-mounted tower-type aerial working system
CN105480872A (en) * 2016-01-15 2016-04-13 天津大学 Automobile crane based on vision feedback and pole tower hoisting method thereof
CN205634710U (en) * 2016-05-31 2016-10-12 湖北天环建筑工程技术有限公司 Tower crane remote control unit
CN106121257A (en) * 2016-08-16 2016-11-16 郑州暖树实业有限公司 Component Intelligent transport method and system for assembled architecture

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109191533A (en) * 2018-08-21 2019-01-11 江苏德丰建设集团有限公司 Tower crane high-altitude construction method based on assembled architecture
CN109191533B (en) * 2018-08-21 2021-06-25 江苏德丰建设集团有限公司 Tower crane high-altitude construction method based on fabricated building
US20210300731A1 (en) * 2020-03-27 2021-09-30 Sumitomo Heavy Industries Construction Cranes Co., Ltd. Crane and monitoring device for crane
CN112216063A (en) * 2020-10-10 2021-01-12 深圳电目科技有限公司 Method for improving construction safety of high-voltage power grid, intelligent controller and construction equipment
CN112216063B (en) * 2020-10-10 2022-02-15 深圳电目科技有限公司 Method for improving construction safety of high-voltage power grid, intelligent controller and construction equipment

Similar Documents

Publication Publication Date Title
CN106586853A (en) Intelligent equipment for component hoisting and manufacturing method of equipment
CN205302523U (en) Infrared intelligence is reported to police to warn and is taken fixing device
CN207844900U (en) A kind of tower crane monitoring camera mounting device
EP3230195A1 (en) Tower crane for erecting a wind turbine, and method for erecting said tower crane
CN107244620A (en) Spliced road deck hoisting structure
CN212101751U (en) Pipeline embedding device for hydraulic engineering
US9284165B2 (en) Method of moving large cranes in the setup system and system of carrying out this method
CN107539928B (en) Aerial working platform arranged on crane boom of automobile crane
CN209702141U (en) A kind of tower crane with projective iteration function
CN206466922U (en) A kind of lifting component intellectuality equipment
CN213416064U (en) Hoisting system for unit plate of glass curtain wall
CN106812300B (en) Multidirectional adjusting type operation platform for construction site and construction method thereof
CN210029827U (en) Tower crane
CN204802903U (en) Safe tower crane
CN207587187U (en) A kind of mobile solar energy signal lamp
CN211315550U (en) Wireless monitoring equipment controlled by remote network
CN212198252U (en) Evaporate and press hoist device for aerated concrete slab production
CN212176500U (en) Adjustable reducing type open caisson safety operation platform
CN205381880U (en) Novel high -rise building is with compound column equipment that hangs
CN212356462U (en) Waterproof device for building
CN210049301U (en) Excavating gear for building engineering
CN207645650U (en) Tower crane lifting luffing linkage
CN103434948A (en) Mast type hoisting device
CN108862002B (en) Hoisting device and hoisting method for ultrathin steel plate shear wall in tower crane blind area
CN207844905U (en) A kind of tower crane equipment for building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426