CN106570788A - Hydropower transportation and inspection visual auxiliary decision system - Google Patents

Hydropower transportation and inspection visual auxiliary decision system Download PDF

Info

Publication number
CN106570788A
CN106570788A CN201610983051.XA CN201610983051A CN106570788A CN 106570788 A CN106570788 A CN 106570788A CN 201610983051 A CN201610983051 A CN 201610983051A CN 106570788 A CN106570788 A CN 106570788A
Authority
CN
China
Prior art keywords
unit
water
electricity
defect
pumped storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610983051.XA
Other languages
Chinese (zh)
Inventor
李建光
温国强
张亚武
张健
张全胜
郝国文
杨超
左程
黄正博
杨传军
刘向东
牛晓波
秦飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Beijing Xuji Electric Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Beijing Xuji Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Xinyuan Co Ltd, Beijing Xuji Electric Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610983051.XA priority Critical patent/CN106570788A/en
Publication of CN106570788A publication Critical patent/CN106570788A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a hydropower transportation and inspection visual auxiliary decision system comprising an application server and a mobile visual auxiliary decision client side. The application server is used for performing data exchange and operation instruction issuing. The mobile visual auxiliary decision client side is connected with the application server. The mobile visual auxiliary decision client side is used for extracting visual operation condition, defect maintenance, hydraulic water regime and comprehensive statistics business data. The mobile visual auxiliary decision client side comprises an operation condition module, a defect detection module, a hydraulic water regime module and a comprehensive statistics module.

Description

A kind of water power fortune inspection visualization aid decision-making system
Technical field
The invention belongs to areas of information technology, more particularly to a kind of water power fortune inspection visualization aid decision-making system.
Background technology
With the development of human society, the consumption more and more higher of the present energy, and many non-renewable energy (such as coals Charcoal, oil, natural gas) widely sought various reproducible clean energy resource (such as sun of increasingly depleted, therefore human society Energy, wind-power electricity generation, hydroelectric generation etc.) energy as an alternative.
It is richly stored with waterpower resourses in China western part, but equally exists that environment is complicated, the problem of difficult management. In particular with the progressively in-depth of power system reform, there is profound change in the internal and external environment that Hydropower Enterprise ' faces.Waterpower What generating had meets the low competitive advantage of national energy policy, cost of electricity-generating under current situation, inevitable requirement its raising Management level and management ability, and be analyzed from magnanimity, various data, excavation searches out valuable number According to, for water power fortune inspection decision analysis support is provided, it has also become Hydropower Enterprise ' develop in the urgent need to.But as hydroelectric generation is looked forward to Industry distribution is wide and many positioned at problem from far-off regions, causes data acquisition and processing (DAP) extremely difficult.
The content of the invention
The problem of the data acquisition difficulty existed for Hydropower Enterprise ' in prior art, embodiment of the present invention skill to be solved Art problem is to provide a kind of effective and efficient water power fortune inspection visualization aid decision-making system, acquisition water power that can be accurately and timely The mass data of enterprise.
In order to solve the above problems, the embodiment of the present invention proposes a kind of water power fortune inspection visualization aid decision-making system, bag Include:Application server and mobile visualization aid decision client;Wherein application server refers to for carrying out data exchange, operation Order is issued;The mobile visualization aid decision client connects application server, the mobile visualization aid decision client Hold for carrying out extracting visual operating condition, defect maintenance, water conservancy project regimen, comprehensive statisticss business datum;
Wherein, the system includes operating condition module, defects detection module, the clear module of water conservancy project water, comprehensive statisticss module.
1st, operating condition module for being stored and provided inquiry, and counted to Hydropower Unit service data;Institute Stating operating condition module includes operating condition Back ground Information unit, unit operation situation unit, Unit Commitment success rate unit;Its In
1.1st, the operating condition Back ground Information unit is for carrying out to the basic service data of pumped storage unit, Hydropower Unit Store and counted, and inquiry is provided.Specifically, can be single by arranging measurement type, timing statisticses, scope of statistics etc. Or combination condition is inquired about.And Query Result then can be by pumped storage statistical table, pumped storage unit generation amount and firing platform time Post-broken line graph, pumped storage start success rate instrumental panel, water power statistical table, Hydropower Unit generated energy and firing platform time post-broken line Figure, water power start the form of the Visual Charts such as success rate instrumental panel and are shown.Record statistics wherein in pumped storage statistical table As a result middle pumped storage unit number of units, the generating direction number of starts, the electricity that generates electricity, the direction number of starts of drawing water, draw water electricity;Pumped storage machine Group generated energy and firing platform time post-broken line graph represent pumped storage unit generation in statistical result with post figure, draw water firing platform, to roll over Line represents pumped storage unit generation electricity and the electricity that draws water in statistical result;Pumped storage startup success rate instrumental panel represents pumped storage unit and takes out The unit starting success rate in water direction and generating direction;In water power statistical table record statistical result in Hydropower Unit number of units, send out The electric direction number of starts, generating electricity;Hydropower Unit generated energy is represented in statistical result with post figure with firing platform time post-broken line graph Hydropower Unit generating firing platform, represents Hydropower Unit generating electricity in statistical result with broken line;Draw water and electrically activate success rate instrument Dial plate represents the unit starting success rate in Hydropower Unit generating direction in system result.
1.2nd, the unit operation situation unit;For uniting to the basic ruuning situation of pumped storage unit, Hydropower Unit Meter, and data retrieval is carried out according to the search condition of user input.Specifically, can by arrange measurement type, timing statisticses, Scope of statistics etc. is single or combination condition is inquired about.And Query Result can then pass through unit operation situation general view list, machine The form of the Visual Charts such as group generated energy and firing platform secondary post-figure of discounting, Unit Commitment situation list is shown.Wherein machine Business Name in group ruuning situation general view list display statistical result, unit number of units, generating firing platform time, generating electricity, draw water Firing platform is secondary, draw water electricity;Unit generation amount and firing platform time post-broken line graph is displayed in sending out for selected company in general view list Electricity, situation of drawing water, post figure shows generating, draw water firing platform, and broken line graph shows generating electricity and the electricity that draws water;Unit Commitment feelings Condition list display selected company Unit Commitment details in general view list, including group name, numbering, the state that starts, grid-connected/solution Row time, beginning state, dbjective state, change mode, change result;
1.3rd, the Unit Commitment success rate unit:For storing Unit Commitment data, and according to the retrieval of user input Condition carries out data retrieval.Specifically, can be by arranging the single or combobars such as measurement type, timing statisticses, scope of statistics Part is inquired about.And Query Result then can by unit operation situation general view list, generate electricity, draw water startup success rate, unit The form of the Visual Charts such as start and stop situation list is shown.Wherein unit operation situation general view list represents in statistical result Pumped storage unit Business Name, unit number of units, generating firing platform time, the electricity that generates electricity, the firing platform that draws water, draw water electricity;Generate electricity, take out Water starts success rate and represents selected company unit generation, startup success rate of drawing water in general view list with pie chart;Unit Commitment situation List display selected company Unit Commitment details in general view list, including group name, numbering, beginning state, grid-connected/off-the-line Time, beginning state, dbjective state, change mode, change result.
2nd, defect overhauls module for unit defect and overhaul data are stored and counted, and provides inquiry. Wherein defect maintenance module includes defect maintenance Back ground Information unit, defect details unit, maintenance details unit;Its In,
2.1 defects overhaul Back ground Information unit;For storing the number of unit defect frequency, maintenance number of times and classification According to, and data retrieval is carried out according to the search condition of user input.Specifically, can by arrange measurement type, timing statisticses, Scope of statistics etc. is single or combination condition is inquired about.And Query Result then can be by defect statistics form, maintenance statistical table The form of the Visual Charts such as lattice, newly-increased defect post figure, maintenance situation broken line graph is shown.Wherein defect statistics charting In statistical result, defect carries out crisis defect, major defect, the classification of general defect according to Hydropower Unit and pumped storage unit to defect Statistics;Maintenance statistical table according to Hydropower Unit and pumped storage unit according to maintenance time of origin service work is carried out A, B, C, D, Regular inspection classified statistic;Newly-increased defect post figure includes:The newly-increased defects count of of that month Hydropower Unit and pumped storage unit;Maintenance situation is rolled over Line chart shows Hydropower Unit and pumped storage unit maintenance number of times using discounting;
2.2 defect details units, for storing defect categorical data, and are carried out according to the search condition of user input Data retrieval.Specifically, can be looked into by arranging the single or combination conditions such as measurement type, timing statisticses, scope of statistics Ask.And Query Result then can be shown by the form of the Visual Chart of defect classified statistic form.Wherein defect is divided Class statistical table includes:Defect entries, report lack all details of list display defect.
2.3 maintenance details units, stop data of answering a pager's call for store Hydropower Unit and pumped storage unit, and according to user The search condition of input carries out data retrieval.Specifically, can be single by arranging measurement type, timing statisticses, scope of statistics etc. Individual or combination condition is inquired about.And Query Result then can be carried out by stopping the form of the Visual Chart of multiple labour situation form Show.Wherein stopping multiple labour situation form includes:Unit stops multiple labour situation, including Business Name, stops multiple labour equipment, maintenance class , do not dispatch reply stop multiple labour time, this monthly plan stop labour time, this month it is actual stop the labour time, fortune inspection operating risk form is listed Operating risk in statistical result during unit maintenance, including Business Name, device name, overhauling project, scheduled overhaul time, solution Except the risk time, there is risk, risk class, counter-measure.
3rd, water conservancy project regimen module is for being stored and being counted to the data of the water conservancy project regimen of hydroelectric power plant, and provided and looked into Ask.Specifically, can be inquired about by arranging the single or combination conditions such as measurement type, timing statisticses, scope of statistics.And look into Ask result then to be shown by the form of water conservancy project Back ground Information form and the Visual Chart of regimen block diagram.Wherein water Work Back ground Information form includes:Power plant's starting-point detection, flood season limit level, design flood level, check water storage level, normal pool level, Level of dead water, upper storehouse peak level, upper storehouse lowest water level, lower storehouse peak level, lower storehouse lowest water level, reservoir inflow, storage outflow, Maximum load, minimum load, average load;Regimen block diagram shows upper storehouse peak level, upper storehouse lowest water level, lower storehouse with post figure Peak level, lower storehouse lowest water level.
4th, comprehensive statisticss module is for being stored and carried out to the comprehensive utilization time data of Hydropower Unit, pumped storage unit Statistics, and inquiry is provided.Comprehensive statisticss module includes that comprehensive statisticss Back ground Information unit, pumped storage comprehensive utilization hourage statistics are single Unit, water power comprehensive utilization hourage statistic unit, equipment query detail unit;Wherein,
4.1 comprehensive statisticss Back ground Information units, for storing the comprehensive utilization hourage of Hydropower Unit, pumped storage unit, and Data retrieval is carried out according to the search condition of user input.Specifically, can be by arranging measurement type, timing statisticses, statistics Scope etc. is single or combination condition is inquired about.And Query Result then comprehensively utilizes hourage post figure, water power by pump-up power station The form of comprehensive utilization hourage post figure, defect maintenance and the Visual Chart such as operation duration post-figure of discounting of standing is shown.Its In, pumped storage comprehensive utilization hourage post figure shows pump-up power station comprehensive utilization hourage;Power station comprehensively utilizes hourage post figure Show power station comprehensive utilization hourage;Fall into maintenance and operation duration post-figure of discounting shows operation duration using post figure, using folding Line chart display defect number and inspection rack.
4.2 pumped storages comprehensively utilize hourage statistic unit, and for storing, pump-up power station generates electricity, drawing water utilizes hourage, and Data retrieval is carried out according to the search condition of user input.Specifically, can be by arranging measurement type, timing statisticses, statistics Scope etc. is single or combination condition is inquired about.And Query Result is then generated electricity by pump-up power station, draw water comprehensive utilization hourage The form of the Visual Chart of form is shown.Pump-up power station generates electricity, comprehensive utilization hourage table content of drawing water includes public affairs Department title, installed capacity, send out point an electricity, the electricity that draws water, gas-to electricity hourage, draw water using hourage, comprehensive utilization hour Number.
4.3 water power comprehensively utilize hourage statistic unit, for storing conventional hydropower station gas-to electricity hourage, and according to The search condition of user input carries out data retrieval.Specifically, can be by arranging measurement type, timing statisticses, scope of statistics Inquired about etc. single or combination condition.And Query Result is then by the visualization figure of conventional hydropower gas-to electricity hourage form The form of table is shown.The conventional hydropower gas-to electricity hourage table content includes Business Name, installed capacity, generate electricity electricity Amount, gas-to electricity hourage.
4.4 equipment queries detail unit, for storing the parameter of each genco's equipment, and according to the retrieval of user input Condition carries out data retrieval.Specifically, can be by arranging the single or combobars such as measurement type, timing statisticses, scope of statistics Part is inquired about;Can also by count place, rated power, hydraulic turbine model, the commissioning date, unit pattern, rated head, Generator mark is inquired about.And Query Result is then shown by the form of the Visual Chart of unit design details table.Should Unit design details table comprising location number, machine group number, the duration that draws water, the duration that generates electricity, the firing platform time of drawing water, generating firing platform, Last time run time, number of defects, maintenance number of times, hidden danger number.After machine group number is selected in unit design details table, system can be in equipment List the important parameter of selected unit in parameter table, including rated power, hydraulic turbine rated power, generator rating power, Rated head, production time, hydraulic turbine model, generator mark, debugging unit, the capacity-increasing transformation date, hydraulic turbine manufacturer, Electromotor manufacturer, remarks, power, turbine impeller pattern, generator amature diameter, unit pattern, the hydraulic turbine after transformation Runner diameter, installation unit.
The above-mentioned technical proposal of the present invention has the beneficial effect that:During above-mentioned technical scheme can be to water power fortune inspection The data of accumulation carry out structuring and quantitative analyses, and the various decision-makings for management level provide effectively support directly perceived.
Description of the drawings
System structure logic diagrams of the Fig. 1 for the embodiment of the present invention.
Specific embodiment
To make the technical problem to be solved in the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing and tool Body embodiment is described in detail.
The embodiment of the present invention proposes a kind of water power fortune inspection visualization aid decision-making system, including:Application server and shifting Dynamic visualization aid decision client;Wherein application server is issued for carrying out data exchange, operational order;Mobile visualization Aid decision client is used to carry out extracting the business numbers such as visual operating condition, defect maintenance, water conservancy project regimen, comprehensive statisticss According to.
As shown in Figure 1, the system includes operating condition module, defects detection module, the clear module of water conservancy project water, comprehensive statisticss Module.
Fig. 1 is the functional schematic of water power fortune inspection visualization aid decision-making system of the present invention.
As shown in figure 1, water power fortune inspection visualization aid decision-making system includes:
(1) operating condition:Realize inquiry, the statistics of crew base operation information.Operating condition module includes operating condition Back ground Information, unit operation situation and Unit Commitment success rate composition.By arranging statistical condition in operating condition Back ground Information The statistics to pumped storage and Hydropower Unit basis service data is realized with inquiry button, especially by setting measurement type, statistics Time, scope of statistics etc. are single or combination condition is inquired about, and Query Result passes through pumped storage statistical table, pumped storage unit generation amount Start success rate instrumental panel, water power statistical table, Hydropower Unit generated energy and firing platform with firing platform time post-broken line graph, pumped storage Secondary post-broken line graph, water power start the Visual Charts such as success rate instrumental panel and represent, record statistics knot wherein in pumped storage statistical table Pumped storage unit number of units in fruit, the generating direction number of starts, the electricity that generates electricity, the direction number of starts of drawing water, draw water electricity;Pumped storage unit Generated energy and firing platform time post-broken line graph represent pumped storage unit generation in statistical result with post figure, draw water firing platform, with broken line Represent pumped storage unit generation electricity and the electricity that draws water in statistical result;Pumped storage startup success rate instrumental panel represents pumped storage unit and draws water The unit starting success rate in direction and generating direction;Hydropower Unit number of units, generating in statistical result is recorded in water power statistical table The direction number of starts, generating electricity;Hydropower Unit generated energy represents in statistical result water with post figure with firing platform time post-broken line graph Group of motors generating firing platform, represents Hydropower Unit generating electricity in statistical result with broken line;Draw water and electrically activate success rate instrument Disk represents the unit starting success rate in Hydropower Unit generating direction in system result.Unit operation situation by arrange statistical condition and Inquiry button is realized to water power or pumped storage unit operation situation statistics, especially by setting measurement type, timing statisticses, statistics Scope etc. is single or combination condition is inquired about, and Query Result is by unit operation situation general view list, unit generation amount and opens The Visual Charts such as dynamic platform time post-figure of discounting, Unit Commitment situation list represent, wherein unit operation situation general view list display Business Name, unit number of units, generating firing platform time, the electricity that generates electricity, the firing platform that draws water in statistical result, draw water electricity;Unit Generated energy is displayed in the generating of selected company, situation of drawing water in general view list with firing platform time post-broken line graph, and post figure shows to be sent out Electricity, the firing platform that draws water are secondary, and broken line graph shows generating electricity and the electricity that draws water;Unit Commitment situation list display is in general view list Selected company's Unit Commitment details, including group name, numbering, the state that starts, grid-connected/off-the-line time, beginning state, target-like State, change mode, change result.Unit Commitment success rate is realized to Hydropower Unit by arranging statistical condition and inquiry button Power generation situation is counted, and is inquired about especially by the single or combination conditions such as measurement type, timing statisticses, scope of statistics are arranged, Query Result by unit operation situation general view list, generate electricity, startup success rate of drawing water, the visualization such as Unit Commitment situation list Chart represents, and wherein unit operation situation general view list represents pumped storage unit Business Name, unit number of units, generating in statistical result Firing platform time, the electricity that generates electricity, the firing platform that draws water, draw water electricity;Generate electricity, startup success rate of drawing water represents general view list with pie chart In selected company's unit generation, startup success rate of drawing water;Unit Commitment situation list display selected company machine in general view list Group start and stop details, including group name, numbering, the state that starts, grid-connected/off-the-line time, beginning state, dbjective state, change side Formula, change result.
(2) defect maintenance:Realize inquiry, the statistics of unit defect and maintenance.Defect maintenance module includes defect maintenance base Plinth information, defect details, maintenance details.By arranging statistical condition and inquiry button in defect maintenance Back ground Information Realize to unit defect frequency, maintenance number of times and classification statistics, especially by arrange measurement type, timing statisticses, Scope of statistics etc. is single or query composition condition is inquired about, as a result by defect statistics form, maintenance statistical table, newly-increased lack Sunken post figure, the maintenance Visual Chart such as situation broken line graph represent, wherein in the statistical result of defect statistics charting defect according to Hydropower Unit and pumped storage unit carry out crisis defect, major defect, general defect classified statistic to defect;Maintenance statistical table is pressed A, B, C, D, regular inspection classified statistic are carried out according to maintenance time of origin to service work according to Hydropower Unit and pumped storage unit;It is newly-increased to lack Sunken post figure shows the newly-increased defects count of of that month Hydropower Unit and pumped storage unit;Maintenance situation broken line graph is using display water power of discounting Unit and pumped storage unit maintenance number of times.It is single by arranging measurement type, timing statisticses, scope of statistics etc. in defect details Or query composition condition is inquired about, Query Result is displayed in defect classified statistic form, and defect list lists defect entries, Report lacks all details of list display defect.By arranging measurement type, timing statisticses, scope of statistics in maintenance details Inquired about etc. single or query composition condition, wherein stopping unit during multiple labour situation form lists statistical result stops multiple labour situation, Including Business Name, stop multiple labour equipment, maintenance classification, scheduling reply and stop multiple labour time, this monthly plan and stop labour time, this month reality Stop the labour time, fortune inspection operating risk form lists operating risk during unit maintenance in statistical result, including Business Name, equipment Title, overhauling project, the scheduled overhaul time, release the risk time, there is risk, risk class, counter-measure.
(3) water conservancy project regimen:Inquiry, the statistics of power plant's water conservancy project regimen are realized, by arranging measurement type, timing statisticses, system The single or combination conditions such as meter scope are inquired about, and are as a result intuitively shown by water conservancy project Back ground Information form and regimen block diagram. Wherein water conservancy project Back ground Information form shows power plant's starting-point detection, flood season limit level, design flood level, check water storage level, normal water-retention Position, level of dead water, upper storehouse peak level, upper storehouse lowest water level, lower storehouse peak level, lower storehouse lowest water level, reservoir inflow, outbound stream Amount, maximum load, minimum load, average load;Regimen block diagram with post figure show upper storehouse peak level, upper storehouse lowest water level, Lower storehouse peak level, lower storehouse lowest water level.
(4) comprehensive statisticss:Realize that water power, pumped storage unit comprehensively utilize the statistics of time.Comprehensive statisticss module includes synthesis Statistical basis information, pumped storage comprehensive utilization hourage statistics, water power comprehensive utilization hourage statistics, equipment query are detailed.It is comprehensive Statistical basis information is realized and comprehensively utilizes hourage to pumped storage and Hydropower Unit by arranging statistical condition and inquiry button Query statistic, is inquired about especially by the single or combination conditions such as measurement type, timing statisticses, scope of statistics are arranged, as a result By pump-up power station comprehensively utilize hourage post figure, power station comprehensively utilize hourage post figure, defect maintenance and operation duration post- The Visual Charts such as figure of discounting represent, and pumped storage comprehensive utilization hourage post figure shows pump-up power station comprehensive utilization hourage;Water power Comprehensive utilization hourage post figure of standing shows power station comprehensive utilization hourage;Fall into maintenance and operation duration post-figure of discounting uses post Figure shows operation duration, using broken line graph display defect number and inspection rack.Pumped storage comprehensive utilization hourage statistics is by setting Put statistical condition and inquiry button realize pump-up power station is generated electricity, the query statistic that draws water using hourage, especially by setting Put that measurement type, timing statisticses, scope of statistics etc. are single or combination condition is inquired about, as a result generate electricity, take out by pump-up power station Water comprehensive utilization hourage form shows that table content includes Business Name, installed capacity, sends out point electricity, the electricity that draws water, generates electricity Using hourage, draw water using hourage, comprehensive utilization hourage.Water power comprehensive utilization hourage statistics is by arranging statistics bar Part and inquiry button realize query statistic to conventional hydropower station gas-to electricity hourage, especially by arrange measurement type, Timing statisticses, scope of statistics etc. are single or combination condition is inquired about, as a result by conventional hydropower gas-to electricity hourage form Show, table content includes Business Name, installed capacity, generating electricity, gas-to electricity hourage.Equipment query is detailed by setting Put statistical condition and inquiry button realizes inquiry to each genco's equipment, and display device detail parameter, querying condition Statistics place, rated power, hydraulic turbine model, commissioning date, unit pattern, rated head, generator mark can be separately provided, Also condition can be combined to be inquired about, the equipment for meeting querying condition can be shown in unit details form, " the detailed table of unit Lattice " are comprising when location number, machine group number, the duration that draws water, the duration that generates electricity, secondary draw water firing platform, generating firing platform, last time operation Between, number of defects, maintenance number of times, hidden danger number;After machine group number is selected in " unit details " form, system can be in device parameter List the important parameter of selected unit in form, including it is rated power, hydraulic turbine rated power, generator rating power, specified Head, production time, hydraulic turbine model, generator mark, debugging unit, capacity-increasing transformation date, hydraulic turbine manufacturer, generating Machine manufacturer, remarks, power, turbine impeller pattern, generator amature diameter, unit pattern, rotary wheel of water turbine after transformation Diameter, installation unit.
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art For, on the premise of without departing from principle of the present invention, some improvements and modifications can also be made, these improvements and modifications Should be regarded as protection scope of the present invention.

Claims (5)

1. a kind of water power fortune inspection visualizes aid decision-making system, it is characterised in that include:Application server and mobile visualization are auxiliary Help decision-making client;Wherein application server is issued for carrying out data exchange, operational order;The mobile visualization auxiliary is determined Plan client connects application server, and the mobile visualization aid decision client is used to carry out extracting visual operation work Condition, defect maintenance, water conservancy project regimen, comprehensive statisticss business datum;
Wherein, the mobile visualization aid decision client includes operating condition module, defects detection module, the clear mould of water conservancy project water Block, comprehensive statisticss module.
2. water power fortune inspection according to claim 1 visualizes aid decision-making system, it is characterised in that the operating condition mould Block for being stored and provided inquiry, and counted to Hydropower Unit service data;The operating condition module includes fortune Row operating mode Back ground Information unit, unit operation situation unit, Unit Commitment success rate unit;Wherein,
The operating condition Back ground Information unit is gone forward side by side for carrying out storage to the basic service data of pumped storage unit, Hydropower Unit Row statistics, and inquiry is provided;Specifically, can be by arranging the single or combobars such as measurement type, timing statisticses, scope of statistics Part is inquired about.And Query Result then can be by pumped storage statistical table, pumped storage unit generation amount and firing platform time post-broken line Figure, pumped storage start success rate instrumental panel, water power statistical table, Hydropower Unit generated energy and firing platform time post-broken line graph, water power and open The form of the Visual Charts such as dynamic success rate instrumental panel is shown;Pumped storage in statistical result is recorded wherein in pumped storage statistical table Unit number of units, the generating direction number of starts, the electricity that generates electricity, the direction number of starts of drawing water, draw water electricity;Pumped storage unit generation amount with Firing platform time post-broken line graph represents pumped storage unit generation in statistical result with post figure, draw water firing platform, represents statistics with broken line As a result middle pumped storage unit generation electricity and draw water electricity;Pumped storage startup success rate instrumental panel represents pumped storage unit and draws water direction and send out The unit starting success rate in electric direction;Hydropower Unit number of units, the startup of generating direction in statistical result is recorded in water power statistical table Number of times, generating electricity;Hydropower Unit generated energy represents in statistical result Hydropower Unit with post figure with firing platform time post-broken line graph and sends out Platform is electrically activated, Hydropower Unit generating electricity in statistical result is represented with broken line;Draw water and electrically activate success rate instrumental panel and represent system As a result the unit starting success rate in middle Hydropower Unit generating direction.
The unit operation situation unit;For counting to the basic ruuning situation of pumped storage unit, Hydropower Unit, and according to The search condition of user input carries out data retrieval.Specifically, can be by arranging measurement type, timing statisticses, scope of statistics Inquired about etc. single or combination condition.And Query Result can then pass through unit operation situation general view list, unit generation amount Shown with the form of the Visual Chart such as firing platform time post-figure of discounting, Unit Commitment situation list.Wherein unit operation feelings Business Name, unit number of units, generating firing platform time, the electricity that generates electricity in condition general view list display statistical result, the firing platform that draws water, Draw water electricity;Unit generation amount is displayed in the generating of selected company, feelings of drawing water in general view list with firing platform time post-broken line graph Condition, post figure shows generating, draw water firing platform, and broken line graph shows generating electricity and the electricity that draws water;The list of Unit Commitment situation shows Show in general view list selected company Unit Commitment details, including group name, numbering, beginning state, grid-connected/off-the-line time, Beginning state, dbjective state, change mode, change result;
The Unit Commitment success rate unit:For storing Unit Commitment data, and carried out according to the search condition of user input Data retrieval;Specifically, can be looked into by arranging the single or combination conditions such as measurement type, timing statisticses, scope of statistics Ask;And Query Result then can by unit operation situation general view list, generate electricity, draw water startup success rate, Unit Commitment situation The form of the Visual Charts such as list is shown;Wherein unit operation situation general view list represents pumped storage unit in statistical result Business Name, unit number of units, generating firing platform time, the electricity that generates electricity, the firing platform that draws water, draw water electricity;Generate electricity, drawing water starts into Power represents selected company unit generation, startup success rate of drawing water in general view list with pie chart;Unit Commitment situation list display Selected company's Unit Commitment details in general view list, including group name, numbering, beginning state, grid-connected/off-the-line time, open Beginning state, dbjective state, change mode, change result.
3. water power fortune inspection according to claim 1 visualizes aid decision-making system, it is characterised in that defect maintenance module is used In unit defect and overhaul data are stored and counted, and provide inquiry.Wherein defect maintenance module includes defect Maintenance Back ground Information unit, defect details unit, maintenance details unit;Wherein,
Defect overhauls Back ground Information unit;For the data for storing unit defect frequency, overhauling number of times and classification, and according to The search condition of user input carries out data retrieval;Specifically, can be by arranging measurement type, timing statisticses, scope of statistics Inquired about etc. single or combination condition;And Query Result then can by defect statistics form, maintenance statistical table, newly-increased lack The form of the Visual Charts such as sunken post figure, maintenance situation broken line graph is shown;Wherein defect statistics charting statistical result Middle defect carries out crisis defect, major defect, general defect classified statistic according to Hydropower Unit and pumped storage unit to defect;Maintenance Statistical table to service work carries out A, B, C, D, regular inspection classification according to maintenance time of origin according to Hydropower Unit and pumped storage unit Statistics;Newly-increased defect post figure includes:The newly-increased defects count of of that month Hydropower Unit and pumped storage unit;Maintenance situation broken line graph is used Discount and show Hydropower Unit and pumped storage unit maintenance number of times;
Defect details unit, for storing defect categorical data, and carries out data inspection according to the search condition of user input Rope;Specifically, can be inquired about by arranging the single or combination conditions such as measurement type, timing statisticses, scope of statistics;And look into Ask result then to be shown by the form of the Visual Chart of defect classified statistic form;Wherein defect categorised statistical form Lattice include:Defect entries, report lack all details of list display defect;
Maintenance details unit, stops data of answering a pager's call for store Hydropower Unit and pumped storage unit, and according to user input Search condition carries out data retrieval;Specifically, can be by arranging the single or groups such as measurement type, timing statisticses, scope of statistics Conjunction condition is inquired about;And Query Result then can be shown by stopping the form of the Visual Chart of multiple labour situation form; Wherein stopping multiple labour situation form includes:Unit stops multiple labour situation, including Business Name, stops multiple labour equipment, maintenance classification, scheduling Reply stop multiple labour time, this monthly plan stop labour time, this month it is actual stop the labour time, fortune inspection operating risk form lists statistical result Operating risk during middle unit maintenance, including when Business Name, device name, overhauling project, scheduled overhaul time, releasing risk Between, there is risk, risk class, counter-measure.
4. water power fortune inspection according to claim 1 visualizes aid decision-making system, it is characterised in that the water conservancy project regimen mould Block is for being stored and being counted to the data of the water conservancy project regimen of hydroelectric power plant, and provides inquiry;Specifically, can be by setting Put that measurement type, timing statisticses, scope of statistics etc. are single or combination condition is inquired about;And Query Result can then pass through water conservancy project The form of the Visual Chart of Back ground Information form and regimen block diagram is shown;Wrap wherein in water conservancy project Back ground Information form Include:Power plant's starting-point detection, flood season limit level, design flood level, check water storage level, normal pool level, level of dead water, upper storehouse highest water It is position, upper storehouse lowest water level, lower storehouse peak level, lower storehouse lowest water level, reservoir inflow, storage outflow, maximum load, minimum negative Lotus, average load;Regimen block diagram shows upper storehouse peak level, upper storehouse lowest water level, lower storehouse peak level, lower storehouse most with post figure Low water level.
5. water power fortune inspection according to claim 1 visualizes aid decision-making system, it is characterised in that the comprehensive statisticss mould Block is for being stored and being counted to the comprehensive utilization time data of Hydropower Unit, pumped storage unit, and provides inquiry;It is comprehensive Statistical module includes comprehensive statisticss Back ground Information unit, pumped storage comprehensive utilization hourage statistic unit, water power comprehensive utilization hour Number statistic unit, equipment query detail unit;Wherein,
Comprehensive statisticss Back ground Information unit, for storing the comprehensive utilization hourage of Hydropower Unit, pumped storage unit, and according to user The search condition of input carries out data retrieval;Specifically, can be single by arranging measurement type, timing statisticses, scope of statistics etc. Individual or combination condition is inquired about;And Query Result then comprehensively utilizes hourage post figure, the comprehensive profit in power station by pump-up power station Shown with the form of the Visual Charts such as hourage post figure, defect maintenance and operation duration post-figure of discounting;Wherein, pumped storage Comprehensive utilization hourage post figure shows pump-up power station comprehensive utilization hourage;Power station comprehensive utilization hourage post figure shows water power Stand and comprehensively utilize hourage;Fall into maintenance and operation duration post-figure of discounting shows operation duration using post figure, shown using broken line graph Defect number and inspection rack;
Pumped storage comprehensively utilizes hourage statistic unit, and for storing, pump-up power station generates electricity, drawing water utilizes hourage, and according to user The search condition of input carries out data retrieval.Specifically, can be single by arranging measurement type, timing statisticses, scope of statistics etc. Individual or combination condition is inquired about;And Query Result then by pump-up power station generate electricity, draw water comprehensive utilization hourage form can Form depending on changing chart is shown;Pump-up power station generates electricity, comprehensive utilization hourage table content of drawing water includes Business Name, dress Machine capacity, send out point an electricity, the electricity that draws water, gas-to electricity hourage, draw water using hourage, comprehensive utilization hourage;
Water power comprehensively utilizes hourage statistic unit, for storing conventional hydropower station gas-to electricity hourage and defeated according to user The search condition for entering carries out data retrieval;Specifically, can be single by arranging measurement type, timing statisticses, scope of statistics etc. Or combination condition is inquired about.And Query Result is then by the shape of the Visual Chart of conventional hydropower gas-to electricity hourage form Formula is shown;The conventional hydropower gas-to electricity hourage table content include Business Name, installed capacity, generating electricity, send out Electricity utilizes hourage;
Equipment query detail unit, for storing the parameter of each genco's equipment, and enters according to the search condition of user input Row data retrieval;Specifically, can be carried out by arranging the single or combination conditions such as measurement type, timing statisticses, scope of statistics Inquiry;Can also be by counting place, rated power, hydraulic turbine model, commissioning date, unit pattern, rated head, electromotor Model is inquired about;And Query Result is then shown by the form of the Visual Chart of unit design details table;The unit is detailed Thin form includes location number, machine group number, the duration that draws water, the duration that generates electricity, the secondary firing platform that draws water, generating firing platform, last time fortune Row time, number of defects, maintenance number of times, hidden danger number.After machine group number is selected in unit design details table, system can be in device parameter list The important parameter of selected unit, including rated power, hydraulic turbine rated power, generator rating power, specified water are listed in lattice Head, production time, hydraulic turbine model, generator mark, debugging unit, capacity-increasing transformation date, hydraulic turbine manufacturer, electromotor Manufacturer, remarks, power, turbine impeller pattern, generator amature diameter, unit pattern, rotary wheel of water turbine are straight after transformation Footpath, installation unit.
CN201610983051.XA 2016-11-09 2016-11-09 Hydropower transportation and inspection visual auxiliary decision system Pending CN106570788A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610983051.XA CN106570788A (en) 2016-11-09 2016-11-09 Hydropower transportation and inspection visual auxiliary decision system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610983051.XA CN106570788A (en) 2016-11-09 2016-11-09 Hydropower transportation and inspection visual auxiliary decision system

Publications (1)

Publication Number Publication Date
CN106570788A true CN106570788A (en) 2017-04-19

Family

ID=58540401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610983051.XA Pending CN106570788A (en) 2016-11-09 2016-11-09 Hydropower transportation and inspection visual auxiliary decision system

Country Status (1)

Country Link
CN (1) CN106570788A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107909215A (en) * 2017-11-30 2018-04-13 成都飞机工业(集团)有限责任公司 A kind of production logistics and early warning visual presentation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007028158A2 (en) * 2005-09-02 2007-03-08 Lightridge Resources Llc Energy and chemical species utility management system
CN103714426A (en) * 2013-12-24 2014-04-09 国家电网公司 Integrated scheduling system for small and medium radial flow type hydropower station group
CN104281130A (en) * 2014-09-22 2015-01-14 国家电网公司 Hydroelectric equipment monitoring and fault diagnosis system based on big data technology
CN105045235A (en) * 2015-07-15 2015-11-11 重庆市同扬电气设备有限公司 Cascade power station remote control system based on intelligent cloud technology
CN105809575A (en) * 2016-03-29 2016-07-27 国家电网公司 Mobile operation system and method for water and electricity production management

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007028158A2 (en) * 2005-09-02 2007-03-08 Lightridge Resources Llc Energy and chemical species utility management system
CN103714426A (en) * 2013-12-24 2014-04-09 国家电网公司 Integrated scheduling system for small and medium radial flow type hydropower station group
CN104281130A (en) * 2014-09-22 2015-01-14 国家电网公司 Hydroelectric equipment monitoring and fault diagnosis system based on big data technology
CN105045235A (en) * 2015-07-15 2015-11-11 重庆市同扬电气设备有限公司 Cascade power station remote control system based on intelligent cloud technology
CN105809575A (en) * 2016-03-29 2016-07-27 国家电网公司 Mobile operation system and method for water and electricity production management

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
余涛: "水电机组故障诊断的集成指示表示与推理", 《中国电机工程学报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107909215A (en) * 2017-11-30 2018-04-13 成都飞机工业(集团)有限责任公司 A kind of production logistics and early warning visual presentation method

Similar Documents

Publication Publication Date Title
Cheng et al. China׳ s small hydropower and its dispatching management
Moss et al. Critical metals in strategic energy technologies
Khahro et al. Evaluation of wind power production prospective and Weibull parameter estimation methods for Babaurband, Sindh Pakistan
CN108717599A (en) A kind of automobile manufacturing enterprise carbon emission accounting system and its method
Roth et al. Sustainability of electricity supply technology portfolio
CN105260836A (en) Automobile manufacture enterprise carbon emission acquisition checking system and method
Vilanova et al. Pumped hydro storage plants: a review
CN203324761U (en) Visualized water level monitoring system for cascade hydropower station
CN104067476A (en) Operation planning system
Balamurugan et al. An optimal hybrid wind-biomass gasifier system for rural areas
CN107578126A (en) A kind of method of airport security number prediction
CN108206547A (en) The method of wind hydrogen coupled electricity-generation system each unit capacity optimization
CN106570788A (en) Hydropower transportation and inspection visual auxiliary decision system
CN103699688B (en) A kind of terminal model of support terminal user's reliability management of power supply
TWM615177U (en) Mobile charging device management system
CN106779207A (en) A kind of new energy for considering to generate electricity and open machine expense is dissolved Economic Analysis Method
CN204440540U (en) A kind of annular array pen container of pen stationery automatic vending machine
CN105024379B (en) A kind of maintenance of fan management scheduling system
O'Neill Weights-Based Gravity Energy Storage Looks to Scale Up
JP5331942B1 (en) Photovoltaic power generation project promotion support device, system and support method
Gea-Bermudez et al. The Influence of Large-Scale Wind Farm Wake Losses and Sector Coupling on the Development of Offshore Grids
CN112529468A (en) Operation mode method of shore power energy storage system and economic evaluation method thereof
CN110649606A (en) Loss reduction and energy saving method for HPLC (high performance liquid chromatography) broadband carrier based on ubiquitous Internet of things
CN106447535A (en) Secondary water supply service monitoring method and system
Elmansour et al. Location of seawater pumped storage hydropower plants: Case of Morocco

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170419