CN106570788A - Hydropower transportation and inspection visual auxiliary decision system - Google Patents
Hydropower transportation and inspection visual auxiliary decision system Download PDFInfo
- Publication number
- CN106570788A CN106570788A CN201610983051.XA CN201610983051A CN106570788A CN 106570788 A CN106570788 A CN 106570788A CN 201610983051 A CN201610983051 A CN 201610983051A CN 106570788 A CN106570788 A CN 106570788A
- Authority
- CN
- China
- Prior art keywords
- unit
- water
- electricity
- defect
- pumped storage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000000007 visual effect Effects 0.000 title claims abstract description 34
- 238000007689 inspection Methods 0.000 title claims abstract description 26
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 150
- 230000007547 defect Effects 0.000 claims abstract description 82
- 238000012423 maintenance Methods 0.000 claims abstract description 55
- 238000001514 detection method Methods 0.000 claims abstract description 7
- 230000005611 electricity Effects 0.000 claims description 88
- 238000003860 storage Methods 0.000 claims description 74
- 238000010304 firing Methods 0.000 claims description 43
- 238000005259 measurement Methods 0.000 claims description 32
- 238000010977 unit operation Methods 0.000 claims description 18
- 238000012800 visualization Methods 0.000 claims description 18
- 230000008859 change Effects 0.000 claims description 13
- 238000013461 design Methods 0.000 claims description 8
- 238000010586 diagram Methods 0.000 claims description 7
- 230000009466 transformation Effects 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 235000006508 Nelumbo nucifera Nutrition 0.000 claims 1
- 240000002853 Nelumbo nucifera Species 0.000 claims 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 claims 1
- 238000004458 analytical method Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 206010016807 Fluid retention Diseases 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000003610 charcoal Substances 0.000 description 1
- 230000002860 competitive effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a hydropower transportation and inspection visual auxiliary decision system comprising an application server and a mobile visual auxiliary decision client side. The application server is used for performing data exchange and operation instruction issuing. The mobile visual auxiliary decision client side is connected with the application server. The mobile visual auxiliary decision client side is used for extracting visual operation condition, defect maintenance, hydraulic water regime and comprehensive statistics business data. The mobile visual auxiliary decision client side comprises an operation condition module, a defect detection module, a hydraulic water regime module and a comprehensive statistics module.
Description
Technical field
The invention belongs to areas of information technology, more particularly to a kind of water power fortune inspection visualization aid decision-making system.
Background technology
With the development of human society, the consumption more and more higher of the present energy, and many non-renewable energy (such as coals
Charcoal, oil, natural gas) widely sought various reproducible clean energy resource (such as sun of increasingly depleted, therefore human society
Energy, wind-power electricity generation, hydroelectric generation etc.) energy as an alternative.
It is richly stored with waterpower resourses in China western part, but equally exists that environment is complicated, the problem of difficult management.
In particular with the progressively in-depth of power system reform, there is profound change in the internal and external environment that Hydropower Enterprise ' faces.Waterpower
What generating had meets the low competitive advantage of national energy policy, cost of electricity-generating under current situation, inevitable requirement its raising
Management level and management ability, and be analyzed from magnanimity, various data, excavation searches out valuable number
According to, for water power fortune inspection decision analysis support is provided, it has also become Hydropower Enterprise ' develop in the urgent need to.But as hydroelectric generation is looked forward to
Industry distribution is wide and many positioned at problem from far-off regions, causes data acquisition and processing (DAP) extremely difficult.
The content of the invention
The problem of the data acquisition difficulty existed for Hydropower Enterprise ' in prior art, embodiment of the present invention skill to be solved
Art problem is to provide a kind of effective and efficient water power fortune inspection visualization aid decision-making system, acquisition water power that can be accurately and timely
The mass data of enterprise.
In order to solve the above problems, the embodiment of the present invention proposes a kind of water power fortune inspection visualization aid decision-making system, bag
Include:Application server and mobile visualization aid decision client;Wherein application server refers to for carrying out data exchange, operation
Order is issued;The mobile visualization aid decision client connects application server, the mobile visualization aid decision client
Hold for carrying out extracting visual operating condition, defect maintenance, water conservancy project regimen, comprehensive statisticss business datum;
Wherein, the system includes operating condition module, defects detection module, the clear module of water conservancy project water, comprehensive statisticss module.
1st, operating condition module for being stored and provided inquiry, and counted to Hydropower Unit service data;Institute
Stating operating condition module includes operating condition Back ground Information unit, unit operation situation unit, Unit Commitment success rate unit;Its
In
1.1st, the operating condition Back ground Information unit is for carrying out to the basic service data of pumped storage unit, Hydropower Unit
Store and counted, and inquiry is provided.Specifically, can be single by arranging measurement type, timing statisticses, scope of statistics etc.
Or combination condition is inquired about.And Query Result then can be by pumped storage statistical table, pumped storage unit generation amount and firing platform time
Post-broken line graph, pumped storage start success rate instrumental panel, water power statistical table, Hydropower Unit generated energy and firing platform time post-broken line
Figure, water power start the form of the Visual Charts such as success rate instrumental panel and are shown.Record statistics wherein in pumped storage statistical table
As a result middle pumped storage unit number of units, the generating direction number of starts, the electricity that generates electricity, the direction number of starts of drawing water, draw water electricity;Pumped storage machine
Group generated energy and firing platform time post-broken line graph represent pumped storage unit generation in statistical result with post figure, draw water firing platform, to roll over
Line represents pumped storage unit generation electricity and the electricity that draws water in statistical result;Pumped storage startup success rate instrumental panel represents pumped storage unit and takes out
The unit starting success rate in water direction and generating direction;In water power statistical table record statistical result in Hydropower Unit number of units, send out
The electric direction number of starts, generating electricity;Hydropower Unit generated energy is represented in statistical result with post figure with firing platform time post-broken line graph
Hydropower Unit generating firing platform, represents Hydropower Unit generating electricity in statistical result with broken line;Draw water and electrically activate success rate instrument
Dial plate represents the unit starting success rate in Hydropower Unit generating direction in system result.
1.2nd, the unit operation situation unit;For uniting to the basic ruuning situation of pumped storage unit, Hydropower Unit
Meter, and data retrieval is carried out according to the search condition of user input.Specifically, can by arrange measurement type, timing statisticses,
Scope of statistics etc. is single or combination condition is inquired about.And Query Result can then pass through unit operation situation general view list, machine
The form of the Visual Charts such as group generated energy and firing platform secondary post-figure of discounting, Unit Commitment situation list is shown.Wherein machine
Business Name in group ruuning situation general view list display statistical result, unit number of units, generating firing platform time, generating electricity, draw water
Firing platform is secondary, draw water electricity;Unit generation amount and firing platform time post-broken line graph is displayed in sending out for selected company in general view list
Electricity, situation of drawing water, post figure shows generating, draw water firing platform, and broken line graph shows generating electricity and the electricity that draws water;Unit Commitment feelings
Condition list display selected company Unit Commitment details in general view list, including group name, numbering, the state that starts, grid-connected/solution
Row time, beginning state, dbjective state, change mode, change result;
1.3rd, the Unit Commitment success rate unit:For storing Unit Commitment data, and according to the retrieval of user input
Condition carries out data retrieval.Specifically, can be by arranging the single or combobars such as measurement type, timing statisticses, scope of statistics
Part is inquired about.And Query Result then can by unit operation situation general view list, generate electricity, draw water startup success rate, unit
The form of the Visual Charts such as start and stop situation list is shown.Wherein unit operation situation general view list represents in statistical result
Pumped storage unit Business Name, unit number of units, generating firing platform time, the electricity that generates electricity, the firing platform that draws water, draw water electricity;Generate electricity, take out
Water starts success rate and represents selected company unit generation, startup success rate of drawing water in general view list with pie chart;Unit Commitment situation
List display selected company Unit Commitment details in general view list, including group name, numbering, beginning state, grid-connected/off-the-line
Time, beginning state, dbjective state, change mode, change result.
2nd, defect overhauls module for unit defect and overhaul data are stored and counted, and provides inquiry.
Wherein defect maintenance module includes defect maintenance Back ground Information unit, defect details unit, maintenance details unit;Its
In,
2.1 defects overhaul Back ground Information unit;For storing the number of unit defect frequency, maintenance number of times and classification
According to, and data retrieval is carried out according to the search condition of user input.Specifically, can by arrange measurement type, timing statisticses,
Scope of statistics etc. is single or combination condition is inquired about.And Query Result then can be by defect statistics form, maintenance statistical table
The form of the Visual Charts such as lattice, newly-increased defect post figure, maintenance situation broken line graph is shown.Wherein defect statistics charting
In statistical result, defect carries out crisis defect, major defect, the classification of general defect according to Hydropower Unit and pumped storage unit to defect
Statistics;Maintenance statistical table according to Hydropower Unit and pumped storage unit according to maintenance time of origin service work is carried out A, B, C, D,
Regular inspection classified statistic;Newly-increased defect post figure includes:The newly-increased defects count of of that month Hydropower Unit and pumped storage unit;Maintenance situation is rolled over
Line chart shows Hydropower Unit and pumped storage unit maintenance number of times using discounting;
2.2 defect details units, for storing defect categorical data, and are carried out according to the search condition of user input
Data retrieval.Specifically, can be looked into by arranging the single or combination conditions such as measurement type, timing statisticses, scope of statistics
Ask.And Query Result then can be shown by the form of the Visual Chart of defect classified statistic form.Wherein defect is divided
Class statistical table includes:Defect entries, report lack all details of list display defect.
2.3 maintenance details units, stop data of answering a pager's call for store Hydropower Unit and pumped storage unit, and according to user
The search condition of input carries out data retrieval.Specifically, can be single by arranging measurement type, timing statisticses, scope of statistics etc.
Individual or combination condition is inquired about.And Query Result then can be carried out by stopping the form of the Visual Chart of multiple labour situation form
Show.Wherein stopping multiple labour situation form includes:Unit stops multiple labour situation, including Business Name, stops multiple labour equipment, maintenance class
, do not dispatch reply stop multiple labour time, this monthly plan stop labour time, this month it is actual stop the labour time, fortune inspection operating risk form is listed
Operating risk in statistical result during unit maintenance, including Business Name, device name, overhauling project, scheduled overhaul time, solution
Except the risk time, there is risk, risk class, counter-measure.
3rd, water conservancy project regimen module is for being stored and being counted to the data of the water conservancy project regimen of hydroelectric power plant, and provided and looked into
Ask.Specifically, can be inquired about by arranging the single or combination conditions such as measurement type, timing statisticses, scope of statistics.And look into
Ask result then to be shown by the form of water conservancy project Back ground Information form and the Visual Chart of regimen block diagram.Wherein water
Work Back ground Information form includes:Power plant's starting-point detection, flood season limit level, design flood level, check water storage level, normal pool level,
Level of dead water, upper storehouse peak level, upper storehouse lowest water level, lower storehouse peak level, lower storehouse lowest water level, reservoir inflow, storage outflow,
Maximum load, minimum load, average load;Regimen block diagram shows upper storehouse peak level, upper storehouse lowest water level, lower storehouse with post figure
Peak level, lower storehouse lowest water level.
4th, comprehensive statisticss module is for being stored and carried out to the comprehensive utilization time data of Hydropower Unit, pumped storage unit
Statistics, and inquiry is provided.Comprehensive statisticss module includes that comprehensive statisticss Back ground Information unit, pumped storage comprehensive utilization hourage statistics are single
Unit, water power comprehensive utilization hourage statistic unit, equipment query detail unit;Wherein,
4.1 comprehensive statisticss Back ground Information units, for storing the comprehensive utilization hourage of Hydropower Unit, pumped storage unit, and
Data retrieval is carried out according to the search condition of user input.Specifically, can be by arranging measurement type, timing statisticses, statistics
Scope etc. is single or combination condition is inquired about.And Query Result then comprehensively utilizes hourage post figure, water power by pump-up power station
The form of comprehensive utilization hourage post figure, defect maintenance and the Visual Chart such as operation duration post-figure of discounting of standing is shown.Its
In, pumped storage comprehensive utilization hourage post figure shows pump-up power station comprehensive utilization hourage;Power station comprehensively utilizes hourage post figure
Show power station comprehensive utilization hourage;Fall into maintenance and operation duration post-figure of discounting shows operation duration using post figure, using folding
Line chart display defect number and inspection rack.
4.2 pumped storages comprehensively utilize hourage statistic unit, and for storing, pump-up power station generates electricity, drawing water utilizes hourage, and
Data retrieval is carried out according to the search condition of user input.Specifically, can be by arranging measurement type, timing statisticses, statistics
Scope etc. is single or combination condition is inquired about.And Query Result is then generated electricity by pump-up power station, draw water comprehensive utilization hourage
The form of the Visual Chart of form is shown.Pump-up power station generates electricity, comprehensive utilization hourage table content of drawing water includes public affairs
Department title, installed capacity, send out point an electricity, the electricity that draws water, gas-to electricity hourage, draw water using hourage, comprehensive utilization hour
Number.
4.3 water power comprehensively utilize hourage statistic unit, for storing conventional hydropower station gas-to electricity hourage, and according to
The search condition of user input carries out data retrieval.Specifically, can be by arranging measurement type, timing statisticses, scope of statistics
Inquired about etc. single or combination condition.And Query Result is then by the visualization figure of conventional hydropower gas-to electricity hourage form
The form of table is shown.The conventional hydropower gas-to electricity hourage table content includes Business Name, installed capacity, generate electricity electricity
Amount, gas-to electricity hourage.
4.4 equipment queries detail unit, for storing the parameter of each genco's equipment, and according to the retrieval of user input
Condition carries out data retrieval.Specifically, can be by arranging the single or combobars such as measurement type, timing statisticses, scope of statistics
Part is inquired about;Can also by count place, rated power, hydraulic turbine model, the commissioning date, unit pattern, rated head,
Generator mark is inquired about.And Query Result is then shown by the form of the Visual Chart of unit design details table.Should
Unit design details table comprising location number, machine group number, the duration that draws water, the duration that generates electricity, the firing platform time of drawing water, generating firing platform,
Last time run time, number of defects, maintenance number of times, hidden danger number.After machine group number is selected in unit design details table, system can be in equipment
List the important parameter of selected unit in parameter table, including rated power, hydraulic turbine rated power, generator rating power,
Rated head, production time, hydraulic turbine model, generator mark, debugging unit, the capacity-increasing transformation date, hydraulic turbine manufacturer,
Electromotor manufacturer, remarks, power, turbine impeller pattern, generator amature diameter, unit pattern, the hydraulic turbine after transformation
Runner diameter, installation unit.
The above-mentioned technical proposal of the present invention has the beneficial effect that:During above-mentioned technical scheme can be to water power fortune inspection
The data of accumulation carry out structuring and quantitative analyses, and the various decision-makings for management level provide effectively support directly perceived.
Description of the drawings
System structure logic diagrams of the Fig. 1 for the embodiment of the present invention.
Specific embodiment
To make the technical problem to be solved in the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing and tool
Body embodiment is described in detail.
The embodiment of the present invention proposes a kind of water power fortune inspection visualization aid decision-making system, including:Application server and shifting
Dynamic visualization aid decision client;Wherein application server is issued for carrying out data exchange, operational order;Mobile visualization
Aid decision client is used to carry out extracting the business numbers such as visual operating condition, defect maintenance, water conservancy project regimen, comprehensive statisticss
According to.
As shown in Figure 1, the system includes operating condition module, defects detection module, the clear module of water conservancy project water, comprehensive statisticss
Module.
Fig. 1 is the functional schematic of water power fortune inspection visualization aid decision-making system of the present invention.
As shown in figure 1, water power fortune inspection visualization aid decision-making system includes:
(1) operating condition:Realize inquiry, the statistics of crew base operation information.Operating condition module includes operating condition
Back ground Information, unit operation situation and Unit Commitment success rate composition.By arranging statistical condition in operating condition Back ground Information
The statistics to pumped storage and Hydropower Unit basis service data is realized with inquiry button, especially by setting measurement type, statistics
Time, scope of statistics etc. are single or combination condition is inquired about, and Query Result passes through pumped storage statistical table, pumped storage unit generation amount
Start success rate instrumental panel, water power statistical table, Hydropower Unit generated energy and firing platform with firing platform time post-broken line graph, pumped storage
Secondary post-broken line graph, water power start the Visual Charts such as success rate instrumental panel and represent, record statistics knot wherein in pumped storage statistical table
Pumped storage unit number of units in fruit, the generating direction number of starts, the electricity that generates electricity, the direction number of starts of drawing water, draw water electricity;Pumped storage unit
Generated energy and firing platform time post-broken line graph represent pumped storage unit generation in statistical result with post figure, draw water firing platform, with broken line
Represent pumped storage unit generation electricity and the electricity that draws water in statistical result;Pumped storage startup success rate instrumental panel represents pumped storage unit and draws water
The unit starting success rate in direction and generating direction;Hydropower Unit number of units, generating in statistical result is recorded in water power statistical table
The direction number of starts, generating electricity;Hydropower Unit generated energy represents in statistical result water with post figure with firing platform time post-broken line graph
Group of motors generating firing platform, represents Hydropower Unit generating electricity in statistical result with broken line;Draw water and electrically activate success rate instrument
Disk represents the unit starting success rate in Hydropower Unit generating direction in system result.Unit operation situation by arrange statistical condition and
Inquiry button is realized to water power or pumped storage unit operation situation statistics, especially by setting measurement type, timing statisticses, statistics
Scope etc. is single or combination condition is inquired about, and Query Result is by unit operation situation general view list, unit generation amount and opens
The Visual Charts such as dynamic platform time post-figure of discounting, Unit Commitment situation list represent, wherein unit operation situation general view list display
Business Name, unit number of units, generating firing platform time, the electricity that generates electricity, the firing platform that draws water in statistical result, draw water electricity;Unit
Generated energy is displayed in the generating of selected company, situation of drawing water in general view list with firing platform time post-broken line graph, and post figure shows to be sent out
Electricity, the firing platform that draws water are secondary, and broken line graph shows generating electricity and the electricity that draws water;Unit Commitment situation list display is in general view list
Selected company's Unit Commitment details, including group name, numbering, the state that starts, grid-connected/off-the-line time, beginning state, target-like
State, change mode, change result.Unit Commitment success rate is realized to Hydropower Unit by arranging statistical condition and inquiry button
Power generation situation is counted, and is inquired about especially by the single or combination conditions such as measurement type, timing statisticses, scope of statistics are arranged,
Query Result by unit operation situation general view list, generate electricity, startup success rate of drawing water, the visualization such as Unit Commitment situation list
Chart represents, and wherein unit operation situation general view list represents pumped storage unit Business Name, unit number of units, generating in statistical result
Firing platform time, the electricity that generates electricity, the firing platform that draws water, draw water electricity;Generate electricity, startup success rate of drawing water represents general view list with pie chart
In selected company's unit generation, startup success rate of drawing water;Unit Commitment situation list display selected company machine in general view list
Group start and stop details, including group name, numbering, the state that starts, grid-connected/off-the-line time, beginning state, dbjective state, change side
Formula, change result.
(2) defect maintenance:Realize inquiry, the statistics of unit defect and maintenance.Defect maintenance module includes defect maintenance base
Plinth information, defect details, maintenance details.By arranging statistical condition and inquiry button in defect maintenance Back ground Information
Realize to unit defect frequency, maintenance number of times and classification statistics, especially by arrange measurement type, timing statisticses,
Scope of statistics etc. is single or query composition condition is inquired about, as a result by defect statistics form, maintenance statistical table, newly-increased lack
Sunken post figure, the maintenance Visual Chart such as situation broken line graph represent, wherein in the statistical result of defect statistics charting defect according to
Hydropower Unit and pumped storage unit carry out crisis defect, major defect, general defect classified statistic to defect;Maintenance statistical table is pressed
A, B, C, D, regular inspection classified statistic are carried out according to maintenance time of origin to service work according to Hydropower Unit and pumped storage unit;It is newly-increased to lack
Sunken post figure shows the newly-increased defects count of of that month Hydropower Unit and pumped storage unit;Maintenance situation broken line graph is using display water power of discounting
Unit and pumped storage unit maintenance number of times.It is single by arranging measurement type, timing statisticses, scope of statistics etc. in defect details
Or query composition condition is inquired about, Query Result is displayed in defect classified statistic form, and defect list lists defect entries,
Report lacks all details of list display defect.By arranging measurement type, timing statisticses, scope of statistics in maintenance details
Inquired about etc. single or query composition condition, wherein stopping unit during multiple labour situation form lists statistical result stops multiple labour situation,
Including Business Name, stop multiple labour equipment, maintenance classification, scheduling reply and stop multiple labour time, this monthly plan and stop labour time, this month reality
Stop the labour time, fortune inspection operating risk form lists operating risk during unit maintenance in statistical result, including Business Name, equipment
Title, overhauling project, the scheduled overhaul time, release the risk time, there is risk, risk class, counter-measure.
(3) water conservancy project regimen:Inquiry, the statistics of power plant's water conservancy project regimen are realized, by arranging measurement type, timing statisticses, system
The single or combination conditions such as meter scope are inquired about, and are as a result intuitively shown by water conservancy project Back ground Information form and regimen block diagram.
Wherein water conservancy project Back ground Information form shows power plant's starting-point detection, flood season limit level, design flood level, check water storage level, normal water-retention
Position, level of dead water, upper storehouse peak level, upper storehouse lowest water level, lower storehouse peak level, lower storehouse lowest water level, reservoir inflow, outbound stream
Amount, maximum load, minimum load, average load;Regimen block diagram with post figure show upper storehouse peak level, upper storehouse lowest water level,
Lower storehouse peak level, lower storehouse lowest water level.
(4) comprehensive statisticss:Realize that water power, pumped storage unit comprehensively utilize the statistics of time.Comprehensive statisticss module includes synthesis
Statistical basis information, pumped storage comprehensive utilization hourage statistics, water power comprehensive utilization hourage statistics, equipment query are detailed.It is comprehensive
Statistical basis information is realized and comprehensively utilizes hourage to pumped storage and Hydropower Unit by arranging statistical condition and inquiry button
Query statistic, is inquired about especially by the single or combination conditions such as measurement type, timing statisticses, scope of statistics are arranged, as a result
By pump-up power station comprehensively utilize hourage post figure, power station comprehensively utilize hourage post figure, defect maintenance and operation duration post-
The Visual Charts such as figure of discounting represent, and pumped storage comprehensive utilization hourage post figure shows pump-up power station comprehensive utilization hourage;Water power
Comprehensive utilization hourage post figure of standing shows power station comprehensive utilization hourage;Fall into maintenance and operation duration post-figure of discounting uses post
Figure shows operation duration, using broken line graph display defect number and inspection rack.Pumped storage comprehensive utilization hourage statistics is by setting
Put statistical condition and inquiry button realize pump-up power station is generated electricity, the query statistic that draws water using hourage, especially by setting
Put that measurement type, timing statisticses, scope of statistics etc. are single or combination condition is inquired about, as a result generate electricity, take out by pump-up power station
Water comprehensive utilization hourage form shows that table content includes Business Name, installed capacity, sends out point electricity, the electricity that draws water, generates electricity
Using hourage, draw water using hourage, comprehensive utilization hourage.Water power comprehensive utilization hourage statistics is by arranging statistics bar
Part and inquiry button realize query statistic to conventional hydropower station gas-to electricity hourage, especially by arrange measurement type,
Timing statisticses, scope of statistics etc. are single or combination condition is inquired about, as a result by conventional hydropower gas-to electricity hourage form
Show, table content includes Business Name, installed capacity, generating electricity, gas-to electricity hourage.Equipment query is detailed by setting
Put statistical condition and inquiry button realizes inquiry to each genco's equipment, and display device detail parameter, querying condition
Statistics place, rated power, hydraulic turbine model, commissioning date, unit pattern, rated head, generator mark can be separately provided,
Also condition can be combined to be inquired about, the equipment for meeting querying condition can be shown in unit details form, " the detailed table of unit
Lattice " are comprising when location number, machine group number, the duration that draws water, the duration that generates electricity, secondary draw water firing platform, generating firing platform, last time operation
Between, number of defects, maintenance number of times, hidden danger number;After machine group number is selected in " unit details " form, system can be in device parameter
List the important parameter of selected unit in form, including it is rated power, hydraulic turbine rated power, generator rating power, specified
Head, production time, hydraulic turbine model, generator mark, debugging unit, capacity-increasing transformation date, hydraulic turbine manufacturer, generating
Machine manufacturer, remarks, power, turbine impeller pattern, generator amature diameter, unit pattern, rotary wheel of water turbine after transformation
Diameter, installation unit.
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art
For, on the premise of without departing from principle of the present invention, some improvements and modifications can also be made, these improvements and modifications
Should be regarded as protection scope of the present invention.
Claims (5)
1. a kind of water power fortune inspection visualizes aid decision-making system, it is characterised in that include:Application server and mobile visualization are auxiliary
Help decision-making client;Wherein application server is issued for carrying out data exchange, operational order;The mobile visualization auxiliary is determined
Plan client connects application server, and the mobile visualization aid decision client is used to carry out extracting visual operation work
Condition, defect maintenance, water conservancy project regimen, comprehensive statisticss business datum;
Wherein, the mobile visualization aid decision client includes operating condition module, defects detection module, the clear mould of water conservancy project water
Block, comprehensive statisticss module.
2. water power fortune inspection according to claim 1 visualizes aid decision-making system, it is characterised in that the operating condition mould
Block for being stored and provided inquiry, and counted to Hydropower Unit service data;The operating condition module includes fortune
Row operating mode Back ground Information unit, unit operation situation unit, Unit Commitment success rate unit;Wherein,
The operating condition Back ground Information unit is gone forward side by side for carrying out storage to the basic service data of pumped storage unit, Hydropower Unit
Row statistics, and inquiry is provided;Specifically, can be by arranging the single or combobars such as measurement type, timing statisticses, scope of statistics
Part is inquired about.And Query Result then can be by pumped storage statistical table, pumped storage unit generation amount and firing platform time post-broken line
Figure, pumped storage start success rate instrumental panel, water power statistical table, Hydropower Unit generated energy and firing platform time post-broken line graph, water power and open
The form of the Visual Charts such as dynamic success rate instrumental panel is shown;Pumped storage in statistical result is recorded wherein in pumped storage statistical table
Unit number of units, the generating direction number of starts, the electricity that generates electricity, the direction number of starts of drawing water, draw water electricity;Pumped storage unit generation amount with
Firing platform time post-broken line graph represents pumped storage unit generation in statistical result with post figure, draw water firing platform, represents statistics with broken line
As a result middle pumped storage unit generation electricity and draw water electricity;Pumped storage startup success rate instrumental panel represents pumped storage unit and draws water direction and send out
The unit starting success rate in electric direction;Hydropower Unit number of units, the startup of generating direction in statistical result is recorded in water power statistical table
Number of times, generating electricity;Hydropower Unit generated energy represents in statistical result Hydropower Unit with post figure with firing platform time post-broken line graph and sends out
Platform is electrically activated, Hydropower Unit generating electricity in statistical result is represented with broken line;Draw water and electrically activate success rate instrumental panel and represent system
As a result the unit starting success rate in middle Hydropower Unit generating direction.
The unit operation situation unit;For counting to the basic ruuning situation of pumped storage unit, Hydropower Unit, and according to
The search condition of user input carries out data retrieval.Specifically, can be by arranging measurement type, timing statisticses, scope of statistics
Inquired about etc. single or combination condition.And Query Result can then pass through unit operation situation general view list, unit generation amount
Shown with the form of the Visual Chart such as firing platform time post-figure of discounting, Unit Commitment situation list.Wherein unit operation feelings
Business Name, unit number of units, generating firing platform time, the electricity that generates electricity in condition general view list display statistical result, the firing platform that draws water,
Draw water electricity;Unit generation amount is displayed in the generating of selected company, feelings of drawing water in general view list with firing platform time post-broken line graph
Condition, post figure shows generating, draw water firing platform, and broken line graph shows generating electricity and the electricity that draws water;The list of Unit Commitment situation shows
Show in general view list selected company Unit Commitment details, including group name, numbering, beginning state, grid-connected/off-the-line time,
Beginning state, dbjective state, change mode, change result;
The Unit Commitment success rate unit:For storing Unit Commitment data, and carried out according to the search condition of user input
Data retrieval;Specifically, can be looked into by arranging the single or combination conditions such as measurement type, timing statisticses, scope of statistics
Ask;And Query Result then can by unit operation situation general view list, generate electricity, draw water startup success rate, Unit Commitment situation
The form of the Visual Charts such as list is shown;Wherein unit operation situation general view list represents pumped storage unit in statistical result
Business Name, unit number of units, generating firing platform time, the electricity that generates electricity, the firing platform that draws water, draw water electricity;Generate electricity, drawing water starts into
Power represents selected company unit generation, startup success rate of drawing water in general view list with pie chart;Unit Commitment situation list display
Selected company's Unit Commitment details in general view list, including group name, numbering, beginning state, grid-connected/off-the-line time, open
Beginning state, dbjective state, change mode, change result.
3. water power fortune inspection according to claim 1 visualizes aid decision-making system, it is characterised in that defect maintenance module is used
In unit defect and overhaul data are stored and counted, and provide inquiry.Wherein defect maintenance module includes defect
Maintenance Back ground Information unit, defect details unit, maintenance details unit;Wherein,
Defect overhauls Back ground Information unit;For the data for storing unit defect frequency, overhauling number of times and classification, and according to
The search condition of user input carries out data retrieval;Specifically, can be by arranging measurement type, timing statisticses, scope of statistics
Inquired about etc. single or combination condition;And Query Result then can by defect statistics form, maintenance statistical table, newly-increased lack
The form of the Visual Charts such as sunken post figure, maintenance situation broken line graph is shown;Wherein defect statistics charting statistical result
Middle defect carries out crisis defect, major defect, general defect classified statistic according to Hydropower Unit and pumped storage unit to defect;Maintenance
Statistical table to service work carries out A, B, C, D, regular inspection classification according to maintenance time of origin according to Hydropower Unit and pumped storage unit
Statistics;Newly-increased defect post figure includes:The newly-increased defects count of of that month Hydropower Unit and pumped storage unit;Maintenance situation broken line graph is used
Discount and show Hydropower Unit and pumped storage unit maintenance number of times;
Defect details unit, for storing defect categorical data, and carries out data inspection according to the search condition of user input
Rope;Specifically, can be inquired about by arranging the single or combination conditions such as measurement type, timing statisticses, scope of statistics;And look into
Ask result then to be shown by the form of the Visual Chart of defect classified statistic form;Wherein defect categorised statistical form
Lattice include:Defect entries, report lack all details of list display defect;
Maintenance details unit, stops data of answering a pager's call for store Hydropower Unit and pumped storage unit, and according to user input
Search condition carries out data retrieval;Specifically, can be by arranging the single or groups such as measurement type, timing statisticses, scope of statistics
Conjunction condition is inquired about;And Query Result then can be shown by stopping the form of the Visual Chart of multiple labour situation form;
Wherein stopping multiple labour situation form includes:Unit stops multiple labour situation, including Business Name, stops multiple labour equipment, maintenance classification, scheduling
Reply stop multiple labour time, this monthly plan stop labour time, this month it is actual stop the labour time, fortune inspection operating risk form lists statistical result
Operating risk during middle unit maintenance, including when Business Name, device name, overhauling project, scheduled overhaul time, releasing risk
Between, there is risk, risk class, counter-measure.
4. water power fortune inspection according to claim 1 visualizes aid decision-making system, it is characterised in that the water conservancy project regimen mould
Block is for being stored and being counted to the data of the water conservancy project regimen of hydroelectric power plant, and provides inquiry;Specifically, can be by setting
Put that measurement type, timing statisticses, scope of statistics etc. are single or combination condition is inquired about;And Query Result can then pass through water conservancy project
The form of the Visual Chart of Back ground Information form and regimen block diagram is shown;Wrap wherein in water conservancy project Back ground Information form
Include:Power plant's starting-point detection, flood season limit level, design flood level, check water storage level, normal pool level, level of dead water, upper storehouse highest water
It is position, upper storehouse lowest water level, lower storehouse peak level, lower storehouse lowest water level, reservoir inflow, storage outflow, maximum load, minimum negative
Lotus, average load;Regimen block diagram shows upper storehouse peak level, upper storehouse lowest water level, lower storehouse peak level, lower storehouse most with post figure
Low water level.
5. water power fortune inspection according to claim 1 visualizes aid decision-making system, it is characterised in that the comprehensive statisticss mould
Block is for being stored and being counted to the comprehensive utilization time data of Hydropower Unit, pumped storage unit, and provides inquiry;It is comprehensive
Statistical module includes comprehensive statisticss Back ground Information unit, pumped storage comprehensive utilization hourage statistic unit, water power comprehensive utilization hour
Number statistic unit, equipment query detail unit;Wherein,
Comprehensive statisticss Back ground Information unit, for storing the comprehensive utilization hourage of Hydropower Unit, pumped storage unit, and according to user
The search condition of input carries out data retrieval;Specifically, can be single by arranging measurement type, timing statisticses, scope of statistics etc.
Individual or combination condition is inquired about;And Query Result then comprehensively utilizes hourage post figure, the comprehensive profit in power station by pump-up power station
Shown with the form of the Visual Charts such as hourage post figure, defect maintenance and operation duration post-figure of discounting;Wherein, pumped storage
Comprehensive utilization hourage post figure shows pump-up power station comprehensive utilization hourage;Power station comprehensive utilization hourage post figure shows water power
Stand and comprehensively utilize hourage;Fall into maintenance and operation duration post-figure of discounting shows operation duration using post figure, shown using broken line graph
Defect number and inspection rack;
Pumped storage comprehensively utilizes hourage statistic unit, and for storing, pump-up power station generates electricity, drawing water utilizes hourage, and according to user
The search condition of input carries out data retrieval.Specifically, can be single by arranging measurement type, timing statisticses, scope of statistics etc.
Individual or combination condition is inquired about;And Query Result then by pump-up power station generate electricity, draw water comprehensive utilization hourage form can
Form depending on changing chart is shown;Pump-up power station generates electricity, comprehensive utilization hourage table content of drawing water includes Business Name, dress
Machine capacity, send out point an electricity, the electricity that draws water, gas-to electricity hourage, draw water using hourage, comprehensive utilization hourage;
Water power comprehensively utilizes hourage statistic unit, for storing conventional hydropower station gas-to electricity hourage and defeated according to user
The search condition for entering carries out data retrieval;Specifically, can be single by arranging measurement type, timing statisticses, scope of statistics etc.
Or combination condition is inquired about.And Query Result is then by the shape of the Visual Chart of conventional hydropower gas-to electricity hourage form
Formula is shown;The conventional hydropower gas-to electricity hourage table content include Business Name, installed capacity, generating electricity, send out
Electricity utilizes hourage;
Equipment query detail unit, for storing the parameter of each genco's equipment, and enters according to the search condition of user input
Row data retrieval;Specifically, can be carried out by arranging the single or combination conditions such as measurement type, timing statisticses, scope of statistics
Inquiry;Can also be by counting place, rated power, hydraulic turbine model, commissioning date, unit pattern, rated head, electromotor
Model is inquired about;And Query Result is then shown by the form of the Visual Chart of unit design details table;The unit is detailed
Thin form includes location number, machine group number, the duration that draws water, the duration that generates electricity, the secondary firing platform that draws water, generating firing platform, last time fortune
Row time, number of defects, maintenance number of times, hidden danger number.After machine group number is selected in unit design details table, system can be in device parameter list
The important parameter of selected unit, including rated power, hydraulic turbine rated power, generator rating power, specified water are listed in lattice
Head, production time, hydraulic turbine model, generator mark, debugging unit, capacity-increasing transformation date, hydraulic turbine manufacturer, electromotor
Manufacturer, remarks, power, turbine impeller pattern, generator amature diameter, unit pattern, rotary wheel of water turbine are straight after transformation
Footpath, installation unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610983051.XA CN106570788A (en) | 2016-11-09 | 2016-11-09 | Hydropower transportation and inspection visual auxiliary decision system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610983051.XA CN106570788A (en) | 2016-11-09 | 2016-11-09 | Hydropower transportation and inspection visual auxiliary decision system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106570788A true CN106570788A (en) | 2017-04-19 |
Family
ID=58540401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610983051.XA Pending CN106570788A (en) | 2016-11-09 | 2016-11-09 | Hydropower transportation and inspection visual auxiliary decision system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106570788A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107909215A (en) * | 2017-11-30 | 2018-04-13 | 成都飞机工业(集团)有限责任公司 | A kind of production logistics and early warning visual presentation method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007028158A2 (en) * | 2005-09-02 | 2007-03-08 | Lightridge Resources Llc | Energy and chemical species utility management system |
CN103714426A (en) * | 2013-12-24 | 2014-04-09 | 国家电网公司 | Integrated scheduling system for small and medium radial flow type hydropower station group |
CN104281130A (en) * | 2014-09-22 | 2015-01-14 | 国家电网公司 | Hydroelectric equipment monitoring and fault diagnosis system based on big data technology |
CN105045235A (en) * | 2015-07-15 | 2015-11-11 | 重庆市同扬电气设备有限公司 | Cascade power station remote control system based on intelligent cloud technology |
CN105809575A (en) * | 2016-03-29 | 2016-07-27 | 国家电网公司 | Mobile operation system and method for water and electricity production management |
-
2016
- 2016-11-09 CN CN201610983051.XA patent/CN106570788A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007028158A2 (en) * | 2005-09-02 | 2007-03-08 | Lightridge Resources Llc | Energy and chemical species utility management system |
CN103714426A (en) * | 2013-12-24 | 2014-04-09 | 国家电网公司 | Integrated scheduling system for small and medium radial flow type hydropower station group |
CN104281130A (en) * | 2014-09-22 | 2015-01-14 | 国家电网公司 | Hydroelectric equipment monitoring and fault diagnosis system based on big data technology |
CN105045235A (en) * | 2015-07-15 | 2015-11-11 | 重庆市同扬电气设备有限公司 | Cascade power station remote control system based on intelligent cloud technology |
CN105809575A (en) * | 2016-03-29 | 2016-07-27 | 国家电网公司 | Mobile operation system and method for water and electricity production management |
Non-Patent Citations (1)
Title |
---|
余涛: "水电机组故障诊断的集成指示表示与推理", 《中国电机工程学报》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107909215A (en) * | 2017-11-30 | 2018-04-13 | 成都飞机工业(集团)有限责任公司 | A kind of production logistics and early warning visual presentation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Cheng et al. | China׳ s small hydropower and its dispatching management | |
Moss et al. | Critical metals in strategic energy technologies | |
Khahro et al. | Evaluation of wind power production prospective and Weibull parameter estimation methods for Babaurband, Sindh Pakistan | |
CN108717599A (en) | A kind of automobile manufacturing enterprise carbon emission accounting system and its method | |
Roth et al. | Sustainability of electricity supply technology portfolio | |
CN105260836A (en) | Automobile manufacture enterprise carbon emission acquisition checking system and method | |
Vilanova et al. | Pumped hydro storage plants: a review | |
CN203324761U (en) | Visualized water level monitoring system for cascade hydropower station | |
CN104067476A (en) | Operation planning system | |
Balamurugan et al. | An optimal hybrid wind-biomass gasifier system for rural areas | |
CN107578126A (en) | A kind of method of airport security number prediction | |
CN108206547A (en) | The method of wind hydrogen coupled electricity-generation system each unit capacity optimization | |
CN106570788A (en) | Hydropower transportation and inspection visual auxiliary decision system | |
CN103699688B (en) | A kind of terminal model of support terminal user's reliability management of power supply | |
TWM615177U (en) | Mobile charging device management system | |
CN106779207A (en) | A kind of new energy for considering to generate electricity and open machine expense is dissolved Economic Analysis Method | |
CN204440540U (en) | A kind of annular array pen container of pen stationery automatic vending machine | |
CN105024379B (en) | A kind of maintenance of fan management scheduling system | |
O'Neill | Weights-Based Gravity Energy Storage Looks to Scale Up | |
JP5331942B1 (en) | Photovoltaic power generation project promotion support device, system and support method | |
Gea-Bermudez et al. | The Influence of Large-Scale Wind Farm Wake Losses and Sector Coupling on the Development of Offshore Grids | |
CN112529468A (en) | Operation mode method of shore power energy storage system and economic evaluation method thereof | |
CN110649606A (en) | Loss reduction and energy saving method for HPLC (high performance liquid chromatography) broadband carrier based on ubiquitous Internet of things | |
CN106447535A (en) | Secondary water supply service monitoring method and system | |
Elmansour et al. | Location of seawater pumped storage hydropower plants: Case of Morocco |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170419 |