CN106569921A - Metering core clock processing method and apparatus for dual-core intelligent electric energy meter - Google Patents

Metering core clock processing method and apparatus for dual-core intelligent electric energy meter Download PDF

Info

Publication number
CN106569921A
CN106569921A CN201610902932.4A CN201610902932A CN106569921A CN 106569921 A CN106569921 A CN 106569921A CN 201610902932 A CN201610902932 A CN 201610902932A CN 106569921 A CN106569921 A CN 106569921A
Authority
CN
China
Prior art keywords
clock
external clock
internal clocking
external
electric energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610902932.4A
Other languages
Chinese (zh)
Other versions
CN106569921B (en
Inventor
王晓东
左嘉
段晓萌
郜波
姜洪浪
赵婷
郭清营
邹跃
高玉晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201610902932.4A priority Critical patent/CN106569921B/en
Publication of CN106569921A publication Critical patent/CN106569921A/en
Application granted granted Critical
Publication of CN106569921B publication Critical patent/CN106569921B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/16Error detection or correction of the data by redundancy in hardware
    • G06F11/1604Error detection or correction of the data by redundancy in hardware where the fault affects the clock signals of a processing unit and the redundancy is at or within the level of clock signal generation hardware
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters

Abstract

The invention provides a metering core clock processing method and apparatus for a dual-core intelligent electric energy meter. According to the metering core clock processing method and apparatus for the dual-core intelligent electric energy meter, a clock is obtained and then an effective initialized clock is obtained before the current clock is obtained, so that a judgment basis is provided for metering data after fault occurrence; and meanwhile, after an external clock is obtained, whether the external clock is abnormal or not is judged, so that a basis is provided for obtaining the effective and accurate current clock. The clock accuracy of the electric energy meter is ensured and a basis is provided for electric energy tariffing of subsequent time-of-use electricity price.

Description

A kind of metering core clock processing method and processing device of twin-core intelligent electric energy meter
Technical field
The present invention relates to the studying technological domain of intelligent electric energy meter, and more particularly, to a kind of twin-core intelligence electric energy The metering core clock processing method and processing device of table.
Background technology
Intelligent electric energy meter is the instrument for recording power information, is that the power information of measure user is made that indelible tribute Offer.
With the variation of record power information, the clock accuracy of intelligent electric energy meter can accurately be recorded for electric energy meter Power information has great meaning, for example, for the power mode for collecting electric energy to user according to rate electric energy, accurately Can the moment of record power consumption and generation electricity consumption be directly connected to and correctly calculate the information such as the electricity cost of user.
However, managing core and metering core as two independent functional process unit metering core masters of twin-core intelligent electric energy meter Complete the metering of basic data, including forward and reverse electric energy and present clock etc., management core mainly completes charging, expense control, aobvious Show, the function such as logout, and manage core and realize billing function according to the present clock that metering core is obtained, thus, metering core is obtained The reliability for taking clock is particularly important, and in prior art, cannot obtain and work as when the peripheral RTC for being arranged at metering core is abnormal During the front moment, electric energy meter will be unable to obtain present clock, so that there is the phenomenon of misregister.
Therefore, how to make metering core accurately be obtained the electricity consumption moment becomes the disaster that those skilled in the art face Topic.
The content of the invention
To solve the above problems, according to an aspect of the present invention, there is provided during a kind of metering core of twin-core intelligent electric energy meter Clock processing method, it is characterised in that include:
An external clock is obtained at the preset time period of interval;
Read internal clocking;
Judge whether the external clock obtains successfully;
If the external clock is obtained successfully, judge whether the external clock is abnormal;
If the external clock exception, the external clock is updated using the internal clocking, otherwise, when using outside Clock updates the internal clocking.
Preferably, methods described also includes, if the external clock is not obtained successfully, and does not obtain successful number of times accumulation During to a preset value, it is judged as external clock failure, electric energy meter recording clock event of failure, and active reporting.
Preferably, methods described also includes, if cannot successfully obtain external clock and cannot at the preset time period of interval The internal clocking is read, then when using the current external clock of effective initialization clock recovery of memory storage and inside Clock, traces to the source for metering core continuous data, while carrying out external clock and internal clocking failure active reporting.
Preferably, it is described to judge whether external clock is abnormal, including:
The reading number of success of the record of external clock is added 1;
Whether the reading number of success for judging the record reaches predetermined threshold value n;
If so, judge the difference of the external clock and initial time for obtaining whether less than (n/2-1) second:If so, when then outside Clock exception;Wherein, the initial time is the time of the external clock for successfully reading for the first time;
Otherwise, external clock is without exception.
Preferably, the preset time period is 500ms.
Preferably, described before external clock of acquisition, also to include at the preset time period of interval, the electric energy meter is performed Power on operation, obtains effectively initialization clock.
Preferably, the method for obtaining effectively initialization clock, including:
When upper electric, the power down time of external clock, internal clocking and internal storage storage is obtained;
Effectively initialization clock is determined in the external clock, the internal clocking and the power down time.
Preferably, it is described that effectively initialization is determined in the external clock, the internal clocking and the power down time Clock, including:
Determine whether the power down time is effective;
Whether effectively initialization clock is effectively determined according to the power down time.
Preferably, it is described to determine efficient clock when power down time is effective, including:
Judge whether the internal clocking and the external clock are legal:
If the internal clocking and external clock are illegal, the power down time is effectively initialization clock;
If the external clock or the internal clocking are legal, the legal clock in external clock and internal clocking is determined;
If the legal clock is earlier than the power down time, or the power down time was earlier than the legal clock 6 months More than, then the power down time is effective initialization clock, otherwise, when the legal clock is effective initialization Clock;
If the external clock, the internal clocking are legal,:
If the external clock is later than the power down time, and the external clock is less than with the difference of the power down time 6 months, then external clock is effectively to initialize clock, otherwise, if internal clocking deducted the difference of external clock less than three months, Internal clocking is effectively initialization clock.
Preferably, it is described when power down time is invalid, it is determined that clock is effectively initialized, including:
Judge whether the external clock is legal with the internal clocking;
If one of them is legal in the external clock and the internal clocking, the external clock with it is described internal when Legal clock is effectively initialization clock in clock;
If the external clock is legal with the internal clocking, judge that internal clocking deducts the difference of external clock and is less than three Individual month, if so, then external clock was effectively initialization clock, and otherwise, internal clocking is effectively initialization clock.
Preferably, when external power power-off cannot obtain internal clocking and external clock, access energy storage device, for for Obtain the internal clocking and provide electric energy with external clock.
According to a further aspect in the invention, there is provided a kind of metering core clock processing meanss of twin-core intelligent electric energy meter, including:
External clock acquiring unit, for obtaining external clock;
Internal clocking reading unit, for reading internal clocking;
Judging unit, for judging to update internal clocking using external clock or updating external clock using internal clocking; And
Refresh unit, for updating the external clock or internal clocking.
Preferably, described device also includes energy storage device, for being the acquisition internal clocking and outer during external power power-off Portion's clock provides electric energy, and the energy storage device is Clock battery or super capacitor.
Preferably, present invention additionally comprises a kind of twin-core intelligent electric energy meter, it is characterised in that include:
Metering core, for completing the metering of forward and reverse electric energy;And
Metering core clock processing meanss, including:
External clock acquiring unit, for obtaining external clock;
Internal clocking reading unit, for reading internal clocking;
Judging unit, for judging to update internal clocking using external clock or updating external clock using internal clocking; And
Refresh unit, for updating the external clock or internal clocking.
The metering core clock processing method and processing device of the twin-core intelligent electric energy meter that the present invention is provided, in interval preset time period Obtain internal clocking and external clock simultaneously afterwards, and determine whether to obtain the whether success of external clock and internal clocking, when obtaining Take external clock success, and external clock is not when having abnormal, refreshes internal clocking using external clock, otherwise, using inside Clock refreshing external clock.Intelligent electric energy meter gets effective current time using effective guarantee of the present invention, is follow-up pipe The charging of reason core provides effective reference frame.
Description of the drawings
By reference to the following drawings, the illustrative embodiments of the present invention can be more fully understood by:
Fig. 1 is the flow process of the metering core clock management method of the twin-core intelligent electric energy meter according to the preferred embodiment of the present invention Figure;
Fig. 2 is the flow chart of the method for judging that the external clock is whether abnormal according to the preferred embodiment of the present invention;
Fig. 3 is the flow chart of the acquisition effectively method of initialization clock according to the preferred embodiment of the present invention;And
The structural representation of the metering core Clock management device of Fig. 4 twin-core intelligent electric energy meters according to the preferred embodiment of the invention Figure.
Specific embodiment
With reference now to accompanying drawing, the illustrative embodiments of the present invention are introduced, however, the present invention can be with many different shapes Formula is not limited to embodiment described herein implementing, there is provided these embodiments are to disclose at large and fully The present invention, and fully pass on the scope of the present invention to person of ordinary skill in the field.For showing for being illustrated in the accompanying drawings Term in example property embodiment is not limitation of the invention.In the accompanying drawings, identical cells/elements are attached using identical Icon is remembered.
Unless otherwise stated, term (including scientific and technical terminology) used herein has to person of ordinary skill in the field It is common to understand implication.Further it will be understood that the term limited with the dictionary being usually used, is appreciated that and it The linguistic context of association area has consistent implication, and is not construed as Utopian or excessively formal meaning.
Fig. 1 is the flow process of the metering core clock management method of the twin-core intelligent electric energy meter according to the preferred embodiment of the present invention Figure.As shown in figure 1, the metering core clock management method of twin-core intelligent electric energy meter is from the beginning of step 101.In a step 101, twin-core The metering core clock of intelligent electric energy meter obtains an external clock at the preset time period of interval.Preferably, the Preset Time Section is 500ms.
Preferably, in a step 102, the internal clocking of reading power meters.It will be appreciated that the internal clocking is to set The clock that the internal clocking acquiring unit inside MCU gets is equipped with, when MCU obtains internal while external clock is obtained Clock, carries out judgement renewal, improves the accuracy rate for getting effective present clock.
Preferably, when external clock cannot be successfully obtained at the preset time period of interval and cannot read described internal Clock, then using the current external clock of effective initialization clock recovery of memory storage and internal clocking, based on metering core Amount data are traced to the source, while carrying out external clock and internal clocking failure active reporting.
Preferably, judge whether the external clock obtains successfully in step 103, if obtaining successfully, carry out step 104, if the external clock is not obtained successfully, and when not obtaining successful number of times and being accumulate to a preset value, when being judged as outside Clock failure, electric energy meter recording clock event of failure, and active reporting.
Preferably, in step 104, judge whether the external clock is abnormal, if the external clock exception, using institute State internal clocking to update the external clock, otherwise, with external clock the internal clocking is updated.
Fig. 2 is the flow chart of the method for judging that the external clock is whether abnormal according to the preferred embodiment of the present invention.Such as Shown in Fig. 2, whether abnormal method 200 is from the beginning of step 201 to judge the external clock.In step 201, by external clock The reading number of success of record add 1.Preferably, when being defined as into starting the time of the external clock for successfully reading for the first time Between.
Preferably, in step 203, whether the reading number of success for judging the record reaches predetermined threshold value n, if so, Step 204 is then carried out, otherwise, external clock is without exception.
Preferably, in step 204, whether the difference of the external clock and initial time for obtaining is judged less than (n/2-1) second, If so, then external clock exception, otherwise, external clock is without exception.
Fig. 3 is the flow chart of the acquisition effectively method of initialization clock according to the preferred embodiment of the present invention.Such as Fig. 3 institutes Show, the method 300 of acquisition effectively initialization clock is from the beginning of step 301.In step 301, twin-core intelligent electric energy meter is carried out During power on operation, the power down time of the external clock, internal clocking and internal storage storage of electric energy meter is obtained.
Preferably, in step 302, determine have in the external clock, the internal clocking and the power down time Effect initialization clock.
Preferably, it is described that effectively initialization is determined in the external clock, the internal clocking and the power down time Clock, including:
Determine whether the power down time is effective;
Whether effectively initialization clock is effectively determined according to the power down time.
Preferably, it is described to determine efficient clock when power down time is effective, including:
Judge whether the internal clocking and the external clock are legal:
If the internal clocking and external clock are illegal, the power down time is effectively initialization clock;
If the external clock or the internal clocking are legal, the legal clock in external clock and internal clocking is determined;
If the legal clock is earlier than the power down time, or the power down time was earlier than the legal clock 6 months More than, then the power down time is effective initialization clock, otherwise, when the legal clock is effective initialization Clock;
If the external clock, the internal clocking are legal,:
If the external clock is later than the power down time, and the external clock is less than with the difference of the power down time 6 months, then external clock is effectively to initialize clock, otherwise, if internal clocking deducted the difference of external clock less than three months, Internal clocking is effectively initialization clock.
Preferably, it is described when power down time is invalid, it is determined that clock is effectively initialized, including:
Judge whether the external clock is legal with the internal clocking;
If one of them is legal in the external clock and the internal clocking, the external clock with it is described internal when Legal clock is effectively initialization clock in clock;
If the external clock is legal with the internal clocking, judge that internal clocking deducts the difference of external clock and is less than three Individual month, if so, then external clock was effectively initialization clock, and otherwise, internal clocking is effectively initialization clock.
Preferably, when external power power-off cannot obtain internal clocking and external clock, access energy storage device, for for Obtain the internal clocking and provide electric energy with external clock.
The twin-core intelligent electric energy meter metering core clock processing method, cannot successfully obtain upon power-up internal clocking and outer During portion's clock, using the internal data store time, recover present clock and trace to the source for metering core continuous data, while entering row clock Failure active reporting.In outer power cut-off, powered using energy storage device, energy storage device includes the Clock battery of low-power consumption and surpasses Level capacitance energy storage equipment, dual power supply, low-power consumption battery is replaceable, it is ensured that clock power reliable power supply.Effectively prevent metering Core obtain present clock mode is single or extraneous power-off and the caused problem that cannot obtain present clock, at the same time, Effectively initialization clock is obtained before present clock is obtained, for the continuous data after breaking down basis for estimation is provided, and for number According to offer node of tracing to the source, meanwhile, after external clock is obtained, judge whether external clock is abnormal, it is to obtain effectively accurately to work as Front clock provides foundation.
The structural representation of the metering core Clock management device of Fig. 4 twin-core intelligent electric energy meters according to the preferred embodiment of the invention Figure.As shown in figure 4, the metering core Clock management device 400 of twin-core intelligent electric energy meter is by external clock acquiring unit 401, inside Clockreading unit 402, judging unit 403 and refresh unit 404 are constituted.Wherein, the external clock acquiring unit 401, For obtaining external clock.
Preferably, the internal clocking reading unit 402, for reading internal clocking
Preferably, the judging unit 403, for judging to update internal clocking using external clock or adopting internal clocking Update external clock;
Preferably, refresh unit 404, for updating the external clock or internal clocking.
Preferably, the metering core Clock management device 400 of the twin-core intelligent electric energy meter also includes energy storage device 405, uses Electric energy is provided for the acquisition internal clocking and external clock when external power power-off, the energy storage device is Clock battery or super Level electric capacity.
The clock processing meanss of the twin-core intelligent electric energy meter, arrange internal clocking acquiring unit, effectively more in metering core Having mended caused intelligent electric energy meter when external clock acquiring unit cannot obtain present clock cannot obtain the defect of present clock, Meanwhile, energy storage device is set, efficiently solve external power power-off and lead to not obtain the technical problem of effective present clock.
Preferably, present invention additionally comprises a kind of twin-core intelligent electric energy meter, including metering core and metering core clock process dress Put, wherein, metering core, for completing the metering of forward and reverse electric energy;The metering core clock processing meanss, including:
External clock acquiring unit, for obtaining external clock;
Internal clocking reading unit, for reading internal clocking;
Judging unit, for judging to update internal clocking using external clock or updating external clock using internal clocking; And
Refresh unit, for updating the external clock or internal clocking.
The present invention is described by reference to a small amount of embodiment.However, it is known in those skilled in the art, as What subsidiary Patent right requirement was limited, except the present invention other embodiments disclosed above equally fall the present invention's In the range of.
Normally, all terms for using in the claims are all solved according to them in the usual implication of technical field Release, unless clearly defined in addition wherein.It is all of to be all opened ground with reference to " one/described/be somebody's turn to do [device, component etc.] " At least one of described device, component etc. example is construed to, unless otherwise expressly specified.Any method disclosed herein Step all need not be run with disclosed accurate order, unless explicitly stated otherwise.

Claims (14)

1. the metering core clock processing method of a kind of twin-core intelligent electric energy meter, it is characterised in that include:
External clock is obtained at the preset time period of interval;
Read internal clocking;
Judge whether the external clock obtains successfully;
If the external clock is obtained successfully, judge whether the external clock is abnormal;
If the external clock exception, the external clock is updated using the internal clocking, otherwise, with external clock more The new internal clocking.
2. metering core clock processing method according to claim 1, it is characterised in that if also including the external clock not When obtaining successfully, and not obtaining successful number of times and be accumulate to a preset value, it is judged as external clock failure, electric energy meter recording clock Event of failure, and active reporting.
3. metering core clock processing method according to claim 1, it is characterised in that also include:
If cannot successfully obtain external clock at the preset time period of interval and the internal clocking cannot be read, using storage The current external clock of effective initialization clock recovery and internal clocking of device storage, traces to the source, together for metering core continuous data Shi Jinhang external clocks and internal clocking failure active reporting.
4. metering core clock processing method according to claim 1, it is characterised in that described to judge whether external clock is different Often, including:
The reading number of success of the record of external clock is added 1;
Whether the reading number of success for judging the record reaches predetermined threshold value n;
If so, judge the difference of the external clock and initial time for obtaining whether less than (n/2-1) second:If so, then external clock is different Often;Wherein, the initial time is the time of the external clock for successfully reading for the first time;
Otherwise, external clock is without exception.
5. the metering core clock processing method of twin-core intelligent electric energy meter according to claim 1, it is characterised in that described default Time period is 500ms.
6. metering core clock processing method according to claim 1, it is characterised in that described at the preset time period of interval Before obtaining an external clock, also include:
The electric energy meter performs power on operation, obtains effectively initialization clock.
7. the metering core clock processing method of twin-core intelligent electric energy meter according to claim 6, it is characterised in that the acquisition The method for effectively initializing clock, including:
When upper electric, the power down time of external clock, internal clocking and internal storage storage is obtained;
Effectively initialization clock is determined in the external clock, the internal clocking and the power down time.
8. metering core clock processing method according to claim 7, it is characterised in that described in the external clock, institute State and determine in internal clocking and the power down time effectively initialization clock, including:
Determine whether the power down time is effective;
Whether effectively initialization clock is effectively determined according to the power down time.
9. metering core clock processing method according to claim 8, it is characterised in that characterized in that, described in power down When time is effective, efficient clock is determined, including:
Judge whether the internal clocking and the external clock are legal:
If the internal clocking and external clock are illegal, the power down time is effectively initialization clock;
If the external clock or the internal clocking are legal, the legal clock in external clock and internal clocking is determined;
If the legal clock is earlier than the power down time, or the power down time was earlier than the legal clock more than 6 months, Then the power down time is effective initialization clock, and otherwise, the legal clock is effective initialization clock;
If the external clock, the internal clocking are legal,:
If the external clock is later than the power down time, and the external clock is less than 6 with the difference of the power down time Month, then external clock is effectively initialization clock, otherwise, interior if internal clocking deducted the difference of external clock less than three months Portion's clock is effectively initialization clock.
10. metering core clock processing method according to claim 8, it is characterised in that described when power down time is invalid, It is determined that clock is effectively initialized, including:
Judge whether the external clock is legal with the internal clocking;
If one of them is legal in the external clock and the internal clocking, in the external clock and the internal clocking Legal clock is effectively initialization clock;
If the external clock is legal with the internal clocking, judge that internal clocking deducts the difference of external clock and is less than three Month, if so, then external clock is effectively initialization clock, and otherwise, internal clocking is effectively initialization clock.
The metering core clock processing method of 11. twin-core intelligent electric energy meters according to claim 1, it is characterised in that work as dispatch from foreign news agency Source power-off and when cannot obtain internal clocking and external clock, access energy storage device, for for the acquisition internal clocking with it is outer Portion's clock provides electric energy.
A kind of metering core clock processing meanss of 12. twin-core intelligent electric energy meters, including:
External clock acquiring unit, for obtaining external clock;
Internal clocking reading unit, for reading internal clocking;
Judging unit, for judging to update internal clocking using external clock or updating external clock using internal clocking;And
Refresh unit, for updating the external clock or internal clocking.
13. metering core clock processing meanss according to claim 12, it is characterised in that also including energy storage device, be used for Electric energy is provided for the acquisition internal clocking and external clock during external power power-off, the energy storage device is Clock battery or super Electric capacity.
14. a kind of twin-core intelligent electric energy meters, it is characterised in that include:
Metering core, for completing the metering of forward and reverse electric energy;And
Metering core clock processing meanss, including:
External clock acquiring unit, for obtaining external clock;
Internal clocking reading unit, for reading internal clocking;
Judging unit, for judging to update internal clocking using external clock or updating external clock using internal clocking;And
Refresh unit, for updating the external clock or internal clocking.
CN201610902932.4A 2016-10-17 2016-10-17 A kind of metering core clock processing method and processing device of twin-core intelligent electric energy meter Active CN106569921B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610902932.4A CN106569921B (en) 2016-10-17 2016-10-17 A kind of metering core clock processing method and processing device of twin-core intelligent electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610902932.4A CN106569921B (en) 2016-10-17 2016-10-17 A kind of metering core clock processing method and processing device of twin-core intelligent electric energy meter

Publications (2)

Publication Number Publication Date
CN106569921A true CN106569921A (en) 2017-04-19
CN106569921B CN106569921B (en) 2019-01-08

Family

ID=58532967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610902932.4A Active CN106569921B (en) 2016-10-17 2016-10-17 A kind of metering core clock processing method and processing device of twin-core intelligent electric energy meter

Country Status (1)

Country Link
CN (1) CN106569921B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106569164A (en) * 2016-10-17 2017-04-19 国家电网公司 Method and system for synchronization testing of electric quantity of double-core electric energy meter
CN107966673A (en) * 2017-12-14 2018-04-27 宁波三星医疗电气股份有限公司 A kind of simple effective clock of power meter management method
CN110736873A (en) * 2019-10-29 2020-01-31 宁波三星医疗电气股份有限公司 clock repairing method, power terminal and power system
CN111398675A (en) * 2020-03-26 2020-07-10 杭州电瓦特信息技术有限责任公司 Electric energy meter reading method, device and system
CN111856916A (en) * 2019-04-30 2020-10-30 联合汽车电子有限公司 External clock diagnosis method
CN112114616A (en) * 2020-08-04 2020-12-22 深圳市宏电技术股份有限公司 Switching method of real-time clock, electronic equipment and computer storage medium
CN114114134A (en) * 2021-11-19 2022-03-01 广东电网有限责任公司汕尾供电局 Time synchronization method of intelligent electric energy meter

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6618455B1 (en) * 1998-08-26 2003-09-09 Fujitsu Limited Clock management method and transmission apparatus for synchronous network system
US20050141333A1 (en) * 2003-11-25 2005-06-30 Elpida Memory, Inc. Latch circuit and synchronous memory including the same
CN101023580A (en) * 2004-09-21 2007-08-22 罗姆股份有限公司 Audio power amplifier ic and audio system equipped therewith
CN103873055A (en) * 2012-12-11 2014-06-18 北京普源精电科技有限公司 Measurement instrument with clock synchronization circuit and clock synchronization method
CN104635196A (en) * 2015-02-10 2015-05-20 武汉阿迪克电子股份有限公司 Real-time clock synchronous error-correcting method for charge-controlled intelligent electric energy meter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6618455B1 (en) * 1998-08-26 2003-09-09 Fujitsu Limited Clock management method and transmission apparatus for synchronous network system
US20050141333A1 (en) * 2003-11-25 2005-06-30 Elpida Memory, Inc. Latch circuit and synchronous memory including the same
CN101023580A (en) * 2004-09-21 2007-08-22 罗姆股份有限公司 Audio power amplifier ic and audio system equipped therewith
CN103873055A (en) * 2012-12-11 2014-06-18 北京普源精电科技有限公司 Measurement instrument with clock synchronization circuit and clock synchronization method
CN104635196A (en) * 2015-02-10 2015-05-20 武汉阿迪克电子股份有限公司 Real-time clock synchronous error-correcting method for charge-controlled intelligent electric energy meter

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106569164A (en) * 2016-10-17 2017-04-19 国家电网公司 Method and system for synchronization testing of electric quantity of double-core electric energy meter
CN106569164B (en) * 2016-10-17 2019-04-23 国家电网公司 A kind of synchronous detecting method and system of twin-core electric energy meter electricity
CN107966673A (en) * 2017-12-14 2018-04-27 宁波三星医疗电气股份有限公司 A kind of simple effective clock of power meter management method
CN107966673B (en) * 2017-12-14 2020-06-09 宁波三星医疗电气股份有限公司 Simple and effective clock management method for electric energy meter
CN111856916A (en) * 2019-04-30 2020-10-30 联合汽车电子有限公司 External clock diagnosis method
CN110736873A (en) * 2019-10-29 2020-01-31 宁波三星医疗电气股份有限公司 clock repairing method, power terminal and power system
CN110736873B (en) * 2019-10-29 2022-02-25 宁波三星医疗电气股份有限公司 Clock repairing method, power terminal and power system
CN111398675A (en) * 2020-03-26 2020-07-10 杭州电瓦特信息技术有限责任公司 Electric energy meter reading method, device and system
CN112114616A (en) * 2020-08-04 2020-12-22 深圳市宏电技术股份有限公司 Switching method of real-time clock, electronic equipment and computer storage medium
CN114114134A (en) * 2021-11-19 2022-03-01 广东电网有限责任公司汕尾供电局 Time synchronization method of intelligent electric energy meter

Also Published As

Publication number Publication date
CN106569921B (en) 2019-01-08

Similar Documents

Publication Publication Date Title
CN106569921A (en) Metering core clock processing method and apparatus for dual-core intelligent electric energy meter
US7117107B2 (en) Computerized methods for data loggers
CN103558453B (en) Multiple feed straight power purchase client's maximum demand acquisition system
CN106959386A (en) A kind of creepage detection method and mobile terminal
CN101282526A (en) Handset standby current, standby time as well as test equipment for charging flow
CN108732502A (en) The acquisition methods and device of residual time length workable for equipment
CN101441589A (en) Detection method of substrate management controller and server thereof
CN104330177A (en) Ultra-low power consumption and portable ground temperature acquisition device and method
CN106197468A (en) The method and system that pedometer step number updates
CN104375929A (en) Method for processing information and electronic equipment
CN107886702A (en) Telecommunication electric energy meter and its workflow based on carrier communication
CN104749943A (en) Screen light-up method and device and intelligent watch
CN111323626A (en) Uncovering detection circuit integrated in MCU and uncovering detection method based on MCU
WO2016041398A1 (en) Method for storing battery level information of mobile terminal and mobile terminal
CN111025223B (en) Clock correction method, device, equipment and storage medium of electric energy meter
CN205814305U (en) A kind of Internet of Things remote measurement body temperature device
Dadhe et al. IOT Based Smart Energy Meter
CN205507046U (en) Lithium ion battery electric quantity monitoring system
CN107241509A (en) A kind of mobile phone step counting system and method
CN105785104B (en) Mobile terminal test electric current determines method and device
CN105590548A (en) Creative electronic perpetual calendar
CN202329722U (en) Intelligent gas meter metering device
CN205720603U (en) Stand-by power supply power-on time detection device
CN109298992A (en) Electronic device and starting time calculation method
CN109407037B (en) Test method of intelligent electric meter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant