CN106569072A CN201610999439.9A CN201610999439A CN106569072A CN 106569072 A CN106569072 A CN 106569072A CN 201610999439 A CN201610999439 A CN 201610999439A CN 106569072 A CN106569072 A CN 106569072A
Authority
CN
China
Prior art keywords
track traffic
switch
section passing
switching switches
passing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610999439.9A
Other languages
Chinese (zh)
Inventor
谭伟珍
张智
吴永生
王鹏
邓樵轩
陈新
欧鸿洲
郭玉涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuzhou CRRC Times Electric Co Ltd
Original Assignee
Zhuzhou CRRC Times Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuzhou CRRC Times Electric Co Ltd filed Critical Zhuzhou CRRC Times Electric Co Ltd
Priority to CN201610999439.9A priority Critical patent/CN106569072A/en
Publication of CN106569072A publication Critical patent/CN106569072A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses a track traffic automatic passing over phase-splitter equipment testing system comprising a signal generator, a signal switch, a T1 selector switch, a T2 selector switch, a T3 selector switch, a T4 selector switch, a DC power supply and a power switch; the signal of the signal generator passes the signal switch, and is respectively pushed to four signal input ends of the track traffic automatic passing over phase-splitter equipment by the T1, T2, T3 and T4 selector switches; the DC power supply passes the power switch, and is connected with the power end of the track traffic automatic passing over phase-splitter equipment. The track traffic automatic passing over phase-splitter equipment testing system is wide in application scope, simple in structure, low in cost, easy to maintain and use, and high in testing efficiency.

Description

A kind of track traffic automatic neutral-section passing device pilot system and test method
Technical field
The present invention relates to railway vehicle device test field, more particularly to a kind of test of track traffic automatic neutral-section passing device System and test method.
Background technology
Track traffic automatic neutral-section passing device is the key equipment of electric railway, the control on equipment locomotive/EMUs Control equipment, locomotive/motor-car power-off is automatically controlled when by non-Electric region, electricity is closed, to avoid locomotive/motor-car powered by non-Electric region And cause electrical equipment to damage.
The pattern of the existing track traffic automatic passing over of neutral section of China:Ground magnetic strength device is buried on track near non-Electric region, Track traffic automatic neutral-section passing device and induction coil are equipped on locomotive/motor-car, can be felt by induction coil during the magnetic strength device of ground Electric impulse signal should be gone out, device is received and produce after electric pulse response wave shape, control locomotive/motor-car power-off, conjunction electricity.Such as Fig. 1 institutes Show, when train travel direction is for forward.During the close non-Electric region of locomotive/motor-car, first T2 induction coils skim over advance notice ground magnetic strength Device, induces electric impulse signal, and device produces an advance notice response wave shape after receiving, after locomotive/motor-car control system is received, first Current of electric unloading order is sent, after current of electric is reduced to 0, then disjunction main circuit breaker order is sent out, cuts off what contact net was brought 25kV high-tension electricities.Then T1 induction coils are skimmed over and force ground magnetic strength device, induce electric impulse signal, and device produces one after receiving It is individual to force disconnected response wave shape, direct disjunction main circuit breaker after locomotive/motor-car control system reception.When anticipating signal fails, by force Compel disconnected response wave shape just to play a role.Behind non-Electric region, T2 induction coils skim over recovery ground magnetic strength device, induce electric arteries and veins Signal is rushed, device produces a recovery response wave shape after receiving, after locomotive/motor-car control system is received, send out closure main circuit breaker Order, then dynamo current loading instruction, current of electric will then revert to previous level.Then T1 induction coils skim over recovery ground Magnetic strength device(It is standby), electric impulse signal is induced, device produces a recovery response wave shape, recovers as locomotive/motor-car after receiving Control(Backup), when previous recovery Signal Fail, the latter response wave shape that recovers just plays a role, and induction coil is patrolled Collecting sequential is:T2→T1→T2→T1.When direction of traffic is backward, its principle is identical, but the logical sequence of induction coil is: T3→T4→T3→T4。
How track traffic automatic neutral-section passing device is tested, could correctly be checked its performance parameter to seem particularly and be closed Key.There is no relevant criterion to device experiment at present, the method for being adopted there are two kinds:One is to be tested using switching signal.External one The 10V dc sources of individual belt switch, manually close switch-dividing and produce a pulse signal.Two is to skim over ground using magnet Magnetic strength device is tested:Hand magnet skims over ground magnetic strength device, produces a magnetic strength induction signal and carrys out detection means response wave shape data.
But two methods can not detect advance notice, force disconnected, recovery response wave shape three's temporal and logic relation;Can not simulate Actual magnetic strength induction signal, actual magnetic strength induction signal be a set of pulses row, its amplitude, pulse width, cycle with velocity correlation; Can not intactly detection means response wave shape data, both test methods differ farther out with actual, and result of the test can not be just Really the quality of judgment means is fine or not.
The content of the invention
The technical problem to be solved in the present invention is that:For the technical problem that prior art is present, the present invention provides one Kind have sequential logic detection function, fault detection capability, can arbitrarily simulate in different train running speeds, different operations Track traffic automatic neutral-section passing device is detected under operating mode, applied range, and simple structure, low cost, safeguard and It is easy to use, the high track traffic automatic neutral-section passing device pilot system of checkability and test method.
To solve above-mentioned technical problem, technical scheme proposed by the present invention is:A kind of track traffic automatic neutral-section passing device Pilot system, including signal generator, signaling switch, T1 switching is switched, T2 switching switches, T3 switching switches, T4 switch switch, Dc source and power switch;
Signaling switch control described in the signal Jing of the signal generator, then respectively T1 switchings described in Jing are switched, T2 switchings are switched, T3 switching switches, T4 switching switches deliver to respectively 4 signal input parts of track traffic automatic neutral-section passing device;
Power switch is connected with the power end of the track traffic automatic neutral-section passing device described in the dc source Jing.
As a further improvement on the present invention, switch also including forward switch, backward and again connection is switched;The dc source Positive pole power switch described in after, respectively by the forward switch, backward switch and again connection switch and the track traffic The input of operating mode forward of automatic neutral-section passing device, backward operating mode input and the again connection of connection operating mode input.
As a further improvement on the present invention, the T1 switchings switch, T2 switching switches, T3 switching switches, T4 switchings is opened Pass is three position switch, is connected by series resistance between the contact of the 3rd position two of the three position switch.
As a further improvement on the present invention, the resistance of the resistance is 600 ohm.
As a further improvement on the present invention, the signaling switch, power switch, forward switch, backward switch and join again Switch is two position switch.
As a further improvement on the present invention, also including oscillograph, the oscillograph is automatic with the track traffic respectively Advance notice/the reset terminal of passing phase insulator device, disconnected output end is forced to connect.
A kind of track traffic automatic neutral-section passing device test method, including:
S1. the pulse signal that induction coil is produced when train passes through ground magnetic strength device is simulated by signal generator;
S2. the operating mode tested as needed to track traffic automatic neutral-section passing device operating mode input applies pumping signal;
S3. T1 switchings switch, T2 switching switches, T3 switching switches, T4 switching switches are got to the 3rd position, and are tried as needed The operating mode tested, according to trigger determined by the operating mode sequential select accordingly to switch successively switch conduction to the track traffic from Dynamic passing phase insulator device is input into the pulse signal;
S4. exported with the response for forcing disconnected output end by the advance notice/reset terminal of the track traffic automatic neutral-section passing device and tested Whether confirmatory test function is normal.
As a further improvement on the present invention, when signal generator simulation train passes through ground magnetic strength device in step S1 Induction coil produce pulse signal be configured according to the speed of service of the train simulated, including pulse signal amplitude, The interference strength of pulse width, pulse period, pulse signal strength and pulse signal.
As a further improvement on the present invention, the operating mode tested as needed that concretely comprises the following steps of step S2 selects right The forward switch answered, or switch backward, or join switch conduction again.
As a further improvement on the present invention, in step S3:When the operating mode of required test is operating mode forward, tool Body step is:
S3.1.1. T1 switching switches, T2 switching switches, T3 switching switches, T4 switching switches are got to into the 3rd position;
S3.1.2. T2 switching switches are beaten to first position, to the track traffic automatic neutral-section passing device input pulse Return after signal to the 3rd position;
S3.1.3. T1 switching switches are beaten to first position, to the track traffic automatic neutral-section passing device input pulse Return after signal to the 3rd position;
S3.1.4. T2 switching switches are beaten to first position, to the track traffic automatic neutral-section passing device input pulse Return after signal to the 3rd position;
S3.1.5. the test for simulating train operating mode forward is completed;
When the operating mode of required test is operating mode backward, concretely comprise the following steps:
S3.2.1. T1 switching switches, T2 switching switches, T3 switching switches, T4 switching switches are got to into the 3rd position;
S3.2.2. T4 switching switches are beaten to first position, to the track traffic automatic neutral-section passing device input pulse Return after signal to the 3rd position;
S3.2.3. T3 switching switches are beaten to first position, to the track traffic automatic neutral-section passing device input pulse Return after signal to the 3rd position;
S3.2.4. T4 switching switches are beaten to first position, to the track traffic automatic neutral-section passing device input pulse Return after signal to the 3rd position;
S3.2.5. the test for simulating train operating mode backward is completed.
As a further improvement on the present invention, step S4 is concretely comprised the following steps:The track is received by oscillograph Advance notice/the reset terminal of traffic automatic neutral-section passing device and force the response of disconnected output end export, and analyze and described respond output and test Whether confirmatory test function is normal.
As a further improvement on the present invention, also detect including device open fault, concrete steps include:
S.A.1. the T1 is switched into one in switch, T2 switching switches, T3 switching switches, T4 switching switches to beat in centre Position, remaining is beaten in the 3rd position;
S.A.2. turn-on power switch is electricity on the track traffic automatic neutral-section passing device, detects that the track traffic is automatic Whether the open circuit fault lamp of passing phase insulator device is lighted, and it be then normal to light;
S.A.3. the switching switch beaten in step S.A.1 in centre position is beaten to the 3rd position;
S.A.4. again turn-on power switch is re-powered for the track traffic automatic neutral-section passing device, detects the track Whether the open circuit fault lamp of traffic automatic neutral-section passing device extinguishes, and extinguishing is then normal;
S.A.5. the normal then judgment means open fault detection of step S.A.2 and step S.A.4 is normal.
As a further improvement on the present invention, also detect including device short trouble, concrete steps include:
S.B.1. the T1 is switched into one in switch, T2 switching switches, T3 switching switches, T4 switching switches to beat in centre Position, and by two contact short circuits of bit positions, remaining is beaten in the 3rd position;
S.B.2. turn-on power switch is electricity on the track traffic automatic neutral-section passing device, detects that the track traffic is automatic Whether the short trouble lamp of passing phase insulator device is lighted, and it be then normal to light;
S.B.3. the open circuit between the centre position Liang Ge contacts of the switching switch in centre position is played in recovering step S.B.1, and Beat to the 3rd position;
S.B.4. again turn-on power switch is re-powered for the track traffic automatic neutral-section passing device, detects the track Whether the short trouble lamp of traffic automatic neutral-section passing device extinguishes, and extinguishing is then normal;
S.B.5. the normal then judgment means short trouble detection of step S.B.2 and step S.B.4 is normal.
Compared with prior art, it is an advantage of the current invention that:
1st, track traffic automatic neutral-section passing device experimental rig of the invention and test method, applied range, as long as arranging not Same signal, middle low speed railway, high-speed railway, heavy haul railway, inter-city passenger rail, a variety of track traffic automatic passing over of neutral section dresses Put, can be examined.
2nd, track traffic automatic neutral-section passing device pilot system of the invention, the electricity with simulation actual motion environmental condition Road, the circuit with detection sequential logic action, with the circuit for arranging failure, can meet various testing inspection demands.
3rd, track traffic automatic neutral-section passing device pilot system circuit structure of the invention is simple, and low cost is easy to maintenance, Easy to use, checkability is high.
4th, track traffic automatic neutral-section passing device test method of the invention, can detect sequential logic action, Ke Yijian The concrete data of device response wave shape in the case of the different speeds of service are surveyed, induction coil can be opened a way with verifying attachment and short circuit event The ability of barrier detection, the ability that can receive signal with verifying attachment can detect function with the ability of verifying attachment anti-jamming signal It is powerful.
Description of the drawings
Fig. 1 is track traffic automatic neutral-section passing device scene operation schematic diagram.
Fig. 2 is specific embodiment of the invention track traffic automatic neutral-section passing device pilot system.
Fig. 3 is that the specific embodiment of the invention tests block diagram.
Fig. 4 is that the specific embodiment of the invention simulates low speed and high speed magnetic induced signal schematic diagram.
Fig. 5 is specific embodiment of the invention oscillograph acquisition device sequential logic action response waveform diagram.
Specific embodiment
Below in conjunction with Figure of description and concrete preferred embodiment, the invention will be further described, but not therefore and Limit the scope of the invention.
As shown in Fig. 2 the track traffic automatic neutral-section passing device pilot system of the present embodiment, including signal generator, letter Number switch, T1 switching switches, T2 switching switches, T3 switching switches, T4 switching switches, dc source and power switch;Signal is sent out The signal Jing signaling switches control of raw device, then Jing T1 switchings switch, T2 switching switches, T3 switching switches, T4 switching switches respectively 4 signal input parts of track traffic automatic neutral-section passing device are delivered to respectively;Dc source Jing power switches are with track traffic certainly The power end connection of dynamic passing phase insulator device.In the present embodiment, the first position of signaling switch is signal input part, is sent out with signal Raw device connection, the second place is signal output part.T1 switching switches, T2 switching switches, T3 switching switches, the of T3 switching switches One position is connected respectively with the output end of signaling switch, the second place respectively from the different arteries and veins of track traffic automatic neutral-section passing device Rush signal input part connection.Wherein, the T1 lines of induction of the second place of T1 switchings switch and track traffic automatic neutral-section passing device Circle input connection, the second place and the T2 induction coils input of track traffic automatic neutral-section passing device of T2 switching switches connect Connect, the second place of T3 switching switches is connected with the T3 induction coil inputs of track traffic automatic neutral-section passing device, T4 switchings The second place of switch is connected with the T4 induction coil inputs of track traffic automatic neutral-section passing device.T1 switching switches, T2 cut Change switch, T3 switching switches, T4 switching switches and be three position switch, pass through between the contact of the 3rd position two of three position switch Series resistance connects.Resistance is used for analogue inductive coil, and the resistance of resistance is 600 ohm.In the present embodiment, switching is switched First position is in Fig. 2 the leftward position for switching switch, and the second place is in Fig. 2 the centre position for switching switch, and first Position is in Fig. 2 the right positions for switching switch.Train includes the rail traffic vehicles such as locomotive, motor-car in the present embodiment.
In the present embodiment, switch also including forward switch, backward and again connection is switched;The positive pole Jing power supplys of dc source are opened Guan Hou, is switched respectively by forward switch, backward and again connection switch is defeated with the operating mode forward of track traffic automatic neutral-section passing device Enter end, backward operating mode input and join the connection of operating mode input again.Signaling switch, power switch, forward switch, backward switch and Join switch again and be two position switch.By forward switch, backward switch and again join switch can easily control track traffic Automatic neutral-section passing device is switched between different operating conditions, it is not necessary to extra to track traffic automatic neutral-section passing device Operating mode is configured, so that test is more convenient, quick, in hgher efficiency.
In the present embodiment, also including oscillograph, oscillograph respectively with the advance notice of track traffic automatic neutral-section passing device/extensive Hold again, force disconnected output end to connect.Advance notice/reset terminal is received by oscillograph and forces the response that disconnected output end is exported to believe Number, and be analyzed, can cause track traffic automatic neutral-section passing device that complete response apparatus need not be installed and test to observe Card response condition, so that the equipment required for test is less, tests more convenient.Certainly, it should be noted that can also Using other response receiving devices advance notice/reset terminal is received with the response signal for forcing disconnected output end to be exported.Meanwhile, oscillograph Can be used for being adjusted checking to the pulse signal simulated of signal generator.In the present embodiment, in pilot system Connecting wire between each device is 0.5mm2Multicore copper cash, so as to ensure the pulse signal that signal generator is simulated, Power supply and operating mode input signal are effectively transmitted.
As shown in figure 3, the track traffic automatic neutral-section passing device test method of the present embodiment, including:S1. signal is passed through Generator simulation train passes through the pulse signal that induction coil is produced during the magnetic strength device of ground;S2. the operating mode tested as needed to Track traffic automatic neutral-section passing device operating mode input applies pumping signal;S3. T1 switchings switch, T2 switching switches, T3 switchings Switch, T4 switching switches get to the 3rd position, and the operating mode tested as needed, and sequential is triggered successively according to determined by operating mode Corresponding switching switch conduction is selected to track traffic automatic neutral-section passing device input pulse signal;S4. it is automatic by track traffic Whether advance notice/the reset terminal of passing phase insulator device and the response for forcing disconnected output end export checking test function normal.
In the present embodiment, signal generator simulation train passes through what induction coil during the magnetic strength device of ground was produced in step S1 Pulse signal is configured according to the speed of service of the train simulated, including amplitude, pulse width, the pulse week of pulse signal The interference strength of phase, pulse signal strength and pulse signal.When being run with friction speed due to train, train passes through ground magnetic strength The amplitude of the pulse signal that induction coil is produced, pulse width, pulse period are also different during device, as shown in figure 4, therefore, pass through The parameter of the pulse signal that signal generator is simulated is set, it is possible to which track traffic is automatic when being run with friction speed to train Passing phase insulator device is tested.Meanwhile, by arranging the signal strength signal intensity that signal generator is simulated, it is set to minimum sensing Signal, can carry out minimum induced signal detection to track traffic automatic neutral-section passing device.By arranging signal generator institute mould Intend the interference strength in signal, anti-interference detection can be carried out to track traffic automatic neutral-section passing device.
In the present embodiment, the operating mode tested as needed that concretely comprises the following steps of step S2 selects corresponding forward switch, Or switch backward, or join switch conduction again.When the operating mode for needing test is operating mode forward, forward switch is beaten to conducting position Put, switch backward and again connection switch is beaten to open position.When the operating mode for needing test is operating mode backward, will backward switch and beat extremely Conduction position, forward switch and again connection are switched to be beaten to open position.
In the present embodiment, in step S3:When the operating mode of required test is operating mode forward, concretely comprise the following steps: S3.1.1. T1 switching switches, T2 switching switches, T3 switching switches, T4 switching switches are got to into the 3rd position;S3.1.2. will T2 switching switches are beaten to first position, are returned to the 3rd position to after track traffic automatic neutral-section passing device input pulse signal; S3.1.3. by T1 switching switch beat to first position, return to after track traffic automatic neutral-section passing device input pulse signal to 3rd position;S3.1.4. T2 switching switches are beaten to first position, to track traffic automatic neutral-section passing device input pulse letter Return after number to the 3rd position;S3.1.5. the test for simulating train operating mode forward is completed;When the operating mode of required test be to Afterwards during operating mode, concretely comprise the following steps:S3.2.1. T1 switching switches, T2 switching switches, T3 switching switches, T4 switching switches are got to 3rd position;S3.2.2. T4 switching switches are beaten to first position, to track traffic automatic neutral-section passing device input pulse letter Return after number to the 3rd position;S3.2.3. T3 switching switches are beaten to first position, to track traffic automatic neutral-section passing device Return after input pulse signal to the 3rd position;S3.2.4. T4 switching switches are beaten to first position, it is automatic to track traffic Return to the 3rd position after passing phase insulator device input pulse signal;S3.2.5. the test for simulating train operating mode backward is completed.
In the present embodiment, it is automatic to track traffic with above-mentioned specific logical sequence by according to selected operating mode Passing phase insulator device applies pulse signal, can detect whether the sequential logic action of track traffic automatic neutral-section passing device is correct. Meanwhile, it is adjusted by the amplitude of the pulse signal simulated to signal generator, width, cycle, can be to simulating train Test at various speeds.The analog pulse signal of signal generator is arranged to into minimum induced signal, whether is detection means There is advance notice, force disconnected, recovery response wave shape output, minimum induced signal detection can be carried out.By arranging signal generator middle arteries The interference strength of signal is rushed, anti-interference detection can be carried out.
In the present embodiment, as shown in figure 5, receiving the advance notice/extensive of track traffic automatic neutral-section passing device by oscillograph Hold and force the response of disconnected output end to export again, and whether analyze response output checking test function normal.In the present embodiment, Advance notice/reset terminal is received by oscillograph and forces the response of disconnected output end to export, not only can intuitively judge track traffic Whether automatic neutral-section passing device makes respective response, moreover it is possible to which response signal is accurately analyzed.
In the present embodiment, also detect including device open fault, concrete steps include:S.A.1. T1 switchings are switched, One in T2 switching switches, T3 switching switches, T4 switching switches is beaten in centre position, and remaining is beaten in the 3rd position;S.A.2. Turn-on power switch is electricity on track traffic automatic neutral-section passing device, detects the open circuit fault of track traffic automatic neutral-section passing device Whether lamp is lighted, and it be then normal to light;S.A.3. the switching switch beaten in step S.A.1 in centre position is beaten to the 3rd Put;S.A.4. again turn-on power switch is re-powered for track traffic automatic neutral-section passing device, the automatic mistake of detection track traffic Whether the open circuit fault lamp of neutral section extinguishes, and extinguishing is then normal;S.A.5. step S.A.2 and step S.A.4 it is normal then The detection of judgment means open fault is normal.
In the present embodiment, also detect including device short trouble, concrete steps include:S.B.1. T1 switchings are switched, One in T2 switching switches, T3 switching switches, T4 switching switches is beaten in centre position, and two contacts of bit positions are short Connect, remaining is beaten in the 3rd position;S.B.2. turn-on power switch is electricity on track traffic automatic neutral-section passing device, detects track Whether the short trouble lamp of traffic automatic neutral-section passing device is lighted, and it be then normal to light;S.B.3. beat in recovering step S.B.1 The open circuit between the centre position Liang Ge contacts of the switching switch in centre position, and beat to the 3rd position;S.B.4. turn on again Power switch is re-powered for track traffic automatic neutral-section passing device, detects the short trouble of track traffic automatic neutral-section passing device Whether lamp extinguishes, and extinguishing is then normal;S.B.5. the normal then judgment means short trouble inspection of step S.B.2 and step S.B.4 Survey normal.
Above-mentioned simply presently preferred embodiments of the present invention, not makees any pro forma restriction to the present invention.Although of the invention It is disclosed above with preferred embodiment, but it is not limited to the present invention.Therefore, it is every without departing from technical solution of the present invention Content, according to the technology of the present invention essence to any simple modification made for any of the above embodiments, equivalent variations and modification, all should fall In the range of technical solution of the present invention protection.

Claims (13)

1. a kind of track traffic automatic neutral-section passing device pilot system, it is characterised in that:Including signal generator, signaling switch, T1 switching switches, T2 switching switches, T3 switching switches, T4 switching switches, dc source and power switch;
Signaling switch control described in the signal Jing of the signal generator, then respectively T1 switchings described in Jing are switched, T2 switchings are switched, T3 switching switches, T4 switching switches deliver to respectively 4 signal input parts of track traffic automatic neutral-section passing device;
Power switch is connected with the power end of the track traffic automatic neutral-section passing device described in the dc source Jing.
2. track traffic automatic neutral-section passing device pilot system according to claim 1, it is characterised in that:Also include forward Switch, backward switch and again connection switch;After positive pole power switch described in of the dc source, opened forward by described respectively Pass, backward switch and again connection switch are with the input of operating mode forward of the track traffic automatic neutral-section passing device, backward operating mode is defeated Enter end and join the connection of operating mode input again.
3. track traffic automatic neutral-section passing device pilot system according to claim 2, it is characterised in that:The T1 switchings Switch, T2 switching switches, T3 switching switches, T4 switching switches are three position switch, the 3rd position of the three position switch Connected by series resistance between two contacts.
4. track traffic automatic neutral-section passing device pilot system according to claim 3, it is characterised in that:The resistance Resistance is 600 ohm.
5. track traffic automatic neutral-section passing device pilot system according to claim 4, it is characterised in that:The signal is opened Pass, power switch, forward switch, backward switch and again join switch be two position switch.
6. track traffic automatic neutral-section passing device pilot system according to claim 5, it is characterised in that:Also include oscillography Device, oscillograph advance notice/reset terminal respectively with the track traffic automatic neutral-section passing device, forces disconnected output end to be connected.
7. a kind of track traffic automatic neutral-section passing device test method, it is characterised in that include:
When S1. simulating train by ground magnetic strength device by signal generator, the pulse signal that induction coil is produced;
S2. the operating mode tested as needed to track traffic automatic neutral-section passing device operating mode input applies pumping signal;
S3. T1 switchings switch, T2 switching switches, T3 switching switches, T4 switching switches are got to the 3rd position, and are tried as needed The operating mode tested, according to trigger determined by the operating mode sequential select accordingly to switch successively switch conduction to the track traffic from Dynamic passing phase insulator device is input into the pulse signal;
S4. exported with the response for forcing disconnected output end by the advance notice/reset terminal of the track traffic automatic neutral-section passing device and tested Whether confirmatory test function is normal.
8. track traffic automatic neutral-section passing device test method according to claim 7, it is characterised in that:Step S1 Middle signal generator simulation train passes through the pulse signal of induction coil generation during the magnetic strength device of ground according to the train simulated The speed of service is configured, including the amplitude of pulse signal, pulse width, pulse period, pulse signal strength and pulse signal Interference strength.
9. track traffic automatic neutral-section passing device test method according to claim 8, it is characterised in that:Step S2 The operating mode tested as needed of concretely comprising the following steps select corresponding forward switch, or switch backward, or join switch conduction again.
10. track traffic automatic neutral-section passing device test method according to claim 9, it is characterised in that:The step In S3:When the operating mode of required test is operating mode forward, concretely comprise the following steps:
S3.1.1. T1 switching switches, T2 switching switches, T3 switching switches, T4 switching switches are got to into the 3rd position;
S3.1.2. T2 switching switches are beaten to first position, to the track traffic automatic neutral-section passing device input pulse Return after signal to the 3rd position;
S3.1.3. T1 switching switches are beaten to first position, to the track traffic automatic neutral-section passing device input pulse Return after signal to the 3rd position;
S3.1.4. T2 switching switches are beaten to first position, to the track traffic automatic neutral-section passing device input pulse Return after signal to the 3rd position;
S3.1.5. the test for simulating train operating mode forward is completed;
When the operating mode of required test is operating mode backward, concretely comprise the following steps:
S3.2.1. T1 switching switches, T2 switching switches, T3 switching switches, T4 switching switches are got to into the 3rd position;
S3.2.2. T4 switching switches are beaten to first position, to the track traffic automatic neutral-section passing device input pulse Return after signal to the 3rd position;
S3.2.3. T3 switching switches are beaten to first position, to the track traffic automatic neutral-section passing device input pulse Return after signal to the 3rd position;
S3.2.4. T4 switching switches are beaten to first position, to the track traffic automatic neutral-section passing device input pulse Return after signal to the 3rd position;
S3.2.5. the test for simulating train operating mode backward is completed.
11. track traffic automatic neutral-section passing device test methods according to claim 10, it is characterised in that:The step S4's concretely comprises the following steps:Advance notice/the reset terminal of the track traffic automatic neutral-section passing device is received by oscillograph and forces disconnected The response output of output end, and whether analyze the response output checking test function normal.
The 12. track traffic automatic neutral-section passing device test methods according to any one of claim 7 to 11, its feature exists In:Also detect including device open fault, concrete steps include:
S.A.1. the T1 is switched into one in switch, T2 switching switches, T3 switching switches, T4 switching switches to beat in centre Position, remaining is beaten in the 3rd position;
S.A.2. turn-on power switch is electricity on the track traffic automatic neutral-section passing device, detects that the track traffic is automatic Whether the open circuit fault lamp of passing phase insulator device is lighted, and it be then normal to light;
S.A.3. the switching switch beaten in step S.A.1 in centre position is beaten to the 3rd position;
S.A.4. again turn-on power switch is re-powered for the track traffic automatic neutral-section passing device, detects the track Whether the open circuit fault lamp of traffic automatic neutral-section passing device extinguishes, and extinguishing is then normal;
S.A.5. the normal then judgment means open fault detection of step S.A.2 and step S.A.4 is normal.
The 13. track traffic automatic neutral-section passing device test methods according to any one of claim 7 to 11, its feature exists In:Also detect including device short trouble, concrete steps include:
S.B.1. the T1 is switched into one in switch, T2 switching switches, T3 switching switches, T4 switching switches to beat in centre Position, and by two contact short circuits of bit positions, remaining is beaten in the 3rd position;
S.B.2. turn-on power switch is electricity on the track traffic automatic neutral-section passing device, detects that the track traffic is automatic Whether the short trouble lamp of passing phase insulator device is lighted, and it be then normal to light;
S.B.3. the open circuit between the centre position Liang Ge contacts of the switching switch in centre position is played in recovering step S.B.1, and Beat to the 3rd position;
S.B.4. again turn-on power switch is re-powered for the track traffic automatic neutral-section passing device, detects the track Whether the short trouble lamp of traffic automatic neutral-section passing device extinguishes, and extinguishing is then normal;
S.B.5. the normal then judgment means short trouble detection of step S.B.2 and step S.B.4 is normal.
CN201610999439.9A 2016-11-14 2016-11-14 Track traffic automatic passing over phase-splitter equipment testing system and testing method Pending CN106569072A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610999439.9A CN106569072A (en) 2016-11-14 2016-11-14 Track traffic automatic passing over phase-splitter equipment testing system and testing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610999439.9A CN106569072A (en) 2016-11-14 2016-11-14 Track traffic automatic passing over phase-splitter equipment testing system and testing method

Publications (1)

Publication Number Publication Date
CN106569072A true CN106569072A (en) 2017-04-19

Family

ID=58542094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610999439.9A Pending CN106569072A (en) 2016-11-14 2016-11-14 Track traffic automatic passing over phase-splitter equipment testing system and testing method

Country Status (1)

Country Link
CN (1) CN106569072A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107748309A (en) * 2017-12-01 2018-03-02 株洲中车电气科技有限公司 Locomotive automatic neutral-section passing system all-round property testing method and product
CN108725263A (en) * 2018-07-30 2018-11-02 广州铁路科技开发有限公司 A kind of new type auto neutral-section passing system onboard control device
CN108919781A (en) * 2018-07-12 2018-11-30 沈阳铁路信号有限责任公司 The self checking method and realization circuit of EMU auto-passing neutral section control system
CN112014675A (en) * 2020-09-02 2020-12-01 中车大同电力机车有限公司 Detection circuit and detection device of automatic passing neutral section system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201040496Y (en) * 2007-02-08 2008-03-26 宁涛 Detecting device for electric locomotive automatic passing neutral section system
CN101811451A (en) * 2010-04-16 2010-08-25 南车株洲电力机车有限公司 Method for controlling passing neutral section of locomotive
CN103213518A (en) * 2013-03-28 2013-07-24 天津凯发电气股份有限公司 Detection system and detection method of ground automatic passing split-phase locomotive position

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201040496Y (en) * 2007-02-08 2008-03-26 宁涛 Detecting device for electric locomotive automatic passing neutral section system
CN101811451A (en) * 2010-04-16 2010-08-25 南车株洲电力机车有限公司 Method for controlling passing neutral section of locomotive
CN103213518A (en) * 2013-03-28 2013-07-24 天津凯发电气股份有限公司 Detection system and detection method of ground automatic passing split-phase locomotive position

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107748309A (en) * 2017-12-01 2018-03-02 株洲中车电气科技有限公司 Locomotive automatic neutral-section passing system all-round property testing method and product
CN108919781A (en) * 2018-07-12 2018-11-30 沈阳铁路信号有限责任公司 The self checking method and realization circuit of EMU auto-passing neutral section control system
CN108919781B (en) * 2018-07-12 2020-10-27 沈阳铁路信号有限责任公司 Self-checking method and implementation circuit of automatic neutral section passing control system of motor train unit
CN108725263A (en) * 2018-07-30 2018-11-02 广州铁路科技开发有限公司 A kind of new type auto neutral-section passing system onboard control device
CN108725263B (en) * 2018-07-30 2024-04-09 广州铁路科技开发有限公司 Vehicle-mounted control equipment of automatic passing neutral section system
CN112014675A (en) * 2020-09-02 2020-12-01 中车大同电力机车有限公司 Detection circuit and detection device of automatic passing neutral section system
CN112014675B (en) * 2020-09-02 2023-08-29 中车大同电力机车有限公司 Detection circuit and detection device of automatic passing neutral section system

Similar Documents

Publication Publication Date Title
CN106569072A (en) Track traffic automatic passing over phase-splitter equipment testing system and testing method
CN109789810B (en) Automatic neutral section passing system of electrified railway section station and control method thereof
CN102035189B (en) Novel monitoring and protecting system for test thyristor of converter valve module
CN109991534A (en) A kind of turn-out track machine equipment relay sequence fault diagnosis system
CN109239587B (en) Thyristor valve test system based on transparent forwarding
RU2011115091A (en) DISTRIBUTED SECURITY MONITORING SYSTEM WITH SECURITY CIRCUIT AND METHOD FOR TESTING SUCH SYSTEM
CN103231668B (en) Self-check type auto-passing neutral section system and auto-passing neutral section method of electrified railway
CN103969576A (en) Dynamic characteristic analyzer for dual-grounding circuit breaker
CN106291235A (en) Railway run-through circuit cable method for monitoring operation states
CN108132412A (en) Coil form power equipment turn-to-turn short circuit diagnostic characteristic extracting method and analysis system
CN104062579B (en) Circuit breaker arc voltage characteristic assay device and test method
CN105445585A (en) Fault diagnosis method and system for primary loop of power grid
CN110949446B (en) Control circuit and method for electronic turnout
CN102663913B (en) Practical training system for operating skills of adjusting safe loop in high-speed motor train units, and control method thereof
CN104330688A (en) Continuity test device and continuity test method of airborne cable
CN102650573A (en) Detecting device for auto-passing phase-splitting function of electric locomotive
CN104133463A (en) Terminal injection-type feeder automation uninterrupted power test method
CN106842012A (en) A kind of separate decision method of live detection
CN108919781B (en) Self-checking method and implementation circuit of automatic neutral section passing control system of motor train unit
CN202512746U (en) High-speed motor train unit pantograph debugging operation skill practical training system
CN102437551B (en) Over-current protection device for transformer and electric locomotive
CN104749486A (en) Residual current protector based IT system single-phase fault positioning method
CN109166362A (en) EMU circuit loop simulation training method and simulation training system
CN106338300A (en) Comprehensive test apparatus and test method for electronic Instrument and bus module of trolleybus
CN107748309A (en) Locomotive automatic neutral-section passing system all-round property testing method and product

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170419

RJ01 Rejection of invention patent application after publication