CN106291235A - Railway run-through circuit cable method for monitoring operation states - Google Patents

Railway run-through circuit cable method for monitoring operation states Download PDF

Info

Publication number
CN106291235A
CN106291235A CN201610615483.5A CN201610615483A CN106291235A CN 106291235 A CN106291235 A CN 106291235A CN 201610615483 A CN201610615483 A CN 201610615483A CN 106291235 A CN106291235 A CN 106291235A
Authority
CN
China
Prior art keywords
transient
speed railway
railway
signal
line cord
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610615483.5A
Other languages
Chinese (zh)
Other versions
CN106291235B (en
Inventor
魏洪文
张立斌
厉新波
王勃
马加庆
渠忠磊
李玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Bohong Electric Co ltd
Original Assignee
ZIBO BOHONG ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZIBO BOHONG ELECTRIC CO Ltd filed Critical ZIBO BOHONG ELECTRIC CO Ltd
Priority to CN201610615483.5A priority Critical patent/CN106291235B/en
Publication of CN106291235A publication Critical patent/CN106291235A/en
Application granted granted Critical
Publication of CN106291235B publication Critical patent/CN106291235B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/083Locating faults in cables, transmission lines, or networks according to type of conductors in cables, e.g. underground

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Locating Faults (AREA)

Abstract

A kind of railway run-through circuit cable method for monitoring operation states, belongs to railway run-through circuit on-line monitoring field.High-speed railway through line cord method for monitoring operation states, including the through line cord of high-speed railway, it is characterized in that: whether produced by detection high-speed railway through circuit cable bus PT residual voltage transient signal, judge whether the through line cord of high-speed railway occurs instantaneity transient fault, the electro-magnetic transient signal flowing through metal screen layer produced by monitoring and the record through line cord of high-speed railway, railway run-through circuit cable is carried out fault pre-alarming, and indicates trouble point distance.The method is compared with original cable method for monitoring operation states, instantaneity transient state earth fault can be occurred before damaging for cable to implement early warning, may filter that train is crossed car, catered to the non-faulting disturbing signals such as lock, effectively reduce the system wrong report that disturbance brings, improve warning accuracy, reduce rate of false alarm.

Description

Railway run-through circuit cable method for monitoring operation states
Technical field
The invention belongs to railway run-through circuit on-line monitoring field, a kind of railway run-through circuit cable runs shape State monitoring method
Background technology
Through track on railway is used for directly can for railway each station electric horn interlocking apparatus and the offer of interval self-closing signaling point Lean on, the power circuit of uninterrupted power source, be the important component part of railway power system, its power supply reliability not only directly affects To the safe operation of railway locomotive, also affect the power supply within railway and distribution work simultaneously, be the weight concerning railway transportation Want item.
Railway transportation develops to high speed, high density direction, it is ensured that the reliable power supply of supply line, is to ensure train Run safe and punctual primary condition.Traditional path monitoring mode uses the mode of manual inspection, and its investment is huge, and When breaking down, fault is not easy to search, and eliminating is wasted time and energy, and accuracy, poor real are often brought great to railway transportation Loss.Along with the speed-raising of current rail track and automatization level improve, the safety and reliability of supply line is proposed Higher requirement, the most correctly and efficiently judges, searches, processes feeder line fault, shorten power off time, restore electricity in time Particularly critical.
At present in the through cable of high-speed railway before there is permanent earth fault, generation repeatedly in very short time by In the punch-through that major insulation cracking causes, puncturing rear major insulation can recover rapidly so that general detection device is difficult to monitor.Ferrum Road through line cord method for monitoring operation states, is under railway run-through line cable running status, in above-mentioned cable instantaneity When transient fault occurs, voltage traveling wave and fault section cable, the metal screen layer transient current to through track cable Waveform is monitored, it is achieved railway run-through line cable fault early warning, determines faulty line section and instruction trouble point distance.
Summary of the invention
According to above deficiency of the prior art, it is an object of the invention to provide a kind of for high-speed railway through track electricity The on-line early warning method of the instantaneity transient fault of cable, the instantaneity transient fault before cable is damaged, implement on-line early warning, It is easy to power supply department shift to an earlier date or planned maintenance, it is to avoid because cable catastrophic failure causes power failure, reduce the warp caused because of power failure Ji loss and the adverse effect bringing enterprise's production and people's lives, improve the railway run-through circuit cable of power supply reliability Method for monitoring operation states.
The technical solution adopted for the present invention to solve the technical problems is: railway run-through circuit cable monitoring running state side Method, including the through line cord of high-speed railway, it is characterised in that: by detection high-speed railway through circuit cable bus PT zero sequence Whether voltage transient signal produces, and judges whether the through line cord of high-speed railway occurs instantaneity transient fault, by prison Survey and the electro-magnetic transient signal flowing through metal screen layer of record high-speed railway through line cord generation, to railway run-through circuit Cable carries out fault pre-alarming, and indicates trouble point distance.
What described monitoring and the record through line cord of high-speed railway produced flows through the electro-magnetic transient letter of metal screen layer Number, refer to that the current sensor utilizing several high-speed railways through circuit monitoring running state device is to railway run-through circuit originally Each case under section substation bus bar becomes and/or the transient state of cable grounding point metal screen layer of the logical number interior power cable line of institute Current signal carries out real-time online collection and record.
Described line cord through to high-speed railway carries out fault pre-alarming, and indicates trouble point distance, refers to utilize Voltage sensor monitors residual voltage signal and instantaneity disturbance occurs, and when meeting trigger condition, it is judged that pass through for high-speed railway Logical circuit generation instantaneity transient fault, extract this moment each case become and/or logical number the transient current of metal screen layer Signal, is uploaded to railway power supply master system platform by this many groups signal, and railway power supply master system platform utilizes transient state The waveform of current signal is analyzed and processes, and determines fault section, and by the row wave reflection information pair of transient current signal Find range in trouble point.
Signal on the through line cord of high-speed railway is sufficiently complex, at least includes that control signal, closing operation, transient state are believed Number, true ground connection steady-state signal etc., in order to accurately judge whether instantaneity transient fault, the waveform collected is analyzed Time, need the waveform gathered is distinguished, therefore distinguish that the setting of condition is extremely important.According to high-speed railway through track electricity Cable practical situation set, described trigger condition refer to residual voltage signal through waveform analysis, its waveform meet:
1) variation tendency reaches empirical value;I.e. waveform angle of elevation is more than or equal to empirical value.As required, empirical value is permissible It it is 30 °-80 °, through arranging, it is simple to display, it is simple to perusal is distinguished.May also be, shown waveform pace of change or Person's rate of climb, the sample point of unit interval, first point and the 4th point data difference are more than 50.
2) superposition transient signal on power frequency waveform;The waveform widths of transient signal is more than or equal to 7/64K.
3) RMS value of energy reaches 50.Can also be arranged as required to as 17-100.
Or described trigger condition refer to residual voltage signal through waveform analysis, the pulse rate of climb reaches in 3 μ s Rise 1.465V, and persistently more than 5.859V in 7 μ s.
Described analysis and process, including to transient electromagnetic transient signal
(1) carry out signal condition and analog digital conversion, and store;
(2) utilize waveform morphology and the energy value of many group transient electromagnetic transient signals, filter misoperation signal, find fault Interval, determine by which case become and/or logical number the fault transient state current signal that sends of the through line cord of high-speed railway;
(3) by the row wave reflection information of this fault transient state current signal, is found range in trouble point.
It is >=500kHz that described voltage sensor gathers residual voltage transient signal sample frequency.
The electromagnetism of the metal screen layer that described current sensor monitoring and record high-speed railway through track cable produce is temporary State signal sampling frequency is >=2MHz.
Railway run-through circuit cable method for monitoring operation states of the present invention is had the beneficial effect that to transport with original cable Row state monitoring method is compared, and instantaneity transient state earth fault can be occurred to implement early warning, may filter that fire before damaging for cable Car is crossed car, is catered to the non-faulting disturbing signals such as lock, effectively reduces the system wrong report that disturbance brings, improves warning accuracy, reduce Rate of false alarm.Particularly: by the bus residual voltage signal monitoring of tested railway run-through circuit cable and metal screen layer Earth conductor transient current monitor, this method can:
1, the railway run-through online fault pre-alarming of circuit cable can be realized, and trouble point distance can be explicitly indicated;
2, the change of supply transformer residual voltage can be monitored, improve warning accuracy, reduce fault misdescription rate;
3, do not change the cable method of operation and structure, be not take up existing system resource, safe and reliable;
Accompanying drawing explanation
Fig. 1 is the electrical schematic diagram of the present invention;
Fig. 2 is the functional-block diagram of the high-speed railway through circuit monitoring running state device of the present invention;
Fig. 3 is the functional-block diagram of the residual voltage monitoring device of the present invention;
Fig. 4 is the actual measurement residual voltage signal waveforms of the present invention;
Fig. 5 is the actual measurement transient current signal oscillogram of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawings embodiments of the invention are described further:
Embodiment 1:
As Figure 1-3, railway run-through circuit cable method for monitoring operation states, including the through line electricity of high-speed railway Cable, case become and/or logical number institute and transformer station, arrange voltage biography on the high-speed railway through circuit cable bus PT of transformer station Sensor gathers residual voltage transient signal, gathers each section of high-speed iron at current sensor set by the change of each case and/or logical number The electro-magnetic transient signal flowing through metal screen layer of the through line cord in road.
The electro-magnetic transient signal that current sensor collects is defeated by high-speed railway through circuit monitoring running state device Deliver to railway power supply master system platform.High-speed railway through circuit monitoring running state device includes the signal that circuit couples Conditioner A, high-speed a/d converter, high-speed comparator, FPGA1, clock decoding A, dynamic memory A and processor A, processor A Host computer, i.e. railway power supply master system platform is connected by Ethernet chip A.Current sensor monitoring and record high-speed iron The electro-magnetic transient signal sampling frequency of the metal screen layer that road through track cable produces is >=2MHz.
The residual voltage transient signal that voltage sensor collects is transported to railway power supply by residual voltage monitoring device Master system platform.Residual voltage monitoring device include signal conditioner B that circuit couples, low-speed a/d converter, FPGA2, Clock decoding B, dynamic memory B and processor B, processor B also connect host computer, i.e. railway power supply by Ethernet chip B Master system platform.It is >=500kHz that voltage sensor gathers residual voltage transient signal sample frequency.
Whether concrete grammar is: produced by detection high-speed railway through circuit cable bus PT residual voltage transient signal Raw, judge whether the through line cord of high-speed railway occurs instantaneity transient fault, passed through by monitoring and record high-speed railway The electro-magnetic transient signal flowing through metal screen layer that logical line cord produces, carries out fault pre-alarming to railway run-through circuit cable, And indicate trouble point distance.
The electro-magnetic transient signal flowing through metal screen layer that monitoring and the record through line cord of high-speed railway produce, refers to Utilize the current sensor of high-speed railway through circuit monitoring running state device to this section of substation bus bar of railway run-through circuit Under each case become and/or the transient current signal of cable grounding point metal screen layer of the logical number interior power cable line of institute is carried out Real-time online gathers and record.
Line cord through to high-speed railway carries out fault pre-alarming, and indicates trouble point distance, refers to utilize voltage to pass Sensor monitors residual voltage signal and instantaneity disturbance occurs, and when meeting trigger condition, it is judged that occur for railway run-through circuit Instantaneity transient fault, extract this moment each case become and/or logical number the transient current signal of metal screen layer, this is many Group signal is uploaded to railway power supply master system platform, and railway power supply master system platform utilizes the ripple of transient current signal Shape is analyzed and processes, and determines fault section, and is surveyed trouble point by the row wave reflection information of transient current signal Away from.
Setting according to high-speed railway through track cable practical situation, trigger condition refers to that residual voltage signal divides through waveform Analysis, its waveform meets:
1) variation tendency reaches empirical value;I.e. waveform angle of elevation is more than or equal to empirical value.As required, empirical value is permissible It it is 30 °-80 °, through arranging, it is simple to display, it is simple to perusal is distinguished.
2) superposition transient signal on power frequency waveform;The waveform widths of transient signal is more than or equal to 7/64K.
3) RMS value of energy reaches 50.
Analyze and process, including to transient electromagnetic transient signal
(1) carry out signal condition and analog digital conversion, and store;
(2) utilize waveform morphology and the energy value of many group transient electromagnetic transient signals, filter misoperation signal, find fault Interval, determine by which case become and/or logical number the fault transient state current signal that sends of the through line cord of high-speed railway;
(3) by the row wave reflection information of this fault transient state current signal, is found range in trouble point.
Embodiment 2:
On the basis of embodiment 1, setting according to high-speed railway through track cable practical situation, trigger condition refers to zero sequence Voltage signal reaches empirical value through waveform analysis, the variation tendency that its waveform meets;Shown waveform pace of change or on Lifting speed, the sample point of unit interval, first point and the 4th point data difference are more than 50.
Embodiment 3:
On the basis of above example, trigger condition is revised as residual voltage signal raising speed in waveform analysis, pulse Degree rises 1.465V in reaching 3 μ s, and persistently more than 5.859V in 7 μ s.
Experiment proves:
As shown in Figure 4, Figure 5, transverse axis is the time, and the longitudinal axis is amplitude.In residual voltage signal waveform Fig. 4, in 0.001 second Produce projection upwards, represent that instantaneity disturbance occurs in residual voltage signal, meet trigger condition, it is judged that for railway run-through circuit There is instantaneity transient fault.
Transfer this moment each case become and/or logical number the transient current signal of metal screen layer, by this many groups signal Being uploaded to railway power supply master system platform, railway power supply master system platform utilizes the waveform of transient current signal to carry out Analyze and process, determine fault section, then by the waveform shown in Fig. 5, find echo, and calculate the fortune from fault moment The row time, is 946.05 meters by velocity of wave * Time Calculation trouble point distance.

Claims (8)

1. high-speed railway through line cord method for monitoring operation states, including the through line cord of high-speed railway, its feature exists In: whether produced by detection high-speed railway through circuit cable bus PT residual voltage transient signal, judge high-speed railway Whether through line cord there is instantaneity transient fault, the stream produced by monitoring and the record through line cord of high-speed railway Through the electro-magnetic transient signal of metal screen layer, railway run-through circuit cable is carried out fault pre-alarming, and indicates trouble point distance.
High-speed railway the most according to claim 1 through line cord method for monitoring operation states, it is characterised in that: described Monitoring and record the through line cord of high-speed railway produce the electro-magnetic transient signal flowing through metal screen layer, if refer to utilize The current sensor of dry high-speed railway through circuit monitoring running state device is to this section of substation bus bar of railway run-through circuit Under each case become and/or the transient current signal of cable grounding point metal screen layer of the logical number interior power cable line of institute is carried out Real-time online gathers and record.
High-speed railway the most according to claim 1 through line cord method for monitoring operation states, it is characterised in that: described Line cord through to high-speed railway carry out fault pre-alarming, and indicate trouble point distance, refer to monitor residual voltage letter Number instantaneity disturbance occurs, and when meeting trigger condition, it is judged that for railway run-through circuit generation instantaneity transient fault, extract this Moment each case become and/or logical number the transient current signal of metal screen layer, this many groups signal is uploaded to railway power supply Master system platform, railway power supply master system platform utilizes the waveform of transient current signal be analyzed and process, really Determine fault section, and by the row wave reflection information of transient current signal, is found range in trouble point.
High-speed railway the most according to claim 3 through line cord method for monitoring operation states, it is characterised in that: described Trigger condition refer to residual voltage signal through waveform analysis, its waveform meet:
1) variation tendency reaches empirical value;
2) superposition transient signal on power frequency waveform;
3) RMS value of energy reaches 50.
High-speed railway the most according to claim 3 through line cord method for monitoring operation states, it is characterised in that: described Trigger condition refer to residual voltage signal through waveform analysis, the pulse rate of climb reaches to rise in 3 μ s 1.465V, and Persistently more than 5.859V in 7 μ s.
High-speed railway the most according to claim 1 through line cord method for monitoring operation states, it is characterised in that: described Analysis and process, including to transient electromagnetic transient signal
(1) carry out signal condition and analog digital conversion, and store;
(2) utilize waveform morphology and the energy value of many group transient electromagnetic transient signals, filter misoperation signal, find faulty section Between, determine by which case become and/or logical number the fault transient state current signal that sends of the through line cord of high-speed railway;
(3) by the row wave reflection information of this fault transient state current signal, is found range in trouble point.
7., according to the high-speed railway through line cord method for monitoring operation states described in claim 1,2,4 or 5, its feature exists In: described voltage sensor residual voltage transient signal sample frequency is >=500kHz.
High-speed railway the most according to claim 1 through line cord method for monitoring operation states, it is characterised in that: described Current sensor monitoring and record high-speed railway through track cable produce metal screen layer electro-magnetic transient signal sampling frequency Rate is >=2MHz.
CN201610615483.5A 2016-07-29 2016-07-29 Railway run-through route cable method for monitoring operation states Active CN106291235B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610615483.5A CN106291235B (en) 2016-07-29 2016-07-29 Railway run-through route cable method for monitoring operation states

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610615483.5A CN106291235B (en) 2016-07-29 2016-07-29 Railway run-through route cable method for monitoring operation states

Publications (2)

Publication Number Publication Date
CN106291235A true CN106291235A (en) 2017-01-04
CN106291235B CN106291235B (en) 2019-07-02

Family

ID=57663294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610615483.5A Active CN106291235B (en) 2016-07-29 2016-07-29 Railway run-through route cable method for monitoring operation states

Country Status (1)

Country Link
CN (1) CN106291235B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106950474A (en) * 2017-03-22 2017-07-14 哈红 The upkeep operation method of railway automatic blocking line
CN107015102A (en) * 2017-05-12 2017-08-04 武汉中直电气股份有限公司 The distance-finding method and system of a kind of direct current rail transportation supply line short trouble
CN108318731A (en) * 2018-01-26 2018-07-24 吉林市盈冲科技有限公司 Boosting cable, lateral connection line current on-Line Monitor Device
CN109119979A (en) * 2018-10-25 2019-01-01 西南交通大学 A kind of cable fault protective device and its guard method
CN111025088A (en) * 2019-12-09 2020-04-17 北京铁诚精锐电力技术有限公司 Railway power line fault positioning method and device
CN111157838A (en) * 2018-11-08 2020-05-15 中国铁路沈阳局集团有限公司科学技术研究所 Intelligent management system for big data of running state of railway power distribution network
CN111999603A (en) * 2020-08-31 2020-11-27 吉林省龙波电气技术有限公司 Cable line distributed fault accurate positioning method and device
CN114236315A (en) * 2021-12-23 2022-03-25 国网山东省电力公司烟台供电公司 Submarine cable running state monitoring device and monitoring method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6798211B1 (en) * 1997-10-30 2004-09-28 Remote Monitoring Systems, Inc. Power line fault detector and analyzer
CN101819244A (en) * 2010-05-05 2010-09-01 淄博文广电气有限公司 On-line early warning method of failure of cross-linked polyethylene power cable
CN102435915A (en) * 2011-11-29 2012-05-02 淄博博鸿电气有限公司 Power cable fault traveling wave synchronization range finding method
CN102590695A (en) * 2012-03-08 2012-07-18 南京理工大学常熟研究院有限公司 Device for detecting and locating failure of power line
CN102866327A (en) * 2012-09-13 2013-01-09 山西省电力公司大同供电分公司 Small-current grounding system fault transient traveling wave detection device and method
CN105738764A (en) * 2016-02-22 2016-07-06 国家电网公司 Power distribution network faulty section positioning method based on transient information full frequency band

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6798211B1 (en) * 1997-10-30 2004-09-28 Remote Monitoring Systems, Inc. Power line fault detector and analyzer
CN101819244A (en) * 2010-05-05 2010-09-01 淄博文广电气有限公司 On-line early warning method of failure of cross-linked polyethylene power cable
CN102435915A (en) * 2011-11-29 2012-05-02 淄博博鸿电气有限公司 Power cable fault traveling wave synchronization range finding method
CN102590695A (en) * 2012-03-08 2012-07-18 南京理工大学常熟研究院有限公司 Device for detecting and locating failure of power line
CN102866327A (en) * 2012-09-13 2013-01-09 山西省电力公司大同供电分公司 Small-current grounding system fault transient traveling wave detection device and method
CN105738764A (en) * 2016-02-22 2016-07-06 国家电网公司 Power distribution network faulty section positioning method based on transient information full frequency band

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106950474A (en) * 2017-03-22 2017-07-14 哈红 The upkeep operation method of railway automatic blocking line
CN106950474B (en) * 2017-03-22 2019-09-27 保定钰鑫电气科技有限公司 The upkeep operation method of railway automatic blocking line
CN107015102A (en) * 2017-05-12 2017-08-04 武汉中直电气股份有限公司 The distance-finding method and system of a kind of direct current rail transportation supply line short trouble
CN108318731A (en) * 2018-01-26 2018-07-24 吉林市盈冲科技有限公司 Boosting cable, lateral connection line current on-Line Monitor Device
CN109119979A (en) * 2018-10-25 2019-01-01 西南交通大学 A kind of cable fault protective device and its guard method
CN111157838A (en) * 2018-11-08 2020-05-15 中国铁路沈阳局集团有限公司科学技术研究所 Intelligent management system for big data of running state of railway power distribution network
CN111025088A (en) * 2019-12-09 2020-04-17 北京铁诚精锐电力技术有限公司 Railway power line fault positioning method and device
CN111025088B (en) * 2019-12-09 2020-12-25 北京铁诚精锐电力技术有限公司 Railway power line fault positioning method and device
CN111999603A (en) * 2020-08-31 2020-11-27 吉林省龙波电气技术有限公司 Cable line distributed fault accurate positioning method and device
CN114236315A (en) * 2021-12-23 2022-03-25 国网山东省电力公司烟台供电公司 Submarine cable running state monitoring device and monitoring method thereof
CN114236315B (en) * 2021-12-23 2023-12-29 国网山东省电力公司烟台供电公司 Submarine cable running state monitoring device and monitoring method thereof

Also Published As

Publication number Publication date
CN106291235B (en) 2019-07-02

Similar Documents

Publication Publication Date Title
CN106291235A (en) Railway run-through circuit cable method for monitoring operation states
CN105988063B (en) A kind of comprehensive on-line monitoring method of transmission line malfunction hidden danger and device
US9669851B2 (en) Route examination system and method
US9834237B2 (en) Route examining system and method
BR112015011644B1 (en) SYSTEM FOR EXAMINING A ROUTE AND METHOD FOR EXAMINING A ROUTE
CN106707084A (en) Method for judging single-phase grounding fault of small-current grounding system
US20140207317A1 (en) Route examining system and method
US10501100B2 (en) Route examining system
CN205880122U (en) Railway link up line cord running state monitoring devices
CN205880119U (en) Join in marriage power system fault positioning system based on zero sequence current detection technique
CN103217622A (en) Power distribution network fault line selection method based on multi-port voltage traveling waves
CN104155568A (en) Method for accurately positioning lightning conductor, struck by lightning, of power transmission line
CN106771730A (en) The intelligent substation real-time calibration equipment of protection device analog quantity sampling circuit and method
CN106184288A (en) A kind of direct current track switch notch state detection method
Persichini et al. EMC analysis of axle counters in the Italian railway network
CN105059316B (en) Checking of routing system and method
CN101713807B (en) High-speed signal acquisition based device and method for recording and analyzing locomotive movably grounded fault
CN108169612A (en) The localization method of overhead line DC transmission system DC short trouble
CN114236315A (en) Submarine cable running state monitoring device and monitoring method thereof
CN110687401A (en) Fault detection system and method for overhead contact system on railway
CN107226109B (en) Intelligent monitoring system for turnout notch
CN202815151U (en) Overhead line system fault determination apparatus
CN106353639B (en) A kind of bus bar protecting method based on voltage and current short time-window wavelet coefficient correlation analysis
BR102016018415B1 (en) ROUTE EVALUATION SYSTEM
CN205880120U (en) Distribution network positioning device based on zero sequence current detects

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 255086 2 2, Shifu Road, Zibo high tech Zone, Shandong

Applicant after: ZIBO WENGUANG ELECTRIC CO.,LTD.

Applicant after: SHANDONG BOHONG ELECTRIC CO.,LTD.

Address before: 255086 2 2, Shifu Road, Zibo high tech Zone, Shandong

Applicant before: ZIBO WENGUANG ELECTRIC CO.,LTD.

Applicant before: ZIBO BOHONG ELECTRIC Co.,Ltd.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20180827

Address after: 255000 E 1209, torch Plaza, No. 111, Liu Quan Road, hi tech Zone, Zibo, Shandong

Applicant after: SHANDONG BOHONG ELECTRIC CO.,LTD.

Address before: 255086 2 2, Shifu Road, Zibo high tech Zone, Shandong

Applicant before: ZIBO WENGUANG ELECTRIC CO.,LTD.

Applicant before: SHANDONG BOHONG ELECTRIC CO.,LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant