CN106557858A - A kind of case and bag design management method and device based on vector plotting - Google Patents
A kind of case and bag design management method and device based on vector plotting Download PDFInfo
- Publication number
- CN106557858A CN106557858A CN201510633640.0A CN201510633640A CN106557858A CN 106557858 A CN106557858 A CN 106557858A CN 201510633640 A CN201510633640 A CN 201510633640A CN 106557858 A CN106557858 A CN 106557858A
- Authority
- CN
- China
- Prior art keywords
- design
- style
- storehouse
- fabric
- library
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
The present invention proposes a kind of case and bag design management method and device based on vector plotting, and method includes:Set up basic data storehouse;Fabric storehouse, hardware storage, style storehouse, part library and reference library are set up respectively, and are saved in background server;Manager sets up planned design, and formulates design requirement, style requirement, time requirement, style and require and with reference to requiring;Designer is required according to design requirement, style, style is required, the cost requirement of finished product and with reference to requiring to be drawn, and calls the fabric storehouse, hardware storage, part library or reference library in drawing course from background server;After the completion of design drawing, printed design exploded view, the version list for generating excel forms make file, and version teacher makes file according to the version list of excel forms and carries out beating version.Implement the case and bag design management method and device based on vector plotting of the present invention, have the advantages that:Result of design can be shared, design efficiency is higher, version cost is beaten in reduction.
Description
Technical field
The present invention relates to case and bag design management field, more particularly to a kind of case and bag design pipe based on vector plotting
Reason method and device.
Background technology
Domestic design Normal University part is set using PS instruments or CorelDRAW tool software design Suitcases & Leatherware
Design sketch is counted out, but it is universal, not for Bag-making industry feature, which does not have modular design
Data management function, such as:The common components such as slide fastener that case and bag are used, pull head, as data can not be shared,
So designer oneself will delineate these components every time, cause to repeat to draw, and no material data manages work(
Can, no team's design management, no planned design management, no design schedule following function do not set
Meter task distribution function, does not select multiple materials in the color matching dispensing plan of case and bag appointed part automatic collocation, does not have
There is the function of quickly seeing multiple color matching effects.So result in team's result of design to share, design efficiency
Lowly, re-cover workload big, the special material matching function of more no Bag-making industry does not meet Bag-making industry
The characteristics of product variations are fast, existing software only become the instrument of design drawing.
In addition, client's correcting is more, version uncertainty is beaten greatly, version Shi Ruguo understands deviation with client's presence, just
Again version is beaten, its dozen of version high costs, order success rate be not high, when client takes a fancy to certain style, but thinks conversion
Other fabrics, beat version again;Every time before exhibition, or before doing printing material will pictorial diagram take pictures, this will
Many material object plates are broken, in order to do these data, which is relatively costly, but is not that each plate in kind can connect
It is single.
The content of the invention
The technical problem to be solved in the present invention is, for prior art above-mentioned result of design can not share,
Design efficiency is low, beat the relatively costly defect of version, there is provided a kind of result of design can be shared, design efficiency compared with
The case and bag design management method and device based on vector plotting of version cost is beaten in high, reduction.
The technical solution adopted for the present invention to solve the technical problems is:A kind of case based on vector plotting of construction
Bag design management method, comprises the steps:
A) set up basic data storehouse;Comprising area and travelling trader's data, department and employee in the basic data storehouse
Data, unit table, color table, cie system of color representation cie table, category table, channel table and style table;
B) set up fabric storehouse, hardware storage, style storehouse, part library and reference library respectively, and by the fabric storehouse,
Hardware storage, style storehouse, part library and reference library are saved in background server;The fabric storehouse includes fabric sheet
The essential information and quantity in stock of body, the hardware storage include the basic relevant information and quantity in stock of five metals;
C) manager sets up planned design, and formulate design requirement, style requirement, time requirement, style will
Ask, the cost requirement of finished product and reference are required;
D) designer is required according to design requirement, style, style is required, the cost requirement of finished product and reference will
Ask and drawn, and call from the background server in drawing course the fabric storehouse, hardware storage,
Part library or reference library;
E) after the completion of design drawing, printed design exploded view, the version list for generating excel forms make file,
Version teacher makes file according to the version list of the excel forms and carries out beating version;The version list of the excel forms makes
Design drawing, the material with reference to corresponding to figure, design drawing, major ingredient, adjuvant, five metals, price are included in file
With age segment information.
In the case and bag design management method based on vector plotting of the present invention, step B) further
Including:
B1 the fabric storehouse) is set up, stock number, the material name of various fabrics is stored in the fabric storehouse
Title, Classification of materials, Sales Channel, for commodity price, feel, category, thickness, quantity in stock and supplier information,
And the photo of the fabric is uploaded according to demand;
B2) set up the hardware storage, and be stored in the hardware storage stock number corresponding to various five metals,
Name of material, Classification of materials, English name, Sales Channel, color, category, supplier, send valency,
For commodity price, quantity in stock and photo;
B3 the style storehouse) is set up, and the case and bag figure and related arrow of various styles is stored in the style storehouse
Measure feature data;
B4) set up the part library, and the component diagram that is stored in the part library in each case and bag and related arrow
Measure feature data;
B5 the reference library) is set up, and the material picture and word of various case and bag is stored in the reference library
Information;
B6 the fabric storehouse, hardware storage, style storehouse, part library and reference library are saved in into the backstage clothes)
Business device;
In above-mentioned steps, step B1), B2), B3), B4) and execution B5) in time without
Sequencing.
In the case and bag design management method based on vector plotting of the present invention, step C) further
Including:
C1) manager is when planned design is set up, in planned design master meter In-put design numbering, exploitation season,
Designer, paper lattice master worker, cie system of color representation cie, style, category, the name of an article, style, age bracket, price, design
Theme, layout design target date, paper lattice plan completion date, front page technology target date, actual design
Target date, completion statuses, date of operation, operator, date created, founder, examination & verification state, examine
Core date and person approving;
C2) select corresponding material in the reference library in planned design sublist, and select hook figure refer to or
Product reference type condition, when select be the hook figure with referring to when, input hook figure person, hook figure shape
State, require deadline, the requirement of hook figure and creation time;When select be the product with referring to when, it is several
According to by output to future print the excel forms version list make file in reference to figure position;
C3) be also designed Work Assignment Plan in the planned design sublist, it is intended that it is related hook figure person and
Hook figure to require, figure person is hooked when drawing, point out automatically the hook figure person preferentially to carry out hook figure work by urgency level
Make.
In the case and bag design management method based on vector plotting of the present invention, step D) enter one
Step includes:
D1 the planned design is divided into into multiple association styles), and each association style is resolved into into several
Material;
D2) designer selects certain association style, according to corresponding element in the selected reference library
Material carries out vector design drawing, and described five are called from the background server during vector design drawing
Corresponding five metals in national treasury, or corresponding part in the part library is called from the background server,
It is combined formula design and after the completion of design hook figure, during the fabric storehouse is called from the background server
Corresponding fabric is filled into the appointed part of product, is that the appointed part of certain association style is carried out repeatedly
Color matching or dispensing;
D3) in design, the number of clicks of the used fabric of record, while certain pass described in Statistic Design
Non-drawing time used by connection style, and draw design efficiency;
D4) after the completion of design, the related global facility number of times for being used and the frequency for being used are analyzed.
The invention further relates to a kind of device for realizing the above-mentioned case and bag design management method based on vector plotting, bag
Include:
Unit is set up in basic data storehouse:For setting up basic data storehouse;Comprising area in the basic data storehouse
And travelling trader's data, department and employee's data, unit table, color table, cie system of color representation cie table, category table, channel table
With style table;
Unit is set up in storehouse:For setting up fabric storehouse, hardware storage, style storehouse, part library and reference library respectively,
And the fabric storehouse, hardware storage, style storehouse, part library and reference library are saved in into background server;It is described
Fabric storehouse includes the essential information and quantity in stock of fabric itself, and the hardware storage includes the basic related letter of five metals
Breath and quantity in stock;
Unit is set up in planned design:For making manager set up planned design, and formulate design requirement, style
Requirement, time requirement, style requirement, the cost requirement of finished product and reference are required;
Design drawing unit:For making designer according to design requirement, style requirement, style requirement, finished product
Cost requirement and with reference to requiring to be drawn, and institute is called in drawing course from the background server
State fabric storehouse, hardware storage, part library or reference library;
Design exploded view print unit:For, after the completion of design drawing, printed design exploded view generates excel
The version list of form makes file, and version teacher makes file according to the version list of the excel forms and carries out beating version;It is described
The version list of excel forms make in file comprising design drawing, the material with reference to corresponding to figure, design drawing, major ingredient,
Adjuvant, five metals, price and age segment information.
In device of the present invention, the storehouse is set up unit and is further included:
Module is set up in fabric storehouse:For setting up the fabric storehouse, various fabrics are stored in the fabric storehouse
Stock number, name of material, Classification of materials, Sales Channel, for commodity price, feel, category, thickness, storehouse
Storage and supplier information, and the photo of the fabric is uploaded according to demand;
Hardware storage sets up module:For setting up the hardware storage, and various five metals are stored in the hardware storage
Corresponding stock number, name of material, Classification of materials, English name, Sales Channel, color, category,
Supplier, send valency, for commodity price, quantity in stock and photo;
Module is set up in style storehouse:For setting up the style storehouse, and various styles are stored in the style storehouse
Case and bag figure and dependent vector characteristic;
Part library sets up module:For setting up the part library, and it is stored in each case and bag in the part library
Component diagram and dependent vector characteristic;
Reference library sets up module:For setting up the reference library, and various case and bag are stored in the reference library
Material picture and Word message;
Memory module:For the fabric storehouse, hardware storage, style storehouse, part library and reference library are saved in
The background server.
In device of the present invention, the planned design is set up unit and is further included:
Planned design MIM message input module:For making manager when planned design is set up, in planned design master
In-put design numbering, exploitation season, designer, paper lattice master worker, cie system of color representation cie, style, category, product in table
Name, style, age bracket, price, design motif, the layout design target date, the paper lattice plan completion date,
Front page technology target date, actual design target date, completion statuses, date of operation, operator, establishment
Date, founder, examination & verification state, examination & verification date and person approving;
Planned design sublist sets up module:It is corresponding in the reference library for selecting in planned design sublist
Material, and the type condition of the reference of hook figure or product reference is selected, it is the hook figure ginseng when what is selected
When examining, it is input into hook figure person, hook figure state, requires deadline, the requirement of hook figure and creation time;Work as selection
Be the product with referring to when, data will export the version list of the excel forms for printing in the future and make text
In part with reference to figure position;
Design work plan of distribution module:For work distribution is also designed in the planned design sublist
Plan, it is intended that related hook figure person and hook figure require, hook figure person in drawing, point out automatically the hook figure person excellent
First hook figure work is carried out by urgency level.
In device of the present invention, the design drawing unit is further included:
Planned design decomposing module:For the planned design is divided into multiple association styles, and each is closed
Connection style resolves into several materials;
Color matching module is decomposed in design:For making the designer select certain association style, according to selected
In the reference library, corresponding material carries out vector design drawing, during vector design drawing after described
Corresponding five metals in the hardware storage is called in platform server, or is called from the background server described
Corresponding part in part library, is combined formula design and after the completion of design hook figure, from the background service
Call corresponding fabric in the fabric storehouse to be filled into the appointed part of product in device, be described certain association money
The appointed part of formula is repeatedly matched colors or dispensing;
Record statistical analysis module:For in design, recording the number of clicks of used fabric, while
Certain non-drawing time used by association style described in Statistic Design, and draw design efficiency;
Global facility analysis module:For after the completion of design, analyzing the number of times used by related global facility
And the frequency for being used.
Implement the case and bag design management method and device based on vector plotting of the present invention, with following beneficial effect
Really:Due to establishing basic data storehouse, fabric storehouse, hardware storage, style storehouse, part library and reference library, and
Basic data storehouse, fabric storehouse, hardware storage, style storehouse, part library and reference library are all saved in background server,
The shared of data can thus be accomplished, can increase as needed in basic data storehouse corresponding area and
Travelling trader's data, department and employee's data, unit table, color table, cie system of color representation cie table, category table, channel table and
Style table;Fabric storehouse includes the essential information and quantity in stock of fabric itself, and hardware storage includes the basic phase of five metals
Pass information and quantity in stock, so, when being designed, will consider the problem of quantity in stock, accomplish right
The control of cost, designer is when being drawn, it is possible to calls corresponding storehouse, greatly facilitates and set
Meter, improves design efficiency, real version in kind is formed after design drawing is approved by client, then carries out beating
Version, can thus reduce beating version cost, so its result of design can be shared, design efficiency is higher, reduction
Beat version cost.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to implementing
Example or accompanying drawing to be used needed for description of the prior art are briefly described, it should be apparent that, describe below
In accompanying drawing be only some embodiments of the present invention, for those of ordinary skill in the art, do not paying
On the premise of going out creative work, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1 is the present invention based on method in case and bag design management method and device one embodiment of vector plotting
Flow chart;
Fig. 2 be the embodiment in set up fabric storehouse, hardware storage, style storehouse, part library and reference library respectively,
And fabric storehouse, hardware storage, style storehouse, part library and reference library are saved in the idiographic flow of background server
Figure;
Fig. 3 is that manager sets up planned design in the embodiment, and formulate design requirement, style requirement,
Time requirement, style are required, the particular flow sheet that the cost requirement of finished product and reference are required;
Fig. 4 be in the embodiment designer require according to design requirement, style requirement, style, finished product
Cost requirement and with reference to requiring to be drawn, and call from background server in drawing course fabric storehouse,
The particular flow sheet of hardware storage, part library or reference library;
Fig. 5 is the structural representation of device in the embodiment.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clearly
Chu, it is fully described by, it is clear that described embodiment is only a part of embodiment of the invention, rather than
Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creation
Property work on the premise of the every other embodiment that obtained, belong to the scope of protection of the invention.
In case and bag design management method and device embodiment of the present invention based on vector plotting, which is based on vector
The flow chart of the case and bag design management method of drawing is as shown in Figure 1.In Fig. 1, the case based on vector plotting is somebody's turn to do
Bag design management method comprises the steps:
Step S01 sets up basic data storehouse:In this step, set up basic data storehouse, basic database be for
Design drawing service.Comprising area and travelling trader's data, department and employee's data, unit in basic data storehouse
Table, color table, cie system of color representation cie table, category table, channel table and style table, wherein, area and travelling trader's data refer to
Be design be and the management to client for which area service, department and employee's data are exactly to people
The management of member, including the job number and phone of personnel etc., unit table is used for the unit for defining fabric and five metals,
The inside includes various units, for example:Long measure and unit of weight etc..Cie system of color representation cie table includes seven kinds of colors,
This seven kinds of colors are red, orange, yellow, green, blue, blue, purple, and color table is specific to color, and user can be with
Carry out self-defined, determined by article No. and color color number.Category table is used for the classification for storing product, and channel table is just
It is the different material of different channels, style table can be used to define style, for example:Sizing bag, Casual Bags,
Gift package, when money bag, pull bar bag, shopping bag etc., before case and bag are done, first-selection is color, color
System and category definition are good, have a lot of categories, for example inside women's bag:Casual Bags, oblique knapsack, handss packet capturing or
Wrist bag, that is, product programming is first built up, and inside traditional software, do not have these management functions.In this reality
Apply under the certain situation of example, can also further increase other data in basic data storehouse, for example:Change behaviour
Make password, replacement operation person, operator's data, enterprises data etc., it is worth mentioning at this point that, pass through
Operator's data can carry out the setting of authority to operator.
Step S02 sets up fabric storehouse, hardware storage, style storehouse, part library and reference library respectively, and by fabric
Storehouse, hardware storage, style storehouse, part library and reference library are saved in background server:In this step, build respectively
Facade material storehouse, hardware storage, style storehouse, part library and reference library, and by fabric storehouse, hardware storage, style storehouse,
Part library and reference library are saved in background server, and such designer can just share data.It is worth mentioning
It is that in the present embodiment, fabric storehouse includes the essential information and quantity in stock of fabric itself, and hardware storage includes five metals
The basic relevant information of material and quantity in stock.In the present embodiment, fabric and five metals are referred to as material.Searching
During one material, traditional way is that do not have this material inside computer, after taking pictures to material, will figure
Piece is placed on inside a file, it is impossible to is carried out the management of stock, not only can be recorded material in the present invention,
And recording the relevant information of material, including supplier information and inventory information, common software is not this work(
Can.
Conventional art then removes design style when being designed because be first to order material, does not take into account that factory's material
Quantity in stock, thus stock can be caused from design level, cause the waste of cost.The present invention is setting
Stock material will be considered when meter, will be designed in the case of profitable to enterprise, specifically,
The quantity in stock that material is looked first at during design be it is how many, for example:By quantity in stock more than a certain specified stockpile number
Material is found out, that is, when design preferentially sees material inventory, is effectively eliminating material inventory
On the basis of go again design style, can thus control cost.
Step S03 manager sets up planned design, and formulate design requirement, style requirement, time requirement,
Style is required, the cost requirement of finished product and reference are required:In this step, manager (typically product manager)
Set up planned design, and formulate design requirement, style requirement, time requirement, style require, finished product into
This requirement and reference are required.
Step S04 designer according to design requirement, style require, style require, the cost requirement of finished product and
With reference to requiring to be drawn, and fabric storehouse, hardware storage, portion are called in drawing course from background server
Part storehouse or reference library:In this step, designer is required according to design requirement, style, style is required, finished product
Cost requirement and with reference to requiring to be drawn, and call from background server in drawing course fabric storehouse,
Hardware storage, part library or reference library.
After the completion of step S05 design drawing, printed design exploded view, the version list for generating excel forms make text
Part, version teacher make file according to the version list of excel forms and carry out beating version:In this step, designer is painted in design
After the completion of figure, printed design exploded view, the version list for generating excel forms make file, and version teacher is according to excel
The version list of form makes file and carries out beating version, the version list of the excel forms of printing make in file comprising design drawing,
Material, major ingredient, adjuvant, five metals, price and age segment information with reference to corresponding to figure, design drawing.So
Version teacher just can carry out beating version quickly.The present invention is using fabric scanning in kind, it is ensured that the verity of fabric, then leads to
Cross matching method fabric is placed in region of interest, the product money of real embodiment out corresponding fabric in computer
Formula design sketch, and print picture;The color of material, then printout design sketch can also be adjusted in addition oneself.
In other words, by the preliminary demand of client in one rudimentary model of computer design, and can print true to client
Recognize, after the feedback for receiving client, then designed model is changed in computer, client finally tentatively approves
Formal version in kind is automatically formed afterwards and beats version advice note, can thus improve and beat version order success rate.
For the present embodiment, above-mentioned steps S02 also further can be refined, and the flow chart after its refinement is such as
Shown in Fig. 2.In Fig. 2, above-mentioned steps S02 are further included:
Step S21 sets up fabric storehouse, be stored in fabric storehouse the stock number of various fabrics, name of material,
Classification of materials, Sales Channel, for commodity price, feel, category, thickness, quantity in stock and supplier information, and
The photo of fabric is uploaded according to demand:In this step, fabric storehouse is set up, various fabrics are stored in fabric storehouse
Stock number, name of material, (such as corium, PU, cloth, screen cloth class, these data are big to Classification of materials
Class, also has group below big class, such as PU is further divided into Fructus Litchi stricture of vagina, falls stricture of vagina, plain weave), Sales Channel,
For commodity price, feel, category, thickness, quantity in stock and supplier information, and the photograph of fabric is uploaded according to demand
Piece, it is worth mentioning at this point that, Classification of materials can also be carried out self-defined, increase group below each big class.
Material can be increased inside little classification, the possibility that such as Fructus Litchi stricture of vagina there are multiple models, different suppliers has
Different thickness, material and color, the different article No.s of different producer's correspondences, same article No. also has different
Color, increase material when, be input into its stock number, name of material, for commodity price, feel, category, thickness,
Quantity in stock, can be with upload pictures.The fabric of each factory is very complicated, and the present embodiment carries out opening
Management, such user just can bring very big side to user oneself to define the related category of oneself needs
Just property.It is noted that fabric data can be changed, increases, deletes, prints and be derived.
Step S22 sets up hardware storage, and the stock number corresponding to various five metals, thing are stored in hardware storage
Material title, Classification of materials, English name, Sales Channel, color, category, supplier, send valency, supply
Commodity price, quantity in stock and photo:In this step, hardware storage is set up, and various five metals institutes are stored in hardware storage
Corresponding stock number, name of material, Classification of materials, English name, Sales Channel, color, category,
Supplier, send valency, for commodity price, quantity in stock and photo.Classification inside hardware storage, is that user can be certainly
What oneself defined, such as:Button class and drawing board class, have classifying and numbering, specific name, upper fraction in group data frame
Class, operating time and operator, for managing the classification of five metals, have inside five metals document frame stock number,
Name of material, Classification of materials, English name, Sales Channel, color, category, supplier, send valency,
For commodity price and quantity in stock.In the present embodiment, the information of supplier, the numbering of each supplier can also be recorded
It is different, in the case of the multiple suppliers of material, supplier base is set up, in fabric storehouse and hardware storage
There is supplier base, it can be seen that the price of supplier, for the pipe to the corresponding multiple suppliers of a material
Reason.
Step S23 sets up style storehouse, and it is special that the case and bag figure and dependent vector of various styles are stored in style storehouse
Levy data:In this step, after designing style, when style storehouse is saved in, it is input into style title, sets
Meter teacher, age bracket, style, price and category, are stored in the case and bag picture and correlation of kind of style in style storehouse
Vector characteristic data, and store in the planned design tables of data of respective associated, it is that Report Forms Service is decomposed in design.
Step S24 sets up part library, and the component diagram that is stored in part library in each case and bag and dependent vector are special
Levy data:In this step, part library is set up, and the component diagram that is stored in part library in each case and bag and correlation
Vector characteristic data.Need oneself to delineate in conventional art, or be put into inside file, with when also
File to be gone for, it is cumbersome.The present invention avoids the need for oneself by part library and delineates, and deposits in part library
What is put is the vector part that the part that designed or other designers share, every time with when directly from
Win in part library, two parts are combined to form a new case and bag, it is also possible to some smallclothes
Hook has been got well and has been put in part library.
Step S25 sets up reference library, and the material picture and Word message of various case and bag are stored in reference library:
In this step, reference library is set up, and the material picture and Word message of various case and bag are stored in reference library.
Specifically, reference library is equivalent to material database, and the picture of the case and bag of bat is put in reference library, has reformed into element
Material, will use when style is designed.Reference library can put multiple pictures of a style, can share
To designer.Reference library be exactly from multiple support channels collect material, material storage can also category deposited
Storage, and can have multiple pictures to be described, record automatically the number of clicks (expression that this material is used
Attention rate) and access times (expression Maturity), in design, the access times of the material chosen are stored to
In reference library.There are several resources in reference library, one kind is finished product resource, and another kind is five metals resource, or
Think valuable resource, such as:Little gadget above case and bag.Each designer oneself can also set up element
The classification of material, for example:Male bag reference class, women's bag reference class, knapsack reference class, are recorded automatically in design
The number of clicks of certain style.
Fabric storehouse, hardware storage, style storehouse, part library and reference library are saved in background server by step S26:
In this step, fabric storehouse, hardware storage, style storehouse, part library and reference library are saved in into background server,
Call when drawing in order to designer, that is, designer is shared to by background server.Designer
When design, if necessary to fill fabric it is necessary to transfer fabric storehouse.Traditional software can not be by enterprise
Internal management is combined with design software.The present invention is by design daily management, cost, work point
Combine with, design efficiency statistics and inventory information, storehouse is increased in traditional technology, when using
Directly transfer.Send to background server when transferring and ask, it is also possible to search category, and it is traditional
It is to look for inside the file of computer, the present invention is looked in mapping software, substantially increases the speed of user's lookup
Degree.It is noted that in above-mentioned steps, the execution of step S21-S25 is in time without sequencing.
In the present embodiment, by first setting up several storehouses, corresponding five metals is called if desired when drawing
Or during fabric, mapping software sends request instruction to background server, background server belongs to according to condition analysiss
In which class, then transfer corresponding material and pass to design software.Convenience is brought to designer.
For the present embodiment, above-mentioned steps S03 also further can be refined, and the flow chart after its refinement is such as
Shown in Fig. 3.In Fig. 3, above-mentioned steps S03 are further included:
Step S31 manager when planned design is set up, in planned design master meter, number, open by In-put design
Send out season, designer, paper lattice master worker, cie system of color representation cie, style, category, the name of an article, style, age bracket, valency
Position, design motif, the layout design target date, the paper lattice plan completion date, the front page technology target date,
Actual design target date, completion statuses, date of operation, operator, date created, founder, examination & verification
State, examination & verification date and person approving:In this step, manager's (usually Design Manager) is setting up design
During plan, In-put design numbering, exploitation season, designer, paper lattice master worker, face in planned design master meter
Colour system, style, category, the name of an article, style, age bracket, price, design motif, layout design complete day
Phase, the paper lattice plan completion date, the front page technology target date, the actual design target date, completion statuses,
Date of operation, operator, date created, founder, examination & verification state, examination & verification date and person approving, also
It is to assign a task.The function of planned design is exactly to set up planned design, Work Assignment Plan and reference to want in fact
Ask.Include inside planned design master meter that design requirement, style are required, time requirement and style are required.
Step S32 selects corresponding material in reference library in planned design sublist, and selects hook figure to refer to
Or product reference type condition, when select be hook figure with referring to when, input hook figure person, hook figure state,
Require the deadline, hook figure requirement and creation time;When select be product with referring to when, data will output
To future print excel forms version list make file in reference to figure position:In this step, in design
The material in reference library is may be referred to, corresponding material in reference library is selected in planned design sublist, and is selected
Select hook figure reference or product reference type condition, when selection be hook figure with referring to when, can pass through
Material is searched with reference to figure numbering, hook figure person, hook figure state is formulated, is required deadline, the requirement of hook figure and wound
Build the time, it is also possible to which input condition (being for example input into numbering, title, specification and color) makes a look up, this
Sample is just easy-to-look-up.When select be product with referring to when, data will export the excel forms of in the future printing
Version list make file in reference to figure position.
Step S33 is also designed Work Assignment Plan in planned design sublist, it is intended that it is related hook figure person and
Hooking figure to require, figure person being hooked when drawing, prompting hook figure person preferentially carries out hook figure work by urgency level automatically:
In this step, Work Assignment Plan is also designed in planned design sublist, it is intended that related hook figure person and
Hooking figure to require, figure person being hooked when drawing, prompting hook figure person preferentially carries out hook figure work by urgency level automatically.
For the present embodiment, above-mentioned steps S04 also further can be refined, and the flow chart after its refinement is such as
Shown in Fig. 4.In Fig. 4, above-mentioned steps S04 are further included:
Planned design is divided into multiple association styles by step S41, and each association style is resolved into several
Material:One planned design corresponds to multiple styles, in this step, planned design is divided into multiple association styles,
Decomposition is namely designed, and each association style is resolved into into several materials, that is, each association
Style is what material, and material includes fabric and five metals.
Step S42 designer selects certain association style, is entered according to corresponding material in selected reference library
Row vector design drawing, calls during vector design drawing from background server corresponding in hardware storage
Five metals, or corresponding part in part library is called from background server, it is combined formula design and is setting
After the completion of meter hooks figure, from background server, corresponding fabric in fabric storehouse is called to be filled into the specifying part of product
Position, is that the appointed part of certain association style is repeatedly matched colors or dispensing:In this step, designer is carried out
Design drawing selects certain association style, carries out vector design according to corresponding material in selected reference library
Draw, corresponding five metals in hardware storage is called from background server during vector design drawing, or
Corresponding part in part library is called from background server, formula design is combined and is completed in design hook figure
Afterwards, from background server, call corresponding fabric in fabric storehouse to be filled into the appointed part of product, be certain
The appointed part of association style is repeatedly matched colors or dispensing, for example:The wrist of case and bag matches somebody with somebody black, and bodice is matched somebody with somebody
Black.
Step S43 records the number of clicks of used fabric in design, while certain pass of Statistic Design
Non-drawing time used by connection style, and draw design efficiency:In this step, in design, record is used
Fabric number of clicks, while Statistic Design certain association style used by non-drawing time (namely design
The time of one case and bag), can thus calculate the design efficiency of designer.
Step S44 analyzes the related global facility number of times for being used and the frequency for being used after the completion of design:
In this step, after the completion of design, the related global facility number of times for being used and the frequency for being used are analyzed.
The present embodiment further relates to a kind of dress for realizing the above-mentioned case and bag design management method based on vector plotting
Put, its structural representation is as shown in Figure 5.In Fig. 5, the device includes that unit 1, storehouse is set up in basic data storehouse
Set up unit 2, planned design and set up unit 3, design drawing unit 4 and design exploded view print unit 5;
Wherein, unit 1 is set up for setting up basic data storehouse in basic data storehouse;In above-mentioned basic data storehouse inclusively
Area and travelling trader's data, department and employee's data, unit table, color table, cie system of color representation cie table, category table, channel
Table and style table;Storehouse set up unit 2 for set up respectively fabric storehouse, hardware storage, style storehouse, part library and
Reference library, and fabric storehouse, hardware storage, style storehouse, part library and reference library are saved in into background server;
Fabric storehouse includes the essential information and quantity in stock of fabric itself, hardware storage include the basic relevant information of five metals and
Quantity in stock;Planned design sets up unit 3 for making manager set up planned design, and formulate design requirement,
Style requirement, time requirement, style requirement, the cost requirement of finished product and reference are required;Design drawing unit 4
For making, designer is required according to design requirement, style requirement, style, the cost requirement of finished product and reference will
Ask and drawn, and call from background server in drawing course fabric storehouse, hardware storage, part library or
Reference library;Design exploded view print unit 5 is for, after the completion of design drawing, printed design exploded view is raw
Version list into excel forms makes file, and version teacher makes file according to the version list of excel forms and carries out beating version;
The version list of excel forms make in file comprising design drawing, the material with reference to corresponding to figure, design drawing, major ingredient,
Adjuvant, five metals, price and age segment information.Due to all including quantity in stock in fabric storehouse and hardware storage, so,
The problem of quantity in stock when being designed, will be considered, accomplish the control to cost, designer is entering
When row is drawn, it is possible to call corresponding storehouse, design is greatly facilitated, raising design efficiency, when setting
Meter is drawn after being approved by client and forms real version in kind, then carries out beating version, can thus reduce beating version
Cost, so its result of design can be shared, design efficiency is higher, version cost is beaten in reduction.
In the present embodiment, storehouse is set up unit 2 and further includes that fabric storehouse is set up module 21, hardware storage and sets up mould
Block 22, style storehouse set up module 23, part library set up module 24, reference library set up module 25 and storage mould
Block 26;Wherein, module 21 is set up for setting up fabric storehouse in fabric storehouse, and various fabrics are stored in fabric storehouse
Stock number, name of material, Classification of materials, Sales Channel, for commodity price, feel, category, thickness, storehouse
Storage and supplier information, and the photo of the fabric is uploaded according to demand;Hardware storage sets up module 22 to be used for
Hardware storage is set up, and the stock number corresponding to various five metals, name of material, material are stored in hardware storage
Classification, English name, Sales Channel, color, category, supplier, send valency, for commodity price, quantity in stock
And photo;Module 23 is set up for setting up style storehouse in style storehouse, and the case of various styles is stored in style storehouse
Bag figure and dependent vector characteristic;Part library sets up module 24 for setting up part library, and in part library
The component diagram being stored in each case and bag and dependent vector characteristic;Reference library set up module 25 for set up refer to
Storehouse, and the material picture and Word message of various case and bag are stored in reference library;Memory module 26 is for by face
Material storehouse, hardware storage, style storehouse, part library and reference library are saved in background server.
In the present embodiment, planned design set up unit 3 further include planned design MIM message input module 31,
Planned design sublist sets up module 32 and design work plan of distribution module 33;Wherein, planned design information is defeated
Enter module 31 for making manager when planned design is set up, in planned design master meter In-put design numbering,
Exploitation season, designer, paper lattice master worker, cie system of color representation cie, style, category, the name of an article, style, age bracket,
Price, design motif, the layout design target date, the paper lattice plan completion date, the front page technology target date,
Actual design target date, completion statuses, date of operation, operator, date created, founder, examination & verification
State, examination & verification date and person approving;Planned design sublist sets up module 32 for selecting in planned design sublist
Corresponding material in reference library is selected, and selects the type condition that hook figure is referred to or product is referred to, work as selection
Be hook figure with referring to when, input hook figure person, hook figure state, require deadline, the requirement of hook figure and establishment
Time;When select be product with referring to when, data will export the version list system of the in the future excel forms of printing
Make in file with reference to figure position;Design work plan of distribution module 33 is for also entering in planned design sublist
Row design work plan of distribution, it is intended that related to hook figure person and hook figure requirement, hooks figure person when drawing, carries automatically
Show that hook figure person preferentially carries out hook figure work by urgency level.
In the present embodiment, design drawing unit 4 further includes that planned design decomposing module 41, design are decomposed
Color matching module 42, record statistical analysis module 43 and global facility analysis module 44;Wherein, planned design
Decomposing module 41 is for being divided into multiple association styles by planned design, and each association style is resolved into some
Individual material;Color matching module 42 is decomposed in design to be used to make designer select certain association style, according to selected
In reference library, corresponding material carries out vector design drawing, from background server during vector design drawing
In call corresponding five metals in hardware storage, or corresponding part in part library is called from background server,
It is combined formula design and after the completion of design hook figure, corresponding face in fabric storehouse is called from background server
Material is filled into the appointed part of product, is that the appointed part of certain association style is repeatedly matched colors or dispensing;
Record statistical analysis module 43 is for when designing, recording the number of clicks of used fabric, while statistics sets
Certain non-drawing time used by association style is counted, and draws design efficiency;Global facility analysis module 44 is used for
After the completion of design, the related global facility number of times for being used and the frequency for being used are analyzed.
In a word, in the present embodiment, by fabric library management function, hardware storage management function, common components
Library management function, reference library management function, planned design management function, design are decomposed management function, are drawn
Function, sorting automatic collocation function and design process tracing management function, by the design management of whole enterprise,
Picture and text person is hooked to designer again to the integrated design flow process of departmental manager, standardized management work from general
Industry, accomplishes that component type is designed, and accelerates design schedule, and Quick material collocation can be visually seen certain on computers
The collocation of product multiple color and material, selects excellent in accomplishing well.Also the work to designers at different levels simultaneously is entered
Row is followed the trail of, and accomplishes standardized management design schedule.Automatic color matching function can help designer quickly automatically right
Fabric and five metals are arranged in pairs or groups, and synchronously manifest design effect, and automatic report generation function can automatically form production
Data;So that being designed into the simpler facility of conversion follow-up work of production.
Presently preferred embodiments of the present invention is the foregoing is only, it is not to limit the present invention, all at this
Within bright spirit and principle, any modification, equivalent substitution and improvements made etc. should be included in this
Within bright protection domain.
Claims (8)
1. a kind of case and bag design management method based on vector plotting, it is characterised in that comprise the steps:
A) set up basic data storehouse;Comprising area and travelling trader's data, department and employee in the basic data storehouse
Data, unit table, color table, cie system of color representation cie table, category table, channel table and style table;
B) set up fabric storehouse, hardware storage, style storehouse, part library and reference library respectively, and by the fabric storehouse,
Hardware storage, style storehouse, part library and reference library are saved in background server;The fabric storehouse includes fabric sheet
The essential information and quantity in stock of body, the hardware storage include the basic relevant information and quantity in stock of five metals;
C) manager sets up planned design, and formulate design requirement, style requirement, time requirement, style will
Ask, the cost requirement of finished product and reference are required;
D) designer is required according to design requirement, style, style is required, the cost requirement of finished product and reference will
Ask and drawn, and call from the background server in drawing course the fabric storehouse, hardware storage,
Part library or reference library;
E) after the completion of design drawing, printed design exploded view, the version list for generating excel forms make file, version
Teacher makes file according to the version list of the excel forms and carries out beating version;The version list of the excel forms makes text
In part comprising design drawing, the material with reference to corresponding to figure, design drawing, major ingredient, adjuvant, five metals, price and
Age segment information.
2. the case and bag design management method based on vector plotting according to claim 1, it is characterised in that
Step B) further include:
B1) set up the fabric storehouse, be stored in the fabric storehouse stock number of various fabrics, name of material,
Classification of materials, Sales Channel, for commodity price, feel, category, thickness, quantity in stock and supplier information, and
The photo of the fabric is uploaded according to demand;
B2) set up the hardware storage, and be stored in the hardware storage stock number corresponding to various five metals,
Name of material, Classification of materials, English name, Sales Channel, color, category, supplier, send valency,
For commodity price, quantity in stock and photo;
B3 the style storehouse) is set up, and the case and bag figure and dependent vector of various styles is stored in the style storehouse
Characteristic;
B4 the part library, and the component diagram and dependent vector being stored in the part library in each case and bag) are set up
Characteristic;
B5 the reference library) is set up, and the material picture and word letter of various case and bag is stored in the reference library
Breath;
B6 the fabric storehouse, hardware storage, style storehouse, part library and reference library are saved in into the background service)
Device;
In above-mentioned steps, step B1), B2), B3), B4) and execution B5) in time without
Sequencing.
3. the case and bag design management method based on vector plotting according to claim 2, it is characterised in that
Step C) further include:
C1) manager is when planned design is set up, in planned design master meter In-put design numbering, exploitation season,
Designer, paper lattice master worker, cie system of color representation cie, style, category, the name of an article, style, age bracket, price, design
Theme, layout design target date, paper lattice plan completion date, front page technology target date, actual design
Target date, completion statuses, date of operation, operator, date created, founder, examination & verification state, examine
Core date and person approving;
C2) select corresponding material in the reference library in planned design sublist, and select hook figure refer to or
Product reference type condition, when select be the hook figure with referring to when, input hook figure person, hook figure shape
State, require deadline, the requirement of hook figure and creation time;When select be the product with referring to when, it is several
According to by output to future print the excel forms version list make file in reference to figure position;
C3) Work Assignment Plan is also designed in the planned design sublist, it is intended that related to hook figure person and hook
Figure requires, hooks figure person when drawing, point out automatically the hook figure person preferentially to carry out hook figure work by urgency level.
4. the case and bag design management method based on vector plotting according to claim 3, it is characterised in that
Step D) further include:
D1 the planned design is divided into into multiple association styles), and each association style is resolved into into several things
Material;
D2) designer selects certain association style, according to corresponding material in the selected reference library
Vector design drawing is carried out, the five metals is called from the background server during vector design drawing
Corresponding five metals in storehouse, or corresponding part in the part library is called from the background server, enter
Row modular design and design hook figure after the completion of, phase in the fabric storehouse is called from the background server
The fabric answered is filled into the appointed part of product, is that the appointed part of certain association style is repeatedly matched somebody with somebody
Color or dispensing;
D3) in design, the number of clicks of the used fabric of record, while certain association described in Statistic Design
Non-drawing time used by style, and draw design efficiency;
D4) after the completion of design, the related global facility number of times for being used and the frequency for being used are analyzed.
5. a kind of for realizing the case and bag design management method based on vector plotting as claimed in claim 1
Device, it is characterised in that include:
Unit is set up in basic data storehouse:For setting up basic data storehouse;In the basic data storehouse comprising area and
Travelling trader's data, department and employee's data, unit table, color table, cie system of color representation cie table, category table, channel table and
Style table;
Unit is set up in storehouse:For setting up fabric storehouse, hardware storage, style storehouse, part library and reference library respectively, and
The fabric storehouse, hardware storage, style storehouse, part library and reference library are saved in into background server;The face
Material storehouse includes the essential information and quantity in stock of fabric itself, and the hardware storage includes the basic relevant information of five metals
And quantity in stock;
Unit is set up in planned design:For making manager set up planned design, and formulate design requirement, style will
Ask, time requirement, style are required, the cost requirement of finished product and with reference to requiring;
Design drawing unit:For making designer require according to design requirement, style requirement, style, finished product
Cost requirement and with reference to requiring to be drawn, and call from the background server in drawing course described
Fabric storehouse, hardware storage, part library or reference library;
Design exploded view print unit:For, after the completion of design drawing, printed design exploded view generates excel
The version list of form makes file, and version teacher makes file according to the version list of the excel forms and carries out beating version;It is described
The version list of excel forms make in file comprising design drawing, the material with reference to corresponding to figure, design drawing, major ingredient,
Adjuvant, five metals, price and age segment information.
6. device according to claim 5, it is characterised in that the storehouse is set up unit and further included:
Module is set up in fabric storehouse:For setting up the fabric storehouse, the thing of various fabrics is stored in the fabric storehouse
Material numbering, name of material, Classification of materials, Sales Channel, for commodity price, feel, category, thickness, stock
Amount and supplier information, and the photo of the fabric is uploaded according to demand;
Hardware storage sets up module:For setting up the hardware storage, and various five metals institutes are stored in the hardware storage
Corresponding stock number, name of material, Classification of materials, English name, Sales Channel, color, category,
Supplier, send valency, for commodity price, quantity in stock and photo;
Module is set up in style storehouse:For setting up the style storehouse, and various styles are stored in the style storehouse
Case and bag figure and dependent vector characteristic;
Part library sets up module:For setting up the part library, and it is stored in each case and bag in the part library
Component diagram and dependent vector characteristic;
Reference library sets up module:For setting up the reference library, and various case and bag are stored in the reference library
Material picture and Word message;
Memory module:For the fabric storehouse, hardware storage, style storehouse, part library and reference library are saved in institute
State background server.
7. device according to claim 6, it is characterised in that the planned design is set up unit and enters
Step includes:
Planned design MIM message input module:For making manager when planned design is set up, in planned design master meter
Middle In-put design numbering, exploitation season, designer, paper lattice master worker, cie system of color representation cie, style, category, the name of an article,
Style, age bracket, price, design motif, layout design target date, paper lattice plan completion date, head
Platemaking technology target date, actual design target date, completion statuses, date of operation, operator, establishment day
Phase, founder, examination & verification state, examination & verification date and person approving;
Planned design sublist sets up module:For corresponding element in the reference library is selected in planned design sublist
Material, and the type condition of the reference of hook figure or product reference is selected, it is the hook figure reference when what is selected
When, it is input into hook figure person, hook figure state, requires deadline, the requirement of hook figure and creation time;When what is selected
Be the product with referring to when, the version list for exporting the excel forms for printing in the future is made file by data
In with reference to figure position;
Design work plan of distribution module:Based on work distribution is also designed in the planned design sublist
Draw, it is intended that related hook figure person and hook figure require, hook figure person in drawing, point out automatically the hook figure person preferential
Hook figure work is carried out by urgency level.
8. device according to claim 7, it is characterised in that the design drawing unit is further wrapped
Include:
Planned design decomposing module:For the planned design is divided into multiple association styles, and each is associated
Style resolves into several materials;
Color matching module is decomposed in design:For making the designer select certain association style, according to selected institute
In stating reference library, corresponding material carries out vector design drawing, from the backstage during vector design drawing
Corresponding five metals in the hardware storage is called in server, or the portion is called from the background server
Corresponding part in part storehouse, is combined formula design and after the completion of design hook figure, from the background server
In call corresponding fabric in the fabric storehouse to be filled into the appointed part of product, be described certain association style
Appointed part repeatedly matched colors or dispensing;
Record statistical analysis module:For in design, recording the number of clicks of used fabric, while system
Described certain non-drawing time used by association style of meter design, and draw design efficiency;
Global facility analysis module:For after the completion of design, number of times that the related global facility of analysis is used and
The frequency for being used.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510633640.0A CN106557858B (en) | 2015-09-28 | 2015-09-28 | Case design management method and device based on vector drawing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510633640.0A CN106557858B (en) | 2015-09-28 | 2015-09-28 | Case design management method and device based on vector drawing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106557858A true CN106557858A (en) | 2017-04-05 |
CN106557858B CN106557858B (en) | 2020-09-11 |
Family
ID=58414764
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510633640.0A Active CN106557858B (en) | 2015-09-28 | 2015-09-28 | Case design management method and device based on vector drawing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106557858B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107464124A (en) * | 2017-07-27 | 2017-12-12 | 迪尚集团有限公司 | Dress designing cloud platform system and its application process |
CN108228998A (en) * | 2017-12-28 | 2018-06-29 | 广州盖特软件有限公司 | Computer based on WEB acts improperly design system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080249652A1 (en) * | 2005-05-10 | 2008-10-09 | Elizabeth Burr | Method and Apparatus for Apparel Customization |
CN102456202A (en) * | 2010-10-28 | 2012-05-16 | 上海无线通信研究中心 | Remote system and method for costume design |
CN103854190A (en) * | 2012-12-06 | 2014-06-11 | 青岛凯妙服饰股份有限公司 | Fine remote clothing customization system |
CN104102768A (en) * | 2014-06-27 | 2014-10-15 | 王大孟 | Garment customization system and customization method |
CN104134148A (en) * | 2014-07-17 | 2014-11-05 | 广州优丹玲服装有限公司 | Garment on-line DIY customization system and garment on-line DIY customization method |
-
2015
- 2015-09-28 CN CN201510633640.0A patent/CN106557858B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080249652A1 (en) * | 2005-05-10 | 2008-10-09 | Elizabeth Burr | Method and Apparatus for Apparel Customization |
CN102456202A (en) * | 2010-10-28 | 2012-05-16 | 上海无线通信研究中心 | Remote system and method for costume design |
CN103854190A (en) * | 2012-12-06 | 2014-06-11 | 青岛凯妙服饰股份有限公司 | Fine remote clothing customization system |
CN104102768A (en) * | 2014-06-27 | 2014-10-15 | 王大孟 | Garment customization system and customization method |
CN104134148A (en) * | 2014-07-17 | 2014-11-05 | 广州优丹玲服装有限公司 | Garment on-line DIY customization system and garment on-line DIY customization method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107464124A (en) * | 2017-07-27 | 2017-12-12 | 迪尚集团有限公司 | Dress designing cloud platform system and its application process |
CN107464124B (en) * | 2017-07-27 | 2023-06-02 | 迪尚集团有限公司 | Cloud platform system for clothing design and application method thereof |
CN108228998A (en) * | 2017-12-28 | 2018-06-29 | 广州盖特软件有限公司 | Computer based on WEB acts improperly design system |
Also Published As
Publication number | Publication date |
---|---|
CN106557858B (en) | 2020-09-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Austin et al. | A data flow model to plan and manage the building design process | |
CN107609721A (en) | Project task distribution method, device, computer equipment and project management system | |
WO2002041221A1 (en) | Product development process | |
US20130117648A1 (en) | Spreadsheet data processing method and system | |
CN109035060A (en) | A kind of structured processes management system and management method | |
Toivonen et al. | Value stream analysis for complex processes and systems | |
CN102999798B (en) | Information management apparatus, approaches to IM and information management system | |
Pal et al. | Demystifying process-level scalability challenges in fashion remanufacturing: An interdependence perspective | |
CN108846645A (en) | A kind of enterprise's flattened management method and system | |
Leyva et al. | Lean Manufacturing application in textile industry | |
Martin | Problem Framing: Identifying the right models for the job | |
CN106557858A (en) | A kind of case and bag design management method and device based on vector plotting | |
Hernández et al. | Enterprise logistics, indicators and physical distribution manager | |
JPH09231280A (en) | Data processing method and its processor | |
Li et al. | A QFD‐Based Evaluation Method for Business Models of Product Service Systems | |
Pezzotta et al. | Evaluation of discrete event simulation software to design and assess service delivery processes | |
CN105373996A (en) | Modeling system based on approval data | |
JPH1015786A (en) | Production planning simulation apparatus | |
CN106651540A (en) | Online traction-based product standard cooperation method and system, and online purchase platform | |
CN104881740A (en) | Method and device for generating multiple bills of material (BOM) of same type in ERP (Enterprise Resource Planning) via paper grid color matching | |
JP2009080530A (en) | Integrated component table preparation system, and integrated component table preparation method | |
JP2001273342A (en) | Product manufacturing method and product manufacturing support method | |
Mohanty et al. | Business process reengineering: value innovation in industrial engineering practices | |
Pal et al. | Feasibility of Fashion Remanufacturing | |
Ratisaksoontorn et al. | Enhancing Sales System Efficiency through Process Mining |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |