CN106557836A - It is a kind of to be directed to processing optimization method processed under primacord - Google Patents

It is a kind of to be directed to processing optimization method processed under primacord Download PDF

Info

Publication number
CN106557836A
CN106557836A CN201610954544.0A CN201610954544A CN106557836A CN 106557836 A CN106557836 A CN 106557836A CN 201610954544 A CN201610954544 A CN 201610954544A CN 106557836 A CN106557836 A CN 106557836A
Authority
CN
China
Prior art keywords
primacord
delta
processing
raw material
plusminus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610954544.0A
Other languages
Chinese (zh)
Inventor
魏善碧
柴毅
胡君颖
邓家林
何昊阳
梁艳玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201610954544.0A priority Critical patent/CN106557836A/en
Publication of CN106557836A publication Critical patent/CN106557836A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of method for processing processed optimization under primacord, priming system rope class production method of the present invention is comprised the following steps, step one:Determine production specification and mission requirements, select primacord processing specification, processing specification to include lower length processed, stamp position, remove length and crimping position;Step 2:Determine the basic parameter of raw material primacord, such as often roll up the length of primacord, diameter, color etc.;Step 3:Optimization problem is set up, according to the total length of all primacords after processing, and processing specifications parameter, find the mode for meeting the production and processing specification;Step 4:Calculation optimization result;Step 5:Analysis result feasibility, sets up corresponding monitoring display interface and data base, and assigns production task.Can realize that primacord reaches the purposes such as minimum, remaining minimum, the reduction processing cost of clout of raw material usage amount in the lower course of processing processed using method of the present invention.

Description

It is a kind of to be directed to processing optimization method processed under primacord
Technical field
The invention belongs to priming system rope class production field, is related to a kind of side for processing optimization processed under primacord Method.
Background technology
Primacord is usually used in while the rope of multiple powder charges of detonating also known as primacord.Raw material primacord is with a roll of mostly Form output, as occasion used, field are different, required primacord length is different.Using front generally requiring to leading Quick-fried rope is processed, and is come into operation after machining again.
At present, under primacord there is problems with the course of processing processed:
(1) under, processing sequence processed is single, causes the waste of primacord clout;
(2) primacord processing method is not reasonably planned, causes the uncontrolled use of raw material primacord, processing cost to increase Plus;
(3) under, process processed does not account for the presence of error, causes percent defective to raise.
Therefore, under current primacord, the course of processing processed needs a kind of rationally efficient optimized algorithm, so as to realize reducing former The use of material and the waste of clout, and improve qualification rate, reduce processing cost.
The content of the invention
In order to solve problem present in the course of processing processed under primacord, the invention discloses a kind of for making under primacord The method of processing optimization.The characteristics of processing of primacord often has small lot, many specifications.If primacord is advised by each Lattice are processed one by one, then the excessive situation of every volume primacord waste material occurs, cause primacord stock roll number to use insufficient, And these waste materials will not be used for processing next time, excessive waste causes processing cost to rise.
In order to reduce the appearance of problem above, the present invention proposes a kind of optimized algorithm of processing processed under primacord, specifically Step is:
Step one:Determine primacord processing specification and production task.Assume the processing specification needed for a collection of primacord of production There are n kinds, the length lower processed of every kind of specification primacord is l1, l2, l3..., ln, needed for every kind of specification, the radical of lower system is a1, a2, a3…an, then under primacord, total length processed is:
L=a1l1+a2l2+a3l3+...+anln
Primacord processes total radical:
A=a1+a2+a3+...+an
Step 2:Determine the parameter and needed raw material volume number of raw material primacord.The diameter of raw material primacord, total length, The parameters such as color have differences, and need to be determined for compliance with this series-produced raw material primacord in advance.Assume to need raw material to lead altogether Quick-fried rope volume number is m, and the length often rolled up is s1, s2, s3..., sm, the basic constraints between raw material length and lower total length processed For:
L≤s1+s2+s3+...+sm
Step 3:Processing planning problem processed under the primacord that foundation is matched with production task.Hypothesis often rolls up primacord The length lower processed of multiple specifications can be processed, every primacord is labeled as δ after machining1, δ2, δ3..., δA, often volume lead it is quick-fried The clout of rope is M1, M2, M3..., Mm, while there is error in process of production and set in view of the length lower processed of each specification The error of fixed same specification is identical, respectively e1, e2, e3..., en, then m volume of primacord need to meet:
M is understood by physical condition1>=0, M2>=0 ..., Mm>=0, and δijExistence restraint condition is:
Wherein δij∈ (0,1) (i=1,2,3..., m;J=1,2,3 ..., A), make set X={ δ111213,... δmA}。
Further, determine the volume number of optimizing materials primacord.Assume that often rolling up primacord is labeled as θ1, θ2, θ3..., θm, then m Volume primacord needs to meet:
θ1s12s23s3+...+θmsm-L≥0
Wherein θi(0,1) (i=1,2,3 ..., m), make set Y={ θ to ∈123,...θm}。
Step 4:Result of calculation is obtained using optimized calculation method.Step 3 proposes the constraint bar for reducing clout and raw material Part, in summary, if thinking, primacord clout and raw material are minimum, ask for equation below by branch and bound method, you can obtain excellent Change result.
Wherein X={ δ111213,...δmA, Y={ θ123,...θm}。
Step 5:Analysis obtains the effectiveness of result, and assigns production task after optimization.After being calculated optimum results, The effectiveness of optimum results is checked, if feasible, optimization production task is assigned;If infeasible, find problem and correct, repeat Above step.
Description of the drawings
In order that the purpose of the present invention, technical scheme and beneficial effect are clearer, the present invention provides drawings described below and carries out Explanation:
Fig. 1 is the flow chart for processing optimization method processed under primacord of the present invention
Fig. 2 is the flow chart that the present invention is embodied as process of manufacture
Below in conjunction with accompanying drawing, the optimization method of the present invention is described in detail.
As shown in figure 1, the present invention provide for processing optimization method processed under primacord, comprise the steps of:
Step one:Determine primacord processing specification and production task.Assume the processing specification needed for a collection of primacord of production There are n kinds, the length lower processed of every kind of specification primacord is l1, l2, l3..., ln, needed for every kind of specification, the radical of lower system is a1, a2, a3…an, then under primacord, total length processed is:
L=a1l1+a2l2+a3l3+...+anln
Primacord processes total radical:
A=a1+a2+a3+...+an
Step 2:Determine the parameter and needed raw material volume number of raw material primacord.The diameter of raw material primacord, total length, The parameters such as color have differences, and need to be determined for compliance with this series-produced raw material primacord in advance.Assume to need raw material to lead altogether Quick-fried rope volume number is m, and the length often rolled up is s1, s2, s3..., sm, the basic constraints between raw material length and lower total length processed For:
L≤s1+s2+s3+...+sm
Step 3:Processing planning problem processed under the primacord that foundation is matched with production task.Hypothesis often rolls up primacord The length lower processed of multiple specifications can be processed, every primacord is labeled as δ after machining1, δ2, δ3..., δA, often volume lead it is quick-fried The clout of rope is M1, M2, M3..., Mm, while there is error in process of production and set in view of the length lower processed of each specification The error of fixed same specification is identical, respectively e1, e2, e3..., en, then m volume of primacord need to meet:
M is understood by physical condition1>=0, M2>=0 ..., Mm>=0, and δijExistence restraint condition is:
Wherein δij∈ (0,1) (i=1,2,3..., m;J=1,2,3 ..., A), make set X={ δ111213,... δmA}。
Further, determine the volume number of optimizing materials primacord.Assume that often rolling up primacord is labeled as θ1, θ2, θ3..., θm, then m Volume primacord needs to meet:
θ1s12s23s3+...+θmsm-L≥0
Wherein θi(0,1) (i=1,2,3 ..., m), make set Y={ θ to ∈123,...θm}。
Step 4:Result of calculation is obtained using optimized calculation method.Step 3 proposes the constraint bar for reducing clout and raw material Part, in summary, if thinking, primacord clout and raw material are minimum, ask for equation below by branch and bound method, you can obtain excellent Change result.
Wherein X={ δ111213,...δmA, Y={ θ123,...θm}。
Step 5:Analysis obtains the effectiveness of result, and assigns production task after optimization.After being calculated optimum results, The effectiveness of optimum results is checked, if feasible, optimization production task is assigned;If infeasible, find problem and correct, repeat Above step.
As shown in Fig. 2 the step of present invention is embodied as process of manufacture is:
Step one:Determine production specification and mission requirements, select primacord processing specification, processing specification to include lower system length Degree, stamp position, removal length and crimping position;
Step 2:Determine the basic parameter of raw material primacord, such as often roll up the length of primacord, diameter, color etc.;
Step 3:Optimization problem is set up, according to the total length of all primacords after processing, and processing specifications parameter, seek The mode for meeting the production and processing specification is looked for, and it is suitable that the processing of optimum is calculated from from the aspect of raw material, clout, error three Sequence;
Step 4:Calculation optimization result;
Step 5:Analysis result feasibility, sets up corresponding monitoring display interface and data base, and assigns production task.

Claims (6)

1. it is a kind of for processing optimization method processed under primacord, it is characterised in that to comprise the following steps:
Step one:Determine primacord processing specification and production task;
Step 2:Determine the parameter and needed raw material volume number of raw material primacord;
Step 3:Processing planning problem processed under the primacord that foundation is matched with production task;
Step 4:Result of calculation is obtained using optimized calculation method;
Step 5:Analysis obtains the effectiveness of result, and assigns production task after optimization.
2. according to claim 1 for processing optimization method processed under primacord, it is characterised in that:Primacord before Processing mode use every kind of specification and produce in order, a kind of specification all machine after under processing a kind of specification, So occur the situation wasted in a large number by raw material primacord, the present invention using plurality of specifications regardless of order processing mode, with Clout is minimum, reduce raw material primacord as far as possible using being principle, processes primacord different in size, greatly reduces and produce into This.
3. it is according to claim 1 for processing optimization method processed under primacord, it is characterised in that step 3 is taken In the following manner:
It is that processing is minimum with the clout M of a collection of many specification primacords in view of first optimization direction, it is proposed that with regard to clout M's Constraints:
s 1 - [ δ 11 ( l 1 ± e 1 ) + ... + δ 1 A ( l n ± e n ) ] ≥ M 1 s 2 - [ δ 21 ( l 1 ± e 1 ) + ... + δ 2 A ( l n ± e n ) ] ≥ M 2 s 3 - [ δ 31 ( l 1 ± e 1 ) + ... + δ 3 A ( l n ± e n ) ] ≥ M 3 ... s m - [ δ m 1 ( l 1 ± e 1 ) + ... + δ m A ( l n ± e n ) ] ≥ M m
M is understood by physical condition1>=0, M2>=0 ..., Mm>=0, and δijExistence restraint condition is:
δ 11 + δ 12 + δ 13 + ... + δ 1 A = 1 δ 21 + δ 22 + δ 23 + ... + δ 2 A = 1 δ 31 + δ 32 + δ 33 + ... + δ 3 A = 1 ... δ m 1 + δ m 2 + δ m 3 + ... + δ m A = 1
Wherein δij∈ (0,1) (i=1,2,3..., m;J=1,2,3 ..., A), whenWhen minimum, then primacord is remaining useless Material is minimum, and now under primacord, processing mode processed is optimized.
4. it is according to claim 1 for processing optimization method processed under primacord, it is characterised in that step 3 is taken In the following manner:
In view of there is error e during lower system, calculatingDuring add error so that whole calculating process is more Tally with the actual situation, so as to improve conforming product rate.
5. it is according to claim 1 for processing optimization method processed under primacord, it is characterised in that step 3 is taken In the following manner:
It is that, on the premise of production task is completed, the volume number m of reduction raw material primacord, carries as far as possible in view of second optimization direction The constraints of number m is gone out to roll up with regard to raw material primacord:
θ1s12s23s3+...+θmsm-L≥0
Wherein θi∈ (0, and 1) (i=1,2,3 ..., m), when the labelled amount of every volume primacordWhen minimum, primacord used Volume number is minimum.
6. it is according to claim 1 for processing optimization method processed under primacord, it is characterised in that step 4 is taken In the following manner:
Take branch and bound method to try to achieve following equations, obtain final optimization pass result.
m i n { X , Y } Σ i = 1 m ( M i + θ i )
Wherein X={ δ111213,...δmA, Y={ θ123,...θm}。
CN201610954544.0A 2016-10-27 2016-10-27 It is a kind of to be directed to processing optimization method processed under primacord Pending CN106557836A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610954544.0A CN106557836A (en) 2016-10-27 2016-10-27 It is a kind of to be directed to processing optimization method processed under primacord

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610954544.0A CN106557836A (en) 2016-10-27 2016-10-27 It is a kind of to be directed to processing optimization method processed under primacord

Publications (1)

Publication Number Publication Date
CN106557836A true CN106557836A (en) 2017-04-05

Family

ID=58443735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610954544.0A Pending CN106557836A (en) 2016-10-27 2016-10-27 It is a kind of to be directed to processing optimization method processed under primacord

Country Status (1)

Country Link
CN (1) CN106557836A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108762733A (en) * 2018-06-05 2018-11-06 重庆大学 One kind is about space flight primacord production monitoring Design of Software Platform
CN109446639A (en) * 2018-10-25 2019-03-08 重庆大学 A kind of primacord crimping autonomous optimization method of parameter based on convolutional neural networks

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103714198A (en) * 2013-11-29 2014-04-09 大连船舶重工集团有限公司 Ship multi-core tube feeding optimization method
CN103970884A (en) * 2014-05-20 2014-08-06 湖州朗讯信息科技有限公司 Child garment tailoring and matching method based on cloth storage current situation
CN104166903A (en) * 2014-08-18 2014-11-26 四川航天系统工程研究所 Task planning method and system based on working procedure division
CN104537503A (en) * 2015-01-15 2015-04-22 深圳市微优微科技有限公司 Data processing method and system
CN105947780A (en) * 2016-05-13 2016-09-21 重庆大学 Automatic control technology for synchronous material collection of detonating fuse

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103714198A (en) * 2013-11-29 2014-04-09 大连船舶重工集团有限公司 Ship multi-core tube feeding optimization method
CN103970884A (en) * 2014-05-20 2014-08-06 湖州朗讯信息科技有限公司 Child garment tailoring and matching method based on cloth storage current situation
CN104166903A (en) * 2014-08-18 2014-11-26 四川航天系统工程研究所 Task planning method and system based on working procedure division
CN104537503A (en) * 2015-01-15 2015-04-22 深圳市微优微科技有限公司 Data processing method and system
CN105947780A (en) * 2016-05-13 2016-09-21 重庆大学 Automatic control technology for synchronous material collection of detonating fuse

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108762733A (en) * 2018-06-05 2018-11-06 重庆大学 One kind is about space flight primacord production monitoring Design of Software Platform
CN109446639A (en) * 2018-10-25 2019-03-08 重庆大学 A kind of primacord crimping autonomous optimization method of parameter based on convolutional neural networks

Similar Documents

Publication Publication Date Title
DE102017001290B4 (en) Machine learning device, industrial machine cell, manufacturing system and machine learning method for learning task sharing among a variety of industrial machines
CN100551566C (en) Automatic ribbon lap method of cold rolling serial production
CN206983533U (en) A kind of coding, detection, the multi-functional die-cutting device of automatic inspection rejects
CN102728707B (en) Roll bending forming method and device for variable cross-section hat-shaped section
CN104217063A (en) Simulation design method for rolling hole patterns of steel rail
US10391539B2 (en) Blanking die apparatus
CN106557836A (en) It is a kind of to be directed to processing optimization method processed under primacord
CN205888558U (en) Full automotive vehicle tablet apparatus for producing
CN204272504U (en) A kind of glue inside contracts the production equipment of reinforcing chip
CN105799205B (en) A kind of full-automatic paper box production system and its method
CN103567341B (en) The method for forging and molding of CAP1400 nuclear pressure container nozzle belt
CN109454466A (en) A kind of no braided metal net Continuous maching system and its processing method
CN203791443U (en) Uncoiling and blanking die and uncoiling and blanking production line using same
CN114912814A (en) Jobshop intelligent scheduling system based on digital twin technology
CN207616104U (en) A kind of automobile door sill production line
CN102744307A (en) Variable cross-section roll bending forming method and device
CN104525579B (en) A kind of improvement method that is suitable for four-high mill roll and is tapered defect
CN107377723A (en) A kind of heat pressing forming device
CN107544444A (en) A kind of synchronous production management method for more equipment rooms
CN103801564A (en) Steel coil data tracking method for cold-rolling continuous-annealing pickling lines
CN205419055U (en) Automatic code fetch unit of shaping sheet metal component of two ware digital bus mills in air conditioner
CN203853787U (en) Device for fully-automatic high-speed manufacturing of metal handle of metal packaging tin
CN109909304A (en) A kind of cold-rolled steel coils weight cutting algorithm with logic of supplementarity
CN107577975A (en) The Intelligent printing method of automatic identification bar code and item number batch
CN102945030A (en) Method for effectively controlling out-of-control production cycle in wafer production process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170405

WD01 Invention patent application deemed withdrawn after publication